PCM-DIR

Daily Inspection Report


RFS #:

11-5719-CM

Issued

Section

Form #

Rev.

PCM

PCM-CA-2Issue 1

Nov-06

Project Title : Al-Huwailah Link Road P0021

Contractor: Bin Omran Trading Company (BOTC)


Weather :

Sunny

TEMP:

30C

HUMIDITY:

Work Location, Description and Stage of Work Inspected:

Site Area
1. Q-Tel
Ch.7+000 to Ch.8+200 @ Alignment A (LHS) line

:Laying of pipe completed.

Ch.8+330 to 9+100 @ Alignment A (LHS) line

: Backfilling works on progress.

Ch.8+220 to ch.8+320 @ Alignment A (LHS) line

: Backfilling works on progress.

Ch.0+685 to 6+700 @ Alignment A (LHS) line

:Laying of pipe completed.

Ch.4+600-5+400 @ Alignment A junction-2 duct crossing

: Backfilling works on progress.

Alignment A junction-8 duct crossing RHS

: Backfilling works completed.

Ch.0+682 @ Alignment A RHS/LHS ext. duct crossing

: Backfilling works on progress.

Ch.9+132 @ Alignment A RHS duct crossing

: Backfilling works on progress.

junction-10 @ Alignment A LHS/RHS duct crossing

: Backfilling works on progress.

2. QAF
Ch.8+300 to Ch.9+100 @ Alignment A (LHS) line

: Backfilling works on progress.

Ch.6+800 to Ch.7+900 @ Alignment A (LHS) line

: Excavation work completed.

JRC-12 no.1,7,9,11,13

:No activity.

Alignment A junction-8 duct crossing RHS

: Backfilling works completed.

Ch.9+126 @ Alignment A RHS/LHS duct crossing

: Backfilling works on progress.

Ch.0+675 @ Alignment A RHS/LHS ext. duct crossing

: Backfilling works on progress.

3. Culvert
Ch.1+832 @ Alignment A (RHS)

:No activity.

Ch..3+345 @ Alignment A (RHS)

:No activity.

Ch..8+746 @ Alignment A (LHS/RHS)

: Backfilling works completed.

4. Type E Duct Crossing


ch.12+072 duct crossing RHS/LHS

:Laying of pipes on progress.

type E-69,70 duct crossing junction-6

:Laying of pipes on progress.

type E-junction-10 duct crossing

:Laying of pipes on progress.

Ch.3+120 @ Alignment A (RHS ) duct crossing ext.

: Backfilling works on progress.

Ch.9+223 @ Alignment A (RHS ) duct crossing ext.

:Laying of pipes on progress.

5. Type H Duct Crossing


ch.12+069 duct crossing RHS/LHS

:Laying of pipes on progress.

Type H-50 @ Alignment A duct crossing junction-5

: Backfilling works on progress.

Type H-77,78 @ Alignment A duct crossing RHS junction-8

: Backfilling works completed.

ch.3+117 @ Alignment A duct crossing RHS ext.

: Backfilling works on progress.

ch.9+225 @ Alignment A duct crossing RHS ext.

:Laying of pipes on progress.

6.Traffic signal
9+300 LHS @ Alignment A (RHS)
9+246 LHS/RHS @ Alignment A (RHS)

: Backfilling works completed.


:Laying of pipes on progress.

junction-3 traffic signal chambers

:Casting of wall concrete completed

junction-4 traffic signal chambers

:Casting of wall concrete completed

junction-5 traffic signal

:Laying of pipes on progress.

PCM-DIR

Daily Inspection Report

Issued

Section

Form #

Rev.

PCM

PCM-CA-2Issue 1

Nov-06

Site Area
7. EN6 Duct Crossing
junction-6 EN6 249,250,248,255 @ Alignment A duct crossing

: Backfilling works on progress.

Ch.11+950,11+948 @ Alignment A (RHS) duct crossing

: Backfilling works on progress.

Ch.9+100 @ Alignment A (RHS) duct crossing

: Backfilling works on progress.

Ch.0+026 @ Alignment A (RHS/LHS) duct crossing ext.

: Backfilling works on progress.

Ch.3+000,3+115 @ Alignment A (RHS) duct crossing ext.

: Backfilling works on progress.

Ch.9+470,9+570,9+670 @ Alignment A (RHS).duct crossing

: Backfilling works on progress.

junction-2 EN6 49,53 @ Alignment A duct crossing

: Backfilling works on progress.

junction-5 EN6 210,211 @ Alignment A slip road duct crossing

: Backfilling works on progress.

