You are on page 1of 39

J P MUKHERJI & ASSOCIATES PVT LTD

Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 1 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No
2400

Particulars

Units

Preferred
Specification

Bidders
Specifications

POWER GENERATION PLANT


The Bidder shall fill all the information required for without disturbing the
sequence and format. If space is not enough, additional pages can be added
giving relevant reference number

2401

TURBO ALTERNATOR , ACCESSORIES AND SYSTEM


Quantity

Nos.

Each turbine and Alternator comprising of following


1.0

Ratings
- Nominal rating at
alternator output terminal
- Maximum continuous
rating at alternator output
terminal
- Maximum economical
rating at alternator output
terminal
- Minimum continuous load
at which turbo-Alternator
can operate as % of MCR
- Minimum steam flow to
condenser

MW

40 MWe

MW

MW
%

Required
during Mode A
Condition
About 15

tph

2.0

Vibrations

mm/sec

Not above 2.8

3.0

Maximum noise level at 1 m


distance from any
equipment

[db(A)]

Below 85

4.0

Confirm that following parts are subjected to secondary stress relieving before
final machining
- Turbine casing
*
- Control valve housing
*
- Bearing housing
*
- Gland housing
*
- Rotor shaft
*

* Bidders to specify

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 2 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Units

Confirm that the rotor


assembly shall be dynamically
balanced and tested for over
speed under vacuum
5.0

Dimensions and weights

5.1

Dimensions
- Dimensions of turbine
- Dimensions of gear box
- Dimensions of alternator
- Total space requirement of
turbo-Alternator assembly
- Height of turbo-Alternator
floor above ground level

5.2

6.0

Weights
Turbine
- Casing
- Assembled rotor
- Base Plate
Gear box complete
Alternator complete
- Stator
- Rotor
- Base Plate
- Air Coolers
Condenser
Heaviest single lift for selection
of crane
Electrical load of equipment
in operation at MCR
Electrical load of equipment
during start-up
Installed electrical power
(excluding standby unit)

* Bidders to specify

Preferred
Specification

LxBxH (m)
LxBxH (m)
LxBxH (m)

*
*
*
*

LxBxH (m)
m

t
t
t
t
t
t
t
t
t
t
t

*
*
*
*
*
*
*
*
*
*
*

kW

*
*
*

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 3 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

7.0

Cogeneration Scheme

7.1
7.1.1
a.

b.

c.
d.
e.

f.

7.1.2
a.

b.

OPTION-1: MILLING
For Mode 'A'
Inlet live steam
- Pressure
-Temperature
- Flow
Extraction Steam @ 8.0 bar
(a)
1st controlled extraction
For steam ejector
Bleed system pressure at
battery limits
Extraction Steam @ 2.6 bar
(a)
Power available at Alternator
Terminal
Condensing System
Condenser operating pressure
Condensing cooling water inlet
temperature
Condenser sizing
Condenser outlet water
temperature
Thermodynamic Efficiency
- 1st Stage
- 2nd Stage
- 3rd Stage

Units

Preferred
Specification

bar (a)
C
t/h

64
500 + 0, - 5
205

t/h
t/h

t/h

26.5
*
No reduction in
pressure down to
40 % of MCR
157.5

MW

35.03

bar (a)
C

0.14
32

To suit operation in
all 3 modes
*

%
%
%

*
*
*

bar (a)
C
t/h

64
500 + 0, - 5
159

t/h
t/h

15
*

For Mode 'B'


Inlet live steam
- Pressure
-Temperature
- Flow
Extraction Steam @ 8.0 bar
(a)
1st controlled extraction
For steam ejector

* Bidders to specify

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 4 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Units

Bleed system pressure at


battery limits
c.
d.
e.

f.

7.1.3
a.

b.

c.
d.
e.

Preferred
Specification

t/h

No reduction in
pressure down to
40 % of MCR
94

MW

28.63

bar (a)
C

*
32

To suit operation in
all 3 modes
*

%
%
%

*
*
*

bar (a)
C
t/h

64
500 + 0, - 5
75

1st controlled extraction


For steam ejector
Bleed system pressure at
battery limits

t/h
t/h

Extraction Steam @ 2.6 bar


(a)
Power available at
Alternator Terminal
Condensing System
Condenser operating pressure
Condensing cooling water inlet
temperature

t/h

0
*
No reduction in
pressure down to
40 % of MCR
53.5

MW

10.06

bar (a)
C

*
32

Extraction Steam @ 2.6 bar


(a)
Power available at
Alternator Terminal
Condensing System
Condenser operating pressure
Condensing cooling water inlet
temperature
Condenser sizing
Condenser outlet water
temperature
Thermodynamic Efficiency
- 1st Stage
- 2nd Stage
- 3rd Stage
For Mode 'C'
Inlet live steam
- Pressure
-Temperature
- Flow
Extraction Steam @ 8.0 bar
(a)

* Bidders to specify

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 5 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Units

Condenser sizing

f.

g.

7.2
7.2.1
a.

b.

c.
d.
e.

