You are on page 1of 12

Data Registry - Pipe Laying Analysis

1 Raw water transmission network analysis


Trace to be covered.
1.1 From tapping point to intake well
1.2 From intake well to treatment plant
Required data for the analysis
a

Topographical survey plan

Longitudinal sections (LS) along proposed path of the transmission line in 10 m interv

up to 3 m on either side at regular intervals indicating details of the bridges and culve
2 Treated water transmission network analysis
From treatment plant to each elevated towers and ground reservoirs (proposed/existing)
2. 1

Existing tank at Meevaobe 100m MSL 80 m3

2. 2

Proposed sump at Wilgamuwa 100 m3

2. 3

Proposed elevated tower at Wilgamuwa 140m MSL 225 m3

2. 4

Existing tank at Bathgampola 160 m MSL 40 m3

2. 5

Existing tank at Naminioya 100m MSL 40 m3

2. 6

Existing tank at Hettipola 110m MSL 125 m3

2. 7

Proposed elevated tower at Viharagama 140m MSL 225 m3

2. 8

Existing tank at Topwalapitiya 100m MSL 40 m3

2. 9

Existing tank at Aliwanguwa 100m MSL 40 m3

2. 10

Existing tank at Viharagama 100m MSL 60 m3

2. 11

Existing tank at Thunhiriyawewa 100m MSL 40 m3

MSL levels of the existing tanks are indicative values only. Verification by the site surveyin
Required data for the analysis
a

Topographical survey plan

Longitudinal sections (LS) along proposed path of the transmission line in 10 m interv

details up to 3 m on either side at regular intervals indicating details of the bridges an

LS shall be covered the above 11 tower/ sump areas along optimum construction trac
3 Treated water distribution network analysis
Trace to be covered

- From treatment plant to direct distributing GNDs (10 GNDs after negotiation with emp
- From existing and proposed elevated tanks to 39 GNDs
3. 1

Kumbuloya

3. 14 Karawgahawewa

3. 2

Tunhiriyawewa

3. 15 Radunnewewa

3. 3

Palupitiya

3. 16 Maraka

3. 4

Rattotayaya

3. 17 Malgammana

3. 5

Dunuwilapitiya

3. 18 Bogahawewa

3. 6

Medakanda

3. 19 Aliyawala

3. 7

Aliwanguwa

3. 20 Weheragala

3. 8

Wiharagama

3. 21 Himbiliyakada

3. 9

Handungamuwa

3. 22 Hettipola

3. 10

Topwalapitiya

3. 23 Naminioya

3. 11

Gemburuoya

3. 24 Dewagiriya

3. 12

Kumbukandane

3. 25 Piduruwella

3. 13

Lendiyangala

3. 26 Guruwelayaya

Additional 10 GNDs after negotiation with employer


3. 40

3. 45

3. 41

3. 46

3. 42

3. 47

3. 43

3. 48

3. 44

3. 49

Required data for the analysis

a Topographical survey plan covering all GND areas. GND should be divided accordingly

b Longitudinal sections (LS) along proposed path of the distribution line in 10 m interva

up to 3 m on either side at regular intervals indicating details of the bridges and culv
c Population data to calculate demand in each distribution section.

Population should be categorized according to the road/ by road and GND division. Ev

being done or not at this stage, to run the WaterGEMS model with demands, the popu

covered in each main road/ by road. With visual inspection, by roads where pipe layin
areas where there are no houses can be omitted.
Separate registry is attached for the transmittal recordings

ath of the transmission line in 10 m intervals and cross section details


indicating details of the bridges and culverts

nd ground reservoirs (proposed/existing)

wa 140m MSL 225 m3

MSL 40 m3

ma 140m MSL 225 m3

MSL 40 m3

L 40 m3

L 60 m3

m MSL 40 m3

alues only. Verification by the site surveying works shall be done.

ath of the transmission line in 10 m intervals and cross section

ntervals indicating details of the bridges and culverts.

mp areas along optimum construction traces.

GNDs (10 GNDs after negotiation with employer)

to 39 GNDs

arawgahawewa

3. 27 Naminigama

adunnewewa

3. 28 Perakanatta
3. 29 Wilgamuwa

algammana

3. 30 Wanarawa

ogahawewa

3. 31 Bathgampola
3. 32 Nagolla

eheragala

3. 33 Moragahaulpotha

mbiliyakada

3. 34 Nugagolla
3. 35 Meewaobe
3. 36 80 Yaya
3. 37 Sonutta

duruwella

3. 38 Uduwelwala

uruwelayaya

3. 39 Sulugune

areas. GND should be divided accordingly in the key plan.

ath of the distribution line in 10 m intervals and cross section details

s indicating details of the bridges and culverts

h distribution section.
to the road/ by road and GND division. Even the pipe laying is

WaterGEMS model with demands, the population survey should be

sual inspection, by roads where pipe laying is not feasible and

Data Registry - Pipe Laying Analysis


Item

Required data for analysis


a

Send Date

Send Date

1. Raw water transmission network analysis


1. 1

Ok

Ok

1. 2

Ok
Pending
2. Treated water transmission network analysis
2. 1
2. 2
2. 3
2. 4
2. 5
2. 6
2. 7
2. 8
2. 9
2 . 10
2 . 11
2 . 12
3.Treated water distribution network analysis
3. 1
3. 2
3. 3
3. 4
3. 5
3. 6
3. 7
3. 8
3. 9
3 . 10
3 . 11
3 . 12
3 . 13
3 . 14
3 . 15
3 . 16
3 . 17
3 . 18
3 . 19
3 . 20
3 . 21
3 . 22

NA
NA

3 . 23
3 . 24
3 . 25
3 . 26
3 . 27
3 . 28
3 . 29
3 . 30
3 . 31
3 . 32
3 . 33
3 . 34
3 . 35
3 . 36
3 . 37
3 . 38
3 . 39
3 . 40
3 . 41
3 . 42
3 . 43
3 . 44
3 . 45
3 . 46
3 . 47
3 . 48
3 . 49

Send Date

Remarks

You might also like