18th sep

21st sep
22nd sep
23rd sep
24th sep
28th sep
29th sep
1st oct
5-Oct
6-Oct
7-Oct
8-Oct
9-Oct
12-Oct
13-Oct
14-Oct

1-Dec
2-Dec
3-Dec
4-Dec
5-Dec

7-Dec
8-Dec
9-Dec
10-Dec
11-Dec
12-Dec

14-Dec

fhc door commented

HANGER COLUMN SHOP DRAWING CHECK , UPDATE ATRIUM SETOUT FOR COLUMNS
fhc door commented , all fire doors commented
reflected ceiling plans commented , excel sheet preparation for comparison
excel sheet for received drawings from C.S.AL , drawing compilation for commenting
ahu structural drawing received , ahu gfc updated accordingly
changes in slab cut - out lukhnow
calculation of area of block b2 lukhnow
finishing schedule update in all plans , changes in brickwork and dimensioning of floor plans ( ahu
nd brick work gfc issue )
lucknow ramp details plan modification , signage package study
mandatory signage excel preparation , cloud and replace other signages to be replaced in all floor
plans
mandatory signage 4 sheet drafting and excel sheet update of the same , finishing schedule
modification of all floor plans
mandatory signage mark location in plan , change in mandatory signage sheets composition of 2
sheets
replace internal signage with mandatory, changes in gfc, update exce
replace internal signage with mandatory, changes in gfc, update excel
add mandatory signages , update drawings to issue revision 1(CR-1) for all gfc's
REFER TO FIRE SAFETY DRAWINGS AND FINALISE ADDITIONAL SIGNAGE LOCATION ,UPDATE EXCEL ,
CHANGE IN DETAIL GFC DRAWING .
COMMMENT ON SIGNAGE SHOP DRAWING RECEIVED FOR APPROVAL ,
RELATE DRAWINGS WITH SIGNAGE (IS -2005) CODE AND MARK IN DETAIL DRAWINGS.
final gfc of signages and cr1 released
update transmittal,commenting and change in plan due to operational req by client, far and non far
areas marking for built up
5 OPERATIONAL ROOMS GFC on a1 , solar panel commenting and coordination
EXCEl sheet for received drawings from C.S.AL , 8 ADDITIONAL ROOMS a3 drgs FOR OPERATIONAL
REQUIREMENT BY CLIENT .
operational requirement excel update .
overlapping plans .

Far calculations and changes in plan , update by

rajiva works - december


area analysis / site plan study
tura working drawing
tura working drawing
type 7 residence deign , editting other files
photoshop render
type 6 residence deign , editting other files
fifth floor plan design nhidcl block
cafeteria floor plan design office block
ground floor plan design office block nhidcl
residence file render
site plan design nhidcl
all residence type render
area sheet excel - tura medical college hospital block
jhansi all residence type render
jhansi - hostel block rendering
area update - tura medical college hospital block
pali auditorium plan , section render
bsf interior furniture layout 1
bsf interior furniture layout 2
raiva works - january