Condenser outlet water


temperature
Thermodynamic Efficiency
- 1st Stage
- 2nd Stage
- 3rd Stage
Captive Power
Total installed electrical power
(excluding standby unit)
Expected electrical load during
start-up
Expected electrical load in
operation at MCR
OPTION -2: DIFFUSER
For Mode 'A'
Inlet live steam
- Pressure
-Temperature
- Flow
Extraction Steam @ 8.0 bar
(a)
1st controlled extraction
For steam ejector
Bleed system pressure at
battery limits
Extraction Steam @ 2.6 bar
(a)
Power available at Alternator
Terminal
Condensing System
Condenser operating pressure
Condensing cooling water inlet
temperature
Condenser sizing
Condenser outlet water
temperature

* Bidders to specify

Preferred
Specification

To suit operation in
all 3 modes
*

%
%
%

*
*
*

kW

kW

kW

bar (a)
C
t/h

64
500 + 0, - 5
214

t/h
t/h

t/h

27.8
*
No reduction in
pressure down to
40 % of MCR
163.45

MW

35.43

bar (a)
C

0.14
32

To suit operation in
all 3 modes
*

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 6 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

f.

7.2.2
a.

b.

c.
d.
e.

f.

7.2.3
a.

Particulars

Thermodynamic Efficiency
- 1st Stage
- 2nd Stage
- 3rd Stage

Units

Preferred
Specification

%
%
%

*
*
*

bar (a)
C
t/h

64
500 + 0, - 5
166.87

t/h
t/h

t/h

15.75
*
No reduction in
pressure down to
40 % of MCR
103.16

MW

29.9

bar (a)
C

*
32

To suit operation in
all 3 modes
*

%
%
%

*
*
*

bar (a)
C
t/h

64
500 + 0, - 5
69.69

For Mode 'B'


Inlet live steam
- Pressure
-Temperature
- Flow
Extraction Steam @ 8.0 bar
(a)
1st controlled extraction
For steam ejector
Bleed system pressure at
battery limits
Extraction Steam @ 2.6 bar
(a)
Power required at
Alternator Terminal
Condensing System
Condenser operating pressure
Condensing cooling water inlet
temperature
Condenser sizing
Condenser outlet water
temperature
Thermodynamic Efficiency
- 1st Stage
- 2nd Stage
- 3rd Stage
For Mode 'C'
Inlet live steam
- Pressure
-Temperature
- Flow

* Bidders to specify

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 7 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

b.

c.
d.
e.

f.

2401-1
1.1

Particulars

Units

Preferred
Specification

1st controlled extraction


For steam ejector
Bleed system pressure at
battery limits

t/h
t/h

Extraction Steam @ 2.6 bar


(a)
Power required at
Alternator Terminal
Condensing System
Condenser operating pressure
Condensing cooling water inlet
temperature
Condenser sizing

t/h

0
*
No reduction in
pressure down to
40 % of MCR
47.16

MW

9.1

bar (a)
C

*
32

To suit operation in
all 3 modes
*

%
%
%

*
*
*

kW

kW

kW

Extraction Steam @ 8.0 bar


(a)

Condenser outlet water


temperature
Thermodynamic Efficiency
- 1st Stage
- 2nd Stage
- 3rd Stage
Captive Power
Total installed electrical power
(excluding standby unit)
Expected electrical load during
start-up
Expected electrical load in
operation at MCR
Steam turbine
Type Impulse/Reaction
Designed Running Speed
Critical Speeds
- Turbine
- Alternator
Steam Flow radial/axial
Number of stages
Conform rotor is single piece
forged Integral with rotor

* Bidders to specify

rpm
rpm
rpm
No.

*
*
*
*
*
*
*
*

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 8 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Method of blade attachment


- Rows with shrouds
- Rows with lacing wires
Type of steam glands
- High Pressure
- Inter stage
- Low Pressure
Size of 66 bar (a) pressure
steam pipe at inlet of turbine
Maximum rotor peripheral
speed
1.2

Units

*
*
*
*
*
*
*
m/s

Material of Construction
Turbine casing
Exhaust hood
Rotor
Blades
Diaphragms
Steam nozzles
Labyrinths
Bearing liners

1.3

Combined stop and


emergency valve (CSEV)
and control valve.

1.4

Safety valves and quick


acting non return valves.
- for 8 bar (a) extraction line
- for 2.6 bar (a) extraction line

1.5

Gland sealing system


- Glands type

1.6

Bearings
- type

* Bidders to specify

*
*
*
*
*
*
*
*

Labyrinth type
sealed with steam
13% Cr, stainless
steel

- Gland packing material


Gland steam condenser
- Type
- Diameter
- Overall length

Preferred
Specification

m
m
Hydrodynamic

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 9 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Units

Preferred
Specification

Bidders
Specifications

Radial and Thrust


bearing.
- material
- Mounting
- Lubrication
- Type of lubrication
- Quantity of oil required
1.7

1.9

Barring Gear
- Type
- Drive motor
- Manual barring included

Yes/No

Motorised
*
*
*

Governing System
Type
Control philosophy of governor
Range of droop adjustment
Range of governor band
adjustment
Maximum speed rise
when full load is thrown off
Type of Extraction pressure
control system

1.10

LPM

*
*
*
*

Electronic
Woodward
505 E or equivalent
Attach
separate
sheet
*
*
rpm

*
*

Lubricating oil system and


turbine control oil system
*

Oil Pumps
Shaft driven Main Oil Pump
Type
Capacity
Head
Auxiliary Oil Pump
Type
Capacity
Head
No. of Pumps
Drive Motor
* Bidders to specify

m3 /h
m

m /h
m
No.

