You are on page 1of 19

PROJECT:

PGMH-MAHOGANY TOWER
LOCATION: PEAFRANCIA ST., PACO, MANILA
SUBJECT:
STATUS OF GEMWOOD DELIVERY

Date of delivery
7/11/2016
7/20/2016
8/11/2016

8/16/2016

8/18/2016
8/20/2016
8/23/2016
8/24/2016
8/25/2016
8/30/2016
8/31/2016
9/1/2016
9/3/2016
9/6/2016
9/6/2016
9/7/2016
9/8/2016

Item
WD-1/1A Jamb
WD-2/2A Jamb
WD-1/1A Jamb
WD-1/1A Panel
WD-3 Jamb
WD-5 Jamb
Door casing (5pcs./set)
WD-2/2A Jamb
Cleats (3pcs./set)
WD-2/2A Jamb
WD-1/1A Panel
WD-1/1A Panel
WD-1/1A Panel
WD-1/1A Panel
WD-5 Panel
Door casing
Cleats
WD-2/2A Panel
WD-2 Jamb
WD-2/2A Panel
WD-1/1A Jamb
WD-1/1A Panel
WD-2/2A Panel
WD-2/2A Jamb
WD-2/2A Panel
WD-3 Louver Panel
WD-2/2A Panel
WD-1/1A Panel

9/21/2016
9/26/2016

Prepared by: John Philip S. Garcia


ASCDC-JSE

WD-2/2A Panel
WD-1/1A Jamb
WD-1/1A Panel
WD-2/2A Panel

Quantity
50
200
244
32
20
18
32 sets
132
32
200
50
80
80
52
36
2110
564
100
467
122
222
72
50
467
100
20
95
40
16
222
32
49

DR #
1891
1955
1961

1963

Note

Different from other towers

2002
2004
2006
2009
2008
2013

Different from other towers

2015
Pulled-out headers
2016
Pulled-out headers
2017
2019

Adjusted headers

2021
2022
2014
2029
2018

32pcs. Balance/ Adjusted (929mm)


Adjusted doors (829mm)
Adjusted headers (929mm)
Adjusted (929mm)/ Completion
Adjusted doors (829mm)

PROJECT:
PGMH-MAHOGANY TOWER
LOCATION: PEAFRANCIA ST., PACO, MANILA
SUBJECT:
DOOR CASING QUANTITY
Floor level
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th

Main door
18
18
18
18
16
16
16
18
18
18
18
18
16
16
16
18
18
294

Bedroom door
32
32
32
32
32
32
32
32
32
32
32
32
28
28
28
32
32
532

Total needed door casing 413 sets or 2065 pcs.


Balance
525 pcs.
Note: There are 29 damaged door casings from
gemwood's delivery last November 14, 2016
Note: 5pcs. of 2.3m of casing per set
1 set can cover two doors

826 doors

PROJECT:
LOCATION:
DATE:
SUBJECT:

PGMH-MAHOGANY TOWER
PEAFRANCIA ST., PACO, MANILA
September 22, 2016
SUMMARY OF OSM WOODEN DOORS & JAMBS DELIVERY SCHEDULE

Prepared by:

John Philip S. Garcia


ASCDC

Checked by:
ATMCI

D
17
17
31
29
2
2
98

Ja
n
.

3
.

D
16
16
30
26
2
2
92

D
ec

D
ec

D
18
18
32
32
2
2
104

D
ec

D
ec

D
18
18
32
32
2
2
104

8
2

ov
.

ov
.

ov
.

ov
.

1
3

D
17
17
32
32
2
2
102

N
ov
.

O
ct
.

D
8
8
16
16
1
1
50

O
ct
.

O
ct
.

D
8
8
16
16
1
1
50

O
ct
.

O
ct
.

D
9
9
16
16
1
1
52

J
33
32
59
59
5
4
192

J
25
25
46
42
3
3
144

D
9
9
16
16
1
1
52

2
0
25
-S
ep

1
0
15
-S
ep

O
ct
.

D
9
9
16
16
1
1
52

A
ug

A
ug

J
36
36
64
64
4
4
208

5
2

A
ug

J
35
35
12
12
7
7
108

S
ep
t.

D
9
9
16
16
1
1
52

S
ep
t.

