Professional Documents
Culture Documents
Project:
12.6.0H
Location:
Contract:
1
11-15-2016
SN:
Engineer:
Filename:
Page:
Date:
Study Case: SM
NEWWORLD
Revision:
Base
Config.:
Normal
Swing
V-Control
Load
Total
XFMR2
XFMR3
Reactor
Line/Cable
Impedance
Tie PD
Total
Synchronous
Generator
Power
Grid
Synchronous
Motor
Induction
Machines
Lumped
Load
Total
Number of Machines:
System Frequency:
60.00 Hz
Unit System:
English
Project Filename:
NEWWORLD
Output Filename:
H:\NEWWORLD\Untitled.ST2
Number of Buses:
Number of Branches:
ETAP
Project:
12.6.0H
Location:
Contract:
2
11-15-2016
SN:
Engineer:
Filename:
Page:
Date:
Study Case: SM
NEWWORLD
Adjustments
Apply
Tolerance
Individual
Adjustments
/Global
Transformer Impedance:
Yes
Individual
Reactor Impedance:
Yes
Individual
No
No
Cable Length:
No
Apply
Temperature Correction
Percent
Individual
Adjustments
/Global
Yes
Individual
Cable Resistance:
Yes
Individual
Degree C
Revision:
Base
Config.:
Normal
ETAP
Project:
12.6.0H
Location:
Contract:
3
11-15-2016
SN:
Engineer:
Filename:
Page:
Date:
Study Case: SM
NEWWORLD
Bus
ID
Type
Initial Voltage
Nom. kV
Base kV
Sub-sys
%Mag.
Ang.
0.00
Bus1
Load
22.900
22.900
100.00
Bus2
Load
22.900
22.900
100.00
0.00
Bus4
Load
0.380
0.380
100.00
180.00
Bus5
SWNG
22.900
22.900
100.00
0.00
4 Buses Total
All voltages reported by ETAP are in % of bus Nominal kV.
Base kV values of buses are calculated and used internally by ETAP .
Revision:
Base
Config.:
Normal
ETAP
Project:
12.6.0H
Location:
Contract:
4
11-15-2016
SN:
Engineer:
Filename:
Page:
Date:
Study Case: SM
NEWWORLD
Revision:
Base
Config.:
Normal
Ohms or Siemens per 1000 ft per Conductor (Cable) or per Phase (Line)
Line/Cable
ID
Cable1
Length
Library
33MCUS1
Size
50
Adj. (ft)
984.3
% Tol.
0.0
#/Phase
1
T (C)
75
R1
X1
Y1
R0
0.143611
0.0585216
0.0000159
0.4523748
X0
0.1439631
Y0
ETAP
Project:
12.6.0H
Location:
Contract:
5
11-15-2016
SN:
Engineer:
Filename:
Page:
Date:
Study Case: SM
NEWWORLD
Revision:
Base
Config.:
Normal
Transformer
ID
T1
Rating
MVA
1.250
Prim. kV
22.900
Sec. kV
Z Variation
%Z
0.380
X/R
5.00
3.50
% Tap Setting
+ 5%
- 5%
% Tol.
Prim.
Sec.
Adjusted
Phase Shift
%Z
Type
Angle
5.0000
YNyn
180.000
Rating
MVA
1.250
Prim. kV
22.900
Conn.
Sec. kV
Type
0.380
Y/Y
Primary
Type
Solid
kV
Secondary
Amp
Ohm
Type
Solid
kV
Amp
Ohm
ETAP
Project:
12.6.0H
Location:
Contract:
6
11-15-2016
SN:
Engineer:
Filename:
Page:
Date:
Study Case: SM
NEWWORLD
Revision:
Base
Config.:
Normal
Branch Connections
CKT/Branch
Connected Bus ID
ID
Type
From Bus
T1
2W XFMR
Bus2
Bus4
106.54
372.89
387.81
Cable1
Cable
Bus1
Bus2
2.70
1.10
2.91
CB1
Tie Breakr
Bus5
Bus1
0.0081934
ETAP
Project:
12.6.0H
Location:
Contract:
7
11-15-2016
SN:
Engineer:
Filename:
Page:
Date:
Study Case: SM
NEWWORLD
Revision:
Base
Config.:
Normal
Power Grid
Connected Bus
ID
U1
ID
Bus5
% Impedance
100 MVA Base
Rating
MVASC
kV
435.000
22.900
R
22.87442
X"
2.28744
Grounding
R/X"
10.00
Type
Wye - Solid
ETAP
Project:
12.6.0H
Location:
Contract:
Page:
Date:
11-15-2016
SN:
Engineer:
Filename:
Study Case: SM
NEWWORLD
Revision:
Base
Config.:
Normal
Bus1
Nominal kV
22.900
Voltage c Factor
= 1.10 (User-Defined)
Line-To-Line-To-Ground Fault
Contribution
From Bus
To Bus
ID
ID
Va
Mag.
