You are on page 1of 170

2 X 300 MW COASTAL THERMA

MASTER DRAWING LIST & STATUS REPORT

S.NO

PKG Serial.Alphabet

DRAWING /DOCUMENT CONTROL REGISTER


DATE OF CLIENT APPVL
SENT TO VENDPR-(RFC)

DATE OF CLIENT
APPROVEL

APPVD REV NO

APPROVED DRG

C I
1
2
3

MDL-DESCRIPTION

EBOP-PACKAGE MDL & STATUS


Project master schedule
Monthly Project Progress report
Master Documentation List
Design Basis Document for EBoP
systems
Key SLD
System Short Circuit Study
Report on voltage profile
(Load flow and motor starting
study)
Voltage Regulation Analysis
Stability Studies
Bus Bar Sizing Calculation
Overall Key Metering & Protection
SLD
I/O list for the EBoP systems
Controlling, Measuring, Indication
Scheme
Cable scope diagram
Generator Transformers Sizing
calculation

C
C
C

1
2
3

5
6

C
C

5
6

8
9
10

C
C
C

8
9
10

11

11

12

12

13

13

14

14

15

15

16

16 Generator Transformers Datasheet

17

17

18

19

20

23/Jun/10

23/Jun/10

Genertor transformer soak pit


sizing calculation
Outline General arrangement
18
Generator Transformer
Transport Outline Sketches For
19
Generator Transformer
List Of Fittings/Instruments
20
Generator Transformer.

Foundation Plan & Loading Details


For Generator Transformer

21

21

22

22

23

23

24

24

25

25

26

26

27

27

28

28 marking and connection diagram

GA ,Foundation and wiring details


of marshalling box
GA and wiring diagram for RTCC
panel of GT
GA Of LV Bushing For Generator
Transformer
GA for HV side bushing of
generator transformer
GA drawing for HVN bushing for
generator trafo.
LV Side Busduct Termination &
Flange Detail
GA of Tap change Mechanism with
Of Generator Transformer

29

Sectional view showing general


constructional features of the
29
transformer, core winding and tap
changers

30

30

31

31 32 Point Facia Annuciator Diagram

32

32

33

33

34

35

36

37

Rating and Diagram Plate For


Generator Transformer

Schematic Diagram Of Cooler


Control For Generator Transformer

Valve Schedule Plate Drawing For


Generator Transformer
Thermal Capability Calculation For
34
Generator Transformer
Details Of RTD System For
35
Generator Transformer
Oil Water Flow Diagram for
36
generator transformer.
Short - CKT. Withstand Capability
37 Calculation For Generator

Transformer
Calculations For Operating
38

38 Pressure Of Pressure Relief

Device For generator transformer


Calculations for Electrical Charac.
39

39 (NLL and LL) of generator

transformer.
40

40

List of Sub Suppliers for Generator


Transformer

Instruction Plate for Aircell


Mounting of generator transformer

41

41

42

42

43

Bushing CT Details of generator


transformer
43 Bidirectional roller assembly drg

44

44

45

45 handling manual for generator

Spare part list for the Generator


transformer
Transportation, Storage and
transformer
Erection, Testing and

46

46 commissioning manual of

Generator Transformer
Operation and maintanance
47

47 manual for the generator

transformer
Quality Assurance plan for
Generator Transformer
Field quality plan for generator
transformer
Design Concept for Generator
transformer
GA and wiring diagram for DM,
C.C. Kiosk & M.Kiosk
Layout of Instrument on
Marshalling Kiosk
Type test report of Generator
Transformer
Layout of Instrument on Cooler
Control Kiosk
Unit aux. Transformer Sizing
calculation

48

48

49

49

50

50

51

51

52

52

53

53

54

54

55

55

56

56 Unit aux. Transformer Datasheet

57

57

58

59

60

61

61

62

62 of marshalling box Unit aux.

Unit aux. Transformer soak pit


sizing calculation
Outline General arrangement
58
Unit aux. transformer
Transport Outline Sketches For
59
Unit aux. transformer
List Of Fittings/Instruments Unit
60
aux. transformer
Foundation Plan & Loading Details
For Unit aux. transformer
GA ,Foundation and wiring details
transformer

GA ,Foundation and wiring details


63

63 of RTCC panel of Unit aux.

transformer
64

65

66

GA Of LV Bushing For Unit aux.


transformer
GA for HV side bushing of Unit
65
aux. transformer
64

Busduct Termination & Flange


66 Detail of HV and LV side of - Unit

aux. transformer
GA of Tap change Mechanism with
67

67 marking and connection diagram

Of Unit aux. transformer


68

68

Rating and Diagram Plate For Unit


aux. transformer

69

69

Schematic Diagram Of Cooler


Control For Unit aux. transformer

70

70

71

72

73

Valve Schedule Plate Drawing For


Unit aux. transformer
Thermal Capability Calculation For
71
Unit aux. transformer
Oil Water Flow Diagram for Unit
72
aux. transformer
Short - CKT. Withstand Capability
73 Calculation For Unit aux.

transformer
Calculations For Operating
74

74 Pressure Of Pressure Relief

Device For Unit aux. transformer


Calculations for Electrical Charac.
75

75 (NLL and LL) of Unit aux.

transformer
List of Sub Suppliers for Unit aux.
transformer
Bushing CT Details of Unit aux.
77
transformer

76

76

77

78

78 Bidirectional roller assembly drg

79

79

80

80 handling manual for Unit aux.

List of spare parts of Unit aux.


transformer
Transportation, Storage and
transformer
Erection, Testing and

81

81 commissioning manual of Unit aux.

transformer

Operation and maintanance


82

82 manual for the Unit aux.

transformer
Manufacturing quality plan for Unit
aux. transformer
Field quality plan for Unit aux.
84
transformer
Type test report of Unit aux.
85
transformer
NGR Sizing calculation for UAT &
86
UST

83

83

84

85

86

87

87 Datasheets for the UAT NGR

88

88

89

89

90

90

91

91

92

92

93

93

94

94 storage instructions for the UAT &

GA drawing for the for the UAT


NGR
Foundation drawing drawing for
the for the UAT NGR
Name plate details of the UAT
NGR
schematic and wiring diagram for
for the UAT NGR
Erection and commissiong manual
for the UAT NGR
Operation and maintanance
manual for the UAT NGR
packing, transportation and
UST NGR
MQP for the for the UAT & UST
NGR

95

95

96

96 FQP for the UAT & UST NGR

97

97 Type tset report of NGR

98

98

99

99 Unit station transformer Datasheet

100
101
102
103

Unit station transformer Sizing


calculation

Unit station transformer soak pit


sizing calculation
Outline General arrangement
A 101
Unit station transformer
Transport Outline Sketches For
A 102
Unit station transformer
List Of Fittings/Instruments Unit
W 103
station transformer
A

100

Foundation Plan & Loading Details


For Unit station transformer

104

W 104

105

W 105 of marshalling box Unit station

GA ,Foundation and wiring details


transformer

GA ,Foundation and wiring details


106

W 106 of RTCC panel of Unit station

transformer
107
108

GA Of LV Bushing For Unit station


transformer
GA for HV side bushing of Unit
W 108
station transformer
W 107

Busduct Termination & Flange


109

W 109 Details of HV and LV side of - Unit

station transformer
GA of Tap change Mechanism with
110

W 110 marking and connection diagram

Of Unit station transformer


111

Rating and diagram plate for Unit


station transformer

111

112

W 112 Control For Unit station

Schematic Diagram Of Cooler


transformer
113
114
115
116

Valve Schedule Plate Drawing For


Unit station transformer
Thermal Capability Calculation For
W 114
Unit station transformer
Details Of RTD System For Unit
W 115
station transformer
Oil Water Flow Diagram for Unit
W 116
station transformer
W 113

Short - CKT. Withstand Capability


117

W 117 Calculation For Unit station

transformer
118

Calculations For Operating


Pressure Of Pressure Relief
W 118
Device For Unit station
transformer

119

W 119 (NLL and LL) of Unit station

Calculations for Electrical Charac.


transformer
120
121

List of Sub Suppliers for Unit


station transformer
Bushing CT Details of Unit station
W 121
transformer
W 120

122

W 122 Bidirectional roller assembly drg

123

W 123

124

W 124 handling manual for Unit station

list of spare part list of Unit station


transformer
Transportation, Storage and
transformer
Erection, Testing and

125

W 125 commissioning manual of Unit

station transformer

Operation and maintanance


126

W 126 manual for the Unit station

transformer
127
128
129

Manufacturing quality plan for Unit


station transformer
Field quality plan for Unit station
W 128
transformer
Type test report of Unit station
W 129
transformer
W 127

130

W 130 Datasheets for the UST NGR

131

W 131

132

W 132

133

W 133

134

134

135

135

136

136

137

137

138

138 MQP for the for the NGR

139

139 FQP for the NGR

140

140

141

Erection, Commissioning,
Operation And Maintenance
141
Instruction Manual For
transformers

142

142

143

143 Spare part list for the transformers

144
145

144 MQP for the transformers


145 FQP for the transformers

146

146

147
148
149

GA drawing for the for the UST


NGR
Foundation drawing drawing for
the for the UST NGR
Name plate details of the UST
NGR
schematic and wiring diagram for
for the UST NGR
Erection and commissiong manual
for the UST NGR
Operation and maintanance
manual for the UST NGR
packing, transportation and
storage instructions for the NGR

Transformer Sizing calculation for


UST

Packing, transportation and


storage manul for the transformers

Drawings for 6.6 kV / 415V, LV


Auxiliary Transformers. 2.5 MVA
Drawings for 6.6 kV / 415V, LV
147
Auxiliary Transformers. 2.0 MVA
Drawings for 6.6 kV / 415V, LV
148
Auxiliary Transformers. 1.6 MVA
Transformer Sizing calculation for
149
SST

Transformer Sizing calculation for


CWT
Transformer Sizing calculation for
WTP
Transformer Sizing calculation for
FWT
Transformer Sizing calculation for
AWPHT
Transformer Sizing calculation for
CHPT
Transformer Sizing calculation for
AHPT
Feeder list for 6.6kV MV
switchgear

150

150

151

151

152

152

153

153

154

154

155

155

156

156

157

Control & Operational Philosophy


for MV System -(Unit switchgear,
157
Station Swgr, CT Swgr,
Compressor Swgr, CHP swgr)

158

158 SLD for MV Unit switchgear -1A

159

159 Data sheet for MV Unit switchgear

160

160

161

161 BOQ for MV Unit switchgear-1A

162

162 SLD for MV Unit switchgear -1B

163

163

164

164 BOQ for MV Unit switchgear-1B

165

165 SLD for MV Unit switchgear -2A

166

166

167

167 BOQ for MV Unit switchgear-2A

168

168 SLD for MV Unit switchgear -2B

169

169

170

170 BOQ for MV Unit switchgear-2B

171

171

172
173

GA and foundation drawing for MV


Unit switchgear-1A

GA and foundation drawing for MV


Unit switchgear-1B

GA and foundation drawing for MV


Unit switchgear-2A

GA and foundation drawing for MV


Unit switchgear-2B

GA & Schematic of bus earthing


truck
GA & Schematic of Line earthing
172
truck
Schematic drawing for 6.6 kV
173
Incomer-1 of 2