Balance
Door
Jamb
7
7
6
6
15
15
11
11
-1
-1
0
0
39
39

S
ep
t.

Total Delivery
Door
Jamb
147
147
147
147
266
266
266
266
20
20
18
18

S
ep
t.

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

Total needed
Door
Jamb
154
154
153
153
281
281
277
277
19
19
18
18

A
ug

A
ug

Door jamb delivery completion

D
16
15
28
30
3
2
94

TOTAL

2nd
52

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16

9
9
16
16
1
1

0
0
0
0
1
1

3rd
52

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16

9
9
16
16
1
1

0
0
0
0
1
1

0
0
0
0
1
1

4th
52

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

9
9
16
16
1
1

9
9
16
16
1
1

7
7
16
16

9
9
16
16
1
1

2
2
0
0
1
1

2
2
0
0
1
1

5th
52

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

9
9
16
16
1
1

9
9
16
16
1
1

16
16

9
9
16
16
1
1

9
9
0
0
1
1

9
9
0
0
1
1

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

8
8
16
16
1
1

8
8
16
16
1
1

16
16

8
8
16
16
1
1

8
8
0
0
1
1

8
8
0
0
1
1

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

8
8
16
16
1
1

8
8
16
16
1
1

16
16

8
8
16
16
1
1

8
8
0
0
1
1

8
8
0
0
1
1

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

8
8
16
16
1
1

8
8
16
16
1
1

4
4

8
8
16
16
1
1

8
8
12
12
1
1

8
8
12
12
1
1

9th
52

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

10th
52

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

11th
52

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

12th
52

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

13th
52

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

14th
46

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

8
8
15
13
1
1

8
8
15
13
1
1

8
8
15
13
1
1

8
8
15
13
1
1

8
8
15
13
1
1

8
8
15
13
1
1

15th
46

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

8
8
15
13
1
1

8
8
15
13
1
1

8
8
15
13
1
1

8
8
15
13
1
1

8
8
15
13
1
1

8
8
15
13
1
1

16th
46

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

8
8
15
13
1
1

8
8
15
13
1
1

8
8
15
13
1
1

8
8
15
13
1
1

8
8
15
13
1
1

8
8
15
13
1
1

17th
52

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

18th
52

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1

9
9
16
16
1
1
192

6th
50

7th
50

8th
50

John Philip S. Garcia


ASCDC

9
9
16
16
1
1

7
6
12
14
2
1

52

Prepared by:

3
1

8
2

WD-1
WD-1A
WD-2
WD-2A
WD-3
WD-5

Ja
n
.

GF
39

D
ec

D
ec

D
ec
.

D
ec
.

N
ov
.

N
ov
.

ov
.
N

ov
.
N

N
ov
.

O
ct
.

O
ct
.

5
1

0
3

O
ct
.

O
ct
.

O
ct
.

t.

2
0
25
-S
ep

t.

S
ep
t.

1
0
15
-S
ep

O
ct
.

5
2

A
ug
.

A
ug
.

S
ep

S
ep
t.

Balance
Door
Jamb
7
7
6
6
12
12
14
14
2
2
1
1

S
ep

Total Delivery
Door
Jamb

A
ug
.

Total needed
Door
Jamb
7
7
6
6
12
12
14
14
2
2
1
1

A
ug
.

A
ug
.

Door jamb delivery completion

D
7
6
12
14
2
1

0
0
0
0
1
1

108

9
9
16
16
1
1
9
9
16
16
1
1
9
9
16
16
1
1
8
8
16
16
1
1
8
8
16
16
1
1
8
8
16
16
1
1

208

9
9
16
16
1
1

9
9
16
16
1
1

52

52

144

9
9
16
16
1
1

52

50

Checked by:
ATMCI

50

102

104

104

92

98

9
9
16
16
1
1
94

PROJECT:
PGMH-MAHOGANY TOWER
LOCATION: PEAFRANCIA ST., PACO, MANILA
SUBJECT:
WOOD DOOR HINGES ORDER SCHEDULE
22-Aug
A
GF
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th
TOTAL
Legend:

