You are on page 1of 5

AL FOUZAN TRADING & GENERAL

CONSTRUCTION CO.
Risk Assessment Record

Likelihood

Project/
Doc. No.: 0010
Location:
Dar Al Hijra
Project
Package 1
Subject :
painting
Assessment done by:
Mohammad .Farooquddin
Date Assessed:
03/01/2017

5
4
3
2
1

10

15

20

25

12

16

20

12

15

10

3
4
5
Severity
Checked by:

Date Checked:

Eng. Abdul Mujeeb


03/01/2017

NOTE: Employees / Workers shall undergo HSE Induction prior to start work assignment. Toolbox talks shall be conducted by HSE Officer/Supervisor prior to each job by
referring to this R.A. & other appropriate references
Low Results: not much additional
Moderate Risk: appropriate additional controls
high risk: priority to eliminate the
Extreme risk: work shall not be started until
controls required
are required
risk
risk is eliminated
Risk
Assessment
No
ACTION

Activities

Hazard Identification

likelihoo
d

Severit
y

Risk Controls

Risk
rate

BY :

Hazardous substances
paints, thinners and
varnishes

Those who are involved


in
Painting as well as
those in the vicinity
who may be affected by
fumes or dermatitis and
skin conditions for
users.

Where possible no hazardous substances to be used


, use water
based alternatives
Where it is considered necessary for a hazardous
substance to be used contact Operations who will
arrange for a COSHH assessment and Safe Working
Procedure to be developed prior to work commencing

Supervis
or/forem
en

Working at height
Using of man lift

Those involved who


need to
access work at height
Falls Serious injury
Death

Where possible work at height should be avoided.


Where this is not possible an assessment must be
made as to how the work will be undertaken safely.

Supervis
or/safety
officer

certified man lift operator.


Man lift certified.

Page 1 of 5

Risk Assessment

AL FOUZAN TRADING & GENERAL


CONSTRUCTION
CO.
10
25
5
15
20
5

Likelihood

Risk
Assessment
Record
8
20
4
12
16
4
3

Project/
Doc. No.: 0010
2
1
Location:
Dar Al Hijra
Project
Package 1
Subject :
painting
Assessment done by:
Mohammad .Farooquddin
Date Assessed:
03/01/2017
3
Electric paddle
Electrical installation
3
Air compressor
meets BS and is
Grinder
maintained in a safe
Condition.
All equipment
purchased meets CE
standards.
Sufficient socket
outlets are provided in
each Office.
Appliances are
appropriately labeled to
denote last and next
test date.
Staff do not attempt
any electrical repairs
themselves only
competent and
authorized Persons to
work on electrical
systems.

12

15

10

3
4
5
Severity

Checked by:
Eng. Abdul Mujeeb
Date Checked: 03/01/2017
6
Instruct staff not to use equipment which has not
been tested.
Staff should be encouraged to visually check
Equipment before use. If they are in any doubt about
the safety of equipment, it must not be used and must
be reported to Health & Safety Services.
Ensure sockets are not overloaded, include Item in
regular health and safety inspection.
Ensure cabling is not subjected to damage by
furniture (e.g. desk legs, chairs and cabinets) or
pedestrians. All cables that must traverse traffic
routes should be protected by cable covers if they
cannot be safely re-routed or Tied back out of the way.

Page 2 of 5

Risk Assessment

safety
officer

AL FOUZAN TRADING & GENERAL


CONSTRUCTION CO.
Risk Assessment Record

Likelihood

Project/
Doc. No.: 0010
5
Location:
4
Dar Al Hijra
3
Project
2
1
Package 1
Subject :
painting
Assessment done by:
Mohammad .Farooquddin
Date Assessed:
03/01/2017
Asbestos
By sanding down walls
4
2
and
ceilings those
undertaking
painting as well as
those in the area may
be exposed to asbestos
fibres.

Sand blast machine,


P.P.E

General concept about Sand


Blasting and Painting .

10

15

20

25

12

16

20

12

15

10

3
4
5
Severity
Checked by:

Eng. Abdul Mujeeb


Date Checked: 03/01/2017
4
The procedures for obtaining authorization to work
must be followed. This procedure will ensure that the
relevant asbestos surveys are consulted and that no
asbestos containing materials are disturbed
If the premises is a domestic house
then no sanding down is permitted

Page 3 of 5

Risk Assessment

Sandblasting is a special physical process that uses


a stream of sand propelled by water or compressed air
and applied on a
Sandblasting creates a powerful abrasive force that
can act on any surface worked on using this air
propelled material There are
Alternative sandblast materials that can be used
depending on the requirement of the work. These
include iron globules, emery and powdered quartz.
Sandblasting is commonly used for cleaning the
cast irons in foundry shops. It is also the preparatory
process done on different kinds of surfaces before
enameling, painting and during the process of
galvanizing. It is also a popular cleaning solution for
surfaces with hard to remove grime and other debris
that accumulate in the
Concrete surfaces of buildings.

Supervis
or/ safety
officer

safety
officer

AL FOUZAN TRADING & GENERAL


CONSTRUCTION
CO.
10
25
5
15
20
5

Likelihood

Risk
Assessment
Record
8
20
4
12
16
4
3

Project/
Doc. No.: 0010
2
1
Location:
Dar Al Hijra
Project
Package 1
Subject :
painting
Assessment done by:
Mohammad .Farooquddin
Date Assessed:
03/01/2017
Portable equipment Those using drill 6
3
Users may use a
Injuries
portable
from moving parts
drill for mixing

External painting in hot


or
cold weather

Those involved heat


exhaustion, sunstroke,
hypothermia

PTW Application

Hazardous activities

12

15

10

3
4
5
Severity

Checked by:
Eng. Abdul Mujeeb
Date Checked: 03/01/2017
Stir paints manually or,
6
Equipment must be suitable for use i.e. proprietary
mixer blade
Equipment must be in good working order and free
from defect
If using an extension lead uncoil fully
Plug into nearest plug socket
RCD must be used
Mixing must be undertaken by staff
4
In hot weather, avoid the hottest part of the day,
wear a high factor sunscreen and drink plenty of
fluids.
Take breaks in shade
In cold weather, ensure appropriate clothing is
worn; take breaks in a warm place if possible. If not
set time limits on external work
Obtain proper work permit before start of work. Permit

Without sufficient
preparation&safety
measures.

should be availed from the concerned authority.

Method statement to be explained to all employees and it


must be made available at the site during the activities.

Barricade Work Area & post necessary sign boards

Page 4 of 5

Risk Assessment

Supervis
or/forem
en

Supervis
or/forem
en

safety
officer

AL FOUZAN TRADING & GENERAL


CONSTRUCTION CO.
Risk Assessment Record

Likelihood

Project/
Doc. No.: 0010
5
Location:
4
Dar Al Hijra
3
Project
2
1
Package 1
Subject :
painting
Assessment done by:
Mohammad .Farooquddin
Date Assessed:
03/01/2017
Work in domestic
Animals, Violence and
9
3
premises
aggression, asbestos

Note:

10

15

20

25

12

16

20

12

15

10

3
4
5
Severity
Checked by:

Eng. Abdul Mujeeb


Date Checked: 03/01/2017
6
No work to be undertaken which disturbs the fabric
of the building including sanding down as we have no
knowledge as to the presence of asbestos.

attached MSDS

Prepared by:
Approved by:

Checked by:

Signature:
Signature:

Signature:

Page 5 of 5