*
Gear
*
*
Gear
*
*
1
*

*
*

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 10 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Units

Preferred
Specification

kW
rpm

*
*

Rating
Speed

Emergency DC Oil Pump


Type
Capacity
Head
Drive Motor - Rating
- Speed
- Voltage
- Battery
- Voltage
- Current
- Ampere hour capacity
- Battery charger
- Starter for DC motor

m /h
m
kW
rpm
V DC
V DC
A
AH

Hand operated pump


Capacity
Head
Oil Purifier with Pump
Capacity
Heater rating
Drive Motor - Rating
- Speed

m3 /h
m

*
*

Descriptio
n
m3 /h
kW

Oil Reservoir and Oil


Coolers
Oil reservoir capacity
Oil reservoir retention time
Oil Coolers
Cooling surface each
Oil flow each
Cooling water flow each
Cooling temperature range
- Oil
- Circulating water

* Bidders to specify

Gear/Centrifugal
*
*
*
*
*
*
*
*
*
*
*
*

*
*
*
*
*

m3
min

*
*

m2
m3 /h
m3 /h

*
*
*
*
*
*

C - 0C
0
C - 0C

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 11 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Units

Minimum 30
minutes
Stainless steel

Capacity of emergency
overhead oil tank
Inside lining material
1.11
1.11.1

Preferred
Specification

Condensing plant
Condenser
Type
Design Code
Tube surface area
No. of passes
Velocity in the tube
Pressure drop across
condenser
Fouling factor (approx.)

m2
No.
m/sec
mm WC

*
*
*
*
*
*
*

Condenser dimensions - Diameter


- Overall length
- Tube withdrawal length

m
m
m

*
*
*

Hot well capacity

m3

Material of Construction
- Shell
- Tube plates
- Tube support plates
- Water boxes
- Tubes

*
Carbon Steel
Carbon Steel
Carbon Steel
Carbon Steel
Admiralty Brass

Atmospheric discharge
device

Exhaust steam Flow


- Minimum
- Average
- Maximum

t/h
t/h
t/h

*
*
*

Cooling water Flow


- Minimum
- Average
- Maximum

t/h
t/h
t/h

*
*
*

* Bidders to specify

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 12 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Cooling water temperatures


- Inlet
- Outlet
Heat content of exhaust steam

Units

C
C
kcal/kg
0

Size of condenser cooling


water
- Inlet
- Outlet
Condensate available for
boiler feed
From turbine condenser
From gland cooling
condenser
- From steam jet ejector
Total quantity of condensate
Temperature of mixed
condensate in hot well

32
42
*

t/h
0
C

Qty
t/h
*
*

Temp
0
C
*
*

*
*
*

Vacuum package
Normal Running Ejector
Inlet Steam Conditions - Pressure
- Temperature
No. of stages
Steam Consumption
Capacity of dry air
Vacuum on suction side
Quick Start Ejector
Hogging
Inlet Steam Conditions
- Pressure
- Temperature
No. of stages
Steam Consumption
Capacity of dry air
Material of construction
Body
Impeller
Shaft

* Bidders to specify

Bidders
Specifications

*
*

1.11.2

Preferred
Specification

Bar (a)
0
C
kg/hr
Nm3 /min
mm WC

Bar (a)
0
C
kg/hr
Nm3/min

*
8
178
*
*
*
*

*
8
178
*
*
*
*
*
*

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 13 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Gland seal type


Time to achieve a vacuum of
250 mm HG
1.11.3

1.12
1.12.1

Condensate extraction
pumps
Quantity
Type
Rating:
- Capacity
- Head
NPSH
Drive Motor
- Rating
- Speed
- Voltage
- Operating load at MCR
Instrumentation and
controls for turbine
Turbine indicating and control
instrumentation provided for
following controls :
- Speed
- Load
- Emergency and control
valve lift
- Control oil pressure
- Journal bearing metal
temperature
- Thrust pad metal
temperature
- Axial position of thrust
collar relative to its own
hosing
- Differential expansion
between shaft and casing
at any critical point
- Shaft eccentricity
- Bearing pedestal or shaft
vibration
- Appropriate steam and
metal temperatures and
their differentials,

* Bidders to specify

Units

min

Preferred
Specification

*
*

No.

2 x 120 % each
*

m3 /hr
mwc
m
kW
rpm
V
kW

*
*
*
*
*
*
*
*

Yes/No

Yes/No
Yes/No

*
*

Yes/No

Yes/No

Yes/No

Yes/No
Yes/No

*
*

Yes/No

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 14 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Units

Preferred
Specification

Yes/No

Yes/No

especially with a view to


ensure safety during
starting operations and
under transient conditions
-

Annunciators and alarms,


wherever required
Turbine accessories
interlock and protections

*
1.12.2

1.12.3

Turbine safety and


protection system to be
provided for :
- Low lubricating oil pressure
- Over speed
- Excessive axial
displacement
- Excessive thrust bearing
wear
- Excessive vibration
- Excessive bearing
temperature
- Low condenser vacuum
- Emergency push button
trip located in centralised
control room and on or
near turbo-Alternator
- High alternator winding
temperature
- High alternator bearing
temperature
Local instrumentation panel
to be provided for :
- Live steam pressure gauge
- Extraction steam 8 bar(a)
pressure gauge
- Extraction steam 2.6 bar
(a) pressure gauge
- Exhaust steam 0.14 bar (a)
pressure gauge
- Gland steam pressure
gauge
- Live steam pressure gauge