Schematic drawing for 6.6 kV


Incomer-2 of 2
Schematic drawing for 6.6 kV Bus
coupler
Schematic drawing for 6.6 kV
Incomer
Schematic drawing for 6.6 kV Tie
Feeder
Schematic drawing for 6.6 kV
Transformer outgoing feeder

174

174

175

175

176

176

177

177

178

178

179

179 Motor outgoing feeder with

Schematic drawing for 6.6 kV


differential protection
180

Schematic drawing for 6.6 kV


180 Motor outgoing feeder without
differential protection

181

181

183

Schematic drawing for 6.6 kV Bus


PT
Schematic drawing for 6.6 kV Line
182
PT
183 Door layout for MV switchgear

184

184 Data Sheet for MV switchgear

185

185

182

186

GA and details of bus transfer


control panel
Wiring diagram for bus transfer
186
control panel

187

187 Logic diagram for MV switchgear

188

188

189

189 Erection and commissiong manual

190

190

191

Flange details for SPBD entry at


MV Panels

Operation and maintanance


manual
packing, transportation and
191
storage instructions

192

192 MQP for the MV panel

193

193 FQP for the MV panel

194

194 SLD for MV Station switchgear

195

195

196

196 BOM for MV Station switchgear

197

197

198

GA and foundation drawing for MV


Station switchgear

SLD for MV Compressor


switchgear
SLD for MV CT cum CW 6.6 kV
198
switchgear

199

199

200

200

201
202
203

GA and foundation drawing for MV


CT cum CW 6.6 Kv switchgear

BOM for MV CT cum CW 6.6 Kv


switchgear
SLD for MV AHP 6.6 KV
201
switchgear
GA and foundation drawing for MV
202
AHP 6.6 KV switchgear
BOM for MV AHP 6.6 KV
203
switchgear

204

204 SLD for MV CHP switchgear

205

205

206

206 BOM for MV CHP switchgear

207

207

208

208

209

209

210

210

211

211

212

212

213

213

214

214

215

215

216

216

217

217

218

218

219

219

220

220

221

221 feeder above 30 kW & up to 110

GA and foundation drawing for MV


CHP switchgear

Control & operational philosophy


for LV switchgear system
Feeder list for LV switchgear
LV SLD for Unit Service
Switchboard-1
LV SLD for Unit Service
Switchboard-2
GA drawing and foundation for Unit
Service Switchboard-1
GA drawing and foundation for Unit
Service Switchboard-2
BOM for Unit Service
Switchboards
Schematic drawing for Incomer -1
of 2
Schematic drawing for Incomer -2
of 2
Schematic drawing for Bus coupler
with 2 incomer
Schematic drawing for ACB Motor
outgoing feeder
Schematic drawing for ACB Tie
feeder (from DGDB)
Schematic drawing for ACB power
outgoing feeder
Schematic drawing for DOL starter
feeder upto 30 kW
Schematic drawing for DOL starter
kW

222
223

Schematic drawing for RDOL


starter feeder
Schematic drawing for MCCB
223
Incomer-1
222

Schematic drawing for MCCB


Incomer-2
Schematic drawing for MCCB Bus
coupler
Schematic drawing for MCCB
power outgoing feeder
Schematic drawing for MCB power
outgoing feeder
Schematic drawing for Bus PT -1
feeder
Schematic drawing for Bus PT -2
feeder
Schematic drawing for Line PT-1
feeder
Schematic drawing for Line PT-2
feeder
Schematic drawing for Control
Transformer-1
Schematic drawing for Control
Transformer-2
Schematic drawing for Space
heater Transformer-1
Schematic drawing for Space
heater Transformer-2
Door layout for LV switchgear
Data Sheet for LV swgr
Logic diagram for LV switchgear
Erection and commissiong manual
for LV switchgear
Operation and maintanance
manual for LV switchgear

224

224

225

225

226

226

227

227

228

228

229

229

230

230

231

231

232

232

233

233

234

234

235

235

236
237
238

236
237
238

239

239

240

240

241

241 storage instructions for LV

242

switchgear
242 MQP for the for LV switchgear

243

243 FQP for the for LV switchgear

244

244

packing, transportation and

245
246

LV SLD for Station service


switchboard
GA drawing and foundation for
245
Station service switchboard
BOM for Station service
246
switchboard

247

247 LV SLD for DG DB

248

248

249

249 BOM for DG DB

250

250

GA drawing and foundation for


DG DB

Schematic drawing for DG Incomer


-1

251
252
253
254

Schematic drawing for DG Incomer


-2
Schematic drawing for DG Incomer
252
-3
Schematic drawing for DG Bus
253
coupler -1 with 3 incomer
Schematic drawing for DG Bus
254
coupler -2 with 3 incomer
251

255

255 LV SLD for Compressor MCC

256

256

257

257 BOM for Compressor MCC

258

258 LV SLD for Hydrogen gen plant DB

259

259 BOM for Hydrogen Plant

260

260 LV SLD for CT-CW MCC

261

261

GA drawing and foundation for


Compressor MCC

262

GA drawing and foundation for CTCW MCC


262 BOM for CT-CW MCC

263

263 LV SLD for Air Washer MCC

264

264

265

265 BOM for Air Washer MCC

266

266 LV SLD for Fuel oil MCC

267

267

268

268 BOM for Fuel oil MCC

269

269 LV SLD for Ash water PH MCC

270

270

271
272

271
272

273

273

274
275

274
275

276

276

277

277

278

278 LV SLD for WRDB

279

279

GA drawing and foundation for Air


Washer MCC

GA drawing and foundation for


Fuel oil MCC

GA drawing and foundation for Ash


water PH MCC
BOM for Ash water PH MCC
LV SLD for Ash Handling MCC
GA drawing and foundation for Ash
Handling MCC
BOM for Ash Handling MCC
LV SLD for Coal Handling MCC
GA drawing and foundation for
Coal Handling MCC
BOM for Coal Handling MCC

GA drawing and foundation for


WRDB

280

280 BOM for WRDB

281

281 LV SLD for Emergency MCC-1

282

282

283

283 BOM for Emergency MCC-1

284

284

285

285

286

286

287

287

288

288

289

289 LV SLD for Station ACDB

290

290

291

291 BOQ for Station ACDB

292

292 LV SLD for Air cond MCC

293

293

GA drawing and foundation for


Emergency MCC-1

Schematic drawing for Incomer -1


of 3
Schematic drawing for Incomer -2
of 3
Schematic drawing for Incomer -3
of 3
Schematic drawing for Bus
coupler-1 with 3 incomer
Schematic drawing for Bus
coupler-2 with 3 incomer

GA drawing and foundation for


Station ACDB

294

GA drawing and foundation for Air


cond MCC
294 BOQ for Air cond MCC

295

295 LV SLD for Fire water PMCC

296

296

297

297 BOQ for Fire water PMCC

298

298 LV SLD for MLDB

299

299

GA drawing and foundation for Fire


water PMCC

300

GA drawing and foundation for


MLDB
300 BOQ for MLDB

301

301 SLD for Ventillation MCC

302

302

303

303 BOQ for Ventillation MCC

304

304 LV SLD for CW DCDB

305

305

306

306 BOQ for CW DCDB

GA drawing and foundation for


Ventillation MCC

GA drawing and foundation for CW


DCDB

307

307 LV SLD for AHP DCDB

308

308

309

309 BOQ for AHP DCDB

310

310 LV SLD for CHP DCDB

311

311

312

312 BOQ for CHP DCDB

313

313

314
315

GA drawing and foundation for


AHP DCDB

GA drawing and foundation for


CHP DCDB

Schematic drawing for DCDB


Incomer-1
Schematic drawing for DCDB
314
Incomer-2
Schematic drawing for DCDB Bus
315
coupler

316

316 LV SLD for UPS DB

317

317

318

318 BOQ for UPS DB

319

319

320

320

321

321

322

322

323

323

324

324

325

325 Busduct routing for UST NSPBD

326

326 Termination details of UST NSPBD

327

327 EKD of UST NSPBD

328

328 Cross sectional details of NSPBD

329

329 Data sheet of NSPBD

330

330

331
332

GA drawing and foundation for


UPS DB

Schematic drawing for DCDB


Incomer-1
Schematic drawing for DCDB
Incomer-2
Schematic drawing for DCDB Bus
coupler
Schematic drawing for DC MCCB
power outgoing feeder
Schematic drawing for DC MCB
power outgoing feeder
Flange details for NSPBD entry at
LV Panels

Erection and commissiong manual


for SPBD
Operation and maintanance
331
manual for SPBD
packing, transportation and
332
storage instructions for SPBD

333

333 MQP for SPBD

334

334 FQP for SPBD

335

335 UPS Room Layout

336

336

337

337

338

338

339

339

340

340

341

341

342

342

343

343

344

344

345

345

346

346

347

347

348
349
350

348
349
350

351

351

352

352 DG Sizing calculation

353

353 Datasheets for DG set

354

354

355

GA layout for MV Switchgear


Room
GA layout for Air washer
Switchgear Room
GA layout for Fire water PMCC
Room
GA layout for WTP Swgr Room
Transformer yard Layout (Power
Transformers)
GA layout for LV Switchgear Room
- TG Building
GA layout for DG Room
GA layout for AHP /Compressor
CR Room
GA layout for CHP PMCC - 1
Room
GA layout for CHP PMCC - 2
Room
GA layout for CHP PMCC - 3
Room
GA layout for CT cum CW CR
Room
GA layout for ACW CR Room
GA layout FO CR Room
GA layout sea water intake
Equipment GA Layout of
Compressor MCC Room

GA drawing for DG sets (With out


enclosure)
Schematic & BOM Drawing of DG
355
Sets

356

356 Foundation details of DG sets

357

357

358

358 Logic diagram for the DG system

359

359

360

P&ID diagram for the fuel oil


system

Schematic and wiring diagrams for


control panels of DG sets
Erection and commissiong manual
360
for DG sets

361
362
363

Operation and maintanance


manual for DG sets
362 List of Spare Parts of DG Sets
packing, transportation and
363
storage instructions for DG sets
361

364

364 MQP for DG sets

365

365 FQP for DG sets

366

366 Datasheet for unit SPBD

367

367 Sizing calculation for unit SPBD

368

368 Routing Layout of 6.6 kV SPBD

369

369

370

370 Cross section details for unit SPBD

371

371 Termination detail of unit SPBD

372

372 EKD of unit SPBD

373

373

374
375

Busduct Routing concept for 6.6


kV Switchgears

Erection and commissiong manual


for SPBD
Operation and maintanance
374
manual for SPBD
packing, transportation and
375
storage instructions for SPBD

