You are on page 1of 6

BILL OF QUANTITIES - STRUCTURAL

CONCRETE WORKS
ITEM NO. DESCRIPTION UNIT QUANTITY MATERIAL COST LABOR COST TOTAL COST
1.0 COLUMN FOOTING m^3 214.85
WALL FOOTING
1.1 Cement 253,523.00 88,733.05 342,256.05
1.2 Sand 11,816.75 4,135.86 15,952.61
1.3 Gravel 118,167.50 41,358.63 159,526.13

2 FOOTING TIE BEAM m^3 38.72


2.1 Cement 45,689.60 15,991.36 61,680.96
2.2 Sand 2,129.60 745.36 2,874.96
2.3 Gravel 21,296.00 7,453.60 28,749.60

3 COLUMN, PC & m^3 114.07


STIFFENER
3.1 Cement 134,602.60 47,110.91 181,713.51
3.2 Sand 6,273.85 2,195.85 8,469.70
3.3 Gravel 62,738.50 21,958.48 84,696.98

4 SLAB ON FILL ,RAMP m^3 56.7


& CORRIDOR
4.1 Cement 66,906.00 23,417.10 90,323.10
4.2 Sand 3,118.50 1,091.48 4,209.98
4.3 Gravel 31,185.00 10,914.75 42,099.75

5 SECOND FLOOR m^3 38.88


SLAB
5.1 Cement 45,878.40 16,057.44 61,935.84
5.2 Sand 2,138.40 748.44 2,886.84
5.3 Gravel 21,384.00 7,484.40 28,868.40

6 THIRD FLOOR m^3 38.91


SLAB
6.1 Cement 45,913.80 16,069.83 61,983.63
6.2 Sand 2,140.05 749.02 2,889.07
6.3 Gravel 21,400.50 7,490.18 28,890.68

7 SECOND FLOOR m^3 44.28


BEAM
7.1 Cement 52,250.40 18,287.64 70,538.04
7.2 Sand 2,435.40 852.39 3,287.79
7.3 Gravel 24,354.00 8,523.90 32,877.90

8 THIRD FLOOR m^3 44.28


BEAM
8.1 Cement 52,250.40 18,287.64 70,538.04
8.2 Sand 2,435.40 852.39 3,287.79
8.3 Gravel 24,354.00 8,523.90 32,877.90

9 ROOF LEVEL m^3 24.2


BEAM
9.1 Cement 28,556.00 9,994.60 38,550.60
9.2 Sand 1,331.00 465.85 1,796.85
9.3 Gravel 13,310.00 4,658.50 17,968.50

10 STAIR m^3 17.37


10.1 Cement 20,496.60 7,173.81 27,670.41
10.2 Sand 955.35 334.37 1,289.72
10.3 Gravel 9,553.50 3,343.73 12,897.23

11 SUN BREAKER m^3 6.77


11.1 Cement 7,988.60 2,796.01 10,784.61
11.2 Sand 372.35 130.32 502.67
11.3 Gravel 3,723.50 1,303.23 5,026.73

12 STAIR ON GRADE m^3 2.20


12.1 Cement 2,596.00 908.60 3,504.60
12.2 Sand 121.00 42.35 163.35
12.3 Gravel 1,210.00 423.50 1,633.50

13 MASONRY UNITS m^2 1045.69


150mm WALL
13.1 CHB # 6 218,941.34 76,629.47 295,570.81
13.2 Cement (Mortar) 251,224.93 87,928.73 339,153.66
13.3 Sand (Mortar) 9,708.19 3,397.87 13,106.05
13.4 Cement (Plaster) 23,691.15 8,291.90 31,983.06
13.5 Sand (Plaster) 920.21 322.07 1,242.28

14 MASONRY UNITS m^2 385.50


100mm WALL
14.1 CHB # 4 66,257.81 23,190.23 89,448.05
14.2 Cement (Mortar) 92,615.60 32,415.46 125,031.07
14.3 Sand (Mortar) 3,578.98 1,252.64 4,831.63
14.4 Cement (Plaster) 8,733.89 3,056.86 11,790.75
14.5 Sand (Plaster) 339.24 118.73 457.97

MATERIAL COST LABOR COST TOTAL COST


SUM= 1,820,606.90 637,212.41 2,457,819.31
Cement Sand Gravel
Mixture Class C = 1:03:06 5 0.5 1
Mixture Class B (Mortar) 1.018 0.0844
Mixture ClassB(Plaster) 8 mm 0.096 0.008
Materials Cost
Rizal Portland Cement 236.00
Washed Sand 110.00 per cubic m.
20 mm or 3/4 Gravel 550.00 per cubic m.
CHB # 4 (750psi) 13.75 1 square m. = 12.5
CHB # 6 (750psi) 16.75
LABOR COST= 0.35

Cement Sand Gravel


Mixture Class C = 1:03:06 5 0.5 1
Mixture Class B (Mortar) 1.018 0.0844
Mixture ClassB(Plaster) 8 mm 0.096 0.008
Materials Cost
Rizal Portland Cement 236.00
Washed Sand 110.00 per cubic m.
20 mm or 3/4 Gravel 550.00 per cubic m.
CHB # 6 (750psi) 16.75
LABOR COST= 0.35

Cement Sand Gravel


Mixture Class C = 1:03:06 5 0.5 1
Mixture Class B (Mortar) 1.018 0.0844
Mixture ClassB(Plaster) 8 mm 0.096 0.008
Materials Cost
Rizal Portland Cement 236.00
Washed Sand 110.00 per cubic m.
20 mm or 3/4 Gravel 550.00 per cubic m.
CHB # 4 (750psi) 13.75 1 square m. = 12.5
CHB # 6 (750psi) 16.75
LABOR COST= 0.35
pcs
pcs

You might also like