* Bidders to specify

Yes/No
Yes/No
Yes/No

*
*
*

Yes/No

Yes/No
Yes/No

*
*

Yes/No
Yes/No

*
*

Yes/No

Yes/No

Yes/No
Yes/No

*
*

Yes/No

Yes/No

Yes/No

Yes/No

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 15 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

1.12.4

Live steam temperature


indicator
Extraction steam 8 bar (a)
pressure temperature
indicator
Extraction steam 2.6 bar
(a) pressure temperature
indicator
Exhaust steam 0.14 bar (a)
pressure temperature
indicator
Gland steam temperature
gauge
Lubricating oil pressure
gauge
Governing oil pressure
gauge
Dial type tachometer
Lubricating oil temperature
indicator
Turbine bearing
temperature indicators
Gear box bearing
temperature indicators
Alternator bearing
temperature indicator
Turbine speed indicator

To confirm that Recording


facilities are available for:
Live steam
- Temperature
- Pressure
- 8 bar (a) steam pressure
- 8 bar (a) steam
temperature
- 8 bar (a) steam flow
- 2.6 bar (a) steam pressure
- 2.6 bar (a) steam
temperature
- 2.6 bar (a) steam flow
- Exhaust steam at 0.14 bar
(a)
- Pressure

* Bidders to specify

Units

Preferred
Specification

Yes/No

Yes/No

Yes/No

Yes/No

Yes/No

Yes/No

Yes/No
Yes/No
Yes/No

*
*

Yes/No

Yes/No

Yes/No

Yes/No

Yes/No
Yes/No
Yes/No
Yes/No

*
*
*
*

Yes/No
Yes/No
Yes/No

*
*
*

Yes/No

*
*

Yes/No

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 16 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Temperature
Steam flow/Condensate

To confirm that Integrating


facilities are available for :
- Live steam flow
- 8 bar (a) steam flow
- 2.6 bar (a) steam flow
- Condensate flow
- Turbine running hours
- Power generated
1.12.5

1.12.6

1.13

Units

Preferred
Specification

Yes/No
Yes/No

*
*

Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No

*
*
*
*
*

To confirm that Dedicated


independent micro
processor based system for
following is provided

- Turbine vibration monitoring

- Turbine governing

*
The turbine control
system shall be
microprocessor
PLC based local
control panel. In
addition the PLC
will accept 4-20 mA
from the DCS for
control of all analog
signals listed in
1.12.3

System integration between


turbine control system and
plant DCS

Thermal
lagging

insulation

and

To confirm that thermal


insulation, lagging and
aluminium cladding for
exposed portion of Turbo
Alternator and accessories.
Aluminium cladding thickness
To confirm that difference

* Bidders to specify

mm
0
C

1.0
20

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 17 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Units

Preferred
Specification

Bidders
Specifications

between the ambient and


outside surface of insulation
temperature shall be not more
than
1.14
1.15
2401-2

2401-3

Attach separate
sheet
Attach separate
sheet

Motor list for Turbine and


Auxiliaries
Pump list for Turbine and
Auxiliaries
Speed reducing gear box
Type of gears
No. of stages
Speed reduction ratio
AGMA service factor
Material of construction and
heat treatment
- Gears
- Casing

*
*
*
1.3
*
*
*

Alternator
Rating
Applicable code
Nominal Output
Duty
Rated Voltage
Voltage variation
Rated Power Factor
Rated Current
Rated Frequency
Frequency variation
Rated Speed
Rotation viewed from NDE
No. of phases
Type of connection
No. of line connections
No. of Neutral connections
Enclosure Alternator
Enclosure Exciter
Cooling System
Excitation System
Short circuit ratio

* Bidders to specify

KVA
kW
V
%
Lag
Amps
Hz
%
rpm

IS 4722/IEC 34
50000
40000
Continuous
11000
10
0.8
*
50
5
1500
*
Three
Star
Three
Three
IP 54
IP 23
CACW
Brush less
*

*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 18 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Design Ambient Temperature


Max. Permissible capacitive
Loading
Max. Permissible inductive
Loading
Steady state 3 phase S.C.
Current
Max. Initial S.C. current (peak)
3 Phase S.C. withstand time
Max. Continuous negative
sequence current withstand
Max. Deviation from sine wave
Synchronous Impedance
Max. Noise level at 1 M from
equipment
Max. Permissible impact load
Mode of earthing
Insulation class
Stator
Rotor
Main Exciter armature
Main exciter field
Temperature rise limited to
class
Stator
Rotor
Type of winding treatment
Stator
Rotor
Max. Vibration
Max. Harmonic content in
output
Overload capacity- 50 %
Overload capacity- 10% in
every 12 hour interval
Efficiency at rated Power
Factor
100% load
75% load
50% load
25% load
Critical speed of Alternator

* Bidders to specify

Units

Preferred
Specification

Bidders
Specifications

C
KVAR
P.F. Lead
KVAR
P.F. Lag
kA

45
*
*
*
*
*

*
*

kA
Sec
%

*
3
Min. 10 %

*
*
*

Ohms
Db

*
*
*

*
*
*

MW
Ohm

*
*/ NGR

*
*
*
*
*
*
*
*

F
F
F
F
B
B

%
Sec
Hour

VPI
Roll impregnation
*
Less than 5
30
1

*
*
*
*
*
*
*
*
*
*

rpm

*
*
*
*
*

*
*
*
*
*

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 19 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Units