376

376 MQP for SPBD

377

377 FQP for SPBD

378

378 Datasheet for Station SPBD

379

379 Sizing calculation for Station SPBD

380

380 Interconnection between Station

Busduct Routing for


Switchgears
Cross section details for Station
SPBD

381

381

382

382 Termination detail of Station SPBD

383

383 EKD of Station SPBD

384

384 Busduct routing for SST NSPBD

385

385 Termination details of SST NSPBD

386

386 EKD of SST NSPBD

387

387 Busduct routing for CWT NSPBD

388

388

389

Termination details of CWT


NSPBD
389 EKD of CWT NSPBD

390

390 Busduct routing for AHPT NSPBD

391

391

392

392

393

393

394

394

395

395

396

396

397

397

398

398

399

399 DC load cycle

400

400 Station Battery and Battery

Termination details of AHPT


NSPBD
EKD of AHPT NSPBD
Busduct routing for AWPHT
NSPBD
Termination details of AWPHT
NSPBD
EKD of AWPHT NSPBD
Busduct routing for CHPT
NSPBD
Termination details of CHPT
NSPBD
EKD of CHPT NSPBD

Sizing Calculation for Unit &


Charger
Datasheets for the Unit & Station
Battery
Datasheets for the Unit & Station
Battery Charger
GA drawing for the Unit & Station
Battery
GA drawing for the Unit & Station
Battery Charger
Room layout - Unit & Station
Battery and Battery Charger

401

401

402

402

403

403

404

404

405

405

406

406 charger panel - Unit & Station

Schematic and wiring diagrams for


Battery Charger
407

407

408

408

409
410
411
412

Sizing Calculation for CW system


Battery and Battery Charger

Datasheets for the CW system


Battery
Datasheets for the CW system
409
Battery charger
410 GA drg for the CW system Battery

GA drg for the CW system Battery


charger
Room layout - CW system Battery
412
and Battery Charger
411

Schematic wiring diagrams and


413

413 BoM for charger panel -CW

system
414

414

Sizing Calculation for AHP system


Battery and Battery Charger

415

415

Datasheets for the battery chargerAHP Area

416

416 Datasheets for battery - AHP Area

417

417

418
419

GA drawing for the charger - AHP


Area
GA drawing for the battery bank 418
AHP Area
Room layout - AHP system Battery
419
and Battery Charger

420

420

Schematic wiring diagrams and


BoM for charger panel -AHP Area

421

421

Sizing Calculation for CHP system


Battery and Battery Charger

422

422

Datasheets for the battery chargerCHP Area

423

423 Datasheets for battery-CHP Area

424

424

425
426

GA drawing for the charger - CHP


Area
GA drawing for the battery bank 425
CHP Area
Room layout - CHP Area Battery
426
and Battery Charger
Schematic wiring diagrams and
BoM for charger panel -CHP Area

427

427

428

428 DC Feeder List

429

429

430

SLD of 220V DCDB for Unit &


Station Loads
GA drawing and foundation for Unit
430
DCDB-1

431

431 BOQ for Unit DCDB-1

432

432

433

Erection and commissiong manual


for DC system
Operation and maintanance
433
manual for DC system
packing, transportation and
storage instructions for DC system

434

434

435

435 MQP for DC system

436

436 FQP for DC system

437

437

438

438 Datasheet for 6.6kV cables

439

439 MV Cable BOQ

440

440 cross section details for MV cables

441

441 MQP for the MV cables

442

442

Sizing Calculation for HT Power


Cables

443
444

Sizing Calculation for LT Power


Cables
443 Datasheet for cables
444 LV Cable BOQ

445

445 Cross section details of the cables.

446

446 MQP for the LV cables

447

447

448

448 Building -cable celler room &

GA drawing of Cable Trays &


Accessories
Cable Tray/Trench Layout TG
Switchgear Room

449

449 Overall Cable Tray/Trench Layout

450

450

451

451 AHP /Compressor CR

Cable Tray/Trench Layout for DG


Room
Cable Tray/Trench Layout for
Room/Outdoor Area

452
453

Cable Tray/Trench Layout for CHP


Outdoor Areas
Cable Tray/Trench Layout for CHP
453
CR Room
452

454

454

455

455

456

456

457

457

458

458

459

459

460

460

Cable Tray/Trench Layout for CT


cum CW CR Room/Outdoor area
Cable Tray/Trench Layout for FO
CR Room
Cable Tray/Trench Layout for sea
water intake
Cable Tray/Trench Layout for
Battery Room
Erection sepcification for cable tray
and cabling
Earthing System Design
Calculations
Earthing System Design
Calculations for CHP Area

General Notes and Typicals for


Earthing system
Plant Outdoor Earthing Layout
Indoor Earthing TG Building -LV &
MV Switchgear Room
Indoor earthing for DG Room
Indoor earthing for AHP
/Compressor CR Room
Indoor earthing for CHP Outdoor
Areas

461

461

462

462

463

463

464

464

465

465

466

466

467

467 Indoor earthing for CHP CR Room

468

468

469

Indoor earthing for CT cum CW


CR Room/Outdoor area
Indoor earthing for ACW CR
469
Room/Outdoor area

470

470 Indoor earthing for FO CR Room

471

471

472

472

473

473

474

474

475

475

476

476

477

477 MACHINE HALL of PH Bulding AT

Indoor earthing for sea water


intake
Indoor earthing for
PTP/DMP/ETP/FW
Erection Specification for Earthing
system
Design Basis Document for Plant
Illumination System
Catalogues for lighting fixtures
Erection sepcification for lightning
syatem
LLD CALCULATION OF
EL+0.000M LVL B'N GRID 1 to 8
LLD CALCULATION OF

478

478 MACHINE HALL of PH Bulding AT

EL+0.000M LVL B'N GRID 9 to 17


LLD CALCULATION OF OIL
479

479 ROOM of PH Bulding (UNIT#3)

AT EL+0.000M LVL.
LLD CALCULATION OF OIL
480

480 ROOM of PH Bulding (UNIT#4)

AT EL+0.000M LVL.
LLD CALCULATION OF SWAS
481

481 ROOM of PH Bulding AT

EL+0.000M LVL.
LLD CALCULATION OF COOLER
482

482 ROOM of PH Bulding AT

EL+0.000M LVL.

LLD CALCULATION OF LP
483

483 DOSING ROOM of PH Bulding AT

EL+0.000M LVL.
LLD CALCULATION OF ALKALI
484

484 ROOM of PH Bulding AT

EL+0.000M LVL.
LLD CALCULATION OF CPU
485

485 CONTROL ROOM of PH Bulding

AT EL+0.000M LVL.
486

LLD CALCULATION OF CABLE


VAULT ROOM CD BAY of PH
486
Bulding AT EL+0.000M LVL B'N
GRID 1 to 18

487

LLD CALCULATION OF
MACHINE HALL of PH Bulding
487
(UNIT#3) AT EL+6.300M LVL B'N
GRID 1 to 8

488

LLD CALCULATION OF
MACHINE HALL of PH Bulding
488
(UNIT#4) AT EL+6.300M LVL B'N
GRID 9 to 17

489

LLD CALCULATION OF
EXCITATION ROOM of PH
489
Bulding (UNIT#3) AT EL+6.300M
LVL.

490

LLD CALCULATION OF
EXCITATION ROOM of PH
490
Bulding (UNIT#4) AT EL+6.300M
LVL.

491

LLD CALCULATION OF 6.6KV


SWITCHGEAR ROOM of PH
491
Bulding (UNIT#3) AT EL+6.300M
LVL.

492

492 SWITCH GEAR (COMMON) of PH

LLD CALCULATION OF 415V


Bulding AT EL+6.300M LVL.
LLD CALCULATION OF 6.6KV
493

493 SWITCH GEAR of PH Bulding

(UNIT#4) AT EL+6.300M LVL.


LLD CALCULATION OF ROOM-1
494

494 of PH Bulding (UNIT#3) AT

EL+6.300M LVL.
LLD CALCULATION OF ROOM-2
495

495 of PH Bulding (UNIT#4) AT

EL+6.300M LVL.
496

LLD CALCULATION OF
MACHINE HALL (COMMON) of
496
PH Bulding AT EL+12.600M LVL
B'N GRID 1 to 18 AB BAY

497

LLD CALCULATION OF
MACHINE HALL (COMMON) of
497
PH Bulding AT EL+12.600M LVL
B'N GRID 1 to 18 BC BAY

498

498 SVS PANEL ROOM of PH Bulding

LLD CALCULATION OF UPS &


(UNIT#3) AT EL+12.600M LVL
LLD CALCULATION OF CNAICO
499

499 ROOM of PH Bulding (UNIT#3) AT

EL+12.600M LVL

500

LLD CALCULATION OF
ELECTRICAL RELAY AND
THERMAL CONTROL
500
ELECTRONIC EQP ROOM of PH
Bulding (UNIT#3) AT EL+12.600M
LVL

501

501 ENGINEER ROOM of PH Bulding

LLD CALCULATION OF
COMMON AT EL+12.600M LVL
LLD CALCULATION OF SHIFT
502

502 INCHARGE ROOM of PH Bulding

COMMON AT EL+12.600M LVL


LLD CALCULATION OF
503

503 CONTROL ROOM of PH Bulding

COMMON AT EL+12.600M LVL

504

LLD CALCULATION OF
ELECTRICAL RELAY AND
THERMAL CONTROL
504
ELECTRONIC EQP ROOM of PH
Bulding (UNIT#4) AT EL+12.600M
LVL

505

505 ROOM of PH Bulding (UNIT#4) AT

LLD CALCULATION OF CNIACO


EL+12.600M LVL
506

LLD CALCULATION OF UPS


PANEL & SVS PANEL ROOM of
506
PH Bulding (UNIT # 4) AT
EL+12.600M LVL.

507

507 BATTERY ROOM UNIT #3 of PH

LLD CALCULATION OF UPS


Bulding AT EL+21.000M LVL.
LLD CALCULATION OF HVDC &
508

508 AHU ROOM of PH Bulding AT

EL+21.000M LVL.

LLD CALCULATION OF BATTERY


509

509 CHARGER ROOM OF PH Building

AT EL+21.000M LVL.
LLD CALCULATION OF BATTERY
510

510 ROOM UNIT #3 AT EL+21.000M

LVL.
LLD CALCULATION OF BATTERY
511

511 ROOM UNIT # 4 AT EL+21.000M

LVL
LLD CALCULATION OF UPS
512

512 BATTERY ROOM UNIT # 4 AT

EL+21.000M
513

LLD CALCULATION OF
DEARATOR FLOOR of PH
513
Bulding (UNIT#3) AT EL+21.000M
LVL.

514

LLD CALCULATION OF
DEARATOR FLOOR of PH
514
Bulding (UNIT#4) AT EL+21.000M
LVL.

515

LLD CALCULATION OF ROOM


b/w BC BAY GRID 1 TO 3 (UNIT
515
#3)) EL+21.0M PH BUILDING AT
EL +21.000M LVL.

516

LLD CALCULATION OF ROOM


b/w BC BAY GRID 15 TO 17 (UNIT
516
#4)) EL+21.0M PH BUILDING
(UNIT #3) AT EL +21.000M LVL.

