You are on page 1of 1

Ite

Description Unit Rate


m
SUBSTRUCTURE
60.00
Clearance 1 m2
80.00
Excavate topsoil 1 m2
500.00
Disposal 1 m3

Trench excavation 450.00


1 m3
Earth work support 750.00
1 m2
200.00
Trimming sides 1 m2
Level & Compaction 40.00
1 m2
Mass concrete 900.00
1 m2
Rubble foundation 7,000.00
1 m3
Formwork 400.00
1 m2
Reinforcement 1 tone 200,000.00

Concrete 13,000.00
1 m3
DPC 300.00
1 m2

600.00
Pit Excavation 1 m3
600.00
Back filling 1 m3
500.00
Remove & disposal 1 m2
400.00
Hardcore filling 1 m2
13,000.00
Concrete Bed 1 m3
200.00
Polythene memb. 100mm wide 1 m2

FINISHES
Floor work

500.00
Cement mortar rendering 1 m2