You are on page 1of 82

BACK UP PERHITUNGAN PELAKSANAAN PEKERJAAN

KEGIATAN
:
PEKERJAAN
:
KONTRAKTOR
:
NILAI KONTRAK
:
VOLUME
:
TAHUN ANGGARAN :
NO
1

PENINGKATAN JALAN KARIMUNJAWA-KEMOJAN


PENINGKATAN JALAN KARIMUNJAWA-KEMOJAN
CV. AJI PERKASA ENGINEERING

2016

STA

SKET

0 s/d 50

4m

PERHITUNGAN
VOLUME
Patching : tb 4 cm

A
A=
B=

3 x
2 x

4m x
2m x

0.04 x 1.00 :
0.04 x 4.00 :

0.5 m3
0.6 m3

1.1
B
B

2 50 s/d 100

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

Lapis Perekat (1 m2 butuh 0,35 liter)


50 x 4.00 m x

0.35 x

+
m3

8.8 m3

70.0 ltr

0.04 x 1.00 :
0.04 x 5.00 :
0.04 x 2.00 :

0.1 m3
0.8 m3
0.1 m3

4m
Patching : tb 4 cm
C

3 x
2 x
1 x

1m x
2m x
1m x

1.0

B
B
3 100 s/d 150

A=
B=
C=

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

+
m3

8.8 m3

68.0 ltr

0.04 x 1.00 :
0.04 x 5.00 :
0.04 x 5.00 :

0.1 m3
0.8 m3
0.2 m3

4m
Patching : tb 4 cm
A

C
B

A=
B=
C=

3 x
2 x
1 x

1m x
2m x
1m x

1.1

C
Latasir tb 2 cm bj 2,2 t/m3
50 x 4.00 m x

0.02 x 2.20 :

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

+
m3

8.8 m3

68.0 ltr

4 150 s/d 200

4m
C

Patching : tb 4 cm

A=
B=
C=

4 x
2 x
2 x

0.5 m x
2m x
1m x

0.04 x 1.00 :
0.04 x 4.00 :
0.04 x 4.00 :

1.0

5 200 s/d 250

0.1 m3
0.6 m3
0.3 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

+
m3

8.8 m3

68.0 ltr

0.04 x 1.00 :
0.04 x 8.00 :

0.5 m3
0.6 m3

4m
Patching : tb 4 cm

B
B

A=
B=

3 x
2 x

4m x
1m x

1.1

B
B

6 250 s/d 300

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

+
m3

8.8 m3

68.0 ltr

0.04 x 1.00 :
0.04 x 5.00 :
0.04 x 2.00 :

0.1 m3
0.8 m3
0.1 m3

4m
Patching : tb 4 cm

A=
B=
C=

3 x
2 x
1 x

1m x
2m x
1m x

1.0

7 300 s/d 350

4m
C

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

+
m3

8.8 m3

68.0 ltr

0.04 x 1.00 :
0.04 x 4.00 :
0.04 x 2.00 :

0.1 m3
0.6 m3
0.2 m3

Patching : tb 4 cm
A=
B=
C=

4 x
2 x
2 x

0.5 m x
2.0 m x
1m x

0.9

8 350 s/d 400

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

+
m3

8.8 m3

68.0 ltr

0.04 x 1.00 :
0.04 x 4.00 :
0.04 x 3.00 :

0.5 m3
0.6 m3
0.5 m3

4m

Patching : tb 4 cm
A=
B=
C=

4 x
2 x
2 x

3m x
2.0 m x
2m x

C
C
1.6
B
C

B
9 400 s/d 450

4m

0.02 x 2.20 :

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

8.8 m3

68.0 ltr

0.04 x 1.00 :
0.04 x 4.00 :
0.04 x 3.00 :

0.4 m3
1.0 m3
0.2 m3

Patching : tb 4 cm
A=
B=
C=

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

+
m3

3 x
3 x
1 x

3m x
2.0 m x
1.5 m x

1.5

B
Latasir tb 2 cm bj 2,2 t/m3
50 x 4.00 m x

0.02 x 2.20 :

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

+
m3

8.8 m3

B
C
10 450 s/d 500

68.0 ltr

0.04 x 1.00 :
0.04 x 4.00 :
0.04 x 3.00 :