517

517 DOSING ROOM OF PH

LLD CALCULATION OF HP
BUILDING AT EL +00.000M LVL.
LLD CALCULATION OF CVL
518

518 PANEL ROOM (UNIT #3) AT EL

+6.3M
LLD CALCULATION OF CVL
519

519 PANEL ROOM (UNIT #4) AT EL

+6.3M
LLD CALCULATION OF Boiler
520

520 3.0M WIDE PLATFORM

(TYPICAL)
521
522
523

LLD CALCULATION OF
TRANSFORMER YARD
LLD CALCULATION OF 3.75M
522
WIDE ROAD (Street Lighting)
LLD CALCULATION OF 7.0M
523
WIDE ROAD (Street Lighting)
521

LLD CALCULATION OF 400kV


SWITCH YARD
LLD Calculation for ESP Area
LLD Calculation for Cooling Tower
& CWPH Area
LLD Calculation for Water Plant
Area-DMP,ETP,PTP,RW
LLD Calculation for Air
Compressor Room/AHP
LLD Calculation for Fuel oil Area
LLD Calculation of Fire Water
Pump House

524

524

525

525

526

526

527

527

528

528

529

529

530

530

531

531 LLD Calculation of Hydrogen Plant

532

532

533

533

534

534

535

535

536

536

537

537

538

538

Lighting Layout Drawing for Power


House at EL+0.000M AC BAY

539

539

Lighting Layout Drawing for Power


House at EL+0.000M CD BAY

540

540

Lighting Layout Drawing for Power


House at EL+6.300M AC BAY

541

541

Lighting Layout Drawing for Power


House at EL+6.300M CD BAY

542

542

Lighting Layout Drawing for Power


House at EL+12.600M AC BAY

543

543

Lighting Layout Drawing for Power


House at EL+12.600M CD BAY

544

544

Lighting Layout Drawing for Power


House at EL+21.000M CD BAY

545

545

546

LLD Calculation of Compressor


House
LLD Calculation of Sea Water
Pump House
LLD Calculation of Ash Water
Pump House
LLD Calculation of Switchyard
Control Bulding
LLD Calculation of AHP House and
AHP Area
KEY SLD FOR ILLUMINATION OF
ENTIRE POWER PLANT

Lighting Layout Drawing for


Transformer Yard
Lighting Layout Drawing for
546
Street / Road Lighting.

Lighting Layout Drawing for 400KV


SWITCH YARD
Lighting Layout Drawing for AHP
House and AHP Area
Lighting Layout Drawing for Ash
Water Pump House
Lighting Layout Drawing for Fire
Water Pump House
Lighting Layout Drawing for
Hydrogen Plant
Lighting Layout Drawing for
SWITCH YARD Control Room
Lighting Layout Drawing for
Compressor House
Lighting Layout Drawing for
Switchyard Control Building
Lighting Layout Drawing for Sea
Water Pump House
Relay Setting calculations
HT Power Cable Schedule
LT Power Cable Schedule
Control Cable Schedule
Design Basis Document for UPS
System
Sizing calculation for the UPS
system

547

547

548

548

549

549

550

550

551

551

552

552

553

553

554

554

555

555

556
557
558
559

556
557
558
559

560

560

561

561

562

562 Datasheets for UPS system

563

563 GA drawing for UPS system

564

564

565

565

566

Schematic and wiring diagrams for


control panels of UPS system

Erection and commissiong manual


for UPS system
Operation and maintanance
566
manual for UPS system
packing, transportation and

567

567 storage instructions for UPS

sysem
568

568 MQP for UPS system

569

569 FQP for UPS system

570

570 communication System (PA /

Design Basis Document for Plant


EPABX)
571
572

Datasheets for communication


system
GA drawing for communication
572
system
571

573

573

Schematic and wiring diagrams for


communication system

574

574

Erection and commissiong manual


for communication system

575

575

Operation and maintanance


manual for communication system

576

576 storage instructions for

packing, transportation and


communication system
577

577 MQP for communication system

578

578 FQP for communication system

579

579

580
581
582

GA drawing for the GT/UST/UST


protection panel
Schematic diagram for the
580
GT/UST/UST protection panel
BOM for the GT/UST/UST
581
protection panel
Wiring table for the GT/UST/UST
582
protection panel

400 KV switchyard
1

Design basic report for 400kV


switchyard

Single Line Diagram for switchyard

Direct Stroke Lightning Protection


Layout for 400kV switchyard

Direct Stroke Lightning Protection


(DSLP) Calculation for 400kV
switchyard

Erection key diagram- Plan &


Section & Al. Cutting Schedule for
400kV switchyard

10

10 Erection key diagram - BOQ

11

11

Layouts - Plan for 400kV


switchyard
Layouts - Section 400kV
switchyard
Clearance diagram Plan & Section
for 400kV switchyard
Structural loading Layout Plan &
Section 400kV switcyard

Detailed drawings for Clamps &


connectors

12

12 MQP for Clamps & connectors

13

13

14

14 GA drawings for string hardware

15

15 GA drawings for Disc insulator

16

16

17

17

18

18

19

19

20

20

21

21

22

22

23

23

24

24 flexible conductor for 400kV

Type Test Reports for Clamps &


connectors

MQP for string hardware & disc


insulator
Type Test Reports for string
hardware & disc insulator
Cable trench layout for 400kV
switchyard
Cable Tray/Trench layout for
switchyard control room
Earthing layout for 400kV
switchyard
Earthing layout for switchyard
control room
Switchyard control room
Equipment Layout
Sag Tension calculation / Stringing
Chart for 400kV switchyard
Short-circuit force calculation on
switchyard
Electrodynamic force on
equipments for 400kV switchyard

25

25

26

26 Busbar sizing calculation

27

27

28
29

Switchyard Earthing Sizing


Calculation
CT, PT sizing calculation for 400kV
28
switchyard
Relay Setting & co-ordination
29
400kV switchyard
Cable schedule & Interconnection
Chart for switchyard

30

30

31

31 Wiring Diagram for CT/CVT JB

32

32 Spare list for the 400kV switchyard

33

33

34

Design calculation for the


switchyard column-Type-1
Design calculation for the
34
switchyard column-Type-2

Design calculation for the


switchyard column-Type-3
Design calculation for the
switchyard column-Type-4
Design calculation for the
switchyard beam-Type-1
Design calculation for the
switchyard beam-Type-2
Design calculation for the
switchyard beam-Type-3
Structural drawing for the
switchyard column-Type-1
Structural drawing for the
switchyard column-Type-2
Structural drawing for the
switchyard column-Type-3
Structural drawing for the
switchyard column-Type-4
Structural drawing for the
switchyard beam-Type-1
Structural drawing for the
switchyard beam-Type-2
Structural drawing for the
switchyard beam-Type-3
Design calculation for the
equipment structure - CT
Design calculation for the
equipment structure - CVT
Design calculation for the
equipment structure - BPI
Design calculation for the
equipment structure - Isolator
Design calculation for the
equipment structure - LA
Design calculation for the
equipment structure - WT
structural drawing for the
equipment structure - CT
structural drawing for the
equipment structure - CVT
structural drawing for the
equipment structure - BPI
structural drawing for the
equipment structure - Isolator
structural drawing for the
equipment structure - LA
structural drawing for the
equipment structure - WT

35

35

36

36

37

37

38

38

39

39

40

40

41

41

42

42

43

43

44

44

45

45

46

46

47

47

48

48

49

49

50

50

51

51

52

52

53

53

54

54

55

55

56

56

57

57

58

58

59

59 wire stringing at A row of Power

Anchoring details of GT bay shield


house.

60

60 Switchyard ACDB Feeder List

61

61

62
63

62
63

64

64

65

65

66

66

67

67

68

68 Switchyard DCDB SLD-220 V

69

69

70

LV Power Cable sizing for


Switchyard
Switchyard ACDB SLD
BOQ for Switchyard ACDB
GA and foundation drawing for the
SWYD. ACDB
Schematic diagram for the SWYD
ACDB
GA and foundation drawing for the
SWYD. DCDB
Switchyard DCDB Feeder List-48
V

Schematic diagram for the SWYD


DCDB
Switchyard DCDB Feeder List-220
70
V

71

71 Switchyard DCDB SLD-48 V

72

72 BOQ for Switchyard DCDB

73

73 calculation-220 V for 400kV

74

switchyard
74 GA drawing of 220V DC battery

75

75 Data sheet of 220V DC battery

76

76

Battery/Battery Charger sizing

77
78

GA drawing of 220V DC battery


charger
Data sheet of 220V DC battery
77
charger
Schematic drawing for the 220V
78
DC battery charger
Battery/Battery Charger sizing
calculation-48 V 400kV switchyard

79

79

80

80 GA drawing of 48V DC battery

81

81 Data sheet of 48V DC battery

82

82

83
84

GA drawing of 48V DC battery


charger
Data sheet of 48V DC battery
83
charger
Schematic drawing for the the 48
84
V DC battery charger

85

85 MQP for Battery & battery charger

86

86 FQP for Battery & battery charger

Type Test Reports for Battery &


battery charger
MQP for BM, CT & CVT JB
Type Test Reports for BM, CT &
CVT JB
GA and foundation drawing for the
Bay marshalling box
Wiring diagram for the the Bay
marshalling box
GA drawing and supporting
structure for the 400kV CB

87

87

88

88

89

89

90

90

91

91

92

92

93

93 Data sheet for the 400kV CB

94

94

95

95 Rating plate for the 400kV breaker

96

96 MQP for the 400kV CB

97

97 FQP for 400kV CB

98

98 Type Test Reports for 400kV CB

99

99 GA drawing for the 400kV CT

100

100 Section Details for 400 kV CT

101

101 Data sheet for the 400kV CT

102

102

103

103 Rating plate for the 400kV CT

104

104 MQP for the 400kV CT

105

105 FQP for 400kV CT

106

106 Type Test Reports for 400kV CT

107

107 GA drawing for the 400kV CVT

108

108 Section Details for 400 kV CVT

109

109 Data sheet for the 400kV CVT

110

110

111

111 Rating plate for the 400kV CVT

112

112 MQP for the 400kV CVT

113

113 FQP for 400kV CVT

Schematic diagram for 400kV


breaker

JB details and block details for


400kV CT

JB details and block details for


400kV CVT

114

114 Type Test Reports for 400kV CVT

115

115

116
117
118
119
120

GA drawing for the 400kV ISO


(With & Without Earth switch)
Data sheet for the 400kV ISO
116
(With & Without Earth switch)
117

Schematic diagram for 400kV ISO


(With & Without Earth switch)

Rating plate for the 400kV ISO


(With & Without Earth switch)
MQP for the 400kV ISO (With &
119
Without Earth switch)
FQP for 400kV ISO (With &
120
Without Earth switch)
118

Type Test Reports for 400kV ISO


(With & Without Earth switch)

