Pre-construction Survey
I confirm that
(a) I will give a copy of the pre-construction survey to each owner of neighbouring
properties when it is ready, but before work commences on site. Each owner will be
given the portion of the survey which is relevant to his property.
I would like to inform that piling / excavation* works will commence at site on _______.
(Date)
________________________________________ _____________________
Builder (Technical Controller) Name & Signature Builders Company Stamp
_______________
Date
* Please delete accordingly. If there are excavation works followed by piling works, BCA
should also be notified on commencement of excavation works.
BEV/ERSS_Aug 2014
Annex B1
2. Site observation
I have identified the presence and assessed the stability of retaining wall, slope or
boundary wall at site. Site photographs are attached in the report.
Boundary wall
>1.8 m high
Retaining wall
Basement construction
Pile caps/Footings
Pond/swimming pool
BEV/ERSS_Aug 2014
Part II - Checklist on Impact Assessment Report
Excavation work
Weakening of slope
Piling work
Demolition work
Hacking work
BEV/ERSS_Aug 2014
Part III Declaration
I confirm that I have identified the types of construction work in Part II, with a view to
determining appropriate preventive measures to be taken so as to prevent any
settlement or movement which may impair the stability of or cause damage to the
whole or part of any premises or building adjacent or in otherwise close proximity to
the building works are attached.
BEV/ERSS_Aug 2014
ERSS_Annex A
DESIGN CONSIDERATIONS FOR EARTH RETAINING OR STABLISING STRUCTURES (ERSS)
_________________________________________
Name, stamp & signature of QP(D)
Date: __________________
SECTION II* (to be completed by the AC for ERSS)
I have independently reviewed and checked the design and construction methodology of ERSS to satisfy that
the ERSS is structurally safe and robust and the measures are also adequate to safeguard the neighbouring
properties, and is in accordance to the building codes and regulations.
__________________________________________
Name, stamp & signature of AC*
Date: _______________
Note:
#
This shall supersede such provisions as clauses 5.2.3 and 5.2.4 of CP4:2003 Code of Practice for Foundations which suggest
that for temporary works, a lower factor of safety may be considered or material overstress is allowed
*Only applicable for AC application.
BEV/ERSS_Aug 2014
CERTIFICATIONS BY QPs and BUILDER ERSS_Annex B
Project Ref:______________ Project Name:____________________________________________
__________________________________________________
Name, stamp & signature of QP(S)
Date: _______________
SECTION II (to be completed by the builder)
1 Erection of ERSS
a I shall comply with the endorsed construction plans and sequence stipulated by the QP and accordingly produce a detailed
excavation plan. All excavation works shall be executed in accordance with the QPs' endorsed plans. I shall obtain approval
from QP and AC (where applicable) before proceeding with any excavation/proceed with the next stage of works.
b I shall implement and maintain the QPs endorsed instrumentation and monitoring plan.
c I shall ensure that the monitoring readings are properly taken by trained persons and to be overseen by the site supervisor, or
the QP.
d I shall ensure that all ERSS works are executed within the critical limits. If any of the allowable limits of ground movement is
reached or there is damage to neighbouring properties, I shall take corrective actions, remove danger immediately and notify
BCA, QP for ERSS, and QP(S).
2 Contingency measures
a I have prepared a contingency plan in consultation with the QP(S) and ensure that adequate resources are on standby to
implement the plan when needed.
___________________________________________
Name & signature of builder (Technical Controller) Date: _______________
BEV/ERSS_Aug 2014
[Form applicable for non-GBW projects] Exc_Non-GBW_AnnexC-1
SITE INSPECTION & APPROVAL RECORDS
Project Ref:. ____________________ Project Name: ___________________________________________________________
This report is to be prepared and certified for ERSS before the construction proceeds to the next strut level or critical
construction stage, as stipulated in the approved plans. The accompanying Flowchart_AnnexC shows the process and use of
this form. The QP(S)(ST) is required to keep a copy of each of these completed reports on site.
