aspern Seestadt Wien - Smart City Vienna

Monika Sturm, Marquart Franz


Siemens AG
Page 0

March 2014

Corporate Technology

Unrestricted Siemens AG 2014. All rights reserved

Future energy challenges:


Cities are in the driver's seat
Growing demand
+

High share of renewable energy

63%

hydro,
wind,
solar,
geothermal,
biomass

33,000 TWh
Renewables

20,300 TWh

Nuclear

Fossil energy
sources

68%

54%

2008

2030

Decentralized energy production

20%

2020

EU-Directive for renewable energy


Stochastic energy flow
Peak demand

Shaved peak demand

Source: E SGA
Page 1

March 2014

Corporate Technology

Unrestricted Siemens AG 2014. All rights reserved

Future energy challenges:


Cities are in the driver's seat

Smart

Evolution of grid and building

Smart Grid

Prosumer
Traditional

2
Decentral Generation

Central Generation
Central generation plants
Central T&D concept

Political trend towards renewable


decentralized generation (e.g. EEG)
First pilots for wind and PV
generation plants

Smart Grid Pilots


Testing of Virtual Power Plant
(VPP) concepts in Europe
Establishment of Demand
Response market in US
First Microgrid pilots
First smart metering roll-outs

Building Management System


Integration of other technical
subsystems, e.g. PV

Energy Efficiency
Total Building Solutions
Remote building and energy
management
First demand response
applications (Sitecontrols)

2000

2012

Building Automation
Building Control
HVAC Control
Pneumatic technology

1990
Source: IC BT / SG project team
Page 2

March 2014

Building Performance

Efficient integration of renewable &


distributed generation by VPPs
Trend towards decentralized grid
structures
Large smart meter installed base
Distribution automation; full knowledge of grid status down to LV-level

Smart Building in Smart Grid

Intelligent energy consumption


Energy supply-side management
Local energy generation
Energy storage
Interface to smart grid

2015-2020

EEG = Erneuerbare Energien Gesetz


Corporate Technology

Unrestricted Siemens AG 2014. All rights reserved

The vision: a sustainable future


The city: Vienna, 1.8 million people

The commitment: transformation into a smart city


Today Vienna is the city with the highest quality of living worldwide. This has been
stated by several international surveys, e.g. Mercer 2010 Quality of Living
Survey.
My clear goal now is to become the Greenest City in the world. Therefore we will
build Aspern - Viennas Urban Lakeside, one of the biggest city development
projects in Europe, as core part of our strategy.

Page 3

March 2014

Corporate Technology

Mayor Dr. Michael Hupl


started the Smart City
Wien in March 2011

Unrestricted Siemens AG 2014. All rights reserved

Creating a new city district in Vienna


Page 4

March 2014

Corporate Technology

Unrestricted Siemens AG 2014. All rights reserved

aspern Seestadt Wien: Viennas future smart city district

5329538228155018
One of the biggest Smart City
Projects in Europe

aspern Seestadt Wien addresses


the Megatrends urbanization and
climate change

Manifold utilization generates


economic impulse and provides
quality of life, ideal living lab

Apartments for 20.000 inhabitants and


20.000 work places until 2030

Future oriented concept including


technologies, products and solutions
for an energy efficient city district

New, multifunctional city district


including apartments, offices, business
and research quarters and a school
campus

Size: 240 Hectare

Page 5

March 2014

Corporate Technology

Unrestricted Siemens AG 2014. All rights reserved

aspern Seestadt Wien living lab offers a unique opportunity


to conduct research on a real site

Concrete steps towards Smart City


Development and implementation of systems in a real
city environment, hand-in-hand with an integrated
district planning (spatial planning, energy planning
and mobility planning)
Demonstration of the performance of these systems
Access to real data of customers, buildings and
networks
Direct feedback from citizens, building operators
and energy suppliers
Risk minimization during the development of
customer proximity and real environment
(reduced time-to-market)
Better use of the innovation potential through
participatory approach of all stakeholders

Page 6

March 2014

Corporate Technology

Unrestricted Siemens AG 2014. All rights reserved

Aspern Smart City Research structure

Siemens AG sterreich, in collaboration with


Headquarters (CT & IC)
Unique Know-how and access to international
expertise in the areas of energy (production
distribution, storage management), building
technologies (energy efficiency, management
systems, security), mobility, project management, IT
& Consulting

Wien Energie GmbH


The largest energy service company of Austria
Supply of 2 million people with electricity, gas,
district heating and telecom services

Wiener Netze GmbH


The largest distribution network operator in
Austria for electricity, gas and district heating

Wien 3420 Aspern Development AG


Owner of extensive properties and
project development in the Seestadt Aspern;
Local marketing and branding
Infrastructural development