0.4 m3
1.0 m3
0.2 m3

4m
Patching : tb 4 cm

A=
B=
C=

2m x
2.0 m x
1m x

1.6

+
m3

Galian

5 x
3 x
2 x

50 x

0.25 m x

0.30 x 2.00 :

7.5 m3

50 x

0.25 m x

0.10 x 2.00 :

2.5 m3

Pasir Urug

11 500 s/d 550

4m

5.0 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.8 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

A=
B=
C=

68.0 ltr

2 x
2 x
3 x

1m x
2.0 m x
1m x

0.04 x 1.00 :
0.04 x 3.00 :
0.04 x 3.00 :

0.1 m3
0.5 m3
0.4 m3

0.9

+
m3

Galian

0.20 x 2.00 :

Patching : tb 4 cm

Pelebaran beton lebar 25 tb 20 cm


D=
50 x 0.25 m x

50 x

0.25 m x

0.30 x 2.00 :

7.5 m3

50 x

0.25 m x

0.10 x 2.00 :

2.5 m3

Pelebaran beton lebar 25 tb 20 cm


D=
50 x 0.25 m x

0.20 x 2.00 :

5.0 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.8 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

Pasir Urug
C`

12 550 s/d 600

4m
B

A=
B=
C=

68.0 ltr

0.04 x 1.00 :
0.04 x 3.00 :
0.04 x 3.00 :

0.2 m3
0.5 m3
0.7 m3

Patching : tb 4 cm

2 x
2 x
3 x

3m x
2.0 m x
2m x

1.4

+
m3

Galian
50 x

0.25 m x

0.30 x 2.00 :

7.5 m3

50 x

0.25 m x

0.10 x 2.00 :

2.5 m3

Pelebaran beton lebar 25 tb 20 cm


D=
50 x 0.25 m x

0.20 x 2.00 :

5.0 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.8 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

C
A

13 600 s/d 640

4m
B

Pasir Urug

Patching : tb 4 cm

68.0 ltr

A=
B=
C=

2 x
1 x
2 x

3m x
2.0 m x
2m x

0.04 x 1.00 :
0.04 x 3.00 :
0.04 x 3.00 :

0.2 m3
0.2 m3
0.5 m3

1.0

+
m3

Galian
40 x

0.25 m x

0.30 x 2.00 :

6.0 m3

40 x

0.25 m x

0.10 x 2.00 :

2.0 m3

Pelebaran beton lebar 25 tb 20 cm


D=
40 x 0.25 m x

0.20 x 2.00 :

4.0 m3

Latasir tb 2 cm bj 2,2 t/m3


40 x 4.00 m x

0.02 x 2.20 :

7.04 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


40 x 4.00 m x

0.34 x

54.4 ltr

C
Pasir Urug

14

0 s/d 50

4m

Patching : tb 4 cm
A=

x -

m x -

: -

15 50 s/d 100

4m

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.30 x

60.0 ltr

Patching : tb 4 cm
A=

x -

m x -

: -

16 100 s/d 150

4m

m3
+
m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.30 x

60.0 ltr

Patching : tb 4 cm
A=

x -

m x -

: -

17 150 s/d 200

m3
+
m3

m3
+
m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.30 x

60.0 ltr

0.04 x 1.00 :

0.2 m3

4m
Patching : tb 4 cm

B
C

A=

2 x

3m x

C
B=
C=

1 x
2 x

0.5 m x
1m x

0.04 x 4.00 :
0.04 x 2.00 :

0.5

0.1 m3
0.2 m3
+
m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 1.00 :
0.04 x 4.00 :
0.04 x 2.00 :

0.2 m3
0.1 m3
0.2 m3

B
B

18 200 s/d 250

4m
Patching : tb 4 cm

C
A=
B=
C=

2 x
1 x
2 x

3m x
0.5 m x
1m x

B
0.5

B
A

19 250 s/d 300

+
m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 1.00 :
0.04 x 4.00 :
0.04 x 2.00 :

0.2 m3
0.1 m3
0.2 m3

4m
Patching : tb 4 cm
A
A=
B=
C=

2 x
1 x
2 x

3m x
0.5 m x
1m x

B
0.5

B
20 300 s/d 350

+
m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 1.00 :
0.04 x 4.00 :
0.04 x 2.00 :