Preferred
Specification

Bidders
Specifications

MVA
%

*
*

*
*
*

X d (UnSat)

X 2 (Sat)

X 2 (UnSat)

X 0 (Sat)

X 0 (UnSat)

Reactances
Base MVA
X d (Sat)

Inertia Constant
2

Moment of Inertia (GD )


Alternator
Excitation System
Excitation system type
Excitation supply
Initial flash excitation
equipment
Short circuit excitation
equipment
Field Breaker
Discharge resistance rating
Redundant Thyrister circuits
Parallel Diodes
Diode Failure compensation
Quadrature Droop
compensation
Exciter rating
Exciter nominal response
PMG rating
PMG Voltage
PMG frequency
AVR make
AVR type, sensitivity, burden
AVR steady state voltage
accuracy
AVR response time
Voltage change for 100% load

* Bidders to specify

Kg M

Brushless
*
*

*
*
*
*

*
*
Required
Required
*Required
*Required

*
*
*
*
*
*

*
>1

*
*

230
50
*
*
*

*
*
*
*
*

ms
%

*
*

*
*

KW
KVA
V
HZ

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 20 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

change
Alternator voltage regulation
Cooling system
Type of cooler
Mounting
No. of coolers/ Sections
Capacity of cooler/ section
Cooling water requirement
Redundancy in cooling system
Arrangement of cooler tubes
Material of cooling tubes
Cooler tube side design
pressure
Bearing
Type of Bearing for DE, NDE
Mounting
Lubrication
Type of lubrication
Quantity of oil required
RTDs
Per Phase
Each Bearing
Cooling system
Inlet
Outlet
Microprocessor based
Multipoint Temperature
scanner with Min. 2 spare
channels and separate output
contacts for Alarm and Trip for
each channel
Space Heater
Alternator
Exciter
Terminal Box

* Bidders to specify

Units

Preferred
Specification

Bidders
Specifications

Less than 0.5

CACW
*
*
*
*
Required
*
Admiralty Brass
*

*
*
*
*
*
*
*
*
*
*

%
LPM

kg/ cm2

LPM

*
*

No.
No.

2
1

*
*
*
*
*

As required
As required
Reputed make

*
*
*
*
*
*
*

As Required
As Required

*
*
*

Suitable for
11 kV, UE, XLPE
Al/Copper cable
termination

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 21 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Total weight of alternator


Total weight of Stator
Total weight of Rotor
Total weight of Exciter
Heaviest lift
110 V, 200 Ah Battery
Make
Type
Capacity at 27 0C at 10 hour
rate
Initial
Rated
End of life
Rated capacity at Min. ambient
temp.
Type of positive plates
No. of positive plates/cell
No. of cells required to give
rated DC Voltage
Capacity at high discharge
rates
@ 15 Min.
@30 Min.
@ 45 Min.
From 1 hour to 10 hour
Max. momentary current (1
Minute)
Expected life of battery
Float charging voltage/current
Trickle charging
voltage/current
Boost charging voltage/current
Equalizing charge
Voltage /Current
Duration
Type of containers
Type of cell
Whether explosion proof vents
are offered
Ah efficiency at rated load
Ventilation requirement
Total weight of battery

* Bidders to specify

Units

Preferred
Specification

Bidders
Specifications

Kg
Kg
Kg
Kg
Kg

*
*
*
*
*

*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*

kg

*
*
*
*

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 22 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Aux. MCC required


Details
Make
Type
Rated Current
Rated Voltage
Total Load
Essential Load
S.C. current withstand for 3
Sec
No. of feeders
Type of construction
Paint shade Exterior / Interior
Type of Enclosure
Panel Height, Length, Width
Panel weight
HT Cables
Make
Type
Rated Voltage for Ue grade
Max. Voltage
No. of core and size
Conductor material
Overall diameter
Min. bending radius
Weight per meter
Max. AC resistance at 75 deg.
C
Reactance (Inductive)
Capacitance per core
Current carrying capacity
In ground
In air
In ducts
Deration factor for various
conditions of laying
Over load capacity & Duration
(Furnish current Vs. withstand
curves)
Recommended operating
temperature
Continuous
After short circuit
* Bidders to specify

Units

kA

Preferred
Specification

Bidders
Specifications

50

*
*
*
*
*
*
*
*

IP
mm
kg

*
*
*
*
*
*

mm
mm
Kg
Ohm/km

*
*
*
*
*
*
*
*
*
*

Ohm/km
F/km

*
*
*
*
*
*
*
*

*
*
*

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 23 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Thermal let through withstand


for 3 sec
Short circuit withstand capacity
for 3 sec
LT Power and control cables
Make
Type
Rated Voltage
Max. Voltage
No. of core and size
Conductor material
Min. bending radius
Weight per meter
Max. AC resistance at 75 deg.
C
Reactance (Inductive)
Capacitance per core
Current carrying capacity
In ground
In air
In ducts
Deration factor for various
conditions of laying
Over load capacity & Duration
(Furnish current Vs. withstand
curves)
Recommended operating
temperature
Continuous
Short circuit withstand capacity
for 3 sec
3.12

3.13

Commissioning spares
List of commissioning spares
shall be submitted
Spares
Spares for two years normal
operation for each turbine shall
include, but not limited to
following:

