You are on page 1of 13

Bar Bending Schedule

Description of
Bar

Bar #

Spacing
" c/c

# of
bars

Nos

61

Cut
length
(ft)
17.33

61

61

61

Total
Length (ft)

Bending
position

Wt lb/ft

Wt (lb)

1057.13

0.376

397.48

17.33

1057.13

0.00

17.33

1057.13

0.00

17.33

1057.13

0.00

MAIN BUILDING
S.No
1
2
3
4
5
6
7

Description
Excavation in foundation of building, bridges
etc complete : In ordinary soil
Plain Cement Concrete incl. placing,
compacting, finishing & curing (Ratio 1:4:8) in
foundation
Plain Cement Concrete incl. placing,
compacting, finishing & curing (Ratio 1:2:4)
Damp proof of cem. conc. 1:2:4 i/c bitumen
coat, 1 layer polythene & 1 coat bitumen (2"
thick)
Pacca brick work in foundation and plinth in
Cement, sand mortar 1:6
Pucca brick work in ground floor Cement, sand
mortar 1:6 upto Lintel Level
Pucca brick work in ground floor Cement, sand
mortar 1:4

Unit

Qty

Cement
(Bags)

Sand
(M3)

Crush
(M3)

M3

1.00

M3

Bricks
(No.)

Skilled
Labor
(Day)

Unskilled Shutterin Vibrator Concrete


Labor
g
(Hour)
Mixer
(Day)
(M2)
(Hour)
0.37

1.00

3.32

0.46

0.92

0.22

1.50

1.00

0.50

M3

1.00

6.16

0.43

0.86

0.22

1.50

1.00

0.50

M2

1.00

0.32

0.02

0.05

0.07

0.24

M3

1.00

1.23

0.28

476.75

0.71

1.44

M3

1.00

1.21

0.26

476.75

0.88

1.97

M3

1.00

1.70

0.24

476.75

0.88

1.97

1.00

0.50

Extra labour for first floor (columns)

M3

1.00

0.09

0.35

Extra labour for first floor (B.B work)

M3

1.00

0.09

0.35

10

RCC (1:2:4) in Slab, Lintel and shades

M3

1.00

0.37

3.13

11

Extra labour for first floor (RCC)

M3

5.00

M3

1.00

M2

1.00

M2

1.00

12
13

Extra labour for arch work in brick masonry,


including labour for centring and decentring
Single layer of tiles 10"x5"x1.25" laid over 4"
earth and 1" mud plaster on top of RC roof slab

6.16

0.43

0.86

0.09

0.01

P&L of polythene sheet on roof

15

Khuras on roof 2'x2'x6"

Each

1.00

0.25

0.02

0.04

16

Bottom khuras of brick masonry in c/s mortar


1:6,4'x2'x4.5" over 3" cem. concrete 1:4:8

Each

1.00

0.35

0.05

0.10

17

Cement plaster 1:4 upto 20' height 1/2" thick

M2

1.00

0.06

M2

1.00

0.05

M3

1.00

M3

1.00

M3

1.00

M2

1.00

1.00

M3

1.00

4.32

0.45

M2

1.00

0.32

0.02

19
20
21
22
23
24
25

Cement pointing struck joints, on walls, upto 20'


height : Ratio 1:3
Filling, watering and ramming earth under floor
with surplus earth from foundation, etc
Supplying and filling sand under floor or
plugging in wells
Brick Ballast or shingle under floor
Provide & lay topping of concrete 1:2:4, incl.
surface finishing & dividing in panels : 2" thick
Provide & fix glass strip 1.5" wide for dividing
the floors into panels : 5mm thick
Plain Cement Concrete incl. placing,
compacting, finishing & curing (Ratio 1:3:6)
Mosaic dado or skirting complete as per specs
Using grey cement : 1/2" thick

Brick
Tiles (No)

7.50

14

18

2.67

Steel
(Ton)

0.35

0.71

0.13

0.29

38

0.14
0.13

0.28

0.18

0.39

0.01

0.06

0.13

0.00

0.09

0.11

50.00

0.18
1.50

0.32

0.02

0.05

0.90

0.35

0.88

0.18

0.44

0.19

0.32

0.00

0.00

0.22

1.50

0.90

0.43

1.00

0.50

Requirment of Material(in MKS And FPS System)