121

121

122

122 GA drawing for the 390kV LA

123

123 Data sheet for the 390kV LA

124

124 Schematic diagram for 390kV LA

125

125 Rating plate for the 390kV LA

126

126

127

127 MQP for the 390kV LA

128

128 FQP for 390kV LA

129

129 Type Test Reports for 390kV LA

130

130 GA drawing for the 400kV BPI

131

131 Data sheet for the 400kV BPI

132

132 MQP for the 400kV BPI

133

133 FQP for 400kV BPI

134

134 Type Test Reports for 400kV BPI

135

135 GA drawing for the Wave Trap

136

136 Data sheet for the Wave Trap

137

137 Rating plate for the Wave Trap

138

138 MQP for the Wave Trap

GA drawing for Surge Monitor for


390kV LA

139

139 FQP for Wave Trap

140

140 Type Test Reports for Wave Trap

141

141

142

Data sheet for 4'' IPS Aluminium


tube
Cross section drawing of 4 '' IPS
142
Aluminium tube

143

143 MQP for 4 '' IPS Aluminium tube

144

144

145

Type Test Report for 4 '' IPS


Aluminium tube
145 WPS, PQR for IPS tube welding

146

146 Data sheet for ACSR Moose

147

147

148

148 MQP for ACSR Moose

149

149 Type Test Report for ACSR Moose

150

150 Data sheet for Shield wire

151

151 Type Test Report for Shield wire

152

152

153

153

154

154

155

155

156

156

157

157

158

158

159

159

160

160

161

161

162

162

163

163

164

164

Cross section drawing of ACSR


Moose

Metering and protection SLD for


switchyard
Design basic report for Control &
Protection Relay Panel
GA drawing & Equipment List for
the GT bay protection panel
Schematic diagram for the GT bay
protection panel
BOM for the GT bay protection
panel
GA drawing & Equipmemt List for
the Line bay protection panel
Schematic diagram for the Line
bay protection panel
BOM for the line bay protection
panel
GA drawing and Equipment List for
the Bus bar protection panel
Schematic diagram for the Bus bar
protection panel
BOM for the Bus bar protection
panel
GA drawing & Equipment List for
the Tie bay protection panel
Schematic diagram for the Tie bay
protection panel

165

165

BOM for the Tie bay protection


panel

166

166

GA drawing & equipment List for


the Reactor bay protection panel

167

167

168

168

169

169

170

170

171

171

172

172

173

173

174
175
176
177

174
175
176
177

178

178 FQP for PLCC system

179

179

Type Test Reports for PLCC


system

180

180

SCADA System Configuration /


Overall SAS architecture drawing

181

181

GA and Schematic drawings for


switchyard automation system

182

182 operation philosophy for the

Schematic diagram for the Reactor


bay protection panel
BOM for the Reactor bay
protection panel
MQP for Control & Protection
panels
FQP for Control & Protection
panels
Type Test Reports for Control &
Protection Relays
Data sheet for PLCC system
PLCC system proposed network
diagram
GA for PLCC panel
Modular layout diagrams
Bill for materials for PLCC
MQP for PLCC system

Functional descriptaion and


switchyard automation system
Detail Bill for Material (BOM) of
SAS System
Design Instruction Sheet (DIS)
RTU Panel
SAT procedure for the switchyard
automation system
FAT procedure for the switchyard
automation system.
Internal View for switchyard
automation system - panels
GTP for switchyard automation
system.
I/O list for the SA system
MQP for 400 kV SAS system

183

183

184

184

185

185

186

186

187

187

188

188

189
190

189
190

191

191 FQP for 400 kV SAS system

Type Test Reports for 400 kV SAS


system

192

192

193

193 RTU Panel Wiring Schematics

194

194 O&M Manual

195

195 GA of UPS and Battery Sizing

196

196

197
198
199

GA drawing & equipment list for


the Metering panel
Schematic diagram for the
197
Metering panel
198 BOM for the Metering panel
199 Board Formation Drawing

L & STATUS
CTP-29-ED-E-PL-M11-001
CTP-29-ED-E-RP-M11-001
CTP-29-ED-E-DL-M11-001
CTP-29-ED-E-DO-M11-001
CTP-29-ED-E-SD-M11-001
CTP-29-ED-E-BE-M11-001
CTP-29-ED-E-BE-M11-002
CTP-29-ED-E-BE-M11-003
CTP-29-ED-E-BE-M11-004
CTP-29-ED-E-DC-M11-001
CTP-29-ED-E-SD-M11-002
CTP-29-ED-E-LM-M11-001
CTP-21-ED-E-LD-M11-001
CTP-29-ED-E-PL-M11-003
CTP-21-ED-E-DC-BAT-001
CTP-21-ED-E-DS-BAT-001
CTP-21-ED-E-DC-BAT-002
CTP-21-ED-E-EA-BAT-001
CTP-21-ED-E-DD-BAT-001
CTP-21-ED-E-LI-BAT-001

1
2

B
A

E
23/Jun/10
V

DATE OF SUBMN TO CLIENT

First submission-REV-0
EDAC TRANSMITTAL NO

Current Status of Drg -Appvd or


Not -(Y) or (N)

VENDOR-(V)

Drawing or
Document
Bending
with

CLIENT-(E)

LATEST DRG SUBN DATE

DRAWING NO

LATEST REV NO

ENT CONTROL REGISTER

DRG CATEGARY ( A,B,C,D)

OASTAL THERMAL POWER PROJECT-EXPANSION PROJE


ST & STATUS REPORT
CLIENT
MEPL

CTP-21-ED-E-CG-BAT-002
CTP-21-ED-E-WD-BAT-001
CTP-21-ED-E-WD-BAT-002
CTP-21-ED-E-DD-BAT-002
CTP-21-ED-E-DD-BAT-003
CTP-21-ED-E-DD-BAT-009
CTP-21-ED-E-DD-BAT-004

CTP-21-ED-E-DD-BAT-005

CTP-21-ED-E-DD-BAT-006

CTP-21-ED-E-ES-BAT-001
CTP-21-ED-E-CD-BAT-002
CTP-21-ED-E-CD-BAT-001
CTP-21-ED-E-FD-BAT-001
CTP-21-ED-E-DC-BAT-003
CTP-21-ED-E-DD-BAT-007
CTP-21-ED-E-FD-BAT-002
CTP-21-ED-E-DC-BAT-004

CTP-21-ED-E-DC-BAT-005

CTP-21-ED-E-DC-BAT-006
CTP-29-ED-E-GN-BAT-001

CTP-21-ED-E-EI-BAT-001
CTP-21-ED-E-DD-BAT-008
CTP-21-ED-E-DD-BAT-010
CTP-29-ED-E-LS-BAT-001
CTP-29-ED-E-MD-BAT-001

CTP-29-ED-E-EI-BAT-002

CTP-29-ED-E-MD-BAT-002
CTP-29-ED-E-MP-BAT-001
CTP-29-ED-E-QC-BAT-001
CTP-21-ED-E-DO-BAT-001
CTP-21-ED-E-WD-BAT-003
CTP-21-ED-E-EA-BAT-003
CTP-21-ED-E-TR-BAT-001
CTP-21-ED-E-EA-BAT-002
CTP-21-ED-E-DC-BBT-001
CTP-21-ED-E-DS-BBT-001
CTP-21-ED-E-DC-BBT-002
CTP-21-ED-E-EA-BBT-001
CTP-21-ED-E-DD-BBT-001
CTP-21-ED-E-LI-BBT-001
CTP-21-ED-E-CG-BBT-002

CTP-21-ED-E-WD-BBT-001

CTP-21-ED-E-WD-BBT-003
CTP-21-ED-E-DD-BBT-002
CTP-21-ED-E-DD-BBT-003
CTP-21-ED-E-DD-BBT-004

CTP-21-ED-E-DD-BBT-005

CTP-21-ED-E-ES-BBT-001
CTP-21-ED-E-CD-BBT-001
CTP-21-ED-E-FD-BBT-001
CTP-21-ED-E-DC-BBT-003
CTP-21-ED-E-FD-BBT-002
CTP-21-ED-E-DC-BBT-004

CTP-21-ED-E-DC-BBT-005

CTP-21-ED-E-DC-BBT-006
CTP-29-ED-E-GN-BBT-001
CTP-21-ED-E-DD-BBT-008
CTP-21-ED-E-DD-BBT-009
CTP-29-ED-E-LS-BBT-001
CTP-29-ED-E-MD-BBT-001

CTP-29-ED-E-EI-BBT-002

CTP-29-ED-E-MD-BBT-002
CTP-29-ED-E-MP-BBT-001
CTP-29-ED-E-QC-BBT-001
CTP-21-ED-E-TR-BBT-001
CTP-21-ED-E-DS-BBT-002
CTP-21-ED-E-DS-BBT-003
CTP-21-ED-E-EA-BBT-002
CTP-21-ED-E-CG-BBT-003
CTP-21-ED-E-ES-BBT-002
CTP-21-ED-E-WD-BBT-002
CTP-29-ED-E-EI-BBT-003
CTP-29-ED-E-MD-BBT-003
CTP-29-ED-E-MD-BBT-004
CTP-29-ED-E-MP-BBT-002
CTP-29-ED-E-QC-BBT-002
CTP-21-ED-E-TR-BBT-002
CTP-21-ED-E-DC-BCT-001
CTP-21-ED-E-DS-BCT-001
CTP-21-ED-E-DC-BCT-002
CTP-21-ED-E-EA-BCT-001
CTP-21-ED-E-DD-BCT-001
CTP-21-ED-E-LI-BCT-001
CTP-21-ED-E-CG-BCT-002

CTP-21-ED-E-WD-BCT-001

CTP-21-ED-E-WD-BCT-003
CTP-21-ED-E-DD-BCT-002
CTP-21-ED-E-DD-BCT-003
CTP-21-ED-E-DD-BCT-004

CTP-21-ED-E-DD-BCT-005

CTP-21-ED-E-ES-BCT-001
CTP-21-ED-E-CD-BCT-001
CTP-21-ED-E-FD-BCT-001
CTP-21-ED-E-DC-BCT-003
CTP-21-ED-E-DD-BCT-007
CTP-21-ED-E-FD-BCT-002
CTP-21-ED-E-DC-BCT-004

CTP-21-ED-E-DC-BCT-005

CTP-21-ED-E-DC-BCT-006
CTP-29-ED-E-GN-BCT-001
CTP-21-ED-E-DD-BCT-008
CTP-21-ED-E-DD-BCT-009
CTP-29-ED-E-LS-BCT-001
CTP-29-ED-E-MD-BCT-001

CTP-29-ED-E-EI-BCT-002

CTP-29-ED-E-MD-BCT-002
CTP-29-ED-E-MP-BCT-001
CTP-29-ED-E-QC-BCT-001
CTP-21-ED-E-TR-BCT-001
CTP-21-ED-E-DS-BCT-002
CTP-21-ED-E-EA-BCT-002
CTP-21-ED-E-CG-BCT-003
CTP-21-ED-E-ES-BCT-002
CTP-21-ED-E-WD-BCT-002
CTP-21-ED-E-EI-BCT-003
CTP-29-ED-E-MD-BCT-003
CTP-29-ED-E-MD-BCT-004
CTP-29-ED-E-MP-BCT-002
CTP-29-ED-E-QC-BCT-002
CTP-21-ED-E-DC-BJA-001

CTP-29-ED-E-EI-BJA-001

CTP-29-ED-E-MD-BJA-001
CTP-29-ED-E-LS-BJA-001
CTP-29-ED-E-MP-BJA-001
CTP-29-ED-E-QC-BJA-001
CTP-21-ED-E-DS-BJA-001
CTP-29-ED-E-DS-BJG-001
CTP-29-ED-E-DS-BJH-001
CTP-21-ED-E-DC-BJB-001

