You are on page 1of 1

SM Supermalls

Construction Kit

TABLE OF CONTENTS

Section Title Page No.


A PRE-CONSTRUCTION REQUIREMENTS 1
B REQUIREMENTS FOR REVIEW (Construction Plans Detailed 2
Requirements)
B.1 Architectural Plans 3
B.2 Mechanical Plans 3
B.3 Electrical Plans 4
B.4 Plumbing and Sanitary Plans 4
B.5 Fire Protection Plans 4
B.6 Gas System Plans 5
B.7 Auxiliary Plans 5
C LIST OF GOVERNMENT REQUIREMENTS 5
D CONSTRUCTION REQUIREMENTS 5
D.1 General Guidelines 5
D.2 Architectural Guidelines 6
D.3 Mechanical Guidelines 8
D.3.1 Airconditioning Guidelines 8
D.3.2 Ventilation Guidelines 9
D.3.3 Other Guidelines 10
D.4 Electrical Guidelines 11
D.5 Plumbing and Sanitary Guidelines 12
D.6 Fire Protection Guidelines 13
D.6.1 Sprinkler Guidelines 13
D.6.2 Kitchen Fire Suppression System Guidelines 14
D.7 Gas System Guidelines 14
E POST-INSTALLATION REQUIREMENTS 15
E.1 General Requirements 15
E.2 Airconditioning System 15
E.3 Ventilation System 15
E.4 Gas System 15
E.5 Electrical System 16
E.6 Plumbing and Sanitary System 16
E.7 Sprinkler System 16
E.8 Request for Final Inspection 16
F MISCELLANEOUS PROVISIONS 17
ANNEXES 18