A

RCC/PCC

Qty

Cement (Bags)
For Cft
For M3

Sand (Cft)/
M3

Crush (Cft)/
M3

Steel(Ton)
For Cft
For M3

P.C.C(1:4:8)

100.00

9.50

335

47.40

94.700

0.223

7.85

P.C.C(1:3:6)

100.00

13.00

435

46.20

92.40

0.223

7.85

P.C.C/R.C.C(1:2:4)

100.00

17.60

621.5

44.00

88.00

0.223

7.85

P.C.C/R.C.C(1:1.5:3)

100.00

22.50

791

42.00

84.00

0.223

7.85

P.C.CR.C.C(1:1:2)

100.00

30.80

1087

38.50

77.00

0.223

7.85

Burnt Brick (Cement Sand Mortor)

Cement (Bags)

Sand

Bricks (No)

For Cft

For M3

Cft/ M3

For CFt

For M3

Brick Cement Mortar(1:6)

100.00

3.50

121.50

26.710

1350.00

47700.00

Brick Cement Mortar(1:5)

100.00

4.00

141.20

25.00

1350.00

47700.00

Brick Cement Mortar(1:4)

100.00

4.800

169.512

24.00

1350.00

47700.00

Brick Cement Mortar(1:3)

100.00

6.00

211.86

22.500

1350.00

47700.00

Sand (Cft)

Sand (M3)

Plastering/Pointing

Cement (Bags)

For Cft

For M3

10

Cement plaster (1:6) 1/2" thick(12mm)

100.00

0.770

7.800

5.820

1.670

11

Cement plaster(1:5)1/2" thick(12mm)

100.00

0.900

9.180

5.660

1.625

12

Cement plaster(1:4)1/2" thick (12mm)

100.00

1.090

11.000

5.440

1.5600

13

Cement plaster(1:3)1/2" thick(12mm)

100.00

1.360

13.770

5.100

1.4600

14

Cement plaster(1:2)1/2" thick(12mm)

100.00

1.820

18.000

4.530

1.300

15

Cement plaster (1:6) 3/4" thick(20mm)

100.00

1.080

12.000

8.050

2.600

16

Cement plaster(1:5)3/4" thick(20mm)

100.00

1.250

14.000

7.830

2.500

17

Cement plaster(1:4)3/4" thick(20mm).

100.00

1.500

17.000

7.520

2.400

18

Cement plaster(1:3)1/2" thick(20mm)

100.00

1.880

22.000

7.050

2.300

19

Cement plaster(1:2)3/4" thick(20mm)

100.00

2.500

28.000

6.260

2.000

20

Ceiling plaster(1:3)1/2" thick(12mm)

100.00

1.250

13.00

4.600

1.350

21

Ceiling plaster(1:4)1/2" thick(12mm)

100.00

1.000

14.00

5.000

1.440

22

Ceiling plaster(1:3)1/4" thick(6mm)

100.00

0.625

7.000

2.3400

0.750

23

Ceiling plaster(1:4)1/4" thick(6mm)

100.00

0.500

5.600

2.500

0.800

24

Cement pointing (1:3)

100.00

0.400

0.400

1.290

0.450

25

Cement pointing (1:2)

100.00

0.520

0.52

1.450

0.400

Sand

Sand

Crush

Crush

Cement (Bags)

DPC
1

For Cft

For M3

For Cft

For M3

Fpr Cft

For M3

26

D.P.C. 1:2:4 (2" thick)

100.00

2.97

32.0

7.420

2.300

14.80

4.520

27

D.P.C. 1:1.5:3( 1" thick/2.5cm)

100.00

1.8900

20.00

3.54

1.060

7.09

2.120

For Cft

For M3

Sand(Cft)

Sand (M3)

Crush (Cft)

Crush (M3)

Flooring

28

2"(5cm)Thick PCC Floor (1:2:4)

100.00

2.97

32.0

7.420

2.500

14.80

4.520

29

2"(5cm)Thick PCC Floor (1:2:4)