* Bidders to specify

Units

Preferred
Specification

Bidders
Specifications

*
kA

Mm
Kg
Ohm/km

*
*
*
*
*
*
*
*
*

Ohm/km
F/km

*
*
*
*
*
*
*
*

kA

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 24 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Turbine
- Front journal bearing
- Rear journal bearing
- Thrust bearing
- Labyrinth fins for casing
and rotor
- Labyrinth fins for glands
- Oil scrapper ring
- Front journal bearing pads
& Rear journal bearing pads
Reduction gear box
- Bearings
Alternator
- Front journal bearing
- Rear journal bearing
- RTDs for bearing
- Bearing set
3.14

2104

1.1

1.2

Units

Preferred
Specification

Bidders
Specifications

No.
No.
No.
Set

1
1
1
1

*
*
*
*

Set
Set
Set

1
1
1

*
*
*

Set
No.
No.
No.
Set

*
1
1
2
1

Special tools and tackles


Bidder to confirm that all tools,
tackles, consumables etc for
erection is included
Bidder shall furnish list of
important tools and tackles

*
*

HP/LP Piping
To confirm complete
piping/piping up to terminal
point is included

Reference drawing
no 2FD-932

66 bar (a) pressure steam


piping
- Material
- Size
- Schedule

Yes/No

8 bar (a) pressure steam


piping
- Material

* Bidders to specify

*
*
*
*
*

mm NB

*
*
*
Yes/No
*

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 25 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Size
Schedule

8 bar (a) pressure steam


header
- Material
- Size
- Schedule
1.3

2.6 bar (a) pressure steam


piping
- Material
- Size
- Schedule
2.6 bar (a) pressure steam
header
- Material
- Size
- Schedule

1.4

1.61.17

0.14 bar (a) pressure steam


piping
- Material
- Size
- Schedule

Units

mm NB

* Bidders to specify

Bidders
Specifications

*
*
Yes/No

mm NB

*
*
*
Yes/No

mm NB

*
*
*
Yes/No

mm NB

*
*
*
Yes/No

mm NB

*
*
*
Yes/No

To confirm all valves,


traps/collecting tank with level
controller, fittings, supports,
gaskets, steam traps,
fasteners etc for all above
piping are included
Gaskets

HP/LP steam pipe lengths


included in supply
H.P pipe line from steam
distribution header to inlet of
turbine 300 mm NB

Preferred
Specification

Include all M.P/L.P


piping gaskets and
One lot spiral wound
metallic type for HP
piping
Qty
*

Unit rate / m in US $
*

Unit rate / m in
US $

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 26 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

M.P pipeline from turbine


uncontrolled extraction to M.P
header 150 NB
L.P pipeline from turbine
controlled extraction to L.P
header 1400 NB
Header lengths
M.P. header of 350 mm NB
L.P. header of 1400 mm NB

Units

*
*

*
*

Calculation sheet for size,


compensation of load due to
thermal expansion etc

1.18

1.19

Shall be furnished on
award of contract

Pressure gauge at steam


headers.

200 mm dial size

Temperature gauge at steam


headers.

200 mm dial size

Condensate piping
- Material
- Size of pipe at terminal
point

Yes/No
mm NB

Thermal
insulation
and
lagging for HP/LP piping
To confirm that thermal
insulation, lagging and
aluminium cladding for piping
in contact with steam,
condensate, hot water and any
other hot fluid is included
Aluminium cladding thickness
To confirm that difference
between the ambient and
outside surface of insulation
temperature shall be not more
than

1.20

Preferred
Specification

Drain water for re-circulation


- Material

* Bidders to specify

mm
0
C

1.0
20

Yes/No
*

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 27 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Size of pipe at terminal


point

Drain for general purpose


water
- Material
- Size of pipe at terminal
point
1300

Steam Distribution system

1301

For 8 bar (a) extracted steam


De-superheated water
temperature
Quantity of de-superheating
water required
For 2.6 bar (a) extracted
steam
De-superheated water
temperature
Quantity of de-superheating
water required

1302

De-super heater water


piping and pumps
Piping
- Material
- Size
- Schedule
Pumps
Type
Capacity
Head
2421
1.1

Units

Preferred
Specification

mm NB

*
Yes/No

mm NB

*
*

3 Nos.
0
C

*
95

t/h

3 Nos.
0

95

t/h

mm NB

*
*
*
*
*
*

m3/hr
mlc

EOT CRANE FOR CO-GENERATION POWER HOUSE


Specifications
Location of crane

Power house

Type of crane

Complete EOT
crane with twin

* Bidders to specify

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 28 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Units

Preferred
Specification

girder, platform
rails, plate box
girder, welded type.
Indoor duty
Operation from

Floor level. All


motions electrically
operated, pendent
type switch

Standards/Codes

IS:807-1976 and
3177-1977 or
equivalent

Class of duty

II

Lifting capacity
Auxiliary hoist
Main hoist
Span

tons
tons
M

20
60
Suitable for building
column centre to
centre 84

Length (L.T.)

84 (approx.)

