METHOD STATEMENT

FOR
WIRING DEVICES SECOND FIX INSTALLATION &
WIRING TERMINATION

KING ABDULLAH FINANCIAL DISTRICT


Parcel 5.07 & 5.08

AL FANAR CO-MEP

TABLE OF CONTENTS

TABLE OF CONTENTS
1.

PANELBOARD INSTALLATION....................................................................................................1
1.1.
1.2.
1.3.
1.4.
1.5.
1.6.

Materials to be used......................................................................................................2
socket outlet &accessories.......................................................................................2&3
equipment & tools to be used--------------------------------------------------------------------------------

Site preparation............................................................................................................. 4
Installation and termination...........................................................................................4
inspection and testing..............................................................................................4&5

METHOD STATEMENT

AL FANAR CO-MEP

WIRING DEVICES SECOND FIX INSTALLATION &


WIRING TERMINATION

AL FANAR CO-MEP

1.1 Materials to be used.

All switchs to be installed, shall be as per approved specification and


approved material submittal. For basements IP protection is IP 56.

Lighting switchs
N.o
1.

Description
220v,20A ONE WAY ONE GANG.

(Installed in super structure and

substructure)

2.
3.

220v,20A ONE WAY ONE GANG. W/P (installed in substructure)


220v,20A ONE WAY TWO GANG. (Installed in super structure and

substructure)

220v,20A ONE WAY TWO GANG W/P. (Installed in super structure and

4.

substructure)

5.

220v,20A ONE WAY THREE GANG. (Installed in super structure and

substructure)

6.

220v,20A ONE WAY FOUR GANG. (Installed in super structure and

substructure)

7.

220v,20A TWO WAY ONE GANG. (Installed in super structure and

substructure)

220v,20A TWO WAY ONE GANG W/P. (Installed in super structure

and substructure)

9.

220v,20A TWO WAY TWO GANG. (Installed in super structure and

substructure)

10.

220v,20A TWO WAY TWO GANG. W/P (Installed in super structure

and substructure)

11.

220v,20A THREE WAY (INTERMEDIATE). (Installed in super

structure)

12.
EXPLOSION PROOF. (Disel tank room)
1.2 SOCKET OUTLETS & ACCESSARIES:All sockets to be installed, shall be as per approved specification and
approved material submittal. For basements IP protection is IP
56.Rating of all isolators shall be as per approved drawing.

AL FANAR CO-MEP
N.o
Description
1. 220v, 13A single switched socket outlet. (Installed in super structure and
substructure)

2.

220v, 13A twin switched socket outlet. (Installed in super structure


and Mezzanine)

3.

220v,13A switched fused spur unit with indicator

(installed in

substructure )

4.
5.

Same but with GFCI. (installed in substructure )


220v ,13A signal switched weather proof socket outlet. (installed in
substructure )

6.
7.

220v, outlet for CCTV. (Installed in super structure and Mezzanine)


3 Phase 4 pole ,fused type isolator (Installed in super structure)
(TOWER A&C )

8.

220v single phase Double pole isolator with indicator lamp for
FCU,IP65.
(Installed in super structure and substructure)

9.

220v ,Single phase double pole isolator(Rating as indicated).


(Installed in super structure )

10.
11.

380v three phase four pole isolator (Rating as indicated).


380v Three phase four pole isolator (Rating as

indicated)IP65(Roof)
12. 220v Flex outlet for water heater.

(Installed in super structure and

substructure)

13. 220v 20A Double pole switched with indicator for water heater.
(Installed in bath rooms -super structure and substructure)

14. 220v ,13A Single switched socket outlet connect to UPS.


(Installed in Elect.rooms low current room -super structure and substructure)

15. 220v, 13A two gang switched outlet connected to UPS.

(Installed in Elect.rooms low current room -super structure and substructure)

1.3 EQUIPMENT &TOOLS TO BE USED.


a) Screw driver.
b) Side cutter.
c) Plaier.
d) Level.
e) Digital Multi meter.
1.4 SITE PREPARATION.

AL FANAR CO-MEP
i. All wiring devices shall be installed as per approved shop
drawing and approved material submittal.
ii. Wiring is completed as per approved drawing.
iii. All wiring devices are free from any damage.
iv. Location of wiring device as per approved drawing.
1.5 INSTALLATION AND TERMINATION:
Installation of all wiring devices shall be refered to KAFD-J09-4421010/KAFD-J09-152-0909 memo.

i. On the already installed back boxes in plastered block walls for

lighting switches are mounted at the height of 1200mm .


ii. Power ,tel &Tv outlet at 300mm
iii. Other outlets in wet area are mounted at height of 1200mm as
given in respective ceramic details drawing from finished floor
level.
iv. Telephone outlet height in services room is 1600mm from FFL.
v. Before proceeding to install the outlet device ,the back boxes
cleaned,surface around the boxes will be repaired and made
flush with the finished wall surfaces.
vi. Terminating the phase ,neutral the earth wire of internal device
terminal blocks.
vii. Using sprit level and manufacturer provided screw ,outlets front
plates are fixed parallel and perpendicular to floor and wall
surface respectively.
1.6 INSPECTION AND TESTING:
i. All wiring devices are fixed as per the location mentioned in the
drawing.
ii. All wiring is done properly.
iii. Wiring device fixed in level.
iv. Outlet devices are tested for voltage.
END