100.00

1.8900

20.00

3.54

1.060

7.09

2.120

30

4" Thick PCC(1:4:8)

100.00

3.1500

33.80

15.70

4.800

31.50

9.600

Brick Tiles(10"x5"x1.25")
31

Brick Tiles(10"x5"x1.25")

Bricks(Tiles) Bricks(Tiles)
100.00

288.00

3100

4.5" Wall
9" Wall
13.5"
18" Wall
22.5" Wall

length 1'
length 1'
length 1'
length 1'
length 1'

1ft
2ft
2.5ft
3ft
3.5ft
4ft
4.5ft
5ft
5.5ft
6ft
6.5ft
7ft
7.5ft
8ft
8.5ft
9ft
9.5ft
10ft
10.5ft
11ft
12ft
13ft
14ft
15ft

3.52 Radday
7 Radday
9 Radday
11 Radday
12 Radday
14 Radday
16 Radday
18 Radday
19 Radday
21 Radday
23Radday
25Radday
27Radday
28Radday
30 Radday
32 Radday
34Radday
35Radday
37Radday
39Radday
43Radday
46Radday
50Radday
53Radday

1 Radda
1 Radda
1 Radda
1 Radda
1 Radda

1.45 Bricks
2.90 Bricks
4.35 Bricks
5.8 Bricks
7.25 Bricks

1ft

3.52

Requirment of Material and Labor(MKS)


S.No

Description

RCC/PCC

Unit

Qty

Cement
(Bags)

Sand (Cft)

Crush
(Cft)

Bricks
(No.)

Steel
(Ton)

Skilled
Labor(No)

Unskilled
Labor(No)

V dry=1.54x V wet

P.C.C(1:4:8)

Cft

100.00

9.50

47.40

94.70

P.C.C(1:3:6)

Cft

100.00

13.00

46.20

92.40

P.C.C/R.C.C(1:2:4)

Cft

100.00

17.60

44.00

88.00

P.C.C/R.C.C(1:1.5:3)

Cft

100.00

22.50

42.00

84.00

P.C.CR.C.C(1:1:2)

Cft

100.00

30.80

38.50

77.00

Reinfr.Steel (Def.bars) in RCCSlab/Lintels(1%)

Cft

1.00

Burnt Brick(CSM)

0.00

1Cft Cantain 20% Wet Vol of Mortor(Vdry=1.54xVol wet)


and Volume of One Brick=0.0623Cft=0.00179M3(Actual)&0.07031Cft=0.00199M3(Nominal)

Brick Cement Mortar(1:6)

Cft

100.00

3.50

26.71

1350.00

Brick Cement Mortar(1:5)

Cft

100.00

4.00

25.00

1350.00

Brick Cement Mortar(1:4)

Cft

100.00

4.80

24.00

1350.00

10

Brick Cement Mortar(1:7)

Cft

100.00

3.00

26.20

1350.00

11

Brick Cement Mortar(1:8)

Cft

100.00

2.60

26.60

1350.00

12

Brick Cement Mortar(1:10)

Cft

100.00

2.18

27.20

1350.00

13

Brick Cement Mortar(1:12)

Cft

100.00

2.18

27.60

1350.00

Damp Proof Course(DPC)

AreaxThickness gives Volume and Vdry =1.54V wet

14

D.P.C. 1:2:4 (2" thick)

Sft

1.00

0.03

0.07

0.15

15

D.P.C. 1:1.5:3( 1" thick/2.5cm)

Sft

1.00

0.02

0.04

0.07

Plastering(Cement Sand)

AreaxThickness gives Volume and Vdry =1.20x1.30V wet

16

Cement plaster (1:6) 1/2" thick(12mm)

Sft

100.00

0.770

5.820

17

Cement plaster(1:5)1/2" thick(12mm)

Sft

100.00

0.900

5.660

18

Cement plaster(1:4)1/2" thick (12mm)

Sft

100.00

1.090

5.440

19

Cement plaster(1:3)1/2" thick(12mm)

Sft

100.00

1.360

5.100

20

Cement plaster(1:2)1/2" thick(12mm)

Sft

100.00

1.820

4.530

21

Cement plaster (1:6) 3/4" thick(20mm)

Sft

100.00

1.080

8.050

22

Cement plaster(1:5)3/4" thick(20mm)

Sft

100.00

1.250

7.830

23

Cement plaster(1:4)3/4" thick(20mm).

