You are on page 1of 78

4.

22/43

..

1.

1.1

22/43

1.2


1.3

1.

2.

3.

2
4.

5.

1.4

//

-
2.
2.1 15

2556

2.2 11

2556

34/2556
.

2.3 6
2557
2.4 16
2557

10/2557 ( 30 : 4
2557)

3.
3.1

4 2 2

1.-

18323 60866 3
03N
7E

(DYG-A)

2. - 18301 60977 1
64N
6E
(LTA-A )


3.1.1





(1)

(2)



(3)


(4)

(5)

4
3.2.1

- 25


0.5


-
-

6
-
20 2
20
3
1.2

1-2

3.2.2

1)
4
2 3
(..2557-2559)
- (DYG-A) ..2557
-(LTA-A)
2)


(Primary target)


2,000
1)

(-

1,050 )
20 30-

7
40
12
1,000

(Drilling fluid)


9 5/8

2)


1,050 -2,000 8

(Synthetic Based
Mud:SBM) SBM

(Filter cake)

3)

4)

(Blow Out Preventor, BOP)



(Manifold)

8
5)

/
(Cellar) /



6)

6.1) (
- 1,050 )


(Cutting)
110.4 ../ Cutting
Top hole cutting area
(EC)
(As)
1. (EC)

4,000 S/cm

Cutting ()

9
4,000 S/cm

4,000 S/cm
()

pH, EC, TDS, Salinity, Total


Petroleum Hydrocarbons, BTEX, As, Cd, Total Cr, Pb,
Hg, Ni, Se, Ba, Cu, Zn, Fe Mn
30

2.

(
Baseline)

Baseline




Baseline

10
6.2) (
1,050 )
SBM 201.1
/

29.6 /

34.8 / SBM





64.4 /

4
257.5




3.2.3




15 /





..2514

11
3.2.4


(+ )


BS&W 2 Wet
Crude


BS&W 2
(

)

3.2.5

2
(Well Suspension)

12
(Well Abandonment)

4.

4.1

41-47




2






4.2
1)


3 26 29 2556
4
24 (TSP)
0.068-0.277 /
10 24 (PM-10)
0.045-0.110 /
(SO2)
0.3-16.6

13
(NO2)
0.8-16.0


24 .. 2547
TSP PM-10 0.330
0.120 /



(SO2)
24 (NO2)
24

2)

2
26 29 2556
24 (Leq 24 hr) 53.8 58.7
(Lmax) 86.5 90.2
90 (L90)
41.8 58.0
15 ..
2540 24 (Leq 24 hr)
(Lmax) 70 115

14
3)


12
21 .. 2556








25 (.. 2547) (Arsenic ; As)


/

(TPH)

(Volatile OrganicsCompounds)




4)

4 22
2556
2
4 8
(.. 2537)
(TSS)

15
- (NH3-N)


(Fe)


(BOD)

(DO) (TCB)
(FCB)
2 3

5)

4 22
2556 - (pH)

(GW3)



(GW4)

(As)

(GW1)


(GW2)

(GW3)
(GW4)

20 (.. 2543)


(Cd)

(Fe)

(GW1)
(GW2)
(GW4)

16

0.5 1
/ (Mn)

(GW2)

(GW4)

20 (.. 2543)
(TPH)

4.3


(Fluvial deposit)

(Pratu Tao Formation)
(Lankrabue Formation)
Flvial Channel
(Flood Plain)
4.4
1)
5






379 96

17
-
(DYG-A) 379 96
- (LTA-A) 372
96
2)


3)

18
4.5


4 22 2556
41 22 5
3
4 11 23

39 30
15
16 15 12
4.6

5
2

63,995.21
56,539.25 ( 88.35)

3,884.39 (
6.07)

2,104.05 ( 3.29)
1,467.51 ( 2.29)
4.7


1 6
7

19
1 15
8
1
13 20

3-5
7

4.8



7 1-5



5.

5.1 1
1
.. 2556

20
1

(1)
(2)
(3)
(4)
(5)

5.2 2
2
.. 2556

21



2
1




(1)

(2)


(3)

5.3

23 16 .. 2556

22

412


( 76.9)
( 23.1)


-



( 64.7)
( 20.0) ( 8.9)
( 89.5)
( 9.5) ( 1.1)








( 90.0)
( 10.0)



( 0-1 )

23

( 52.4)
( 38.5) ( 5.2)
( 76.4)
( 22.5) ( 1)





(
1-5 )
(
52.9)
( 38.1) ( 5.2)
(
81.0) ( 16.3)
( 2.8) 4.5-5




7.


..
22/43

24
34/2556 11
2556
4
..
6
2557

8.


..

22/43

..

22/43

1. 2.2-3 2-13
1


22/43


1.1-1

- ( 1.1-1)
-

(
(

1.1-1)
1.1-1)

1. 2.8-3 22
51

1.2-1

1.2-2


2.8-4
2-52

2.8-4

1.

3
2

1)

- 3,871

(Concrete Pit) 378

- 12,730


(Buffer zone) 17,523
1

2)

3)


1.