0.2 m3
0.1 m3
0.2 m3

4m
Patching : tb 4 cm
B

A=
B=
C=

2 x
1 x
2 x

3m x
0.5 m x
1m x

0.5
Latasir tb 2 cm bj 2,2 t/m3
50 x 4.00 m x

B
B
A

Lapis Perekat (1 m2 butuh 0,34 liter)

0.02 x 2.20 :

+
m3

8.80 m3

B
A

21 350 s/d 400

50 x

4.00 m x

2 x
1 x
2 x

3m x
0.5 m x
1m x

0.34 x

68.0 ltr

0.04 x 3.00 :
0.04 x 4.00 :
0.04 x 2.00 :

0.7 m3
0.1 m3
0.2 m3

4m
A

Patching : tb 4 cm

A=
B=
C=

C
C

B
A

22 400 s/d 450

4m
A

1.0
Latasir tb 2 cm bj 2,2 t/m3
50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 3.00 :
0.04 x 4.00 :
0.04 x 2.00 :

0.7 m3
0.1 m3
0.2 m3

Patching : tb 4 cm
A=
B=
C=

2 x
1 x
2 x

3m x
0.5 m x
1m x

C
A

1.0

23 450 s/d 500

4m

B
B

4m

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 3.00 :
0.04 x 4.00 :
0.04 x 2.00 :

0.7 m3
0.1 m3
0.2 m3

Patching : tb 4 cm
A=
B=
C=

2 x
1 x
2 x

3m x
0.5 m x
1m x

+
m3

24 450 s/d 500

+
m3

1.0

+
m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 3.00 :
0.04 x 4.00 :
0.04 x 2.00 :

0.7 m3
0.1 m3
0.2 m3

Patching : tb 4 cm
A=
B=
C=

2 x
1 x
2 x

3m x
0.5 m x
1m x

B
C
25

0 s/d 50

4m
C

B
C
26 50 s/d 100

3,8 m

B
C
27 100 s/d 150

3,6 m

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

2 x
3 x
3 x

3m x
0.5 m x
2m x

0.04 x 3.00 :
0.04 x 4.00 :
0.04 x 2.00 :

0.7 m3
0.2 m3
0.5 m3

0.2 x

50 m x

0.07 x 1.00 :

0.7 m3
2.1 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

1 x
3 x
2 x

4m x
0.5 m x
4m x

0.04 x 3.00 :
0.04 x 4.00 :
0.04 x 2.00 :

0.5 m3
0.2 m3
0.6 m3

0.2 x

50 m x

0.07 x 1.00 :

0.7 m3
2.1 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

Patching : tb 4 cm
1 x
3 x
2 x

4m x
0.5 m x
4m x

0.04 x 3.00 :
0.04 x 4.00 :
0.04 x 2.00 :

0.5 m3
0.2 m3
0.6 m3

0.4 x

50 m x

0.07 x 1.00 :

1.4 m3
2.8 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

8.80 m3

A=
B=
C=
Ris
D=

0.02 x 2.20 :

Patching : tb 4 cm

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

A=
B=
C=
Ris
D=

+
m3

Patching : tb 4 cm

1.0

A=
B=
C=
Ris
D=

28 150 s/d 200

3,4 m
Patching : tb 4 cm
A
A=
B=
C=
Ris
D=

B
D

1 x
1 x
1 x

3m x
0.5 m x
3m x

0.04 x 1.00 :
0.04 x 1.00 :
0.04 x 1.00 :

0.1 m3
0.0 m3
0.1 m3

0.3 x

50 m x

0.07 x 2.00 :

2.1 m3
2.4 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

29 200 s/d 250

3,4 m
Patching : tb 4 cm
A
A=
B=
C=
Ris
D=

B
D

1 x
1 x
1 x

3m x
0.5 m x
3m x

0.04 x 1.00 :
0.04 x 1.00 :
0.04 x 1.00 :

0.1 m3
0.0 m3
0.1 m3

0.3 x

50 m x

0.07 x 2.00 :

2.1 m3
2.4 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

30 250 s/d 300

3,6 m
Patching : tb 4 cm

A
2 x
1 x
2 x

2m x
2.0 m x
3m x

0.04 x 3.00 :
0.04 x 2.00 :
0.04 x 4.00 :