Sft

100.00

1.500

7.520

24

Cement plaster(1:3)1/2" thick(20mm)

Sft

100.00

1.880

7.050

25

Cement plaster(1:2)3/4" thick(20mm)

Sft

100.00

2.500

6.260

26

Ceiling plaster(1:3)1/2" thick(12mm)

Sft

100.00

1.250

4.600

27

Ceiling plaster(1:4)1/2" thick(12mm)

Sft

100.00

1.000

5.000

28

Ceiling plaster(1:3)1/4" thick(6mm)

Sft

100.00

0.625

2.3400

29

Ceiling plaster(1:4)1/4" thick(6mm)

Sft

100.00

0.500

2.500

Flooring

AreaxThickness gives Volume and Vdry =1.54V wet

30

2"(5cm)Thick PCC Floor (1:2:4)

Sft

1.00

31

2"(5cm)Thick PCC Floor (1:2:4)

Sft

1.00

32

Brick Tiles(10"x5"x1.25")

Sft

1.00

2.88

Pointing

33

Cement pointing (1:3)

Sft

100.00

0.400

1.290

34

Cement pointing (1:2)

Sft

100.00

0.52

1.450

Requirment of Material and Labor


S.No

Description

Unit

Qty

Cement
(Bags)

Sand
(M3)

Crush
(M3)

RCC/PCC
P.C.C(1:4:8)

M3

100.00

335.00

47.400

94.700

P.C.C(1:3:6)

M3

100.00

435.00

46.200

92.400

P.C.C/R.C.C(1:2:4)

M3

100.00

621.50

44.00

88.00

P.C.C/R.C.C(1:1.5:3)

M3

100.00

791.00

42.00

84.00

P.C.CR.C.C(1:1:2)

M3

100.00

1087.00

38.500

77.000

Reinfr.Steel (Def.bars) in RCCSlab/Lintels(1%)

M3

100.00

Burnt Brick(CSM)
Brick Cement Mortar(1:6)

M3

100.00

121.50

25.70

47700

Brick Cement Mortar(1:5)

M3

100.00

141.20

25.00

47700

Brick Cement Mortar(1:4)

M3

100.00

169.51

24.00

47700

10

Brick Cement Mortar(1:3)

M3

100.00

211.86

22.500

47700

Damp Proof Course(DPC)


D.P.C. 1:2:4 (2" thick)

12

D.P.C. 1:1.5:3( 1" thick/2.5cm)

AreaxThickness gives Volume and Vdry =1.54V wet


M2

1.00

0.32

0.02

0.05

M2

1.00

0.20

0.01

0.02

Plastering(Cement Sand)

13

Cement plaster (1:6) 1/2" thick(12mm)

M2

100.00

7.80

1.6700

14

Cement plaster(1:5)1/2" thick(12mm)

M2

100.00

9.18

1.6250

15

Cement plaster(1:4)1/2" thick (12mm)

M2

100.00

11.00

1.5600

16

Cement plaster(1:3)1/2" thick(12mm)

M2

100.00

13.77

1.4600

17

Cement plaster(1:2)1/2" thick(12mm)

M2

100.00

18.00

1.30

18

Cement plaster (1:6) 3/4" thick(20mm)

M2

100.00

12.00

2.600

19

Cement plaster(1:5)3/4" thick(20mm)

M2

100.00

14.00

2.500

20

Cement plaster(1:4)3/4" thick(20mm).