3-Nov
A

72
64

105
105

21-Nov
A

64
64

105
105

5-Dec
A

72
72

105
105

19-Dec
A

72
72

105
105

9-Jan
A

Ordered
72
105
72
105

72
64

144

210

136

210

128

210

144

210

144

210

136

A = Main door (3.5"x3.5"x2mm Loose pin stainless steel 2mm/Nippon brand


B = Bedroom, electrical & water meter room (3.0"x3.0"x2mm Loose pin sta

Prepared by: John Philip S. Garcia


ASCDC-JSE

9-Jan

23-Jan
B

64
64

93
93

6-Feb
A
39

B
90

72
72
183

105
105
300

105
93

198

128

186

on brand)
pin stainless steel 2mm/Nippon brand)

13
18
18
18
18
16
16
16
18
18
18
18
18
16
16
16
18
18

18
18
18
18
18
18
18

N
ov
.2
1

N
ov
.7

31
O
ct
.

17
O
ct
.

O
ct
.

10

9
t.
1
Se
p

Se
p

t.
5

2
Au
g.
2

GF
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th

13

18
18
18
18
18
18
18
18
18
18

31

Ja
n.
8

Ja
n.
7

Ja
n.
6

Ja
n.
5

Ja
n.
4

Ja
n.
3

Ja
n.
2

N
ov
.2
1
N
ov
.2
8
D
ec
.1
2

N
ov
.7

O
ct
.

CHB
Tiling
Vinyl
D&J

Ma. 1
Feb. 28
2w/f
Aug. 22 Jun. 12
2w/f
Sept. 16 Jun. 14
2w/f
Aug. 1 Feb. 13
1.5w/f
AUG. 7 - MAY 14
2w/f

3-Nov-15
###

###

700
322

3-Nov

###

700

PROJECT:
PGMH-MAHOGANY TOWER
LOCATION: PEAFRANCIA ST., PACO, MANILA
SUBJECT:
OSM DOOR LOCKSETS DELIVERY SCHEDULE
SUMMARY

Main Door (WD-1/1A)


Storage room (WD-3/3A)
Water meter room (WD-5)
Electrical room (WD-3)
Bedroom (WD-2/2A)
T & B (WD-1/1A & WD-2/2A)
Legend:

Total needed
A
B
RH LH RH LH
154 153
0
1
18
0
0
18
277 281
153 154

19-Sep
A
RH
36

24-Oct
B

LH
36

RH

A
LH

RH
42

21-Nov
B

LH
42

RH

John Philip S. Garcia


ASCDC-JSE

LH

5
4

5
64
36

64
36

RH
43

5-Jan
B

LH
43

RH

A
LH

Checked by:
ATMCI

80
42

RH
33

B
LH
32
1

RH

LH

59
32

59
33

4
5

80
42

A = Satin Stainless Steel Finish Entrance Door Mortise Lockset w/ Lever Handle
B = Satin Stainless Steel Finish Cylindrical Lockset w/ Lever Handle

Prepared by:

4
74
43

78
43

PROJECT:
PGMH-MAHOGANY TOWER
LOCATION: PEAFRANCIA ST., PACO, MANILA
SUBJECT:
OSM DOOR LOCKSETS DELIVERY SCHEDULE

PER FLOOR
Total needed
A
B
RH LH RH LH
GF
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
2F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
3F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
4F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
5F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
6F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
7F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
8F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
9F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
10F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
11F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
12F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
13F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
14F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
15F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
16F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
17F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B
18F
Main Door
Storage room
Water meter room
Electrical room
Bedroom
T&B

