System Description

Fire alarm System

Design Scope Consultant


1. Design fire alarm System including Notification
devices, Alarm devices, Emergency lighting and
Voice evacuation.
2. Connection to the existing panel to be done (if
capacity is enough) or new Panel to be proposed .

Electrical Light and


power

1. Design for Power and Light system to be done


and to be connected with either SMDB-Gym for
extended area or Spare circuits to be utilized from
FDBs coming from SMDB-FC and SMDB-Gym
2. Highly energy efficient devices must be used to
ensure as less additional load as possible.

Telephone and Data


system

New telephone and data points to be provided and


to be connected with existing Telephone and Data
network (separate for each Gym and Restaurant
Area)
SMATV/MATV system New SMATV/MATV points to be provided and to
be connected with existing SMATV/MATV network
(separate for each Gym and Restaurant Area)

SITE VISIT REPORT FOR ELECTRICAL SYSTEM


Contractor Scope/Guidelines
Additional notes
Contractor to make sure if existing Panel has enough capacity to
Existing Panel is Simples 4010, Supplier advice is required as a must.
add more points and if not than New panel as per supplier
recommendation to be installed instead of existing panel to feed the
complete gym and Restaurant area

Contractor must in any case make the as built for the SMDB s for
Gym and FC area also for each Final DB to check spare available
and to check how much load is available at the current stage and
how to accommodate the additional load either all on one SMDB
Gym or using spare or additional circuits in the Final DBs (This
might also cause to change the Final DB itself by using more
circuits DB) Also the equipment in laundry are not operational at
this stage hence forth care to be taken for selecting low power and
as much less equipment as possible as it might be a danger for
consuming all load space.
Authority approval must be obtained after making the as built for
any additional circuits or any modification to the current system.

The Gym and Family club (restaurant area) are fed from Same LV panel from the
substation room. The sMDB for Gym and Family club area are feeding to further small
Final Dbs for final branch circuits
There is complete lack of information for as built panel schedules and as built
drawings hence forth a solid decision cannot be made.
But as the extension area for restaurant and Gym might only increase about 50 KW
connected load and demand on transformer might increase by 35KW (considering
Normal light points, sockets, AC, water heater),and as described above there is no
information at all regarding as built system drawings or Panel schedules hence it is
not safe to assume that this load can be accommodated in the 10 % margin given by
the authority to load the transformer.
Another Observation was made that the substation location is far from the SMDB
locations hence forth is would be practically the worst choice to dig the roads and
Landscape area in between these two to either lay down new cable for new SMDBs or
even to modify the existing cable.
The study also further showed that already some extra circuits have been added to
the existing network via smdb-FC (for kitchen). All spare circuits from smdb have
been utilized for SMDB-FC but for SMDB-Gym still 3 spares are available. There is no
authentic information for Final Dbs for spare circuits as it needs detailed study.

Due to non-availability of Person having the key to the Telephone room it was not
possible to visualize it, but it is safe to say that current system is enough for additional
5-10 Telephone data points that might come.
SMATV box was found in both areas and it is safe to say that existing service panels
are enough to feed additional points, because for the worst case we might only need
to change the devices inside the SMATV box for more outputs.