M2

100.00

17.00

2.400

21

Cement plaster(1:3)1/2" thick(20mm)

M2

100.00

22.00

2.300

22

Cement plaster(1:2)3/4" thick(20mm)

M2

100.00

28.00

2.000

23

Ceiling plaster(1:3)1/2" thick(12mm)

M2

100.00

13.00

1.350

24

Ceiling plaster(1:4)1/2" thick(12mm)

M2

100.00

10.00

1.440

25

Ceiling plaster(1:3)1/4" thick(6mm)

M2

100.00

7.000

0.7500

26

Ceiling plaster(1:4)1/4" thick(6mm)

M2

100.00

5.600

0.800

Flooring

AreaxThickness gives Volume and Vdry =1.20x1.30V wet

AreaxThickness gives Volume and Vdry =1.54V wet

27

2'(5cm)Thick PCC Floor (1:2:4)

M2

1.00

28

2'(5cm)Thick PCC Floor (1:2:4)

M2

1.00

29

Brick Tiles(10"x5"x1.25")

M2

1.00

Unskilled
Labor(No)

1Cft Cantain 20% Wet Vol of Mortor(Vdry=1.54xVol wet)


and Volume of One Brick=0.0623Cft=0.00179M3(Actual)&0.07031Cft=0.00199M3(Nominal)

Skilled
Labor(No)

7.85

11

Steel (Ton)

V dry=1.54x V wet

Bricks
(No.)

Pointing

30

Cement pointing (1:3)

M2

100.00

4.65

0.490

31

Cement pointing (1:2)

M2

100.00

6.00

0.400

Bar Weight (Imperial Sizes)


1Kg=2.204lb 1000Kg=1 ton 2204lb=1 ton
Wt(Ib/ft)=(DiaxDia)in^2x2.671 Wt(Kg/m)=((DiaxDia)in^2x0.0061654)
Unit wt=490Ib/Cft=7852.41Kg/M3=222.32Kg/ft, Wt(Kg/ft)=(diaxdia)in^2X1.212
Convert wt Ib/ft to Kg/m(Wt <Kg/m>=1.49xWt<Ib/ft>) and (Wt<Ib/ft=0.672xWt<Kg/m>)
Bar#

Dia in

3
4
5
6
7
8
9
10
11
14
18

3/8=0.375
1/2=0.5
5/8=0.625
6/8=0.75
7/8=0.875
8/8=1
9/8=1.128
10/8=1.270
11/8=1.410
14/8=1.693
18/8=2.257

X-Sec Area Perimeter in


0.11
0.2
0.31
0.44
0.6
0.79
1
1.27
1.56
2.25
4

1.18
1.57
1.96
2.36
2.75
3.14
3.54
3.99
4.43
5.32
7.09

Unit Weight
lb/ft
0.376
0.668
1.043
1.502
2.044
2.67
3.4
4.303
5.313
7.65
13.6

Unit Weight
Kg/ft
0.1706
0.3031
0.4732
0.6815
0.9274
1.2114
1.5426
1.9524
2.4106
3.4710
6.1706

Unit Weight
Meters/Ton
Kg/m
0.56
1788
0.995
1006
1.554
644
2.24
447
3.046
328
3.98
251
5.07
199
6.41
161
7.92
133
11.40
20.26

Bar Weight (MetricSizes)


Dia mm X-Sec Area
8
10
12
16
20
22
25
28
32
36

50.3
78.5
113.1
201.1
314.2
380.1
490.9
615.8
804.3
1017.9

Unit Weight Unit Weight


Kg/m
Ib/ft
0.395
0.266
0.616
0.415
0.888
0.598
1.579
1.063
2.466
1.660
2.984
2.008
3.854
2.594
4.834
3.253
6.313
4.249
7.99
5.377