Business Agency Wien

Project duration 1.10.2013 - 30.9.2018


Page 7

March 2014

Corporate Technology

Developing the business position of Vienna


First point of contact for national and international
companies

Unrestricted Siemens AG 2014. All rights reserved

Aspern Smart City Research program covers the urgent


R&D topics

Page 8

March 2014

Corporate Technology

Unrestricted Siemens AG 2014. All rights reserved

Aspern Smart City Research R&D focus areas


Security of supply
Energy must always be reliable
and affordable

Renewable Energy
Integration and management of
renewable energy sources to
reduce CO2 and increase energy
efficiency

Low voltage grid control


In the future, millions of small power
producers feed electricity into the grid. The
low voltage grid provides stability in the
network and balances production and
consumption.

Consumption Control
Demand Management;
Power consumption in real-time to
adapt to price fluctuations; Smart
meters

Energy storage
Efficiently use of Energy
Reducing energy consumption, intelligent control
and energy management of multimodal
distribution networks and building mgmt. will lead
to high savings

Page 9

March 2014

Corporate Technology

Since wind and solar energy supply


irregular, power storage and
management are necessary

Unrestricted Siemens AG 2014. All rights reserved

R&D programm aligned with customer needs


Three customer segments, their optimization demands, and their optimization levers

Energy Retailer
More profitable tariff models
energy load forecasts
optimization of tariff models
optimization of energy procurement

Facility Manager

LV Grid Operator

Cost-optimized, efficient energy supply


optimization of self-consumption
optimization of power (procurement) via
forecasts & management
participation in energy markets

City
Data
Center

Stable, efficient low-voltage grids


considering small investments
LV grid monitoring
LV grid control and management
optimized LV grid planning
Low-Voltage Grid

Building Automation
Meter

Page 10

March 2014

Corporate Technology

Unrestricted Siemens AG 2014. All rights reserved

Future facility manager tasks:


From building technician to building energy manager

Monitoring

Alarm handling

Simulation &
forecast

Facility Manager

Optimization

Buy/sell strategy

BEMS*
Schedule

Optimization
1

Optimization of self
consumption
Weather

Forecasting
2

Optimization of power
procurement
Price

Analysis
3

Participation in energy
markets

LV Info

Monitoring

* BEMS: Building Energy Management System


Page 11

March 2014

Corporate Technology

Unrestricted Siemens AG 2014. All rights reserved

Future world of LV Grid Operator:


From blind to optimized LV planning and operation
Monitoring

Alarm Handling

Plug &
Automate

Adaptive Grid
Control

LV Grid Operator
Augmented
Grid Planning

Advanced outage reporting 4


Integration of decentralized
1
LV grid management

Distributed LV
grid operation

Grid monitoring and alarm


handling

Page 12

March 2014

Corporate Technology

Strategic distribution grid


planning

Operational distribution
grid planning

Unrestricted Siemens AG 2014. All rights reserved

Future analytical applications needed by energy customers


Modeling New Rate Programs
Outage Analysis
Event Tracking and Trending
Load Profiling
Data Collection Analysis
Grid Loss
Detection of Energy Theft
Distribution Network Planning ..

Page 13

March 2014

Corporate Technology

Unrestricted Siemens AG 2014. All rights reserved

R&D program supported by Teradata


LINEAR SCALABILITY
Variable and undefined data sources as well as the effective amount of data are partially unknown at the beginning
of R&D program - DWH end users needs will be elaborated during the R&D program

LOGICAL DATA MODEL


Research derives from different starting points and will converge at a certain phase in the project.
The logical data model as blueprint for the DWH physical data model allows flexibility at the project set up even
considering unclear data sources and attributes at the beginning

In-Database features
Teradata database offers various capabilities needed in the research project such as temporal feature, several
aggregation and calculation features and In-Database statistics functionality with R

TERADATA LAB
Within the research program it was very important to provide the business owners a tool that allows easy
integration of new information to existing structures in order to evaluate the use of new data sources.
Page 14

March 2014

Corporate Technology

Unrestricted Siemens AG 2014. All rights reserved

aspern Seestadt Wien acts as a test lab for new developments

The infrastructure of the Seestadt Vienna is partially adapted to the


needs of research and development

The test lab offers the ideal conditions for participating in


demonstration and implementation projects in the framework of
national and international support

The proximity to customers and end users and the opportunity to


test developments on the target systems, can:

Development cycles are optimized

The economic benefits of the new solutions are evaluated

Tests are performed, whether the new products / solutions


(data center) can also be rolled out to existing infrastructure

Page 15

March 2014

Corporate Technology

Unrestricted Siemens AG 2014. All rights reserved

Page 16

March 2014

Corporate Technology

Unrestricted Siemens AG 2014. All rights reserved