Vb
Ang.
Mag.
0.00
Vc
Ang.
Bus1
Total
100.00
0.0
0.0
Bus2
Bus1
100.00
0.0
0.00
0.0
U1
Bus5
100.00
0.0
100.00
-120.0
Bus4
Bus2
33.33
180.0
66.67
0.0
Bus5
Bus1
100.00
0.0
0.00
0.0
Mag.
0.00
Ia
Ang.
Mag.
Ib
Ang.
Ic
Mag.
Ang.
Mag.
Ang.
I1
I2
I0
10.967
-125.7
10.967
114.3
7.311
3.656
3.656
0.0
0.000
0.0
0.00
0.0
0.000
0.0
0.000
0.0
0.000
0.0
0.000
0.000
0.000
100.00
120.0
0.000
0.0
10.967
-125.7
10.967
114.3
7.311
3.656
3.656
66.67
0.0
0.000
0.0
0.000
0.0
0.000
0.0
0.000
0.000
0.000
0.00
0.0
0.000
0.0
10.967
-125.7
10.967
114.3
7.311
3.656
3.656
ETAP
Project:
12.6.0H
Location:
Contract:
Page:
Date:
11-15-2016
SN:
Engineer:
Filename:
Study Case: SM
NEWWORLD
Fault at bus
Bus2
Nominal kV
22.900
Voltage c Factor
Revision:
Base
Config.:
Normal
= 1.10 (User-Defined)
Line-To-Line-To-Ground Fault
Contribution
From Bus
To Bus
ID
ID
Va
Mag.
Vb
I2
I0
0.0
0.000
0.0
9.513
-124.4
9.649
109.2
6.378
3.495
2.883
100.00
0.0
13.42
-128.3
14.60
152.1
0.000
0.0
9.513
-124.4
9.649
109.2
6.378
3.495
2.883
35.40
-179.6
70.80
0.4
70.80
0.4
0.000
0.0
0.000
0.0
0.000
0.0
0.000
0.000
0.000
Bus5
100.00
0.0
100.00
-120.0
100.00
120.0
0.000
0.0
9.513
-124.4
9.649
109.2
6.378
3.495
2.883
Bus1
100.00
0.0
13.42
-128.3
14.60
152.1
0.000
0.0
9.513
-124.4
9.649
109.2
6.378
3.495
2.883
Bus2
Bus4
Bus2
U1
Bus5
Ang.
Mag.
Ang.
Mag.
Ang.
Mag.
0.00
Bus1
Mag.
Ic
0.0
106.21
Ang.
Ib
0.00
Total
Mag.
Ia
0.4
Bus2
Ang.
Vc
Ang.
I1
ETAP
Project:
12.6.0H
Location:
Contract:
Page:
10
Date:
11-15-2016
SN:
Engineer:
Filename:
Study Case: SM
NEWWORLD
Fault at bus
Bus4
Nominal kV
0.380
Voltage c Factor
Revision:
Base
Config.:
Normal
= 1.05 (User-Defined)
Line-To-Line-To-Ground Fault
Contribution
From Bus
To Bus
ID
ID
Va
Mag.
Vb
Ang.
Mag.
Vc
Ang.
Mag.
Ia
Ang.
Mag.
Ib
Ang.
Ic
Mag.
Ang.
Mag.