Meters/Ton

Foot/Ton

2532
1623
1126
633
406
335
259
207
158
125

8305
5324
3693
2076
1332
1100
850
678
518
410

Particular of Item

S.No
1

Excavation In Ordinary Soil

Excavation In Hard Soil

BB Work in Cement Mortar in Foundation and Plinth

BB work in Super Structure

R.B Work

Qty per day

Skilled Labour

200Cft/5.66M3

Un-Skilled Labour
1 Mazdoor
1 Mazdoor

100Cft/2.83M3

I Mason

2 Mazdoor

70Cft/2m3

I Mason

2 Mazdoor

Plastering

200Sft/20M2

I Mason

2 Mazdoor

Pointing

300Sft/28M3

I Mason

2 Mazdoor

Floor Topping

100Sft/2.83M3

I Mason

2 Mazdoor

PCC

10

RCC

11

Shuttering

12

Filling/Campacting of Earth under Floor

300Cft

1 Mazdoor

13

Sand Cushion Under floor

300Cft

1 Mazdoor

14

Brick Ballast under floor

300Cft

1 Mazdoor

15

DPC

16

Brick laid by Mason


Brick laid by Mason in foundation

17

Steel Fixing

18

Paint Enamal

19

Paint Emulsion

20

Electrification

I Mason

1 Mazdoor

1000 Nos

I Mason

2 Mazdoor

1350 Nos

I Mason

2 Mazdoor

1 ton

2 steel fixer

ITEM WISE BREAKDOWN FOR ANY QAUNTITY

S.NO

Discripation of items

Qty

Cement
(bags)

Sand
(cft)

Crush
(cft)

Bricks
(No)

Steel
(ton)

Tiles
(No)

Mud
(cft)

Surkhi Polthyne Bitumen


(kg) (sheet) sft
(kg)

Skilled Unskilled
Labor
Labor

P C C (1:4:8)

0.090

0.47

0.948

0.010

0.03

P C C (1:2:4)

0.170

0.44

0.88

0.01

0.03

Bricks works(1:4CSM)

0.05

13.60

0.01

0.03

Bricks works(1:3CSM)

0.06

0.23

13.60

0.01

0.03

Bricks works(1:6CSM)

0.035

13.60

0.01

0.03

Steel 1/2" dia

0.00030

0.01

0.03

Steel 3/8" dia

0.00017

0.01

0.03

Brick Tiles(10"X5"X1.25")

Bitumens 10/20 Grade

10

Polthyene Sheet 100Gauge

11

DPC (1:2:4)

12

14

Mud
Cement Plaster 1/2"
thick(1:3csm)
Cement Plaster 1/2"
thick(1:6 csm)

15

13

3
0.09
1.00
0.03

0.44

0.88
0.0033

0.013

0.05

0.01

0.02

0.013

0.05

0.01

0.02

Coping (1:3:6)

0.01

0.05

0.9

0.01

0.02

16

Floor PCC1:2:4

0.013

0.05

0.9

0.01

0.02

17

Struck pointing (1:3 csm)

0.013

0.05

18

1/2" Skirting (1:2 csm)

20

0.664

Bar Weight (Imperial Sizes)


1Kg=2.204lb 1000Kg=1 ton 2204lb=1 ton
Unit weight of steel =490lb/ ft 3=222.32Kg/ft 3=7852.41Kg/m3
Wt(lb/ft)=(diaxdia)in2X2.671
Wt(Kg/ft)=(diaxdia)in2X1.212
Unit Weight Unit Weight
Bar#
Dia (in)
Unit Weight lb/ft
Kg/ft
Kg/m
3
0.375
0.376
0.1706
0.56
4
0.5
0.668
0.3031
0.995
5
0.625
1.043
0.4732
1.554
6
0.75
1.502
0.6815
2.24
7
0.875
2.044
0.9274
3.046
8
1
2.67
1.2114
3.98
9
1.125
3.4
1.5426
5.07
10
1.25
4.303
1.9524
6.41
11
1.375
5.313
2.4106
7.92
14
1.75
7.65
3.4710
11.40
18
2.25
13.6
6.1706
20.26

Requirment of Material
S.No

Description

RCC/PCC

Unit

Qty

Cement (Bags)

Sand (Cft)

Crush (Cft)

P.C.C(1:4:8)

Cft

1.00

0.095

0.47

0.947

P.C.C(1:3:6)

Cft

1.00

0.130

0.46

0.924

P.C.C and R.C.C (1:2:4) with 1% steel

Cft

1.00

0.176

0.44

0.88

P.C.C/R.C.C(1:1.5:3)

Cft

1.00

0.225

0.42

0.84

P.C.CR.C.C(1:1:2)

