Purpose
To ensure conformity of the product per the international standards and
additional clients requirement.
Reference Documents
International Codes/Standards
Standard /code
Description
Part A:Ferrous material Specification
ASME Sec II
Part B:Non Ferrous Material Specification
Part C:Specification for welding rods, Electrode and
filler metal
ASME Sec V
Non Destructive Examination
ASME Sec VIII-Div I
Rules for construction of pressure vessel
ASME Sec IX
Welding & Brazing qualification
NACE MR 0175
Material Resistant to sulfide stress cracking
ISO 15156
Petroleum and natural gas industries -- Materials for
use in H2S-containing environments in oil and gas
production
Applicable ASTM specifications
Saudi Aramco Material Specifications System (If Applicable)
SAMSS
01-SAMSS-016
32-SAMSS-004
Description
Qualification of Pipeline, In-Plant Piping and Pressure
Vessel Steels for Resistance to Hydrogen-Induced Cracking
Manufacturer of pressure vessel
SAES
SAES-W-010
SAES-H-100
Description
Welding Requirement for pressure vessel
SAES-A-301
Materials Resistant to
Sulfide Stress Corrosion Cracking
Description
Form 175-091900
Pressure Vessel
Procedure
Inspection Procedure for Pressure vessel is as follows;
1) Document Review:
a. Inspector to check the Purchase Order and its attachments i.e. ITP, Design
Drawings, Data Sheet Approved Procedures, Pre qualification Documents, client
specifications, project specifications and inspection requirements (Form 175) etc.
b. The purchase order shall clearly state the description of the pressure vessel
(Quantity, Dimension, service etc..) as well as the client and international
specification applicable.
c. Unless otherwise mentioned in the Purchase Order, ASME sec VIII Div I ,Saudi
Aramco Specification 32-SAMSS-004 and ASME stamp is applicable for all
pressure vessel.
d. Material required for the manufacturer of pressure vessel will be in accordance
with ASME Sec II part Client specification.
e. Pre-inspection meeting is conducted in prior to start of fabrication activities and
to discuss & finalize all the QA/QC activity for the project and to Finalize the
Inspection Test Plan(ITP).
f. Inspection activities are to be carried out as per the agreed Inspection test Plan.
Report:
A report shall be generated in standard approved format w.r.t. the activities mentioned
above.
Responsibility:
QC inspectors are responsible for performing the inspection.