Professional Documents
Culture Documents
DATE:
RIG:
FOREMAN:
WELL NAME:
OPERATION:
PERSONNEL CERTIFICATIONS:
Enter "T" if date entered indicates date training was taken.
Enter "E" if date entered indicates date training expires.
POSITION
Foreman
NAME
BADGE #
BOP
FIRST AID
H2S
OTHER
NAME
BADGE #
SAG
Cert #
Cert Expiry
OTHER
Foreman
Toolpusher
Toolpusher
Driller
Driller
POSITION
Crane Op
Crane Op
Forklift Op
Forklift Op
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
Page 1
1-1
NO N/A
1-2
1-3
1-4
1-5
1-6
1-7
1-8
1-9
2-1
YES
2-8
condition
2-9
2-10
2-11
2-12
2-13
2-14
2-15
2-17
2-18
2-16
2-19
2-20
NO N/A
2-2
NO N/A
2-3
3. SCR ROOM
YES
2-4
2-5
2-6
2-7
3-1
NO N/A
3-2
3-3
COMMENTS:
COMMENTS:
Page 2
YES
5-6
4. ACCUMULATOR
YES
4-1
4-2
discharge
NO N/A
5-8
5-9
5-10
5-11
5-12
4-3
No leaks in system
4-4
4-5
4-6
4-7
NO N/A
Date of
last test:__________________
4-8
4-9
5-13
5-14
5-15
5-16
5. MUD PUMPS
YES
NO N/A
5-1
5-2
5-3
5-4
debris
5-17
5-18
5-5
COMMENTS:
COMMENTS:
Page 3
YES
6. MUD TANKS
YES
6-1
NO N/A
6-16
falling
guarded
6-2
NO N/A
6-17
operable
6-3
6-4
6-18
6-19
surfaces
6-5
7. SUB-STRUCTURE
YES
NO N/A
7-1
7-2
6-8
7-3
6-9
6-10
6-6
6-7
(MSDS) available
6-11
condition
7-4
7-5
7-6
6-12
6-13
6-14
6-15
7-7
7-88
7-9
7-10
7-11
COMMENTS:
accumulator lines
COMMENTS:
Page 4
YES
7-12
8. RIG FLOOR
YES
8-1
YES
NO N/A
NO N/A
8-15
8-16
8-17
8-2
NO N/A
8-14
8-18
8-19
8-20
8-21
8-22
8-23
8-8
8-24
8-9
8-25
8-26
8-27
8-3
8-4
8-5
Handrails in place
8-6
8-7
clean
8-10
8-11
8-12
8-28
8-13
COMMENTS:
COMMENTS:
Page 5
YES
8-30
8-31
8-32
8-33
8-34
8-35
YES
NO N/A
8-29
8-44
NO N/A
8-45
8-46
8-47
8-36
8-37
8-38
8-49
properly spaced
8-39
9. DOGHOUSE
YES
9-1
8-40
8-42
8-43
9-2
9-3
9-4
8-41
NO N/A
.
9-5
.
9-6
COMMENTS:
COMMENTS:
Page 6
YES
9-7
NO N/A
10. DERRICK
9-8
9-9
YES
10-1
10-2
10-3
[location:_______________]
9-11
blankets
9-12
10-4
10-5
material
9-13
9-10
NO N/A
board:________________
9-14
10-6
10-7
10-8
10-9
10-10
9-15
9-16
9-17
9-18
9-19
10-11
10-12
COMMENTS:
COMMENTS:
Page 7
YES
NO N/A
YES
10-29
10-14
10-30
10-15
10-13
10-31
10-33
10-19
10-20
10-18
10-17
10-16
NO N/A
10-34
10-21
10-22
10-23
NO N/A
11-1
11-2
11-3
10-24
11-4
10-25
Easily accessible
11-5
10-26
Inspected weekly
10-27
10-28
to catwalk
11-6
11-7
mm) diameter
COMMENTS:
COMMENTS:
Page 8
YES
11-8
NO N/A
11-9
YES
12-1
NO N/A
11-10
12-2
12-3
12-4
11-11
11-12
closed position
12-5
12-6
12-7
11-14
11-15
12-9
11-16
11-17
11-18
12-8
12-10
12-11
12-12
12-13
12-14
COMMENTS:
COMMENTS:
Page 9
13-1
NO N/A
13-2
15-4
15-5
13-4
NO N/A
13-3
YES
15-3
14-1
16-1
14-4
Readily accessible
Locations identified
Inspected weekly
14-5
14-6
14-3
NO N/A
14-2
NO N/A
16-2
16-3
16-4
14-7
Bench grinders:
14-8
16-5
monthly
16-6
NO N/A
15-1
16-7
15-2
16-8
upright
COMMENTS:
COMMENTS:
Page 10
YES
Note:
NO N/A
17-2
NO N/A
18-1
17-3
17-4
Crane 1
Crane #: ________________
Certificate
Expiry: ________________
17-7
18-4
18-5
18-6
17-9
17-10
YES
19-2
19-3
17-12
NO N/A
19-1
17-11
19. GENERAL
________________
18-3
1 1/2 turns
17-8
________________
cutting, or grinding
17-6
Crane 2
18-2
17-5
Crane Inspection
Certificate
COMMENTS:
COMMENTS:
Page 11
YES
19-4
NO N/A
19-5
19-6
19-7
YES
20-1
shift
19-8
NO N/A
19-9
19-10
19-11
19-12
Drill procedure
20-2
20-3
for 50 ppm
Note: All ED&M reports will always
recommend Drilling change their policy to 10
& 20 ppm, in line with general industry
practice.
19-13
19-14
19-15
19-16
COMMENTS:
20.4
20-5
COMMENTS:
Page 12
YES
NO N/A
YES
NO N/A
20-6
20-15
20 -7
20-16
20-17
20-8
the location
returns
20-9
20-10
20-18
20-19
20-20
20-11
20-12
20-21
ropes
20-22
20-23
20-24
20-13
6 on rig floor
2 at shale shaker
2 at mud mixing area
1 at choke manifold
1 in monkey board
SCBA located as follows
20.14
COMMENTS:
packs
20-25
20-26
2 in toolpusher's office
2 in Aramco representative's office
2 in mud logging unit
1 in SCR room
3 on rig floor
COMMENTS:
Page 13