0.5 m3
0.2 m3
1.0 m3

0.2 x

30 m x

0.07 x 2.00 :

0.8 m3
2.4 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

A=
B=
C=
Ris
D=

B
C

C
D

D
B

31 300 s/d 350

B
3,6 m
Patching : tb 4 cm

A
C

A=
B=
C=
Ris
D=

B
C

B
A
D

2 x
1 x
2.1 x

2m x
2.0 m x
3m x

0.04 x 3.00 :
0.04 x 2.00 :
0.04 x 4.00 :

0.5 m3
0.2 m3
1.0 m3

0.2 x

30 m x

0.07 x 2.00 :

0.8 m3
2.5 m3

B
A
D

D
A

32 350 s/d 400

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

3,6 m

Patching : tb 4 cm
A=
B=
C=
Ris
D=

B
C

B
A
D

D
A

0.02 x 2.20 :

33 400 s/d 450

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

2 x
1 x
2.0 x

2m x
2.0 m x
3m x

0.04 x 3.00 :
0.04 x 2.00 :
0.04 x 4.00 :

0.5 m3
0.2 m3
1.0 m3

0.2 x

30 m x

0.07 x 2.00 :

0.8 m3
2.4 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 3.00 :
0.04 x 2.00 :
0.04 x 3.00 :

0.5 m3
0.3 m3
0.7 m3

B
4m
A

Patching : tb 4 cm
A=
B=
C=

2 x
2 x
2.0 x

2m x
2.0 m x
3m x

C
1.5
B

34 450 s/d 500

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 5.00 :
0.04 x 4.00 :
0.04 x 3.00 :

0.6 m3
0.2 m3
0.7 m3

B
4m

Patching : tb 4 cm
C

A
B
A

A=
B=
C=

1 x
0.5 x
2.0 x

3m x
2.0 m x
3m x

B
1.5

A
A

C
C
35 500 s/d 550

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

B
4m

m3

Patching : tb 4 cm

C
A=
B=
C=

A
B
A

1 x
0.5 x
2.0 x

3m x
2.0 m x
3m x

0.04 x 5.00 :
0.04 x 4.00 :
0.04 x 3.00 :

0.6 m3
0.2 m3
0.7 m3

B
1.5

A
B

A
C
C
36

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 2.00 :
0.04 x 2.00 :
0.04 x 3.00 :

0.2 m3
0.1 m3
0.7 m3

0 s/d 50

4m
A

Patching : tb 4 cm

A=
B=
C=

1 x
0.5 x
2.0 x

3m x
2.0 m x
3m x

1.0

A
B

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 2.00 :
0.04 x 2.00 :
0.04 x 3.00 :

0.2 m3
0.5 m3
0.2 m3

C
37 50 s/d 100

4m
A

A=
B=
C=

Patching : tb 4 cm
3 x
2 x
1.0 x

1m x
3.0 m x
2m x

A
1.0

C
C

38 100 s/d 150

4m
B

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 2.00 :
0.04 x 2.00 :
0.04 x 3.00 :

0.1 m3
0.2 m3
0.2 m3

Patching : tb 4 cm
A=
B=
C=

m3

1 x
2 x
1.0 x

1m x
1.0 m x
2m x

0.5

A
LPA 20 cm
D=
D

0.2 x

30 m x

4.00 x

m3

24.0 m3

39 150 s/d 200

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 2.00 :
0.04 x 2.00 :
0.04 x 3.00 :

0.2 m3
0.4 m3
0.4 m3

4m
A

Patching : tb 4 cm

A=
B=
C=

1 x
2 x
1.0 x

3m x
2.5 m x
3m x

1.0

40 200 s/d 250

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 2.00 :
0.04 x 2.00 :
0.04 x 3.00 :

0.3 m3
0.3 m3
0.4 m3

4m
Patching : tb 4 cm

A=
B=
C=

2 x
2 x
1.0 x

2m x
2.0 m x
3m x

A
1.0

41

0 s/d 50

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 5.00 :
0.04 x 4.00 :
0.04 x 4.00 :

