You are on page 1of 12

FISH TOWN - HARPER ROAD PROJECT PHASE 1

Paving of Harper - Karloken (50km)


and
Maintenance of
Karloken to Fish Town (80km)

USCS

PC KM 7+522 RHS

Gravel

Sand

Silt/Clay

Liquid Limit

16

52

28

36

(%)

Expected Equivalent
CBR (%)

Group Index: SC
Classification: Clayey sand with gravel
Chainage:
Numner of
Blows

PC KM 7+522 RHS
Average
SPT
Penetration (mm)

10

95.0

119

20

51.0

145

30

26.0

199

8.0

251

35
refusal @35 blows

Contractors Materials Engineer

90% Min

1
ken (50km)
ntenance of

Date: 12-Jul-16
Platicity Index

Natural Moisture (%)

17

46.4

Materials Engineer

No of Blows
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

FISH TOWN - HARPER ROAD PROJECT PHASE 1


Paving of Harper Karloken (50km) and
Maintenance of Karloken to Fish Town (80km)
Date:
PC KM 7+522 RHS
Rod Reading (mm)
DCP Index (mm)
0
10
40
40
45
5
50
5
56
6
61
5
69
8
72
3
81
9
89
8
95
6
105
10
110
5
113
3
120
7
124
4
129
5
134
5
138
4
140
2
146
6
149
3
152
3
155
3
159
4
162
3
165
3
166
1
168
2
170
2
172
2
173
1
175
2
176
1
178
2
180
2

Contractors Materials Engineer

Engineers Representa

E1
per (80km)
12-Jul-16

HS
SPT

(%)
98
49
138
138
126
138
109
177
103
109
126
98
138
177
117
154
138
138
154
216
126
177
177
177
154
177
177
304
216
216
216
304
216
304
216
216

Engineers Representative

FISH TOWN - HARPER ROAD PROJECT PHASE 1


Paving of Harper - Karloken
(50km) and
Maintenance of Karloken to Fish Town (80km)
Sample Description:
Sample Designation:

PC KM 7+522 RHS
U-Drain subsoil material

Oven Dry Mass Before Washing (g):


Oven Dry Mass After Washing (g):

2000.0
1445.7

Sieve Size (mm)

Mass Retained (g)

37.50
20.00
10.00
5.00
2.00
0.425
0.075
Pan
Wash Loss

79.12
33.70
125.14
165.22
206.60
306.74
519.58
9.6
554.3
2000.0

Total

Percentage
Retained (%)
4.0
1.7
6.3
8.3
10.3
15.3
26.0
28.2

PARTICLE SIZE ANALYSIS


100
90
80
70
60
Pa ssing (%)

50
40
30
20
10
0

0.01

0.10

1.00
Sieve (mm)

Contractor's Materials Engineer

10.00

SE 1
- Karloken

(80km)
Date

Percnentage
Passing (%)
96.0
94.4
88.1
79.8
69.5
54.2
28.2

05 July 2016

Passing
96
94
88
80
70
54
28

NALYSIS

10.00

100.00

mm)

Materials Engineer

FISH TOWN - HARPER ROAD PROJECT PHASE 1


Paving of Harper - Karloken (50km) and Maintenance of
Karloken to Fish Town (80km)

Sample Description:

PC KM 7+522 RHS

Sample Designation:

DETERMINING THE LIQUID LIMIT & PLASTICITY INDEX &LINEAR SHRINK


LIQUID LIMIT
Container number

27

Number of blows

38

30

Wt.of Container +Wet soil (g)

53.54

51.67

Wt.of Container +Dry soil (g)

48.34

46.84

Wt.of water

(g)

5.2

4.83

Wt.of Container weight

(g)

32.95

32.95

Wt.of Dry soil

(g)

15.39

13.89

Moisture content

(%)

33.8

34.8

( %)

Average

38.0

37.0

36.0

Moisture content %

35.0

34.0

33.0

32.0
15

20

25

30

No. of blows

Liquid Limit

36.1

Plastic Limit

19.1

Plasticity Index

17.0

Contractor's Materials Engineer

R ROAD PROJECT PHASE 1


km) and Maintenance of
own (80km)

Date

05 July 2016

TICITY INDEX &LINEAR SHRINKAGE OF SOILS


LIQUID LIMIT

25

PLASTIC LIMIT

26

40

14

15

28

19

53.54

51.64

50.78

50.78

48.13

46.57

48.04

48.01

5.41

5.07

2.74

2.77

32.95

32.95

33.32

33.89

15.18

13.62

14.72

14.12

35.6

37.2

18.6

19.6

30

No. of blows

19.1

35

40

Engineers Assistant Materials Engineer

FISH TOWN - HARPER ROAD PROJECT PHASE 1


Paving of Harper - Karloken
(50km) and
Maintenance of Karloken to Fish Town (80km)
NATURAL MOISTURE CONTENT DETERMINATION
PC KM 7+522 RHS

Date:

Container number

26

Wt.of Container +Wet soil

(g)

148.51

Wt.of Container +Dry soil

(g)

110.47

Wt.of water

(g)

38.04

Wt.of Container weight

(g)

32.98

Wt.of Dry soil

(g)

77.49

Moisture content

(%)

49.1

Average

(%)

Contractor's Materials Engineer

46.4

Engineers Assistant Materials Engineer

05-Jul-16
10
135.26
104.65
30.61
34.63
70.02
43.7
46.4

terials Engineer

You might also like