Ch.9+228 @Alignment A duct crossing RHS

:Laying of pipes completed.

junction-5 EN6 214,215 @ Alignment A duct crossing

: Backfilling works on progress.

junction-8 EN6 294,295 @ Alignment A duct crossing

: Backfilling works on progress.

8.TSE
Ch.12+102 @ Alignment A (RHS/LHS) duct crossing

:Laying of pipes on progress.

Ch.9+367 @ Alignment A (LHS) junction-6 duct crossing

: Backfilling works on progress.

Ch.0+685 @ Alignment A (LHS)/(RHS) EXT.duct crossing

: Backfilling works on progress.

Ch.8+780 to ch.8+860 @ Alignment A (RHS) mainline

:Laying of aggregate bedding on progress

Ch.3+950 to onwards @ Alignment A (RHS) mainline

:Laying of hdpe pipe on progress.

Ch.10+700 to 11+300 @ Alignment A (RHS) mainline

: Backfilling works completed.

Ch 1+600 to 2+700 RHS @ Alignment A


Ch.2+700 to 3+000 @ Alignment A (RHS) main line
Ch.9+100 to ch.10+625 @ Alignment A (RHS) mainline
Ch.4+000 to onwards @ Alignment A (RHS) mainline
Ch 2+000 to 2+500 RHS @ Alignment A
DC-53,32 @ Alignment A median
DC-chambers @ Alignment A

: Backfilling works on progress.


:Laying of aggregate surround completed
: Backfilling works on progress.
:Laying of aggregate bedding on progress
: Backfilling works on progress.
:Casting of wall concrete completed
:Casting of blinding on progress.

9.Street light
ch.12+154 RHS/LHS @ Alignment A duct crossing

:Laying of pipes on progress.

ch.9+242 RHS/LHS @ Alignment A duct crossing

:Laying of pipes on progress.

junction-2 @ Alignment A duct crossing

: Backfilling works on progress.

ch.9+541,9+625 RHS @ Alignment A duct crossing

: Backfilling works on progress.

Street light foundation (yard) 12 m

:Casting of street light foundation 60 nos. completed.

Street light foundation (yard) 10 m

:Casting of street light foundation 106 nos. completed.

Street light foundation (yard)

:Preparation of reinforcement and shutter on progress

Street light foundation (alignment A)


Street light high must foundation
Street light high must foundation

:No activity.
:No activity.
: Backfilling works on progress.

Street light high must foundation

:No activity.

Street light high must foundation

:No activity.

10.Drainage VC Pipe Crossing


Ch.0+697 RHS ext. @ Alignment A crossing

: Backfilling works completed.

11.Swale
Ch.0+900 to onwards @ Alignment A (LHS)

:Preparation of formation on progress.

PCM-DIR

Daily Inspection Report

Section

Form #

PCM

PCM-CA-2Issue 1

Issued

Rev.

Nov-06

Site Area
12.Electrical
Sub station @ Alignment A (RHS)
Ch.0+800 to ch.1+200 @ Alignment A (median alignment A)

:Casting of blinding completed


: Excavation works completed.

13.ITS
Ch.9+172 @ Alignment A (LHS)/(RHS) EXT.duct crossing

:Laying of pipes on progress.

Ch.9+360-9+380 @ Alignment A (RHS)

:Laying of pipes on progress.

Ch.12+033 @ Alignment A (RHS/LHS) duct crossing

: Backfilling works on progress.

Ch.9+232 @ Alignment A (RHS) duct crossing


Ch.2+400 to onwards @ Alignment A (RHS) line

:Laying of pipe completed.


:Laying of sand surround on progress.

Ch.1+900 to onwards @ Alignment A (RHS) line

: Backfilling works on progress.

Ch.2+500 to onwards @ Alignment A (RHS) line

:Laying of pipes on progress.

Ch.2+700 to onwards @ Alignment A (RHS) line

:Laying of sand bedding on progress.

Ch.3+200 to onwards @ Alignment A (RHS) line


Ch.7+400 to onwards @ Alignment A (RHS) line
ITS chambers alignment A
Ch.7+300 to onwards @ Alignment A (RHS) line

: Excavation on progress.
: Excavation on progress.
: Preparation of formation level on progress.
:Laying of pipes on progress.