I1
I2
I0
Bus4
Total
100.29
-0.2
0.00
0.0
0.00
0.0
0.000
0.0
39.988
169.9
39.707
49.6
26.565
13.340
13.225
Bus2
Bus4
97.66
-177.3
94.08
61.1
102.15
-56.6
0.000
0.0
39.988
169.9
39.707
49.6
26.565
13.340
13.225
Bus1
Bus2
98.25
-177.8
94.93
61.4
101.63
-57.0
0.439
110.1
0.583
30.5
0.585
-171.2
0.441
0.221
0.219
U1
Bus5
100.00
-180.0
100.00
60.0
100.00
-60.0
0.439
110.1
0.583
30.5
0.585
-171.2
0.441
0.221
0.219
Bus1
Bus5
98.25
-177.8
94.93
61.4
101.63
-57.0
0.439
-69.9
0.583
-149.5
0.585
8.8
0.441
0.221
0.219
ETAP
Project:
12.6.0H
Location:
Contract:
Page:
11
Date:
11-15-2016
SN:
Engineer:
Filename:
Study Case: SM
NEWWORLD
Fault at bus
Bus5
Nominal kV
22.900
Voltage c Factor
Revision:
Base
Config.:
Normal
= 1.10 (User-Defined)
Line-To-Line-To-Ground Fault
Contribution
From Bus
To Bus
ID
ID
Va
Mag.
Vb
Ang.
Mag.
Vc
Ang.
Mag.
Ia
Ang.
Mag.
Ib
Ang.
Ic
Mag.
Ang.
Mag.
Ang.
I1
I2
I0
7.311
3.656
3.656
Bus5
Total
100.00
0.0
0.00
0.0
0.00
0.0
0.000
0.0
10.967
-125.7
10.967
114.3
U1
Bus5
100.00
0.0
100.00
-120.0
100.00
120.0
0.000
0.0
10.967
-125.7
10.967
114.3
7.311
3.656
3.656
Bus2
Bus1
100.00
0.0
0.00
0.0
0.00
0.0
0.000
0.0
0.000
0.0
0.000
0.0
0.000
0.000
0.000
Bus4
Bus2
33.33
180.0
66.67
0.0
66.67
0.0
0.000
0.0
0.000
0.0
0.000
0.0
0.000
0.000
0.000
Bus5
Bus1
100.00
0.0
0.00
0.0
0.00
0.0
0.000
0.0
0.000
0.0
0.000
0.0
0.000
0.000
0.000
ETAP
Project:
12.6.0H
Location:
Contract:
12
11-15-2016
SN:
Engineer:
Filename:
Page:
Date:
Study Case: SM
NEWWORLD
Revision:
Base
Config.:
Normal
3-Phase Fault
kV
Bus1
22.900
Bus2
Bus4
Bus5
I"k
Line-to-Ground Fault
ip
Ik
10.967
15.820
10.967
22.900
9.873
14.241
0.380
39.905
76.517
22.900
10.967
15.820
10.967
ip
Ib
10.967
Ik
10.967
15.820
9.873
9.221
13.301
9.221
39.905
39.790
76.296
39.790
10.967
15.820
10.967
10.967
All fault currents are in rms kA. Current ip is calculated using Method C.
* LLG fault current is the larger of the two faulted line currents.
I"k
Line-to-Line Fault
10.967
I"k
ip
*Line-to-Line-to-Ground
Ib
Ik
9.498
9.498
9.498
13.701
9.221
8.550
12.333
8.550
39.790
34.559
66.266
34.559
9.498
13.701
9.498
9.498
I"k
ip
Ib
10.967
Ik
10.967
15.820
10.967
8.550
9.649
13.919
9.649
9.649
34.559
39.988
76.675
39.988
39.988
10.967
15.820
10.967
10.967
ETAP
Project:
12.6.0H
Location:
Contract:
13
11-15-2016
SN:
Engineer:
Filename:
Page:
Date:
Study Case: SM
NEWWORLD
Revision:
Base
Config.:
Normal
Fault Zf (ohm)
Resistance
Reactance
Impedance
Resistance
Reactance
Impedance
Resistance
Reactance
Impedance
Resistance
Reactance
Impedance
Bus1
22.900
1.31951
0.13195
1.32609
1.31951
0.13195
1.32609
1.31951
0.13195
1.32609
0.00000
0.00000
0.00000
Bus2
22.900
1.46086
0.18955
1.47311
1.46086
0.18955
1.47311
1.76476
0.27365
1.78585
0.00000
0.00000
0.00000
Bus4
0.380
0.00194
0.00544
0.00577
0.00194
0.00544
0.00577
0.00202
0.00546
0.00582
0.00000
0.00000
0.00000
Bus5
22.900
1.31951
0.13195
1.32609
1.31951
0.13195
1.32609
1.31951
0.13195
1.32609
0.00000
0.00000
0.00000