0.2 m3
0.3 m3
0.5 m3

4m
B

Patching : tb 4 cm
A=
B=
C=

2 x
2 x
1.0 x

0.5 m x
1.0 m x
3m x

A
A
1.0

C
A

A
B
42 50 s/d 100

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

B
4m

m3

Patching : tb 4 cm

A=
B=
C=

2 x
2 x
1.0 x

0.5 m x
1.0 m x
3m x

0.04 x 5.00 :
0.04 x 4.00 :
0.04 x 4.00 :

0.2 m3
0.3 m3
0.5 m3

A
A
1.0

C
A

A
B
43 100 s/d 150

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 1.00 :
0.04 x 5.00 :
0.04 x 1.00 :

0.2 m3
0.4 m3
0.1 m3

B
4m
Patching : tb 4 cm

A=
B=
C=

2 x
2 x
1.0 x

2m x
1.0 m x
3m x

A
0.7

m3

B
B
C

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 1.00 :
0.04 x 4.00 :
0.04 x 4.00 :

0.2 m3
0.3 m3
0.5 m3

B
44 150 s/d 200

4m
Patching : tb 4 cm

A=
B=
C=

2 x
2 x
1.0 x

2m x
1.0 m x
3m x

A
1.0

B
45 200 s/d 250

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 1.00 :
0.04 x 4.00 :
0.04 x 4.00 :

0.2 m3
0.3 m3
0.5 m3

B
4m

Patching : tb 4 cm
C
C

A=
B=
C=

2 x
2 x
1.0 x

2m x
1.0 m x
3m x

A
B
B

1.0

C
C

LPA tebal 30 cm

m3

C
D=
D

46 250 s/d 280

0.3 x

4m x

50.00 x

60.0 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 2.00 :
0.04 x 1.00 :
0.04 x 2.00 :

0.3 m3
0.1 m3
0.2 m3

4m
A

C
C

Patching : tb 4 cm
A=
B=
C=

2 x
2 x
1.0 x

2m x
1.0 m x
3m x

A
0.6

m3

D
LPA tebal 30 cm
D=

47

0 s/d 50

25 m x

4.00 x

30.0 m3

Latasir tb 2 cm bj 2,2 t/m3


30 x 4.00 m x

0.02 x 2.20 :

5.28 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


30 x 4.00 m x

0.34 x

40.8 ltr

0.04 x 3.00 :
0.04 x 1.00 :
0.04 x 4.00 :

0.2 m3
0.1 m3
0.3 m3

4m
Patching : tb 4 cm

4m

A
C
C

1m x
1.0 m x
2m x

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 6.00 :
0.04 x 3.00 :
0.04 x 5.00 :

0.5 m3
0.2 m3
0.4 m3

Patching : tb 4 cm

2 x
2 x
1.0 x

0.6

A=
B=
C=

48 50 s/d 100

0.3 x

A=
B=
C=

2 x
2 x
1.0 x

1m x
1.0 m x
2m x

B
1.12

C
A

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

m3

8.80 m3

A
C

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 3.00 :
0.04 x 2.00 :
0.04 x 3.00 :

0.2 m3
0.1 m3
0.2 m3

A
49 100 s/d 150

4m
Patching : tb 4 cm
B

A
A

A=
B=
C=

2 x
1 x
1.0 x

1m x
1.0 m x
2m x

B
0.56

C
C
C

50 150 s/d 200

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 2.00 :
0.04 x 2.00 :
0.04 x 4.00 :

0.2 m3
0.2 m3
0.3 m3

4m
Patching : tb 4 cm
B
B

2 x
2 x
1.0 x

1m x
1.0 m x
2m x

0.64

A
C
C

51 200 s/d 250

A=
B=
C=

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 4.00 :
0.04 x 2.00 :
0.04 x 4.00 :

0.3 m3
0.2 m3
0.3 m3

4m
Patching : tb 4 cm
B
B

A=
B=
C=

2 x
2 x
1.0 x

1m x
1.0 m x
2m x

0.80

A
C
C

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 3.00 :
0.04 x 2.00 :
0.04 x 4.00 :

0.5 m3
0.2 m3
0.3 m3

A
52 250 s/d 300

4m
Patching : tb 4 cm
B
A

A=
B=
C=

4 x
3 x
1.0 x

1m x
1.0 m x
2m x

A
B

1.04

A
C

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 4.00 :
0.04 x 2.00 :
0.04 x 2.00 :