14.DSSS
ch.12+130 @ Alignment A (RHS/LHS) duct crossing

:Laying of pipes on progress.

ch.0+710 @ Alignment A (RHS ext.) duct crossing

: Backfilling works on progress.

Ch.8+235 to 8+320 @ Alignment A (mainline)

: Backfilling works completed

Ch.0+740 to 0+790 @ Alignment A (mainline)

: Backfilling works on progress.

junction-8 @ Alignment A (RHS/LHS) duct crossing

: Backfilling works on progress.

ch.3+105@ Alignment A (RHS ext.) duct crossing

: Backfilling works on progress.

Ch.8+970 to onwards @ Alignment A (mainline)

:Laying of pipes on progress.

Ch.9+300 to 9+224 @ Alignment A (RHS) duct crossing

: Backfilling works on progress.

Ch.7+800 to 8+200 @ Alignment A (mainline)


Ch.8+970 to onwards @ Alignment A (mainline)
DSSS chamber @ Alignment A (mainline)

: Backfilling works on progress.


:Laying of sand bedding on progress.
:Preparation of reinforcement steel bar on progress

15.Irrigation duct crossing


Junction-5 @ Alignment A duct crossing slip road

:Laying of pipes on progress.

16.Water line @ Align.A (LHS)


Ch.8+450 to 9+043 @ Alignment A (LHS)
Ch.9+057 to 9+532 @ Alignment A (LHS)

: Backfilling works on progress.


:Pressure test completed.

Ch.9+650 to 9+950 @ Alignment A (LHS)

: Backfilling works on progress.

Ch.10+690 to 10+860 @ Alignment A (LHS)

: Backfilling works on progress.

Ch.0+000 to ch.6+654 @ Alignment A (LHS)pipe ch.

:Pressure test completed.

Ch.6+564 to ch.7+641 @ Alignment A (LHS)pipe ch.

:Pressure test final completed.

Ch.11+900 to onwards @ Alignment A (LHS) pipe ch.

:Laying of pipes completed.

Ch.12+065 crossing @ Alignment A (LHS/RHS)

:Laying of pipes completed.

W0-03 ,BV-04,BV-05,AV-02,AV-03 @ Alignment A (LHS) pipe ch.

: Waterproofing for wall and base completed.

WO-8 @ Alignment A (LHS)

: Waterproofing for wall and base completed.

AV-09 @ Alignment A (LHS)

: Casting of wall concrete completed.

AV-11 @ Alignment A (LHS)

: Casting of wall concrete completed.

Installation of fittings waterline chambers @ Alignment A (LHS)

:On progress

PCM-DIR

Daily Inspection Report

Section

Form #

PCM

PCM-CA-2Issue 1

Issued

Rev.

Nov-06

Remarks (Safety/Stoppage/Delay/Obstruction):
A-Safety

B-Delay/Obstruction

Instruction to Contractor:

Man Power
Designation

Equipment

No.

Type

Site Engineer

Breaker

Foreman

12

Excavator

Unskilled Labour

86

JCB

C.hand

B.Roller

pipe fitter

15

generator cummin

Steel fixer

16

Shovel

carpenter

22

B.truck

mason

Water tanker

welder for hdpe pipe

welding machine(HDPE PIPE)


bobcat
t.mixer
M.crane
6" dewatering pump
4" dewatering pump
concrete vibrator
generator (Dewatering)

TOTAL

178

Inspector Name :

ARE Signature

Date : 24/3/2014

PCM-DIR

Daily Inspection Report

Section

Form #

Rev.

PCM

PCM-CA-2Issue 1

Issued
Nov-06

Daily Progress Photos 24-03-2014

1.Laying of pipes for TSE Duct crossing alignment A RHS/LHS


ch.12+102 on progress

Note:
1.Concrete delivery on site 30 SRC 4 cu.m.
2.RFI inspected
IR-16210
IR-16213
IR-15748
IR-15739
IR-16252
IR-16022
IR-16021
IR-16023
IR-16016
IR-16017
IR-16018
IR-16012
IR-16011
IR-16013
IR-16286
IR-16278
IR-16290

2.Laying of pipes for irrigation cuct crossing alignment A juncti


on progress

ed

06
PCM-DIR#:

497

ed

06

nos. completed.

6 nos. completed.

utter on progress

ed

06

ed

06

No.
9
13
9
4
1
1
6
1
3
2
1
2
2
5
5
4

68

Monday

ed

06

t crossing alignment A junction-5


progress