Professional Documents
Culture Documents
1 of 23
2 of 23
3 of 23
TILTING STERILIZER
BESTEEL Berhad (111216-X)
Easy and safe to operate & needs little training for the
operators and engineers
4 of 23
5 of 23
a..\
..\..\
..\ ..
\S\c.ppt
a....\\....\\....\\S\p.ppt
...\
..\..\
..\..\
..\S\idx.ppt
a..\
..\ ..
..\\..
..\\S\m.pp
t
w..
..\\ ..
..\\ ..
..\\S\w.
pdf
6 of 23
a..\
..\ ..
..\\..
..\\S\3.
Ppt
Tilting Sterilizer
Horizontal Sterilizer
No. of Peak
Cycle Time
72 to 83 mins
Average 1.07%
23 to 27 t/h
11 t/h
<1 %
<2 %
Operation Flexibility
1 to 3 peaks
2 to 3 peaks
Steam Consumption
Minimal
Less
More
18
32
Unstripped Bunch
Heat Loss
Number of Equipment
Number of Operator per
shift (60 t/h mill)
7 of 23
Tilting Sterilizer
Cost of Investment
Horizontal Sterilizer
8 of 23
Cycle Time
Unstripped Bunch
Oil Loss in EFB
Maintenance
Requirement
Cost of Operation
General Operation &
Working Environment
Tilting Sterilizer
Vertical Sterilizer
72 to 83 mins
<1 %
<3 % *
Average 1.07%
Low
Simple to operate
* Based on technical specification issued by other for Air Tawar POM, Kota Tinggi
9 of 23
Time
(min.)
Deaeration
1st Peak
5.5
2nd Peak
Holding
36.5
Exhaust/Purging/Drain
50
FFB Filling
15 to 18
Discharge SFB
7 to 15
72 to 83
Size 30T
30
23 to 27
7200
3200
64
1500/1700
JIS SS 400
3.5
150
Yes
Yes
Optional
Optional
Tilting
Yes
DESCRIPTION
Holding Capacity t (tonne)
Size 30T
30
72 to 83
15 to 18
50
7 to 15
Average 1.07%
<1
170-200
DOBI
>2.73
12 of 23
Mar-10
Loss(%)
1.88
NA
NA
1.01
NA
0.86
5.21
1.86
NA
2.01
2.49
NA
0.58
0.62
1.12
NA
1.00
NA
NA
NA
1.25
NA
0.49
1.05
0.82
NA
0.51
1.11
1.01
1.08
1.03
5.21
0.49
1.35
Apr-10
Loss(%)
NA
NA
NA
0.44
NA
0.70
NA
0.56
NA
1.19
0.63
NA
1.62
1.68
1.78
NA
0.69
NA
1.13
NA
1.14
1.06
NA
0.86
0.55
0.66
1.82
NA
0.58
NA
NA
1.82
0.44
1.01
May-10
Loss(%)
NA
NA
0.83
1.79
NA
0.92
NA
NA
0.31
0.82
NA
0.46
0.62
NA
0.81
NA
1.10
NA
0.58
0.32
NA
0.81
0.66
NA
0.56
1.24
0.37
NA
1.09
NA
0.94
1.79
0.31
0.79
Jun-10
Loss(%)
NA
NA
0.55
NA
NA
NA
1.61
0.85
0.72
0.72
NA
0.82
1.01
1.43
NA
NA
1.25
NA
0.91
NA
1.20
NA
1.09
0.72
NA
0.93
0.62
0.94
0.60
NA
NA
1.61
0.55
0.94
Jul-10
Loss(%)
0.63
NA
1.07
NA
0.89
0.99
0.90
1.18
NA
NA
NA
NA
NA
1.23
0.82
NA
2.19
1.13
1.25
0.59
0.75
0.81
NA
NA
0.90
1.90
0.89
2.68
1.38
NA
1.41
2.68
0.59
1.18
13 of 23
Aug-10
Loss(%)
0.51
0.85
NA
1.82
0.87
NA
1.10
0.58
1.10
1.00
0.76
NA
NA
0.92
1.48
1.34
1.05
0.90
0.97
NA
1.15
1.20
1.53
NA
1.31
1.38
NA
1.10
0.83
0.81
NA
1.82
0.51
1.07
Sep-10
Loss(%)
NA
1.15
NA
0.84
1.18
1.38
2.70
NA
NA
NA
NA
NA
NA
0.54
0.75
NA
NA
1.28
0.85