Centre to centre of gantry


track rails

Type of hook supplied

Standard C type as
per IS:3815 or
equivalent

Section of gantry rail


End carriage
Wheel base
Material of travelling wheel
Maximum load excluding
impact on travelling wheel
(wheel load)
Wheel dia
Hardness of wheel

* Bidders to specify

lbs/yard
mm

*
*
EN-8 forged

tons
mm
BHN

*
250

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 29 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Units

Crab
Centre of traverse wheels
Material of traverse wheels
Dia of traverse wheels
Hardness of traverse wheels

Preferred
Specification

mm

*
EN-8 forged

mm
BHN

*
250

Platform
Type

Chequered plate (5
mm thick)
One continuous on
one side
Two small on the
other side

Number

Hoisting rope
Factory of safety

Brakes
Main Hoisting motion

Electro hydraulic
thrustor * mm dia
Electro hydraulic
thrustor * mm dia

Auxiliary Hoisting motion


C.T. Motion

Electro hydraulic
thrustor * mm dia
Electro hydraulic
thrustor * mm dia

L.T. Motion
Motors
Qty
Main hoist
1
Auxiliary
hoist
Long travel
Cross travel

1
1
1

Type
Sq.
cage
Sq.
cage
Slip ring
Slip ring

Details of helical gear boxes


for

* Bidders to specify

Bidders
Specifications

HP
*

Rev
960

Enclosure
TEFC

Ratings
40 % CDF

960

TEFC

40 % CDF

*
*

960
960

TEFC
TEFC

40 % CDF
40 % CDF

Reputed make,
splash lubricated,
Service factor of
2.0 for Class II
duty. As per BS
436 or equivalent

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 30 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Units

Main Hoist
Auxiliary Hoist
C.T.
L.T.

Power cables
Control cables
Limit switches
Panels
1.2

Spares for 2 year operation

Preferred
Specification

Bidders
Specifications

Details of gear
boxes to be
furnished by Bidder
Details of gear
boxes to be
furnished by Bidder
Details of gear
boxes to be
furnished by Bidder
Details of gear
boxes to be
furnished by Bidder

Copper armoured
Copper Flexible
included
included
Yes/ no

1828 & 1829 Cooling Tower, Auxiliaries and Pumps


1828
1.1-1.9

Cooling tower and


auxiliaries
Cooling tower
Make
Type
Structure
Fill
No of cells
Model
Working parameters
- Total Capacity
- Hot water temperature
(inlet)
- Cold water temperature

* Bidders to specify

Induced draft
(cross flow)
RCC (Employers
scope)
Extended PVC V
bar
7
*
10800 m3/hr
42 0C
32 0C

*
*
*

*
*

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 31 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Units

(outlet)
- Design wet bulb type
- Evaporator loss
- Drift loss % max
Dimensions
- Overall dimensions (approx)
- Width
- Length
- Height
Inside basin
- Width
- Length
Static pumping head
Fans
Make
Number
Diameter
No of blades
RPM
Material of construction
Blade
Hub
Hub cover
BHP per cell
Reduction gear
No of units
Make
Model no.
Ratio
Type of gears
Safety factor
Designed life of gears and
bearings
Drive shaft
No of units
Type
Shaft material
Yoke material
Balancing
Motors
No of units

* Bidders to specify

Preferred
Specification

28 0C

m
m
m

*
*
*
*
*

m
m
MWC

*
*
*

*
*
*
*
*
*
*
*
*
*
*
*
*
*
Over 2.0
*
*
*
*
*
*
*

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 32 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Make
Enclosure

Rated HP
Synchronous speed (RPM)
Phase
Voltage
Insulation
Construction material
Frame work
Casing
Fill
Eliminators
Bolts, nuts & washers
Fan cylinders
Nails
Distribution nozzles
Basin

Units

Preferred
Specification

*
TEFC weather
proof (IP 55)
suitable for cooling
tower duty.
*
1500
3
400 5 %
Class F
RCC (Employers
scope)
RCC (Employers
scope)
Full wave
SS-304
RCC (Employers
scope)
SS-304/Screw
shank
Polypropylene
RCC (Employers
scope)

All instrumentation and


controls within battery limits

Valves, fittings, piping


within battery limits

Included

Valve schedule/specification
CW water pipe size
Running length considered for
tender purpose
ACW water pipe size
Running water considered for
tender purpose
1.10

Motor list

1.11

Pump list

* Bidders to specify

*
*
*
Attach separate
sheet
Attach separate
sheet

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 33 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

1.12

Motor control centre at new


pump house near cooling
tower
General
Make
Size
Type of enclosure
Thickness of sheet metal

*
*
IP4X
2 mm

Incoming feeder
Type
Volt meter
Make
Size
Range

*
ACB (EDO)
Required
*
96 x96 sq. mm.
0-500 Volt

KW meter
Make
Size
Range

Required
*
96 x 96 sq.mm.
*

KWH meter
Make
Size
Range

Required
*
96 x 96 sq. mm.

Ammeter
Make
Size
Range

Required
*
96 x96 sq.mm.
*

Indicating lamps
Make
Type

Coloured
*
LED

Voltmeter selector switch


Make
Type

Required
*
Rotary

Outgoing feeders
Type

As per requirement
ACB/MCCB
/MPCB

* Bidders to specify

Units

Preferred
Specification

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 34 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

1.13

Particulars

Units

Preferred
Specification

No. of feeders

Ammeter selector switch


Make
Type
Cable gland provided

Required
*
Rotary

Power capacitors
Make
Type

*
APP

Cables
Make
Type
Size
Voltage grade

*
Armoured, Al
As per requirement
1100 Volt

Push button stations


Make
Type of enclosure
No. of actuators ( NO/NC)

