Scope of
Sr.no DRAWING no Qty UOM
Work
1 PIPING of Auxilarry
2" 602.75
1.1 1046-k72-04-ISO-041 ID
1.2 1046-k72-04-ISO-042 2" ID 608.75
1.3 1046-k72-04-ISO-043 2" ID 595.81
1.4 1046-k72-04-ISO-044 2" ID 608.75
1.5 1046-k72-04-ISO-045 2" ID 586.85
1.6 1046-K72-04-ISO-006 6" ID 35
1.7 1046-K72-04-ISO-007 6" ID 48.25
1.8 1046-K72-04-ISO-008 6" ID 56.25
1.9 1046-K72-04-ISO-010 6" ID 28.25
1.1 1046-K72-04-ISO-012 10" ID 292.25
1.12 1046-K72-04-ISO-013 12"/10" ID 120
1.13 1046-K72-04-ISO-014 6" ID 156
1.14 1046-K72-04-ISO-015 6" ID 42
1.15 1046-K72-04-ISO-021 4" ID 64
1.16 1046-K72-04-ISO-022 4" ID 24
1.17 1046-K72-04-ISO-023 2" ID
1.18 1046-K72-04-ISO-024 2" ID
1.19 1046-K72-04-ISO-025 10" ID
1.2 1046-K72-04-ISO-026 6" ID
1.21 1046-K72-04-ISO-027 10" ID
1.22 1046-K72-04-ISO-028 10" ID
1.23 1046-K72-04-ISO-029 4" ID
1.24 1046-K72-04-ISO-030 2" ID
1.25 1046-K72-04-ISO-031 10" ID
1.26 1046-K72-04-ISO-032 4" ID
1.27 1046-K72-04-ISO-033 6" ID
1.28 1046-K72-04-ISO-034 2" ID
1.29 1046-K72-04-ISO-035 2" ID
1.3 1046-K72-04-ISO-036 2" ID
1.31 1046-K72-04-ISO-017 4" ID
1.32 1046-K72-04-ISO-018 1" ID
1.33 1046-K72-04-ISO-019 1" ID
1.34 1046-K72-04-ISO-020 2" ID
1.35 1046-K72-04-ISO-009 3" ID
1.36 1046-K72-04-ISO-011 2" ID
1.37 1046-K72-04-ISO-016 1" ID
1.38 1046-K72-04-ISO-001 18" ID
1.39 1046-K72-04-ISO-002 18" ID
1.4 1046-K72-04-ISO-003 2" ID
1.41 1046-K72-04-ISO-004 2" ID
1.42 1046-K72-04-ISO-005 3" ID
2 Firewater Line Rerouting
2.1 14" ID 142
5 INSULATION
Insulation
Pipe Description
Type
5.1 A1A 2" SQ.M IH
5.2 12/10-A02-CS150-S80 12"/10" SQ.M IH
5.3 A1A 6" SQ.M IS
5.4 10" IH
10-A4-CS150-S80 SQ.M
5.5 A1A 10" SQ.M IS
5.6 A1M 4" SQ.M IS
5.7 A1M 2" SQ.M IS
5.8 A1M 4" SQ.M IS
5.9 A1M 4" SQ.M IS
5.1 A1M 1" SQ.M IS
6 EQUIPEMENT ERECTION
6.1 COMPRESSOR 1 Nos
6.2 MOTOR 1 Nos
6.3 SEPARATOR SKID 1 Nos
6.4 COOLER 1 Nos
6.5 SUCTION KOD 1 Nos
6.6 DISCHARGE KOD 1 Nos
7 HOT TAPPING of 36" Flare input line
7.1 SCAFFOLDING
7.2 SPLIT TEE FITTUP
7.3 MACHINE ALIGNMENT for Hot Tapping
8 HOT TAPPING of 10" Discharge line
8.1 EXCAVATION
8.2 SPLIT TEE FITTUP
8.3 MACHINE ALIGNMENT for Hot Tapping
9 MOTOR Activity
9.1 Shaft coupling 1
9.2 Motor Alignment 1
10 COMPRESSOR ACTIVITY
10.1 Compressor Alignment 1
10.2 Compressor Grouting 1
11 SEPARATOR ACTIVITY
11.1 Separator Skid Alignment 1
11.2 Separator Skid Grouting 1
13 HYDROTEST
14 Radiography Test
Radiography Test Will be Done on
14.1
spool bases
15 CHEMICAL CLEANING
15.1
Flushing with water to remove dirt etc.
15.2 Degreasing
15.3 Inhibited acid circulation
awaiting
approved drg
Isometric Drawing
Pending
142
at the end of the
project
PIPE Doubling
72
done as per GAD
Drawing not
made
Material not
receipt at site
contractor not
assigned
contractor not
assigned
Pipe Spool
drawing Pending
Pipe Spool
drawing Pending
Pipe Spool
drawing Pending
Drawing Pending