You are on page 1of 2

TRANSMISSION CORPORATION OF A.P.

LIMITED
SITE :

DATE :

Name of the Substation


Name of the Feeder
Date of testing
Metering Circuit Testing
Applied I
Ammeter
&V

:
:
:
:
Voltmeter

MW

PHASE

SETTING

O/L R

PS =

TL =

PS =

TL =

PS =

TL =

PS =

TL =

O/L B

E/L

Energy Meter
Currents

O/L &E/L Relay Make :


Inputs verification:
Input V& I
R phase
voltage
current

O/L Y

MVAR

PICK
UP

MW

MVAR

PF

Type
Y phase
voltage

PSM TIME(actual) TIME

B phase
current

voltage

REMARKS

Testing:

current

DC Incoming
1) At C&R panels DC wiring terminations checked for loose contacts if any.
DC Voltage: + to - =
; + to E =
; - to E =
At C & R panels CT wiring terminations checked for loose contacts if any
At C & R panels PT wiring terminations checked for loose contacts if any.
Earthing of control & Relay panel (continuity of panel earth bar with main earth mat)
Remarks

Functional checks:
1. Remote close
:
2. Remote trip
:
3. Protection trip
:
4. All Indications
:
5. All annunciations :
6. Breaker Trouble Alarms: