You are on page 1of 4

HBJV

Demands

Bridge Checks
Bridge Type
Typical Span
Steel girder depth
Pier span length
No of Steel girders
average Steel girder area
Total steel girder area
Additional Steel allowance
Total Steel weight
Deck Width
Average Deck Thickness
Concrete Area
Diaphragm
Diaphragm weight
Dead Load
Carriageway Width
Surfacing Allowance
Surfacing UDL
Single Barrier UDL
No of Barriers
total Barrier UDL
Utilities
Utilities UDL

Pier Girder
Width
Depth
top flange
900
60
web
25
2630
bot flange
900
60
Length
18 m

Okahu Viaduct
55 m
2750 mm
18 m
4
113965 mm2
455859 mm2
15%
40 kN/m
24 m
300 mm
7.2 m2
0 m Width
0.0 kN
220.4 kN/m

1 m depth

SLS Demands

Span Girder
Width
Depth
600
30
16
2680
600
40
37 m

Area
18000
42880
24000
84880 mm2

22 m length

Dead load plus diaphragm

6060

12120

1276

2552

825

1650

160

319

Dead Load
SDL

6060
2261

12120
4521

UDL
HN

288.75
229

577.5
229

23.2 m
2 kPa
46.4 kN/m
15 kN/m
2
30 kN/m
0.25 kPa
5.8 kN/m

23.2
3
0.8
21.7

Area
54000
65750
54000
173750 mm2

Max Reaction at
Abutment
Pier

Live Load for one lane


Carriageway width
No of design lanes
Lane factor (ALF)
Lane position

N2U Bid

0.8
14.0

Lane width
7.733333
0.8
0
Total ALF
6.2
0.0
e
Live load UDL transverse moment
Live Load HN transverse moment

2.4
2.4 m
1640
1301

3280
1301

1.0DL+1.SLS+1.35LL
SLS axial load

9999

19255

SLS transverse overturning moment

3971

6185

ULS Axial load

14029

26821

ULS transverse overturning moment

6618

10308

TOTAL ULS Demand1.35DL+2.25LL (I=1)

TP file:///var/www/apps/conversion/tmp/scratch_6/339013234.xlsx
339013234.xlsx

12/03/2016

page1 of 4

HBJV

Span

N2U Bid

Pile Demands

55 m

Pier
Cross Beam Dimensions
Column Dimension
Pile Cap
Substructure Weight

Okahu Viaduct
No of

Width
1
1
1

Depth
2.1
1.8
5.8

Superstructure DL+SDL
Superstructure LL
Negative Skin Friction

Length / Height
2.5
6
2

19.4
17
13.8

Weight
2546 kN
4590 kN
4002 kN
11138 kN

SLS
NSF
total Working Load
Live load transverse SLS moment
max pile SLS Demand

16641 kN
2613 kN
kN
30393 kN
6185 kNm
4031 kN

Substructure; 1.35DL
Superstructure ULS (DL+LL)
1.2Creep & Shrinkage
Negative Skin Friction (1.5xNSF)
Total ULS Demand
Live load transverse ULS moment
No of Piles
Max ULS Pile Demand

15037 kN
26821 kN
0 kN
0 kN
41858 kN
10308 kNm
8
5619 kN

ULS Check

Foundation Material

low to medium
ULS

Pile Diameter
End Bearing Geotech ULS
strength reduction factor
skin friction
skin friction length
strength reduction factor

0.9 m
15 Mpa
0.6
800 kpa
4m
0.6
ULS

ULS Pile Capacity

end bearing
skin friction
Total ULS Pile Capacity Nb
Demand

5726 kN
5429 kN
11154 kN
5619 kN

Working
0.9
3 Mpa
1
300 kpa
4
1
Working
1909
3393
Working Capacity
5301 kN
Demand
4031 kN

OK
TP file:///var/www/apps/conversion/tmp/scratch_6/339013234.xlsx
339013234.xlsx

Pile Demands

page 2 of 4
12/03/2016

Pile Coordinate
No of Piles
One or two pile rows
Max pile in one row
Axial Load
Moment in x direction
Moment in y Direction

Pier 1

Pile Spacing x direction


Pile Spacing y direction

Pile

x
1
2
3
4
5
6
7
8
0
0
0
0
0
0
0
0
0
0
0
0

xave axis
yave axis

Pile spacing

4m

Eccentric Loading
c & S + EQ/T

0m
0m

x-xave

y
0
4
8
12
0
4
8
12
0
0
0
0
0

0
0
0
0
4
4
4
4
0
0
0
0
0

(x-xave)2

-6.00
-2.00
2.00
6.00
-6.00
-2.00
2.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0

y-yave

36.00
4.00
4.00
36.00
36.00
4.00
4.00
36.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0

Pile Demands
Axial
Mx axial My axial Total
-2.00
4.00
5232
-387
0
-2.00
4.00
5232
-129
0
-2.00
4.00
5232
129
0
-2.00
4.00
5232
387
0
2
4
5232
-387
0
2
4
5232
-129
0
2
4
5232
129
0
2
4
5232
387
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
(y-yave)2

160.00

6.00
2.00

4.5

ULS Demands

Okahu Viaduct

8
1 (1 or 2)
8
41858 kN
10308 kNm
0 kNm

32.00

4846
5103
5361
5619
4846
5103
5361
5619
0
0
0
0
0
0
0
0
0
0
0
0

41858

PILE SPACING

Max Pile Load


Min Pile Load

3.5

5619 kN
0 kN

3
2.5
2
1.5
1
0.5
0
0

10

12

file:///var/www/apps/conversion/tmp/scratch_6/339013234.xlsx
ULS pile loads
339013234.xlsx

14

12/03/2016

Pile Coordinate
No of Piles

Pier 1

Axial Load
Moment in x direction
Moment in y Direction

30393 kN
6185 kNm
0 kNm

Pile Spacing x direction


Pile Spacing y direction

8.4 m
8.5 m

Pile

x
1
2
3
4
5
6
7
8
0
0
0
0
0
0
0
0
0
0
0
0

xave axis
yave axis

SLS Demands

Okahu Viaduct

x-xave

y
0
4
8
12
0
4
8
12
0
0
0
0
0
0
0

6.00
2.00

0
0
0
0
4
4
4
4
0
0
0
0
0
0
0

Eccentric Loading
c & S + EQ/T

(x-xave)2

-6.00
-2.00
2.00
6.00
-6
-2
2
6
0
0
0
0
0
0
0
0
0
0
0
0

36.00
4.00
4.00
36.00
36
4
4
36
0
0
0
0
0
0
0
0
0
0
0
0
160.00

y-yave

Pile Demands
(y-yave)2
Axial
-2.00
4.00
-2.00
4.00
-2.00
4.00
-2.00
4.00
2
4
2
4
2
4
2
4
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
32.00

3799
3799
3799
3799
3799
3799
3799
3799
0
0
0
0
0
0
0
0
0
0
0
0

Mx axial
My axial
Total
-232
0
-77
0
77
0
232
0
-232
0
-77
0
77
0
232
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Max Pile Load


Min Pile Load

4031 kN
0 kN

3567
3722
3876
4031
3567
3722
3876
4031
0
0
0
0
0
0
0
0
0
0
0
0
30393