Cft

1.00

0.308

0.39

0.77

RCC Slab 5" thick(1:2:4) with 1% steel

Sft

1.00

0.073

0.18

0.37

Bricks Lintel 5"(.41667Cft),steel spacing 12"c/c

Sft

1.00

0.0485

0.122

0.242

Burnt Brick(CSM)

0.00222

.926 Kg
2

1Cft Cantain 20% Wet Vol of Mortor(Vdry=1.54xVol wet)


and Volume of One Brick=0.0623Cft=0.00179M3(Actual)&0.07031Cft

Brick Cement Mortar(1:6)

Cft

1.00

0.04

0.27

14.00

Brick Cement Mortar(1:4)

Cft

1.00

0.05

0.24

14.00

10

Brick Cement Mortar(1:7)

Cft

1.00

0.03

0.26

14.00

11

Brick Cement Mortar(1:8)

Cft

1.00

0.03

0.27

14.00

12

Brick Cement Mortar(1:10)

Cft

1.00

0.02

0.27

14.00

13

Brick Cement Mortar(1:12)

Cft

1.00

0.02

0.28

14.00

Plastering(Cement Sand)

14

Cement plaster (1:6) 1/2" thick(12mm)

Sft

1.00

0.008

0.058

15

Cement plaster(1:5)1/2" thick(12mm)

Sft

1.00

0.01

0.057

16

Cement plaster(1:4)1/2" thick (12mm)

Sft

1.00

0.011

0.054

17

Cement plaster (1:6) 3/4" thick(20mm)

Sft

1.00

0.011

0.081

18

Cement plaster(1:4)3/4" thick(20mm).

Sft

1.00

0.015

0.075

0.073

AreaxThickness gives Volume and Vdry =1.20x1.30V wet

Flooring

19

2"(5cm)Thick PCC Floor (1:2:4)

Sft

1.00

0.029

20

Bricks Tiles

Sft

1.00

0.002

21

Skirting 1/2"

Sft

1.00

0.030

22

Pointing 1:3 CSM

Sft

1.00

0.004

0.147
2.66

0.0130

Bar Weight (Imperial Sizes)


Wt(lb/ft)=(diaxdia)in2X2.671

E
Bar#
3
4
5
6

Steel (Ton)

V dry=1.54x V wet

Bricks (No.)

Wt(Kg/ft)=(diaxdia)in2X1.212

1Kg=2.204lb
Dia (in) Unit Weight lb/ft Unit Weight Kg/ft Unit Weight Kg/m 1000Kg=1 ton
2204lb=1 ton
Unit Wt of steel =490 lb/ft3
0.375
0.376
0.1706
0.56
=222.32 Kg/ft3
=7852.41 Kg/m3
0.5
0.668
0.3031
0.995
Wt(lb/ft)=(diaxDia)in2 X 2.671
0.625
1.043
0.4732
1.554
wt(Kg/ft)=(DiaxDia)in2 X1.212
Wt(Kg/m)=1.49xWt(lb/ft)
0.75
1.502
0.6815
2.24
Wt(lb/ft)=.673XWt(Kg/m)

0.875

2.044

0.9274

3.046

2.67

1.2114

3.98

1.125

3.4

1.5426

5.07

10

1.25

4.303

1.9524

6.41

11

1.375

5.313

2.4106

7.92

14

1.75

7.65

3.4710

11.40

18

2.25

13.6

6.1706

20.26

.606 Kg

Requirment of Material
S.No

Description

RCC/PCC

Unit

Qty

Cement (Bags)

Sand (Cft)

Crush (Cft)

P.C.C(1:4:8)

Cft

100.00

9.500

47.40

94.700

P.C.C(1:3:6)

Cft

100.00

13.000

46.20

92.400

P.C.C and R.C.C (1:2:4) with 1% steel

Cft

100.00

17.600

44.00

88.00

P.C.C/R.C.C(1:1.5:3)

Cft

100.00

22.500

42.00

84.00

P.C.CR.C.C(1:1:2)

Cft

100.00

30.800

38.50

77.00

RCC Slab 5" thick(1:2:4) with 1% steel

Sft

100

7.33

18.33

36.66

Bricks Lintel 5"(.41667Cft),steel spacing 12"c/c

Sft

100

4.85

12.2

24.2

Burnt Brick(CSM)