CTP-21-ED-E-DC-BJC-001
CTP-29-ED-E-DC-BJD-001
CTP-29-ED-E-DC-BJE-001
CTP-29-ED-E-DC-BJF-001
CTP-29-ED-E-DC-BJG-001
CTP-29-ED-E-DC-BJH-001
CTP-29-ED-E-EL-BBA-001

CTP-21-ED-E-LD-BBA-001

CTP-21-ED-E-SD-BBA-001
CTP-21-ED-E-DS-BBA-001
CTP-21-ED-E-EA-BBA-001
CTP-21-ED-E-BM-BBA-001
CTP-21-ED-E-SD-BBB-001
CTP-21-ED-E-EA-BBB-001
CTP-21-ED-E-BM-BBB-001
CTP-22-ED-E-SD-BBA-001
CTP-21-ED-E-EA-BBA-002
CTP-21-ED-E-BM-BBA-002
CTP-22-ED-E-SD-BBA-002
CTP-21-ED-E-EA-BBA-003
CTP-21-ED-E-BM-BBA-003
CTP-29-ED-E-DD-BBA-001
CTP-29-ED-E-DD-BBA-002
CTP-29-ED-E-WD-BBA-001

CTP-29-ED-E-WD-BBA-002
CTP-29-ED-E-WD-BBA-003
CTP-29-ED-E-WD-BBA-004
CTP-29-ED-E-WD-BBA-005
CTP-29-ED-E-WD-BBA-006
CTP-29-ED-E-WD-BBA-007

CTP-29-ED-E-WD-BBA-008
CTP-29-ED-E-WD-BBA-009
CTP-29-ED-E-WD-BBA-010
CTP-29-ED-E-EA-BBA-001
CTP-21-ED-E-DS-BBA-001
CTP-21-ED-E-EA-BBA-002
CTP-21-ED-E-WD-BBA-002
CTP-29-ED-E-LD-BBA-002
CTP-29-ED-E-DD-BBA-003
CTP-29-ED-E-EI-BBA-001
CTP-29-ED-E-MD-BBA-001
CTP-29-ED-E-MD-BBA-002
CTP-29-ED-E-MP-BBA-001
CTP-29-ED-E-QC-BBA-001
CTP-21-ED-E-SD-BBC-001
CTP-21-ED-E-EA-BBC-001
CTP-21-ED-E-BM-BBC-001
CTP-29-ED-E-SD-BBE-001
CTP-21-ED-E-SD-BBF-001

CTP-21-ED-E-EA-BBF-001
CTP-21-ED-E-BM-BBF-001
CTP-29-ED-E-SD-BBG-001
CTP-29-EA-E-EA-BBG-001
CTP-29-ED-E-BM-BBG-001
CTP-29-ED-E-SD-BBH-001
CTP-29-ED-E-EA-BBH-001
CTP-29-ED-E-BM-BBH-001
CTP-29-ED-E-LD-BFA-002
CTP-29-ED-E-EL-BFA-001
CTP-21-ED-E-SD-BFA-001
CTP-21-ED-E-SD-BFA-001
CTP-21-ED-E-EA-BFA-001
CTP-21-ED-E-EA-BFA-002
CTP-21-ED-E-BM-BFA-001
CTP-21-ED-E-WD-BFA-001
CTP-21-ED-E-WD-BFA-002
CTP-21-ED-E-WD-BFA-003
CTP-21-ED-E-WD-BFA-004
CTP-21-ED-E-WD-BFA-005
CTP-21-ED-E-WD-BFA-006
CTP-21-ED-E-WD-BFA-007
CTP-21-ED-E-WD-BFA-008
CTP-21-ED-E-WD-BFA-009
CTP-21-ED-E-WD-BFA-010

CTP-21-ED-E-WD-BFA-011
CTP-21-ED-E-WD-BFA-012
CTP-21-ED-E-WD-BFA-013
CTP-21-ED-E-WD-BFA-014
CTP-21-ED-E-WD-BFA-015
CTP-21-ED-E-WD-BFA-016
CTP-21-ED-E-WD-BFA-017
CTP-21-ED-E-WD-BFA-018
CTP-21-ED-E-WD-BFA-019
CTP-21-ED-E-WD-BFA-020
CTP-21-ED-E-WD-BFA-021
CTP-21-ED-E-WD-BFA-022
CTP-21-ED-E-EA-BFA-003
CTP-29-ED-E-DS-BFA-001
CTP-29-ED-E-LD-BFA-001
CTP-29-ED-E-EI-BFA-001
CTP-29-ED-E-MD-BFA-001
CTP-29-ED-E-MD-BFA-002
CTP-29-ED-E-MP-BFA-001
CTP-29-ED-E-QC-BFA-001
CTP-29-ED-E-SD-BFB-001
CTP-29-ED-E-EA-BFB-001
CTP-21-ED-E-BM-BFB-001
CTP-29-ED-E-SD-BFC-001
CTP-29-ED-E-EA-BFC-001
CTP-21-ED-E-BM-BFC-001
CTP-21-ED-E-WD-BFC-001

CTP-21-ED-E-WD-BFC-002
CTP-21-ED-E-WD-BFC-003
CTP-21-ED-E-WD-BFC-004
CTP-21-ED-E-WD-BFC-005
CTP-29-ED-E-SD-BFD-001
CTP-29-ED-E-EA-BFD-001
CTP-21-ED-E-BM-BFD-001
CTP-29-ED-E-SD-BFE-001
CTP-29-ED-E-BM-BFE-001
CTP-29-ED-E-SD-BFF-001
CTP-29-ED-E-EA-BFF-001
CTP-21-ED-E-BM-BFF-001
CTP-29-ED-E-SD-BFG-001
CTP-29-ED-E-EA-BFG-001
CTP-21-ED-E-BM-BFG-001
CTP-29-ED-E-SD-BFH-001
CTP-29-ED-E-EA-BFH-001
CTP-21-ED-E-BM-BFH-001
CTP-29-ED-E-SD-AFJ-001
CTP-29-ED-E-EA-AFJ-001
CTP-21-ED-E-BM-AFJ-001
CTP-29-ED-E-SD-AFK-001
CTP-29-ED-E-EA-AFK-001
CTP-29-ED-E-BM-AFK-001
CTP-29-ED-E-SD-BFL-001
CTP-29-ED-E-EA-BFL-001
CTP-21-ED-E-BM-BFL-001
CTP-29-ED-E-SD-BFM-001
CTP-29-ED-E-EA-BFM-001

CTP-21-ED-E-BM-BFM-001
CTP-29-ED-E-SD-BRC-001
CTP-29-ED-E-EA-BRC-001
CTP-21-ED-E-BM-BRC-001
CTP-21-ED-E-WD-BRC-001
CTP-21-ED-E-WD-BRC-002
CTP-21-ED-E-WD-BRC-003
CTP-21-ED-E-WD-BRC-004
CTP-21-ED-E-WD-BRC-005
CTP-29-ED-E-SD-BHC-001
CTP-21-ED-E-EA-BHC-001
CTP-21-ED-E-BM-BHC-001
CTP-29-ED-E-SD-BLA-001
CTP-29-ED-E-EA-BLA-001
CTP-29-ED-E-BM-BLA-001
CTP-29-ED-E-SD-BLC-001
CTP-29-ED-E-EA-BLC-001
CTP-29-ED-E-BM-BLC-001
CTP-29-ED-E-SD-BLE-001
CTP-29-ED-E-EA-BLE-001
CTP-29-ED-E-BM-BLE-001
CTP-29-ED-E-SD-BLG-001
CTP-29-ED-E-EA-BLG-001
CTP-29-ED-E-BM-BLG-001
CTP-29-ED-E-SD-BUC-001
CTP-29-ED-E-EA-BUC-001
CTP-29-ED-E-BM-BUC-001

CTP-29-ED-E-SD-BUC-002
CTP-29-ED-E-EA-BUC-002
CTP-29-ED-E-BM-BUA-002
CTP-29-ED-E-SD-BUC-003
CTP-29-ED-E-EA-BUC-003
CTP-29-ED-E-BM-BUA-003
CTP-29-ED-E-WD-BUC-001
CTP-29-ED-E-WD-BUC-002
CTP-29-ED-E-WD-BUC-003
CTP-29-ED-E-SD-BRA-001
CTP-29-ED-E-EA-BRA-001
CTP-29-ED-E-BM-BRA-001
CTP-29-ED-E-WD-BUC-001
CTP-29-ED-E-WD-BUC-002
CTP-29-ED-E-WD-BUC-003
CTP-29-ED-E-WD-BUC-004
CTP-29-ED-E-WD-BUC-005
CTP-21-ED-E-DD-BHA-001
CTP-21-ED-E-GA-BHA-001
CTP-21-ED-E-GA-BHA-002
CTP-21-ED-E-EI-BHA-001
CTP-29-ED-E-DD-BHA-001
CTP-21-ED-E-DS-BHA-001
CTP-29-ED-E-EI-BHA-001
CTP-29-ED-E-MD-BHA-001
CTP-29-ED-E-MD-BHA-002

CTP-29-ED-E-MP-BHA-001
CTP-29-ED-E-QC-BHA-001
CTP-29-ED-E-GA-M13-009
CTP-29-ED-E-GA-M13-010
CTP-29-ED-E-GA-M13-011
CTP-29-ED-E-GA-M13-012
CTP-29-ED-E-GA-M13-013
CTP-29-ED-E-GA-M13-014
CTP-29-ED-E-GA-M13-001
CTP-29-ED-E-GA-M13-002
CTP-29-ED-E-GA-M13-003
CTP-29-ED-E-GA-M13-004
CTP-29-ED-E-GA-M13-021
CTP-29-ED-E-GA-M13-022
CTP-29-ED-E-GA-M13-005
CTP-29-ED-E-GA-M13-006
CTP-29-ED-E-GA-M13-007
CTP-29-ED-E-GA-M13-008
CTP-29-ED-E-GA-M13-023
CTP-29-ED-E-DC-BRV-001
CTP-29-ED-E-DS-BRV-001
CTP-29-ED-E-EA-BRV-001
CTP-29-ED-E-DD-BRV-001
CTP-29-ED-E-CG-BRV-002
CTP-29-ED-E-FD-BRV-001
CTP-29-ED-E-LD-BRV-001
CTP-29-ED-E-WD-BRV-001
CTP-29-ED-E-EI-BRV-001