0.2 m3
0.2 m3
0.2 m3

C
53 300 s/d 350

4m
Patching : tb 4 cm
C

A
A

1 x
2 x
1.0 x

1m x
1.0 m x
2m x

54 350 s/d 400

A=
B=
C=

0.48

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 3.00 :
0.04 x 3.00 :
0.04 x 4.00 :

0.5 m3
0.2 m3
0.3 m3

4m
Patching : tb 4 cm
C

A=
B=
C=

4 x
2 x
1.0 x

1m x
1.0 m x
2m x

1.04

A
B

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 3.00 :
0.04 x 3.00 :
0.04 x 4.00 :

0.2 m3
0.2 m3
0.3 m3

C
55 400 s/d 450

4m

Patching : tb 4 cm
C

A
C
A
B

A=
B=
C=

2 x
2 x
1.0 x

1m x
1.0 m x
2m x

B
0.80

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

56 450 s/d 500

4m
Patching : tb 4 cm
C

B
C

A=
B=
C=

1.5 x
2.1 x
1.0 x

2m x
1.0 m x
2m x

0.04 x 4.00 :
0.04 x 3.00 :
0.04 x 4.00 :

0.5 m3
0.3 m3
0.3 m3

1.05

C
B

A
C

57 500 s/d 516

m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

0.04 x 4.00 :
0.04 x 4.00 :

0.2 m3
0.2 m3

4m
Patching : tb 4 cm
A
A

A=
B=

2.0 x
1 x

0.5 m x
1.0 m x

0.32

B
B

58

0 s/d 50

m3

Latasir tb 2 cm bj 2,2 t/m3


16 x 4.00 m x

0.02 x 2.20 :

2.82 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


16 x 4.00 m x

0.34 x

21.8 ltr

3,6 m
C

Patching : tb 4 cm

2 x
1 x
2 x

2m x
2.0 m x
3m x

0.04 x 3.00 :
0.04 x 2.00 :
0.04 x 4.00 :

0.5 m3
0.2 m3
1.0 m3

0.2 x

30 m x

0.07 x 1.00 :

0.4 m3
2.0 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

A=
B=
C=
Ris
D=

B
C

D
B

59 50 s/d 100

B
3,6 m
A

C
D

C
C

Patching : tb 4 cm
A=
B=
C=
Ris
D=

2 x
2 x
2 x

2m x
2.0 m x
3m x

0.04 x 3.00 :
0.04 x 2.00 :
0.04 x 4.00 :

0.5 m3
0.3 m3
1.0 m3

0.2 x

50 m x

0.07 x 1.00 :

0.7 m3
2.5 m3

C
D

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

B
60 100 s/d 150

3,6 m
Patching : tb 4 cm

A
C

A=
B=
C=
Ris
D=

2 x
2 x
2 x

2m x
2.0 m x
3m x

0.04 x 3.00 :
0.04 x 2.00 :
0.04 x 5.00 :

0.5 m3
0.3 m3
1.2 m3

0.2 x

30 m x

0.07 x 1.00 :

0.4 m3
2.4 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

D
B

C
61 150 s/d 200

3,6 m
C

A=
B=
C=
Ris
D=

Patching : tb 4 cm

B
A

2 x
2 x
2 x

2m x
2.0 m x
3m x

0.04 x 3.00 :
0.04 x 3.00 :
0.04 x 4.00 :

0.5 m3
0.5 m3
1.0 m3

0.4 x

30 m x

0.07 x 1.00 :

0.8 m3
2.8 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

B
62 200 s/d 250

3,6 m
C

Patching : tb 4 cm

A=
B=
C=
Ris
D=

2 x
2 x
2 x

2m x
2.0 m x
3m x

0.04 x 3.00 :
0.04 x 3.00 :
0.04 x 4.00 :

0.5 m3
0.5 m3
1.0 m3

0.2 x

30 m x

0.07 x 1.00 :

0.4 m3
2.3 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

D
B

A
B
63 250 s/d 300

3,6 m
B

Patching : tb 4 cm

B
A=
B=
C=
Ris
D=

2 x
2 x
2 x

2m x
2.0 m x
3m x

0.04 x 1.00 :
0.04 x 3.00 :
0.04 x 4.00 :