19-Sep
A
RH

24-Oct
B

LH

RH

A
LH

RH

21-Nov
B

LH

RH

A
LH

RH

5-Jan
B

LH

RH

A
LH

6
1

LH

6
1

12
7

16
9

16
9

16
9

16
9

16
9

16
9

16
9

16
9

16
9

1
16
9

1
16
9

16
9

1
1

1
16
8

16
8

16
8

16
8

16
8

16
8

16
8

16
8

16
9

16
9

16
9

16
9

1
1

1
16
8

16
8

1
1

1
16
8

16
8

1
1

1
16
9

16
9

1
1

1
16
9

16
9

1
16
9

16
9

16
9

16
9

16
9

13
8

15
8

13
8

15
8

1
1

1
16
9

16
9

1
1

1
13
8

15
8

1
1

1
13
8

16
9

16
9

16
9

1
16
9

16
9

1
1

1
1

15
8

1
13
8

15
8

1
1

1
16
9

1
1

16
9

1
1

16
9

1
16
9

16
9

1
1

16
9

1
16
9

15
8

1
1

13
8

16
9

12
7

1
16
9

14
6

1
1

LH

1
14
6

RH

1
1

RH

16
9

1
1

1
16
9

16
9

A= Satin Stainless Steel Finish Entrance Door Mortise Lockset w/ Lever Handle
B= Satin Stainless Steel Finish Cylindrical Lockset w/ Lever Handle

Prepared by: John Philip S. Garcia


ASCDC-JSE

Checked by:

PROJECT:
PGMH-MAHOGANY TOWER
LOCATION: PEAFRANCIA ST., PACO, MANILA
SUBJECT:
LOCKSET DELIVERY STATUS AS OF 9/22/16

Main Door (WD-1/1A)


Storage room (WD-3/3A)
Water meter room (WD-5)
Electrical room (WD-3)
Bedroom (WD-2/2A)
T & B (WD-1/1A & WD-2/2A)
Legend:

Total needed
A
B
RH LH RH LH
154 153
0
1
18
0
0
18
277 281
153 154

Delivered
A
B
RH LH RH LH
48
48

Balance
A
RH
106

B
LH
105
1

RH

LH

250
126

254
127

18
18
27
27

27
27

A = Satin Stainless Steel Finish Entrance Door Mortise Lockset w/ Lever Handle
B = Satin Stainless Steel Finish Cylindrical Lockset w/ Lever Handle

Project:
Location:
Subject:
BOQ
Floor level
GF
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th

Floor level
GF
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th

PGMH-MAHOGANY TOWER
Peafrancia st., Paco, Manila
Vinyl onsite delivery schedule
7966.28 m2
Total area (sq. m.)
Quantity per floor (box)
361.4
199
468.2
258
468.2
258
468.2
258
468.2
258
444.8
245
444.8
245
444.8
245
468.2
258
468.2
258
468.2
258
468.2
258
468.2
258
412.6
227
412.6
227
412.6
227
468.2
258
468.2
258
8083.8
4453
note: Included @ kitchen cabinet floor
Exceeds BOQ by: 117.52 m2

Total area (sq. m.)


360.65
454.7
454.7
454.7
454.7
432.8
432.8
432.8
454.7
454.7
454.7
454.7
454.7
400.6
400.6
400.6
454.7
454.7
7862.55

Quantity per floor (box)


199
250
250
250
250
238
238
238
250
250
250
250
250
221
221
221
250
250
4326

Attic stock (1.5%)/(box)


3
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
71

Total
202
262
262
262
262
249
249
249
262
262
262
262
262
231
231
231
262
262
4524

Date required onsite

Attic stock (1.5%)/(box)


3
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
71

Total
202
254
254
254
254
242
242
242
254
254
254
254
254
225
225
225
254
254
4397

Date required onsite

STATUS
For
For
For
For

delivery
delivery
delivery
delivery

STATUS
For
For
For
For

delivery
delivery
delivery
delivery

Project:
Location:
Subject:

PGMH-MAHOGANY TOWER
PEAFRANCIA ST., PACO, MANILA
VINYL PLANKS ONSITE DELIVERY SCHEDULE

Floor level

Total area (sq. m.)

Quantity per floor (box)

Attic stock (box)

Total (box)

2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th
Ground floor

454.7
454.7
454.7
454.7
432.8
432.8
432.8
454.7
454.7
454.7
454.7
454.7
400.6
400.6
400.6
454.7
454.7
360.65
7862.55

250
250
250
250
238
238
238
250
250
250
250
250
221
221
221
250
250
199
4326

4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
3
71

254
254
254
254
242
242
242
254
254
254
254
254
225
225
225
254
254
202
4397

Prepared by:

Engr. John Philip S. Garcia


ASCDC- JSE

Date required onsite

STATUS
For
For
For
For

15-Jan-17
15-Feb-17
15-Mar-17
15-Apr-17

15-May-17

delivery
delivery
delivery
delivery

You might also like