Voltmeter
MW
PHASE
SETTING
O/L R
PS =
TL =
PS =
TL =
PS =
TL =
PS =
TL =
O/L B
E/L
Energy Meter
Currents
O/L Y
MVAR
PICK
UP
MW
MVAR
PF
Type
Y phase
voltage
B phase
current
voltage
REMARKS
Testing:
current
DC Incoming
1) At C&R panels DC wiring terminations checked for loose contacts if any.
DC Voltage: + to - =
; + to E =
; - to E =
At C & R panels CT wiring terminations checked for loose contacts if any
At C & R panels PT wiring terminations checked for loose contacts if any.
Earthing of control & Relay panel (continuity of panel earth bar with main earth mat)
Remarks
Functional checks:
1. Remote close
:
2. Remote trip
:
3. Protection trip
:
4. All Indications
:
5. All annunciations :
6. Breaker Trouble Alarms: