Saudi Aramco 7903 (08/06) Page 1 of 2

eMail Data...

NONMATERIAL REQUIREMENTS

Save Data...

REV. ______________________
DATE: ______________________

FOR
HIGH VOLTAGE SF6 DEAD TANK CIRCUIT BREAKERS

DEVELOPMENT NO.

ITEM/TAG NUMBERS:_________________________________________________________________
___________________________________________________________________________________

REQUISITION/PURCHASE ORDER NO.

COPIES AS INDICATED IN COLUMN 1 MUST BE FURNISHED WITH BIDDER'S QUOTATION.


COPIES AS INDICATED IN COLUMN 2 MUST BE FURNISHED ON DATES AS INDICATED. (DATES
CALCULATED BY BUYER AS PART OF WRITTEN PURCHASE ORDER ARE BASED ON SUCCESSFUL BIDDER'S QUOTE
AND INCLUDE PROVISIONS FOR MAILING TIME.)
BIDDER PROMISES THAT IN THE EVENT A PURCHASE ORDER IS AWARDED TO HIM, HE WILL SUBMIT REQUESTED
COPIES AS STATED IN COLUMN 2 WITHIN NUMBER OF CALENDAR WEEKS AS INDICATED IN COLUMN 5 AFTER
HIS RECEIPT OF PURCHASE ORDER.
SEE THE ATTACHMENT TO THIS SHEET FOR EXPLANATION OF PRIORITY CODES.
3

HARD COPIES

NOTE:

DESCRIPTION
601. PRELIMINARY DRAWINGS FOR REVIEW AND APPROVAL BY BUYER
1. COMPOSITE ENGINEERING/SUB-VENDOR MATERIAL PROCUREMENT/
MANUFACTURING/TESTING SCHEDULE
2. FOUNDATION LOADING ANCHOR BOLT LOCATION DRAWING
3. COMPOSITE OUTLINE AND COMPONENT ARRANGEMENT DRAWING, INCLUDING
CONTROL CABINET AND CONTROL CABLE ENTRY ARRANGEMENT
4. POWER AND/OR CONTROL SCHEMATIC DIAGRAMS

602. CERTIFIED DRAWINGS, LITERATURE, PHOTOGRAPHS, ETC.


1. FOUNDATION LOADING AND ANCHOR BOLT LOCATION DRAWING
2. COMPOSITE OUTLINE AND COMPONENT ARRANGEMENT DRAWINGS, INCLUDING
CONTROL CABINET AND CONTROL CABLE ENTRY ARRANGEMENT.
3. CURRENT TRANSFORMER SPECIFICATIONS AND ACCURACY CLASSIFICATION
4. POWER AND/OR CONTROL SCHEMATIC DIAGRAMS
5. BILLS OF MATERIAL INCLUDING CATALOG DATA OF BUSHINGS, QUANTITY OF
SF6 GAS
6. PHYSICAL WIRING DIAGRAMS, WITH TERMINAL IDENTIFICATION
7. NAMEPLATE DATA
8. PRICE LISTS OF SPECIAL TOOLS, DEVICES REQUIRED FOR INSTALLATION
ERECTION MAINTENANCE AS APPLICABLE

603. OPERATIONS, MAINTENANCE MANUALS, INSTALLATION INSTRUCTIONS, TEST


CERTIFICATES, ETC.
1. INSTALLATION AND ERECTION INSTRUCTIONS
2. CERTIFIED TEST REPORTS, CERTIFICATES, DATA AND CURVES
3. OPERATING INSTRUCTIONS
4. MAINTENANCE MANUAL OR INSTRUCTIONS

NOTES: (A) PURCHASE ORDER NUMBER AND ITEM/TAG NUMBER MUST BE NOTED ON ALL DATA
SUBMITTED.
(B) IDENTICAL ITEMS MAY BE REPRESENTED ON A COMMON DRAWING PROVIDED ITEM/TAG
IDENTIFICATION OF THOSE ITEMS ARE CLEARLY SHOWN.
(C) WHEN DRAWINGS ARE RETURNED "APPROVED" OR "APPROVED EXCEPT AS NOTED,"
THE VENDOR MAY START FABRICATION. WHEN DRAWINGS ARE RETURNED "DISAPPROVED,"
THE VENDOR SHOULD NOT START FABRICATION. THE VENDOR MUST RESUBMIT
CORRECTED DRAWINGS FOR APPROVAL WITHIN TWO (2) WEEKS.
(D) THE NOTES ON THE ATTACHMENT TO THIS SHEET ARE A PART OF NONMATERIAL
REQUIREMENTS AND CONSEQUENTLY OF THE PURCHASE ORDER.
(E) NORMALLY ONLY THREE HARD COPIES AND ONE SOFT COPY ARE REQUIRED.

SUBMITTAL OF
REQUIRED DRAWINGS,
MANUALS, ETC.

BIDDER TO COMPLETE COLUMN 5 AND RETURN COMPLETED FORM WITH


HIS QUOTATION.
PRIORITY

SOFT COPY

COPIES REQUIRED

NO. OF
CALENDAR
WEEKS

DUE
DATES

1
1
1
1

2
2
2
2
2
2
3
2

3
3
3
3

BIDDER'S SIGNATURE:

COMPANY:_______________________________________
BIDDER'S REF. NO.:_________________________________
DATE:_____________________________________________

Saudi Aramco 7903 (08/06) Page 2 of 2

CERTIFIED DRAWINGS, LITERATURE AND PHOTOGRAPHS:


NOTES
GENERAL: 1. The applicable nonmaterial requirement form reference number 601.1 (etc.) must be shown on each
document.
2. All drawings and manuals (etc.) must be written in the English language. Unless stated otherwise in the material
description or specication of this Quotation Request/Purchase Order, it is preferred that all dimensions and
weights must be in the "Le System Internationale D'Unites" (S.I.) metric systems of units. The pound, foot,
and second system may be used as an alternative for equipment designed to a nonmetric specication.
3. The drawings and literature (etc.) should not be bound in books or hard covers since they will be incorporated
in Plant Record Books.
601

PRELIMINARY DRAWINGS AND DATA FOR REVIEW AND APPROVAL BY BUYER


In the event that a purchase order is awarded, Buyer's approval of these drawings is required prior to fabrication
of the units covered by such order.

602

CERTIFIED DRAWINGS, LITERATURE, PHOTOGRAPHS, ETC.


ALL PRINTS OF FINAL DRAWINGS must be marked or certied to indicate:
a. That the drawings are nal and that all dimensions and material specications are identical to those of
the material or equipment being supplied by Vendor;
b. That no further changes must be made either by Vendor or by Buyer;
c. That all revisions requested previously by buyer are included.

603

OPERATIONS, MAINTENANCE MANUALS, INSTALLATION INSTRUCTIONS, TEST CERTIFICATES, ETC.


All drawings, documents, manuals, lists or other literature must be clearly marked with Buyer's Purchase Order
Number and item number, and manufacturer's serial numbers pertaining to the material or equipment being
furnished.
SHOPS OR MAINTENANCE MANUALS must include:
a. Dimensions of mating surfaces;
b. Tolerances applied to dimensions;
c. Clearance between moving surfaces;
d. Instructions for maintenance, disassembly, repair, overhaul and assembly;
e. System of trouble detection and remedy.
PRIORITY CODES
1. Required as soon as possible after receipt of purchase order.
2. Required as soon as possible after receipt of buyer's comments on preliminary drawings and specications
(etc.) catalog information, detailed drawings of sub-vendors and parts data.
3. Required as soon as possible after receipt of all non-material requirements covered by item 602 and
after nal inspection and testing.