0.83
NA
0.77
0.75
NA
1.64
0.50
1.08
NA
1.05
1.23
NA
2.70
0.50
1.09
Oct-10
Loss(%)
NA
1.49
0.53
1.65
2.17
1.95
0.64
NA
0.78
0.89
0.75
1.31
0.64
1.93
NA
1.17
0.72
0.93
0.75
1.22
1.08
1.05
NA
NA
1.70
0.76
0.78
1.17
NA
1.14
1.38
2.17
0.53
1.14
Year Average
1.07%
Date
Capacity
Tons
FFB/Day
Steam
Usage
kg/Ton FFB
Electricity
Usage kW/Ton
FFB 2
Steam
Pressure
barg
% Oil (wet)
in Fruit
Fibre
% Oil (wet)
in EFB
% Oil (wet) in
1/7/10
2/7/10
3/7/10
4/7/10
5/7/10
6/7/10
7/7/10
8/7/10
10/7/10
11/7/10
12/7/10
Average
1284
1323
1264
1276
1382
1411
1178
1200
1424
1395
1486
1329
180
180
no data
no data
no data
170
200
190
no data
200
200
187
1.59
1.56
no data
no data
no data
1.47
1.76
1.66
no data
1.50
1.58
1.59
2.90
2.90
2.90
2.90
2.80
2.90
2.70
2.60
2.30
2.40
2.30
2.69
4.10
4.67
4.07
3.96
3.83
4.60
4.69
3.67
4.49
4.11
3.82
4.18
2.00
2.45
1.70
1.89
3.50
1.68
1.66
1.93
1.62
1.52
1.78
1.98
1.12
1.26
0.88
1.02
0.58
0.85
1.45
0.91
0.99
1.57
1.77
1.13
1 at decanter outlet
2 Sterilization station and loading ramp areas
Steam flow measured using vortex flow meter
FFB are sourced from third party plantations
14 of 23
Wastewater1
% USB
<1%
<1%
<1%
<1%
<1%
<1%
<1%
<1%
<1%
<1%
<1%
<1%
Client
Tee Teh Palm
Oil Mill
PT Pinago
Utama
Berkat Setia
Sdn Bhd
Berkat Setia
Sdn Bhd
Unit x FFB
Capacity/h
3 x 30 tones
2 x 20 tones
2 x 30 tones
2 x 30 tones
CPI
4 x 30 tones
CPI
1 x 30 tones
Felcra
3 x 20 tones
Chumpron SP
Palm Oil Ltd
Saraw ak OIL
Palms Bhd
Ladang
Langkap
Private mill
Status
Remarks
Operation since
Sept. 2009
Operation since
July 2009
Replacement of
horizontal sterilizers
Add-on to existing
horizontal sterilizers
Phase 1 replacement of
Installation
horizontal sterilizers
Phase 2 replacement of
Construction
horizontal sterilizers
Operation since Replacement of
March 2010
horizontal sterilizers
Final
Second phase upgrading
Negotiation
Change from using
Installation
vertical sterilizers
4 x 30 tones
Construction
New Mill
4 x 30 tones
Construction
New Mill
4 x 30 tones
Engineering
Mill upgrading
Engineering
New Mill
2 x 30 tones
15 of 23
Location
Client
Unit x FFB
Capacity/h
Status
Remarks
Papua New
Guinea
Perak,
Malaysia
Kalimantan,
Indonesia
Indonesia
Client
3 x 30 tones
Final Negotiation
New Mill
Private mill
10 x 30 tones
Negotiation
Indonesia
Client
2 x 30 tones
New Mill
16 of 23
Tilting
Sterilizers
Loading Ramp
Loading
Ramp
Existing
Horizontal
Sterilizers
Tilting
Sterilizers
18 of 23
Tilting
Sterilizers
Loading Ramp
19 of 23
20 of 23
Existing
Horizontal
Sterilizers
21 of 23
Thank You
Thank
You
23 of 23