0.222

92.6 Kg
2

60.6 Kg

1Cft Cantain 20% Wet Vol of Mortor(Vdry=1.54xVol wet)


and Volume of One Brick=0.0623Cft=0.00179M3(Actual)&0.07031Cft

Brick Cement Mortar(1:6)

Cft

100.00

3.50

26.71

1400.00

Brick Cement Mortar(1:4)

Cft

100.00

4.80

24.00

1400.00

10

Brick Cement Mortar(1:7)

Cft

100.00

3.00

26.20

1400.00

11

Brick Cement Mortar(1:8)

Cft

100.00

2.60

26.60

1400.00

12

Brick Cement Mortar(1:10)

Cft

100.00

2.18

27.20

1400.00

13

Brick Cement Mortar(1:12)

Cft

100.00

2.18

27.60

1400.00

Plastering(Cement Sand)

14

Cement plaster (1:6) 1/2" thick(12mm)

Sft

100.00

0.770

5.820

15

Cement plaster(1:5)1/2" thick(12mm)

Sft

100.00

0.90

5.660

16

Cement plaster(1:4)1/2" thick (12mm)

Sft

100.00

1.100

5.440

17

Cement plaster (1:6) 3/4" thick(20mm)

Sft

100.00

1.080

8.050

18

Cement plaster(1:4)3/4" thick(20mm).

Sft

100.00

1.500

7.520

7.330

Steel (Ton)

V dry=1.54x V wet

Bricks (No.)

AreaxThickness gives Volume and Vdry =1.20x1.30V wet

Misc.

19

2"(5cm)Thick PCC Floor (1:2:4)

Sft

100.00

2.930

20

Bricks Tiles

Sft

100.00

0.200

21

Skirting 1/2"

Sft

100.00

3.000

22

Pointing 1:3 CSM

Sft

100.00

0.400

23

Paint Enamel

Sft

100.00

24

Paint Emulsion

Sft

100.00

25

Bitumen

14.660
266.00

1.3000

Bar Weight (Imperial Sizes)


Wt(lb/ft)=(diaxdia)in2X2.671

E
Bar#
3
4
5
6
7
8
9
10
11

Wt(Kg/ft)=(diaxdia)in2X1.212

1Kg=2.204lb
Dia (in) Unit Weight lb/ft Unit Weight Kg/ft Unit Weight Kg/m 1000Kg=1 ton
2204lb=1 ton
Unit Wt of steel =490 lb/ft3
0.375
0.376
0.1706
0.56
=222.32 Kg/ft3 = 7852.41Kg/m3
Wt(lb/ft)=(diaxDia)in2 X 2.671
0.5
0.668
0.3031
0.995
wt(Kg/ft)=(DiaxDia)in2 X1.212
Wt(Kg/m)=1.49xWt(lb/ft)
0.625
1.043
0.4732
1.554
Wt(lb/ft)=.673XWt(Kg
# 3 ----- 40'----- 146.51 Bars----- 1 Ton
0.75
1.502
0.6815
2.24
# 4 ----- 40'----- 82.48 Bars---- 1 Ton
# 5 ----- 40'----- 52.85 Bars----- 1 Ton
0.875
2.044
0.9274
3.046
# 6 ----- 40'----- 36.68 Bars---- 1 Ton
# 7 ----- 40'----- 26.95 Bars----- 1 Ton
1
2.67
1.2114
3.98
# 8 ----- 40'----- 20.63 Bars---- 1 Ton
# 9 ----- 40'----- 16.20 Bars---- 1 Ton
1.125
3.4
1.5426
5.07
# 10 ----- 40'----- 12.80 Bars---- 1 Ton
1.25
4.303
1.9524
6.41
# 11 ----- 40'----- 10.37 Bars---- 1 Ton
# 14 ----- 40'----- 7.20 Bars---- 1 Ton
1.375
5.313
2.4106
7.92
# 18 ----- 40'----- 4.051 Bars---- 1 Ton

14

1.75

7.65

3.4710

11.40

18

2.25

13.6

6.1706

20.26