*
IP 5X
2+2

Drawings to be furnished
with tender by Bidder

General arrangement
drawings of cooling tower
showing details of tower with
basin, pump house, with
electrical panels, and piping
arrangement
Thermal performance curves
Fan characteristic curves
Pump characteristic curves
List of deviations, if any

Spares for 2 year operation


and maintenance of
equipment

* Bidders to specify

Yes/No
Yes/No
Yes/No
*
included

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 35 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

1829

Pumps

1.1

Preferred
Specification

Circulating water pumps


Service

Quantity
Type
Capacity
Head
Speed
Water to be pumped
- Specific gravity
- Temperature
- pH
Material of construction
- Casing
- Impeller
- Shaft
- Sleeve
- Seal
Coupling type
Drive motor, kW rating
- Motor type
- Power supply
- Speed
Coupling guard
Foundation bolts
Valves, piping, fittings
1.2

Units

To circulate
cooling water from
cooling tower to
condenser of DEC
type TA
4 Nos.
Horizontal
centrifugal
3500 m3/hr
40 mlc
980 rpm
1.0
30-40 0C
7.0
Cast iron
Stainless steel
Stainless steel
Stainless steel
Mechanical
Flexible coupling
*
TEFC sq. cage
400 V, 3 ph, 50 Hz
980 rpm
Included
Included
Included

Auxiliary cooing water


pumps
Service

Quantity

* Bidders to specify

To circulate
cooling water from
cooling tower to
Auxiliaries of DEC
turbine.
4 Nos.

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 36 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Type
Capacity
Head
Speed
Water to be pumped
- Specific gravity
- Temperature
- pH
Material of construction
- Casing
- Impeller
- Shaft
- Sleeve
- Seal
Coupling type
Drive motor, kW rating
- Motor type
- Power supply
- Speed
Coupling guard
Foundation bolts
Valves, piping, fittings
1.3

Make up water pumps


Service
Quantity
Type
Capacity
Head
Speed
Water to be pumped
- Specific gravity
- Temperature
- pH
Material of construction
- Casing
- Impeller
- Shaft
- Sleeve
- Seal

* Bidders to specify

Units

Preferred
Specification

Horizontal
centrifugal
600 m3/hr
40 mlc
980 rpm
1.0
30-40 0C
7.0
Cast iron
Stainless steel
Stainless steel
Stainless steel
Mechanical
Flexible coupling
TEFC sq. cage
400 V, 3 ph, 50 Hz
980 rpm
Included
Included
Included
To pump water to
cooling tower
basin
2 Nos.
Horizontal
centrifugal
300 m3/hr
30 mlc
980 rpm
1.0
35-45 0C
7.0
Cast iron
Stainless steel
Stainless steel
Stainless steel
Mechanical

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 37 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Coupling type
Drive motor, kW rating
- Motor type
- Power supply
- Speed
Coupling guard
Foundation bolts
Valves, piping, fittings
1.4

Units

Preferred
Specification

Flexible coupling
*
TEFC sq. cage
400 V, 3 ph, 50 Hz
980 rpm
Included
Included
Included

Main Cooling water piping


from cooling tower to
condenser
and
from
condenser back to cooling
tower
- Material
- Size of main pipes
- Valves, fittings.

mm NB
Included

Auxiliary
Cooling
water
piping from cooling tower to
oil cooler/ alternator and
from oil cooler/ alternator
back to cooling tower
- Material
- Size of main pipes
- Valves, fittings.

mm NB
Included

Make up water piping


- Material
- Size of main pipes
- Valves, fittings.

mm NB
Included

To confirm all valves,


traps/collecting tank with
level
controller,
fittings,
supports, gaskets, fasteners
etc for all above piping are
included

* Bidders to specify

Yes/No

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 38 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No
2423

Particulars

Units

Preferred
Specification

COMPRESSED AIR SYSTEM

1.1-1.4

Air compressor for


instrumentation
Model
Make
Type
Quantity
To confirm the compressor is
non lubricating type
To confirm the air supply shall
be moisture free
Capacity
Pressure

No.

*
*
Non lubricated,
air/water cooled
Two
*
*

Nm3/hr
bar(a)

*
8

Electrical Control Panel

Low oil pressure cut


out switch
High discharge
Pres/Temp cut out
Capacity control Hour
meter

After Cooler/Moisture
Separator

To be provided. The
outlet air temperature
5 0C above cooling
water outlet
temperature

Air drier unit


Capacity
-

Suitable to air
compressor
*

Absorption tower details

Drive motor
Power
Speed
Type of coupling/V-belt
Set of air piping, valves,
fittings, instrumentation

* Bidders to specify

*
kW
Rpm

*
*
Included

Bidders
Specifications

J P MUKHERJI & ASSOCIATES PVT LTD


Tendaho Sugar Project

TECHNICAL SCHEDULE

Section-VI-E
Page - 39 / 39

BID DOCUMENT FOR


POWER GENERATION PLANT
Item
No

Particulars

Units

Electrical
MCC
Air receiver
Capacity
Size D x height
Pressure ratings
Mountings

Air piping, tubing for


instrumentation
- Material
- Size of delivery pipe of
compressor
Spares for 2 year operation
and maintenance

* Bidders to specify

Preferred
Specification

Provided at Plant
control room.
min

30
*
*
Safety valve, drain
valve, pressure
gauge, fusible plug
etc.
Included

mm NB

*
*
Included

Bidders
Specifications

You might also like