Location/Section: ________________________________________________________________________________________
__________________________________________
Name, stamp & signature of QP(S)
Date: _______________
Section C: When applicable, to be completed and certified by QP(D), with assessment report appended
I have assessed and reviewed the adequacy of the as-installed key structural elements of the ERSS, results of instrumentation and
monitoring readings, actual ground conditions and the changes highlighted by the QP(S) and conclude that ( please tick only one of
the boxes below)
The changes do not require a re-design of the ERSS. ERSS works to the next construction stage can proceed.
Amendment submission to BCA is required before ERSS works to the next construction stage can proceed, and no excavation
is permitted.
___________________________________________
Name, stamp & signature of QP(D)
Date: _______________
Section D: When applicable, to be completed and certified by the AC
I have reviewed the adequacy of as-installed key structural elements of the ERSS, results of instrumentation and monitoring
readings and actual ground conditions and the QP(D)s assessment report and concluded that (please tick only one of the boxes
below)
The changes do not require a re-design of the ERSS. I agree to permit the builder to proceed ERSS works to the next
construction stage.
Amendment submission to BCA is required before ERSS works to the next construction stage can proceed, and no excavation
is permitted.
___________________________________________
Name, stamp & signature of AC
Date: ________________
BEV/ERSS_Aug 2014
Flowchart_AnnexC
BEV/ERSS_Aug 2014
ERSS_Annex D
GROUND MOVEMENT ASSESSMENT RECORD
(This record is to be completed by the QP(S) promptly upon the completion of every strut level or critical construction stages
and a copy must be kept on site)
Location/Section: ____________________________
a I have assessed the results taken from the monitoring instrumentation and site observations. The maximum
measured movements are:
Wall lateral deflection : ________________ mm
b I have inspected the site and its neighbouring areas, and assessed the performance of ERSS as constructed;
and I am satisfied that ERSS is structurally adequate and the works can safely proceed to the next excavation
or construction stage.
2 Actions taken
a # I am not satisfied with ERSS as installed and its performance, and its shortcomings are as follows:
______________________________________
Name, stamp & signature of QP(S)
Date:
a I confirm that the ERSS have been constructed according to the construction plans and design calculations
endorsed by the QP.
b I confirm that the readings of the monitoring instruments from __________ to ___________ (dates) are
properly taken by instrumentation specialist. I have kept a record of the dates and times of these events
including the construction/excavation activities.
Other comments:
________________________________________________________
Name & signature of Site Supervisor(s) Date: ___________
BEV/ERSS_Aug 2014
ERSS_Annex E
Monthly Instrumentation and Monitoring for Excavation Works
(This form shall be completed by QP(S) and submitted to CBC/BCA by 7th day of the following month when any works
shown in approved ERSS plan such as installation of wall or support, ground improvement, excavation, removal of
support or wall, etc, started/ongoing and until the ERSS works is fully backfilled to ground level and or completion of
removal of temporary retaining wall.
Building settlement/monitoring
Instrument Current This Form Work
Alert level hasSuspension
to be Date of Remarks
Ref. reading submitted level Reading
electronically through
CORENET ESS
See guideline below
Building damage (including boundary wall, structural and non-structural damage)
Building Description Remarks
name/address
QP(S): ____________________
PE's Stamp/Signature of QP appointed under Section 8(1)(b) or 11(1)(d)(ii) of Building Control Act
Note: (Under Section 20 of the Building Control Act, any person who makes or produces any declaration,
report, record, document etc which is false in a material particular, shall be guilty of an offence.)
BEV/ERSS_Aug 2014
Guide on e-Submission of Annex E Form.
A. STEPS for QP
1. Download the form and drag to the work area under application reference
number.
2. Right click the form under work area and click Open
BEV/ERSS_Aug 2014
4. Right click the form again under work area and select Recipient
BEV/ERSS_Aug 2014
6. Login to the server. A pop up screen below will appear. Click Begin.
BEV/ERSS_Aug 2014