You are on page 1of 4

CRISTINO M.

ANIBO

POSITION APPLIED FOR


OTHER SKILLS
WELDER

:
:

PIPE WELDER 6G (SMAW)


PLATE WELDER / FCAW

PERSONAL INFORMATION
Date of Birth
Civil Status
Height
Weight
Citizenship
Religion
Sex
SSS No.
TIN No.
Passport No.
Languages

:
:
:
:
:
:
:

:
July 24, 1966
Married
:
57
:
140lbs
Filipino
Catholic
Male
03-8590265-8
158-428-824
:
EB0355857
English / Tagalog

EDUCATIONAL ATTAINMENT
Secondary
Address
Graduate

:
:
:

Malaya National High School


Malaya, Pililla, Rizal
1984

Primary
Address
Graduate

:
:
:

Malaya Elementary School


Malaya, Pililla, Rizal
1980

TRAINING AND SEMINARS ATTENDED

Construction Manpower Development Center


PHIL ASIA ( February 11, 2004)
Miescor
( May 16, 2006)
Executive Technical Consultants ( November 2006)
Consolidated Traning System Inc. (CTSI). (October 12, 2006
October 14, 2006)

WORKING EXPERIENCE
Company
(KSC)
Address
Position
Inclusive Date

:
:
:
:

KENANA SUGAR COMPANY LIMITED


Khartoum Republic of Sudan
WELDER (SMAW)
October 29, 2011- April 28, 2012

Job Description
Full welding all pipe joint and flange with diameter of
81030 inches.
Use for cooling tower and injection pump.
Full welding all pipe support and their bracket bracing.
Company
Address
Position
Inclusive Date

:
:
:

MECHATRENDS
Pandacan, Manila
PIPE WELDER (SMAW)
:
February 10, 2010 June 15, 2010

Job Description
Tacking and full welding of all joint and flange for Pandacan
oil depot.
Company
Address
Lao PDR.
Position
Inclusive Date

:
:

WHESSOE SDN, BHD


Baan Huay Mor, Muang Hom Kwang Veientiane

WELDER ( SMAW)
:
September 19, 2007 October 6, 2009

Job Description
Work with Namngum 2 Hydro Electric Power Plant Project
LAO PDR for the construction of penstock, manifold,
headrace and steel liner.
Full welding of all horizontal and circumferential joint of
shell plates for Namngum 2 Hydro Electic Power Plant
Project.
Full welding of all joint sickle plates with thickness of 210
mm and 120 mm.
Full welding of all grout plug and stiffiner ring for Hydro
Electric Power Plant Project.

Company
Address
Project
Project 2
Position
Inclusive Date

:
:

WHESSOE SDN, BHD


Port of Sudan, Africa
:
EPCC of Marine Terminal Facilities
Basin Oil Development Project.
WELDER (SMAW)
:
February 21, 2005 February 22, 2006

Job Description
Worked with EPCC of Marine Terminal Facilities Project 2
melut Basin Oil Development Project port of Sudan Africa.
Full welding of all horizontal and vertical position of oil
tank.
Full welding of pipe joint and flange for oil tank.
Tacking and full welding of oil tank girder and their support.
Company
Address
Position
Inclusive Date

:
:
:

WHESSOE Phil, Const Inc.


Kalayaan, Laguna
WELDER (SMAW)
:
August 5, 2002 November 11, 2004

Job Description
Worked with WHESSOE Philippines Construction Inc for
Kalayaan II Penstock Project.
Full Welding of all pipe joint and flange in auxillary for
penstock project.
Full welding of heavy wall tankcircumferential and
horizontal with thickness of 50 mm, 25 mm and 15 mm.
Tacking and full welding of stiffiner ring and pipe support
for auxillary.
Company
Address
Position
Inclusive Date

:
:
:

VOITH Paper
Alfonso St. Pasig City
WELDER (SMAW)
:
July 26, 2001 March 2002

Job Description
Worked with Voith Paper In baggaging NAIA IPT 3.

Full welding of all joint of structural use in baggaging NAI


IPT 3.
Company
Address
Position
Inclusive Date

:
:
:

ECCO ASIA /BALLFOUR BEATTY


Sto. Domingo Bay Laguna
PIPE WELDER (SMAW)
:
March 1995 July 2001

Job Description
Worked with ECCO ASIA / BALLFOUR BEATTY in fabrication
and metal division.
Full welding of circumferential joint inside and outside of
Silo Tank for flour daniel project.
Full welding of pressurable vessels of Pryce gas, Petron and
Pilipinas Shell.
Full welding of heavy columns for Panay power Plant.
Full welding of all joint of pressurable vssels including their
saddle and support.

I hereby certify that the above information is true and correct to


the best of my knowledge and belief.

CRISTINO M.
ANIBO
Applicant

You might also like