0.2 m3
0.5 m3
1.0 m3

0.2 x

50 m x

0.07 x 1.00 :

0.7 m3
2.3 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

D
B

B
C

64 200 s/d 350

3,6 m
Patching : tb 4 cm

A=
B=
C=
Ris
D=

1.5 x
2 x
2 x

2m x
2.0 m x
3m x

0.04 x 2.00 :
0.04 x 3.00 :
0.04 x 4.00 :

0.2 m3
0.5 m3
1.0 m3

0.3 x

50 m x

0.07 x 1.00 :

1.1 m3
2.7 m3

Latasir tb 2 cm bj 2,2 t/m3


50 x 4.00 m x

0.02 x 2.20 :

8.80 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


50 x 4.00 m x

0.34 x

68.0 ltr

D
B
C
A

65 350 s/d 380

3,6 m
Patching : tb 4 cm

A=
B=
C=
Ris
D=

1.5 x
1 x
2 x

2m x
2.0 m x
1m x

0.04 x 2.00 :
0.04 x 2.00 :
0.04 x 3.00 :

0.2 m3
0.2 m3
0.2 m3

0.2 x

50 m x

0.07 x 1.00 :

0.7 m3
1.3 m3

Latasir tb 2 cm bj 2,2 t/m3


30 x 4.00 m x

0.02 x 2.20 :

5.28 m3

Lapis Perekat (1 m2 butuh 0,34 liter)


30 x 4.00 m x

0.34 x

40.8 ltr

C
D
C

Total
Total
Total
Total
Total
Total
Total

Patching
Latasir
Lapis Perek
LPA
Galian
Urugan Pas
Beton K 30

Mengetahui

Menyetujui
CV.

Jepara, Juni 2016


Dibuat oleh
CV. Aji Perkasa Engineering

(Pengawas)

RJAAN

PATCH

LATASIR

PEREKAT

LPA

GALIAN

UR PASIR

BETON

m3

m3

ltr

m3

m3

m3

m3

KET
JL. A DAHLAN

1.1

8.8

70

1.0

8.8

68

1.1

8.8

68

1.0

8.8

68

1.1

8.8

68

1.0

8.8

68

0.9

8.8

68

1.6

8.8

68

1.5

8.8

68

1.6

7.5

2.5

5.0

8.8

68

0.9

7.5

2.5

5.0

8.8

68

1.4

7.5

2.5

5.0

8.8

68

1.0

4.0

7.04

54.4
JL. KI HAJAR
DEWANTORO

8.80

60

8.80

60

8.80

60

0.5

8.80

68

0.5

8.80

68

0.5

8.80

68

0.5

8.80

68

1.0

8.80

68

1.0

8.80

68

1.0

8.80

68

1.0

8.80

68

JL. DANANG JAYA

2.1

8.80

68

2.1

8.80

68

2.8

8.80

68

2.4

8.80

68

2.4

8.80

68

2.4

8.80

68

2.5

8.80

68

2.4

8.80

68

1.5

8.80

68

1.5

8.80

68

1.5

8.80

68

JL. PERINTIS

1.0

8.80

68

1.0

8.80

68

0.5

24.0

8.80

68

1.0

8.80

68

1.0

8.80

68

JL. PEMUDA

1.0

8.80

68

JL. PEMUDA

1.0

8.80

68

0.7

8.80

68

1.0

8.80

68

1.0

60.0

8.80

68

0.6

30.0

5.28

40.8
JL. SOEDIRMAN

0.6

8.80

68

1.1

8.80

68

0.6

8.80

68

0.6

8.80

68

0.8

8.80

68

1.0

8.80

68

0.5
8.80

68

1.0

8.80

68

0.8

8.80

68

1.1

8.80

68

0.3

2.82

21.76

JL. KAPURAN

2.0

8.80

68

2.5

8.80

68

2.4

8.80

68

2.8

8.80

68

2.3

8.80

68

2.3

8.80

68

2.7

8.80

68

1.3

5.28

40.8

81.17

eering

557.22
4283.8
114.00
28.5
9.5
19.0

BACK UP PERHITUNGAN PELAKSANAAN PEKERJAAN

JL. DANANG JAYA

JL. SOEDIRMAN

You might also like