CTP-29-ED-E-MD-BRV-001
CTP-29-ED-E-LS-BRV-001
CTP-29-ED-E-MD-BRV-002
CTP-29-ED-E-MP-BRV-001
CTP-29-ED-E-QC-BRV-001
CTP-21-ED-E-DS-BBY-001
CTP-21-ED-E-DS-BBY-001
CTP-21-ED-E-GA-BRV-001
CTP-21-ED-E-GA-BBY-001
CTP-21-ED-E-DD-BBY-001
CTP-21-ED-E-GA-BRV-002
CTP-29-ED-E-DD-BRV-001
CTP-29-ED-E-EI-BBY-001
CTP-29-ED-E-MD-BBY-001
CTP-29-ED-E-MD-BBY-002
CTP-29-ED-E-MP-BBY-001
CTP-29-ED-E-QC-BBY-001
CTP-21-ED-E-DS-BCY-001
CTP-21-ED-E-DC-BCY-001
CTP-21-ED-E-GA-BCY-001
CTP-21-ED-E-DD-BCY-001
CTP-29-ED-E-DD-BRV-001
CTP-29-ED-E-EI-BRV-001
CTP-21-ED-E-GA-BHB-001
CTP-21-ED-E-GA-BHB-002
CTP-21-ED-E-EI-BHB-001

CTP-29-ED-E-GA-BHF-001
CTP-29-ED-E-GA-BHF-002
CTP-21-ED-E-EI-BHF-001
CTP-29-ED-E-GA-BHK-001
CTP-29-ED-E-GA-BHK-002
CTP-21-ED-E-EI-BHK-001
CTP-29-ED-E-GA-BFJ-001
CTP-29-ED-E-GA-BFJ-002
CTP-21-ED-E-EI-BFJ-001
CTP-29-ED-E-GA-BHL-001
CTP-29-ED-E-GA-BHL-002
CTP-21-ED-E-EI-BHL-001
CTP-29-ED-E-DC-BTA-001
CTP-21-ED-E-DC-BTA-002
CTP-21-ED-E-DS-BTA-001
CTP-21-ED-E-DS-BTA-002
CTP-21-ED-E-EA-BTA-001
CTP-21-ED-E-GA-BTA-001
CTP-21-ED-E-GA-BTA-002
CTP-21-ED-E-WD-BTA-001

CTP-29-ED-E-DC-BTC-001
CTP-29-ED-E-DS-BTC-001
CTP-29-ED-E-DS-BTC-002
CTP-29-ED-E-EA-BTC-001
CTP-29-ED-E-GA-BTC-001
CTP-29-ED-E-GA-BTC-002

CTP-29-ED-E-WD-BTC-001

CTP-29-ED-E-DC-BTC-002
CTP-29-ED-E-DS-BTC-003
CTP-29-ED-E-DS-BTC-004
CTP-29-ED-E-EA-BTC-002
CTP-29-ED-E-GA-BTC-003
CTP-29-ED-E-GA-BTC-004
CTP-29-ED-E-WD-BTC-002

CTP-29-ED-E-DC-BTC-003
CTP-29-ED-E-DS-BTC-005
CTP-29-ED-E-DS-BTC-006
CTP-29-ED-E-EA-BTA-003
CTP-29-ED-E-GA-BTA-005
CTP-29-ED-E-GA-BTA-006
CTP-29-ED-E-WD-BTA-003
CTP-29-ED-E-EL-BUA-001
CTP-21-ED-E-SD-BUA-001
CTP-21-ED-E-EA-BUA-001
CTP-21-ED-E-BM-BUA-001
CTP-29-ED-E-EI-BUA-001
CTP-29-ED-E-MD-BUA-001
CTP-29-ED-E-MD-BUA-002
CTP-29-ED-E-MP-BUA-001

CTP-29-ED-E-QC-BUA-001
CTP-29-ED-E-DC-BBX-001
CTP-29-ED-E-DS-BBX-001
CTP-29-ED-E-BM-BBX-001
CTP-29-ED-E-DD-BBX-001
CTP-29-ED-E-DD-BBX-001
CTP-29-ED-E-DC-BFX-001
CTP-29-ED-E-DS-BFX-001
CTP-29-ED-E-BM-BFX-001
CTP-29-ED-E-DD-BFX-001
CTP-29-ED-E-MP-BFX-001
CTP-29-ED-E-GA-M12-001
CTP-29-ED-E-CR-M12-001
CTP-29-ED-E-CR-M12-002
CTP-29-ED-E-CR-M12-003
CTP-29-ED-E-CR-M12-004
CTP-29-ED-E-CR-M12-005
CTP-29-ED-E-CR-M12-006
CTP-29-ED-E-CR-M12-007
CTP-29-ED-E-CR-M12-008
CTP-29-ED-E-CR-M12-009
CTP-29-ED-E-CR-M12-010
CTP-29-ED-E-EI-M12-001
CTP-29-ED-E-DC-M15-001
CTP-29-ED-E-DC-M15-002

CTP-29-ED-E-GN-M15-001
CTP-29-ED-E-GA-M15-001
CTP-29-ED-E-GA-M15-003
CTP-29-ED-E-GA-M15-006
CTP-29-ED-E-GA-M15-007
CTP-29-ED-E-GA-M15-008
CTP-29-ED-E-GA-M15-009
CTP-29-ED-E-GA-M15-010
CTP-29-ED-E-GA-M15-011
CTP-29-ED-E-GA-M15-012
CTP-29-ED-E-GA-M15-013
CTP-29-ED-E-GA-M15-014
CTP-29-ED-E-EI-M15-001
CTP-29-ED-E-DO-M14-001
CTP-29-ED-E-DS-M14-001
CTP-29-ED-E-EI-M14-001

CTP-29-ED-E-DC-M14-001

CTP-29-ED-E-DC-M14-002

CTP-29-ED-E-DC-M14-003

CTP-29-ED-E-DC-M14-004

CTP-29-ED-E-DC-M14-005

CTP-29-ED-E-DC-M14-006

CTP-29-ED-E-DC-M14-007

CTP-29-ED-E-DC-M14-008

CTP-29-ED-E-DC-M14-009

CTP-29-ED-E-DC-M14-010

CTP-29-ED-E-DC-M14-011

CTP-29-ED-E-DC-M14-012

CTP-29-ED-E-DC-M14-013

CTP-29-ED-E-DC-M14-014

CTP-29-ED-E-DC-M14-015

CTP-29-ED-E-DC-M14-016

CTP-29-ED-E-DC-M14-017

CTP-29-ED-E-DC-M14-018

CTP-29-ED-E-DC-M14-019

CTP-29-ED-E-DC-M14-020

CTP-29-ED-E-DC-M14-021

CTP-29-ED-E-DC-M14-022

CTP-29-ED-E-DC-M14-023

CTP-29-ED-E-DC-M14-024

CTP-29-ED-E-DC-M14-025

CTP-29-ED-E-DC-M14-026

CTP-29-ED-E-DC-M14-027

CTP-29-ED-E-DC-M14-028

CTP-29-ED-E-DC-M14-029

CTP-29-ED-E-DC-M14-030

CTP-29-ED-E-DC-M14-031

CTP-29-ED-E-DC-M14-032

CTP-29-ED-E-DC-M14-033

CTP-29-ED-E-DC-M14-034

CTP-29-ED-E-DC-M14-035

CTP-29-ED-E-DC-M14-036

CTP-29-ED-E-DC-M14-037

CTP-29-ED-E-DC-M14-038

CTP-29-ED-E-DC-M14-039

CTP-29-ED-E-DC-M14-040

CTP-29-ED-E-DC-M14-041

CTP-29-ED-E-DC-M14-042

CTP-29-ED-E-DC-M14-043

CTP-29-ED-E-DC-M14-044
CTP-29-ED-E-DC-M14-045
CTP-29-ED-E-DC-M14-046
CTP-29-ED-E-DC-M14-047

CTP-29-ED-E-DC-M14-048
CTP-29-ED-E-DC-M14-049
CTP-29-ED-E-DC-M14-050
CTP-29-ED-E-DC-M14-051
CTP-29-ED-E-DC-M14-052
CTP-29-ED-E-DC-M14-053
CTP-29-ED-E-DC-M14-054
CTP-29-ED-E-DC-M14-055
CTP-29-ED-E-DC-M14-056
CTP-29-ED-E-DC-M14-057
CTP-29-ED-E-DC-M14-059
CTP-29-ED-E-DC-M14-060
CTP-29-ED-E-DC-M14-061
CTP-29-ED-E-DC-M14-001
CTP-29-ED-E-GA-M14-001

CTP-29-ED-E-GA-M14-002

CTP-29-ED-E-GA-M14-003

CTP-29-ED-E-GA-M14-004

CTP-29-ED-E-GA-M14-005

CTP-29-ED-E-GA-M14-006

CTP-29-ED-E-GA-M14-007
CTP-29-ED-E-GA-M14-008
CTP-29-ED-E-GA-M14-009

CTP-29-ED-E-GA-M14-010
CTP-29-ED-E-GA-M14-011
CTP-29-ED-E-GA-M14-012
CTP-29-ED-E-GA-M14-013
CTP-29-ED-E-GA-M14-014
CTP-29-ED-E-GA-M14-015
CTP-29-ED-E-GA-M14-016
CTP-29-ED-E-GA-M14-017
CTP-29-ED-E-GA-M14-018
CTP-29-ED-E-DC-M17-001
CTP-29-ED-E-LC-M16-001
CTP-29-ED-E-LC-M16-002
CTP-29-ED-E-LC-M16-003
CTP-29-ED-E-DO-BRW-001
CTP-29-ED-E-DC-BRW-001
CTP-29-ED-E-DS-BRW-001
CTP-29-ED-E-EA-BRW-001
CTP-29-ED-E-WD-BRW-001
CTP-29-ED-E-EI-BRW-001
CTP-29-ED-E-MD-BRW-001
CTP-29-ED-E-MD-BRW-002
CTP-29-ED-E-MP-BRW-001
CTP-29-ED-E-QC-BRW-001
CTP-29-ED-E-DO-CYA-001
CTP-29-ED-E-DS-CYA-001
CTP-29-ED-E-EA-CYA-001

CTP-29-ED-E-WD-CYA-001
CTP-29-ED-E-EI-CYA-001

CTP-29-ED-E-MD-CYA-001

CTP-29-ED-E-MD-CYA-002
CTP-29-ED-E-MP-CYA-001
CTP-29-ED-E-QC-CYA-001
CTP-29-ED-E-EA-BYA-001
CTP-29-ED-E-WD-BYA-001
CTP-29-ED-E-BM-BYA-001
CTP-29-ED-E-WD-BYA-002

CTP-29-ED-E-DO-ABD-001
CTP-29-ED-E-SD-ABD-001
CTP-29-ED-E-GA-ABD-001
CTP-29-ED-E-GA-ABD-002
CTP-29-ED-E-GA-ABD-003
CTP-29-ED-E-GA-ABD-004
CTP-29-ED-E-GA-ABD-005

CTP-29-ED-E-DC-ABD-001

CTP-29-ED-E-EI-ABD-001
CTP-29-ED-E-BM-ABD-001
CTP-29-ED-E-GA-ABD-010

CTP-29-ED-E-MP-ABD-006
CTP-29-ED-E-TR-ABD-001
CTP-29-ED-E-GA-ABD-011
CTP-29-ED-E-GA-ABD-012
CTP-29-ED-E-MP-ABD-007
CTP-29-ED-E-TR-ABD-002
CTP-29-ED-E-GA-ABD-006
CTP-29-ED-E-CR-ABD-001
CTP-29-ED-E-GA-ABD-007
CTP-29-ED-E-GA-ABD-009
CTP-29-ED-E-GA-ABD-008
CTP-29-ED-E-DC-ABD-002