1.3-1

80

1.3.1

1.3-2

2.

(+ )


40 / 1.3-3

(Oily Water)

3.


3,871 715.36

1,200 378

12.6

3 4
283.5

9.6

4.

6,617.4



1


1.
4

127.9-220.5 ..
120

120-288

40-66

(Younger Terrace Deposits Aquifer; Qyt)


120
(Old

Terrace Deposit Aquifer; Qot) 1.4-1


30-40

1.




5
2-54
90 AASHTO

90

- 90

AASHTO

T99

AASHTO

- (Embankment)
(Silty Clay)
85

-

85


(1)

1.5-1)

10


90 AASHTO T99

(2)

(Base line Data)

(3)


(Embankment)


85

AASHTO

T99

11

(4)

85

(5)

ASSHTO

T99




0.8 1.50

90 ASTM D-1556
(6)

x
17 x 51
1
2 ( 1.5 2) 516

1.

12

1.

2-57

AASHTO T99 T180

0.8 1.50

90

ASTM D-1556

2.

3.

Water Stop

13


1.
7
2.8-14

1.7-1


2-67
3

2
1.

8


(cutting)

(Top Hole Cutting)

(Top Hole Cuttings Pit)

14

Composite 1
(EC) (As)
(Ba) (Cr6+) (Hg)

(Pb)

(EC) (As)


1)

4,000

(S/cm3)

- EC 4,000 /

-

- Baseline

15

1.8-1
2)

4,000

(S/cm3)
(EC) 4,000 / /
/
Baseline

4,000
/

Baseline
1.8-2

16



1.

9

-

17

1.
10

2.11-6 2-151

1.10-1

18

2.


2.
2

3.2.2.1

()

3-21 324

2.
3
-
(Max Min)

- (Max
Min) 2.3-1

19

2. 3.1-1
4


A4 A3

2.4-1

20

2.
5

1)

0.10-40.00 /

2555)

(Arsenic)(

, 2545) ( 2.5-1)

0.5 ( / )

21

2)







2556


22











15-15-15 17-17-17

16-20-0 10-52-17

--
(Calcium) (Sulphur)

23

0.1

Mononitrophenol

1.8




(Sodium Arsenite)




Mononitrophenol



2.
6

4 4

24

2.5

25

26

1.2


275.7 3.56








(CdCl2)
(Tarnish)

27

(PbO)


.. 2553

(Iron and Managanese)

0.3 0.05







2:1 20:1

28


(Anaerobic) reduction
FeCO3 MnCO3 (
)


Oxidation Fe(OH)3
Fe2O3 MnO2



2.
7

29

2.
8


1 5

( 2.8-2)

30

80,996.9
1,084.6

1,041.0
882.0
666.7

704.3

/ 117.78

/ 8.7 /

5.81 / 2.8-3


2. 3.4-1
9
3-183

24 .. 2556

31

2.9-1

2.

1
0 6

.. 2557

32

33



2. 3.5-1
1
1 3-223

2.10-2

2.11-1


0-5
2 13

34


2.11-1

2.11-1

2.11-4

2.
1
2

(1)

(2)
5

2.12 1

35

(1)

(2556)
1 6
7
1 15
8
1 13
20
(2)
3
( 2.12-2
2.12-3)

36

3-5
7
(3)



(Self-Care Level)




3

26-54
(4)

37


(Secondary Care Secondary Medical Care : SMC)


(Tertiary Care Tertiary Medical
Care : TMC)




3
(5)

38



(Self-Care Level)




3

..

3.
1

39

DYG-A

LTA-A

120

40-66

(Younger Terrace Deposits Aquifer;Qyt


)

120
(Old terrace deposit aquifer; Qot)


30-40

40




(Drawdown) (Radius of influence)

3.1-1 (


) Starpoint software;
Infinite extent, pump test analysis software version 4.0
(United state)

3.1-1

(Drawdown)
(Radius of influence) 3.1-1

41



DYG-A
5 10 20 50 100 0.18
3.64


103.3 682.6 LTA-A
5 10 20 50 100
0.16 3.24

94.3 681.5
( 3.1-2)
(Young terrace
deposit aquifer; Qyt) 30 80

1,078 2,634

42

3.
2


Synthetic

Based Mud

3.2-1

43

3.

(zero
discharge)


1)

(A) 3,871
(Concrete Pit) 1,200

44

378

11.812.6

3 4
283.5
8.99.6

50
1
15
5 Vacuum
Suction 15 3
15 5

45

14
225

API Separator

2)



(Run Off)

18,286
17,523

46

6,617.4

1

4.
1

4.

..


2
(Corporate Social Responsibility CSR)

47

CSR

1)

2)

3)

5)

4)


CSR
/

48

CSR

/ CSR

22/43 4.2-1






10
/
3

49

4.
3


500
2

DCD14066

- 970 PW16610

- 870 4.3-1

50

3
1 (Up gradient well) 2

3 (Down gradient well)



1

500

51

4.
4

52


/ Blow Out Contingency Plan






53

(Oil Spill Plan)








API

Separator

54

You might also like