You are on page 1of 1

3 2 1

3 2 1 L
6.00m
6.00m L
3.00m 3.00m L/4 L/2 L/4
3.00m 3.00m

B-1 B-1
D SP. 200mm O.C.

L/4

D @ SUPPORT
SP. 200mm O.C.
C-2

2.45m
FTB-1

D @ END
SP. 300 O.C.
D

B-2
FTB-1
SEE DETAIL
SP. 200mm O.C.

L/2
4.20m
4.00m

L
C1F1 C1F1 S-1

WF1

2.45m
ELEV. (-2.00)
SEE STAIR DETAIL
B-2

4.20m

1.75m
4.00m

WF1

L/4
S-1

ELEV. (-2.10) C USE:

1.75m
B-1 B-1 10mm. ties spaced 1@0.05m.,
PLAN ELEVATION 3@0.075m., rest@0.20m.o.c.
FTB-1 WF1 CUT BAR CONCRETE SLAB

0.15m.
C

11.00m
FTB-1
C1F1 C1F1 C1F1 BEND BARS ALTERNATESECTION
STRAIGHT BARS 4 CANTILEVERED BEAM DETAIL

5.00m

5.00m
11.00m

S-1 S-01 SCALE 1 :20 MTS


S-1

B-1

B-1

B-1
0.10 m THK.CONC. SLAB
w/ 10mm BAR @ SLAB DETAIL
FTB-1

FTB-1
5.00m

0.50m.O.C. BOTHWAYS
ELEV. (-2.00)
FTB-1

L1 L2
B B-1 B-1

W2

W2
2.00m

2.00m
FTB-1 FTB-1 WELL COMPACTED FILL 10mm. top and bottom bars
B spaced @ 200mm. bothways

0.11m.
C1F1 C-2
C1F1
A
2.00m

W2

1 FOUNDATION PLAN GROUND FLOOR FRAMING PLAN


B-3 B-3 B-3

S-01 SCALE 1 : 100 MTS 2


S-01 SCALE 1 : 100 MTS
5 TYPICAL DETAIL OF SLAB
S-02 SCALE 1 : 30 MTS
2.00m

L1 L2

1.83m 2.33m
L1/4 Splice zone for top bars
L2/4 L2/4 L2/4
Splice zone for top bars
40mm
Typ.

2-CONT. TOP BAR 2-CONT. TOP BAR EXTRA TOP BAR


EXTRA TOP BAR

2.70 m.
0.20m
2-CONT. BOTTOM BAR 2-CONT. BOTTOM BAR
.165L1 .165L1 .165L2 .165L2
FIN. GROUND FLOOR LINE
40mm
Typ.

No splice shall be No splice shall be


allowed 2d from allowed 2d from
the face of the support the face of the support

2d 2d

0.30m
USE:
10mm. ties spaced 1@0.05m.,

0.80m
3@0.075m., 3@0.10m., rest@0.20m.o.c. B1

3 TYPICAL BEAM DETAIL 6 FOOTING TIE BEAM DETAIL


S-01 SCALE 1 : 50 MTS N.G.L (+0.0) W2
S-01 SCALE 1 :20 MTS

VARIES
1.20m.

VARIES
SCHEDULE OF BEAMS 0.35m
.025

0.25m 0.25m 0.25m


3-16mm 3-16mm 3-16mm
0.35m

0.35m

0.35m

2-16mm 2-16mm
2-16mm
B-1 3-16mm
3-16mm
3-16mm
@SUPPORT @MID-SPAN @SUPPORT

FIN. LOWER GRND. FLOOR LINE


0.35m
1.20m

0.20m 0.20m 0.20m


N.G.L (-2.20)
0.25m

0.25m

0.25m

B-2 3-16mm 2-16mm 3-16mm


2-16mm 3-16mm 2-16mm

FOOTING TIE BEAM

VARIES
@SUPPORT @MID-SPAN @SUPPORT

0.60
0.25m 0.25m 0.25m USE:
C1F1 10mm. ties spaced 1@0.05m.,
0.30m

0.30m

2- 16mm
0.30m

B-3 2- 16mm
2- 16mm 2- 16mm
2- 16mm
3@0.075m., rest@0.20m.o.c. for columns
2- 16mm
2- 16mm 2- 16mm 2- 16mm

0.30m
@SUPPORT @MID-SPAN @SUPPORT

7
COLUMN FOOTING DETAIL

0.15m
S-01 SCALE 1 : 20 MTS 100MM THK GRAVEL
BEDDING

SCHEDULE OF COLUMNS 0.30m

0.35m 0.15m SECTION


3-16mm WALL FOOTING DETAIL DETAIL OF COLUMN
0.30m
0.35m

2-16mm 8
2-16mm 9
3-16mm 2-16mm S-01 SCALE 1 :20 MTS
S-01 SCALE 1 :30 MTS
C-1 C-2

ARCHITECTURAL ENGINEERING Drawings and specifications and other contract documents PROJECT TITLE SHEET CONTENT Cadd/Drawn By: cta APPROVED BY: SHEET NO.
duly signed, stamped or sealed as instruments of service, are
the intellectual property and documents of the Architect, Date:
whether the object for which they are made is executed or Revised By:
not. It shall be unlawful for any person, to duplicate or to AS-BUILT COMMERCIAL & 3-BEDROOM
ARCHITECT CIVIL ENGINEER make copies of said documents for use in the repetition of
and for other projects or buildings, whether executed partly
or in whole, without the written consent of Architect or
RESIDENTIAL BUILDING AS ASHOWN Date:
Checked By:
MR.&MRS. NELSON ALIGUYON
OWNER
S-01
REG. NO. TIN NO. REG. NO. TIN NO.
PTR NO. PLACE PTR NO. PLACE author of said documents.
R.A. 9266 LOCATION: POTIA, ALFONSO LISTA, IFUGAO Date:
03-23-14

You might also like