CTP-29-ED-E-DC-ABD-003

CTP-29-ED-E-DC-ABD-004
CTP-29-ED-E-DC-ABD-020
CTP-29-ED-E-DC-ABD-021
CTP-29-ED-E-DC-ABD-005
CTP-29-ED-E-DC-ABD-006
CTP-29-ED-E-LC-ABD-001
CTP-29-ED-E-WD-ABD-005
CTP-29-ED-E-LS-ABD-001
CTP-29-ED-E-DC-ABD-007
CTP-29-ED-E-DC-ABD-008

CTP-29-ED-E-DC-ABD-009
CTP-29-ED-E-DC-ABD-010
CTP-29-ED-E-DC-ABD-011
CTP-29-ED-E-DC-ABD-012
CTP-29-ED-E-DC-ABD-013
CTP-29-ED-E-CG-ABD-001
CTP-29-ED-E-CG-ABD-002
CTP-29-ED-E-CG-ABD-003
CTP-29-ED-E-CG-ABD-004
CTP-29-ED-E-CG-ABD-005
CTP-29-ED-E-CG-ABD-006
CTP-29-ED-E-CG-ABD-007
CTP-29-ED-E-DC-ABD-014
CTP-29-ED-E-DC-ABD-015
CTP-29-ED-E-DC-ABD-016
CTP-29-ED-E-DC-ABD-017
CTP-29-ED-E-DC-ABD-018
CTP-29-ED-E-DC-ABD-019
CTP-29-ED-E-CG-ABD-008
CTP-29-ED-E-CG-ABD-009
CTP-29-ED-E-CG-ABD-010
CTP-29-ED-E-CG-ABD-011
CTP-29-ED-E-CG-ABD-012
CTP-29-ED-E-CG-ABD-013
CTP-29-ED-E-GA-ABD-013

CTP-29-ED-E-EL-ANA-001
CTP-29-ED-E-DC-ANA-001
CTP-29-ED-E-SD-ANA-001
CTP-29-ED-E-BM-ANA-001
CTP-29-ED-E-EA-ANA-001
CTP-29-ED-E-WD-ANA-001
CTP-29-ED-E-EA-ANA-001
CTP-29-ED-E-EL-ANK-001
CTP-29-ED-E-SD-ANK-002
CTP-29-ED-E-WD-ANK-001
CTP-29-ED-E-EL-ANK-002
CTP-29-ED-E-SD-ANK-001
CTP-29-ED-E-BM-ANK-001
CTP-29-ED-E-DC-ANK-001
CTP-29-ED-E-GA-ANK-001
CTP-29-ED-E-DC-ANK-001
CTP-29-ED-E-GA-ANK-002
CTP-29-ED-E-DC-ANK-002
CTP-29-ED-E-WD-ANK-002
CTP-29-ED-E-DC-ANK-002
CTP-29-ED-E-GA-ANK-003
CTP-29-ED-E-DC-ANK-003
CTP-29-ED-E-GA-ANK-004
CTP-29-ED-E-DC-ANK-004
CTP-29-ED-E-WD-ANK-003
CTP-29-ED-E-MP-ANK-001
CTP-29-ED-E-QC-ANK-001

CTP-29-ED-E-TR-ANK-001
CTP-29-ED-E-MP-AVA-001
CTP-29-ED-E-TR-AVA-001
CTP-29-ED-E-EA-ABD-008
CTP-29-ED-E-WD-ABD-004
CTP-29-ED-E-EA-ABD-001
CTP-29-ED-E-DS-ABD-001
CTP-29-ED-E-WD-ABD-001
CTP-29-ED-E-ES-ABD-001
CTP-29-ED-E-MP-ABD-001
CTP-29-ED-E-QC-ABD-001
CTP-29-ED-E-TR-ABD-003
CTP-29-ED-E-EA-ABD-002
CTP-29-ED-E-DD-ABD-001
CTP-29-ED-E-DS-ABD-002
CTP-29-ED-E-EA-ABD-003
CTP-29-ED-E-ES-ABD-002
CTP-29-ED-E-MP-ABD-002
CTP-29-ED-E-QC-ABD-002
CTP-29-ED-E-TR-ABD-004
CTP-29-ED-E-EA-ABD-004
CTP-29-ED-E-DD-ABD-002
CTP-29-ED-E-DS-ABD-003
CTP-29-ED-E-EA-ABD-005
CTP-29-ED-E-ES-ABD-003
CTP-29-ED-E-MP-ABD-003
CTP-29-ED-E-QC-ABD-003

CTP-29-ED-E-TR-ABD-005
CTP-29-ED-E-EA-ABD-006
CTP-29-ED-E-DS-ABD-004
CTP-29-ED-E-WD-ABD-002
CTP-29-ED-E-ES-ABD-004
CTP-29-ED-E-MP-ABD-004
CTP-29-ED-E-QC-ABD-004
CTP-29-ED-E-TR-ABD-006
CTP-29-ED-E-EA-ABD-007
CTP-29-ED-E-DS-ABD-005
CTP-29-ED-E-WD-ABD-003
CTP-29-ED-E-ES-ABD-005
CTP-29-ED-E-GA-ABD-014
CTP-29-ED-E-MP-ABD-005
CTP-29-ED-E-QC-ABD-005
CTP-29-ED-E-TR-ABD-007
CTP-29-ED-E-GA-ABD-015
CTP-29-ED-E-DS-ABD-006
CTP-29-ED-E-MP-ABD-008
CTP-29-ED-E-QC-ABD-006
CTP-29-ED-E-TR-ABD-008
CTP-29-ED-E-GA-ABD-016
CTP-29-ED-E-DS-ABD-007
CTP-29-ED-E-ES-ABD-006
CTP-29-ED-E-MP-ABD-009

CTP-29-ED-E-QC-ABD-007
CTP-29-ED-E-TR-ABD-009
CTP-29-ED-E-DS-ABD-008
CTP-29-ED-E-DD-ABD-003
CTP-29-ED-E-MP-ABD-010
CTP-29-ED-E-TR-ABD-010
CTP-29-ED-E-EI-ABD-002
CTP-29-ED-E-DS-ABD-009
CTP-29-ED-E-DD-ABD-004
CTP-29-ED-E-MP-ABD-011
CTP-29-ED-E-TR-ABD-011
CTP-29-ED-E-DS-ABD-010
CTP-29-ED-E-TR-ABD-012
CTP-29-ED-E-SD-ARA-001
CTP-29-ED-E-DO-ARA-001
CTP-29-ED-E-EA-ARA-001
CTP-29-ED-E-WD-ARA-001
CTP-29-ED-E-BM-ARA-001
CTP-29-ED-E-EA-ARA-002
CTP-29-ED-E-WD-ARA-002
CTP-29-ED-E-BM-ARA-002
CTP-29-ED-E-EA-ARA-003
CTP-29-ED-E-WD-ARA-003
CTP-29-ED-E-BM-ARA-003
CTP-29-ED-E-GA-ARA-001
CTP-29-ED-E-WD-ARA-004

CTP-29-ED-E-BM-ARA-004
CTP-29-ED-E-GA-ARA-002
CTP-29-ED-E-WD-ARA-006
CTP-29-ED-E-BM-ARA-005
CTP-29-ED-E-MP-ARA-001
CTP-29-ED-E-QC-ARA-001
CTP-29-ED-E-TR-ARA-001
CTP-29-ED-E-DS-AYA-001
CTP-29-ED-E-SD-AYA-001
CTP-29-ED-E-ES-AYA-001
CTP-29-ED-E-SD-AYA-002
CTP-29-ED-E-BM-AYA-001
CTP-29-ED-E-MP-AYA-001
CTP-29-ED-E-QC-AYA-001
CTP-29-ED-E-TR-AYA-001
CTP-29-ED-E-LD-APA-001
CTP-29-ED-E-GA-APA-001
CTP-29-ED-E-DO-APA-001
CTP-29-ED-E-BM-APA-001
CTP-29-ED-E-DO-APA-002
CTP-29-ED-E-MP-APA-001
CTP-29-ED-E-MP-APA-002
CTP-29-ED-E-GA-APA-002
CTP-29-ED-E-DS-APA-001
CTP-29-ED-E-LM-APA-001
CTP-29-ED-E-MP-APA-003
CTP-29-ED-E-QC-APA-001

CTP-29-ED-E-TR-APA-001
CTP-29-ED-E-WD-APA-001
CTP-29-ED-E-MD-APA-001
CTP-29-ED-E-GA-APA-003
CTP-29-ED-E-GA-APA-004
CTP-29-ED-E-WD-APA-002
CTP-29-ED-E-BM-APA-002
CTP-29-ED-E-GA-APA-005

23/Jun/10
APD

CMD

RJD
23/Jun/10 23/Jun/10
23/Jun/10 23/Jun/10

Drg/Doc Approved (APD) or


Commented (CMD) or
Rejected (RJD) By Client

DATE OF CLIENT FEED


BACK

Second submission-REV-1
DATE OF RE-SUBMISSION
TO CLIENT

EDAC TRANSMITTAL NO

Drg/Doc Approved (APD) or


Commented (CMD) or
Rejected (RJD) By Client

DATE OF CLIENT FEED


BACK

irst submission-REV-0

DATE OF RE-SUBMISSION
TO CLIENT

EDAC TRANSMITTAL NO

Drg/Doc Approved (APD) or


Commented (CMD) or
Rejected (RJD) By Client

DATE OF CLIENT
COMMENT/APPROVEL

ANSION PROJECT
Third Submission REV-2

23/Jun/10 23/Jun/10

Fifth Submission -REV-4


DATE OF RE-SUBMISSION
TO CLIENT

EDAC TRANSMITTAL NO

Drg/Doc Approved (APD) or


Commented (CMD) or
Rejected (RJD) By Client

DATE OF CLIENT FEED


BACK

DATE OF RE-SUBMISSION
TO CLIENT

EDAC TRANSMITTAL NO

Drg/Doc Approved (APD) or


Commented (CMD) or
Rejected (RJD) By Client

DATE OF CLIENT FEED


BACK

DATE OF RE-SUBMISSION
TO CLIENT

EDAC TRANSMITTAL NO
Fourth Submission REV-3
Sixth Submission REV-5

23/Jun/10 23/Jun/10

23/Jun/10

23/Jun/10
23/Jun/10
23/Jun/10
23/Jun/10
23/Jun/10

Drg/Doc Approved (APD) or


Commented (CMD) or
Rejected (RJD) By Client

DATE OF CLIENT FEED


BACK

Seventh Submission REV-6


DATE OF RE-SUBMISSION
TO CLIENT

EDAC TRANSMITTAL NO

Drg/Doc Approved (APD) or


Commented (CMD) or
Rejected (RJD) By Client

DATE OF CLIENT FEED


BACK

DATE OF RE-SUBMISSION
TO CLIENT

EDAC TRANSMITTAL NO

Drg/Doc Approved (APD) or


Commented (CMD) or
Rejected (RJD) By Client

DATE OF CLIENT FEED


BACK

Sixth Submission REV-5


Eight Submission-REV-7