Professional Documents
Culture Documents
GRAEVINSKO-ARHITEKTONSKI
FAKULTET
DIPLOMSKI RAD
Betonske konstrukcije
Tema: Proraun armiranobetonske konstrukcije stambenog objekta spratnosti
G2+G1+P+5
Komisija:
Dr. Predrag Blagojevi
Dr. Verka Prolovi
Dr. Dragoslav Stoji
Diplomski rad
Izgled objekta
Igled objekta
Sadraaj
I PROJEKTNI ZADATAK.....................................................................................................................5
II TEHNIKI IZVETAJ......................................................................................................................7
III GRAFIKI PRILOZI
3.1. Situacija..................................................................................................................................10
3.2. Osnove....................................................................................................................................11
3.3. Preseci....................................................................................................................................19
3.4. Fasade.....................................................................................................................................21
3.5. Plan pozicija...........................................................................................................................25
IV BETONSKE KONSTRUKCIJE
4.1. TEHNIKI OPIS STATIKOG PRORAUNA.........................................................................34
4.2. ANALIZA OPTEREENJA........................................................................................................36
4.2.1. STALNO OPTEREENJE...............................................................................................36
4.2.1.1. Povrinsko optereenje...............................................................................................36
4.2.1.2. Linijsko optereenje...................................................................................................41
4.2.1.3. Optereenje na stapaninim krakovima......................................................................47
4.2.1.4. Aktivni pritisci tla.......................................................................................................48
4.2.2. IZUZETNO OPTEREENJE...........................................................................................51
4.2.3. POVREMENA OPTEREENJA......................................................................................51
4.2.3.1. Korisno optereenje....................................................................................................51
4.2.3.2. Optereenje od snega..................................................................................................51
4.2.3.3. Optereenje od vetra...................................................................................................51
4.3. Izvetaj iz programskog paketa Radimpex Tower 6..................................................................57
4.4. Dimenzionisanje stuba - POS S3................................................................................................141
4.4.1. Klasifikacija konstrukcije prema osetljivosti na horizontalna pomeranja i duine izvijanja
stubova............................................................................................................................141
4.4.2. Duina izvijanja stuba efektivna duina stuba.............................................................142
4.4.3. Provera stabilnosti vitkog elementa (stuba) na uticaj izvijanja.......................................148
4.4.3.1. Provera stabilnosti na izvijanje segmenata stuba koji su u oblasti srednje vitkosti
Metodom dopunske ekscentrinostiza x pravac (za moment oko ose y tj.
M2)............................................................................................................................149
4.4.3.2. Provera stabilnosti na izvijanje segmenata stuba koji su u oblasti srednje vitkosti
Metodom dopunske ekscentrinosti za y pravac (za moment oko ose x tj.
M3)............................................................................................................................157
4.4.4. Dimenzionisanje stuba (vitkog elementa) prema graninom stanju nosivosti (proraun
podune armature) ..........................................................................................................165
4.4.5. Dimenzionisanje stuba (vitkog elementa) prema graninom stanju nosivosti (proraun
poprene armature-uzengija)...........................................................................................176
4.4.6. Poreenje rezultata dimenzinisanja dobijenih u programu Tower 6 i runo.................177
4.4.7. Izvetaj iz programskog paketa Radimpex Tower.........................................................178
4.5. Plan armiranja - Stub S3.............................................................................................................188
4.6. Dimenzionisanje AB platna u ramu H5 (ZN 6)..........................................................................189
4.6.1. Poreenje rezultata dimenzinisanja dobijenih u programu Tower 6 i runo.................193
4.6.2. Izvetaj iz programskog paketa Radimpex Tower........................................................194
4.7. Plan armiranja AB zid..............................................................................................................198
4.8. Meuspratna konstrukcija..........................................................................................................199
I PROJEKTNI ZADATAK
Za dati arhitektonski koncept stambenog objekta spratnosti G2+G1+P+5 na katastarskoj parceli br.
953/1, 953/2 i 954, K.O. Beii, Crna Gora, projektovati noseu konstrukciju od armiranog betona:
1. Betonske konstrukcije
2. Fundiranje
3. Drvene konstrukcije
Za dato reenje krovne konstrukcije, izvriti dimenzionisanje elemenata: roga, podronjae i stuba
drvene konstrukcije, kao i kontrolu napona u datim elementima.
II TEHNIKI IZVETAJ
1. Lokacija:
Lokacija se nalazi na urbanistikoj parceli 70.15 K.O Beii, Crna Gora, povrine 529,29 m2,
koja je i graevinska parcela. Indeks zauzetosti je 0,58, indeks izgraenosti 3,50. Maksimalana povrina
pod objektima je 309,11m2, maksimalna BRGP je 1854,69 m2. Bruto povrina prizemlja objekta je
297,54 m2, razvijen BRGP 1847,40m2. Indeks zauzetosti je 0,56, ideks izgraenosti je 3,49. Graevinska
parcela sa svoje june strane izlayi na ulicu, sa zapadne starne je susedni objekat spratnosti P+4.
Teren je u padu u pravcu sever-jug. Nulta kota objekta odgovara apsolutnoj koti od 25,43 m.
Ulaz u objekta je sa istone strane, ulaz u garau sa zapadne starne, a prostor oko objekta je kaskadno
organizovan sa stazama i stepenitima i sa svoje june starne prati profil postojeeg trena.
2. Funkcija:
Kota 0,00 m je na nivou prizemlja , dok je kota garae 2 na -6,05 m, kota jame auto lifta na -7,85 m,
a ukupna visina objekta iznad terena sa krovnom konstrukcijom je +19,65 m. U garaama su
projektovana parking mesta, prostor za manipulaciju vozila kao i auto-lift. U prizemlju je se nalazi ulaz
u zgradu. Prostor prizemlja i svih spratova je projektovan kao stambeni prostor.
3. Konstrukcija
4. Podovi
5. Plafoni
6. Prozori i vrata
Sva spoljanja stolarija je od Al profila sa termo prekidom. Povrinska zatita profila se izvodi
eloksiranjem ili plastificiranjem u boji po izboru.
Za spoljanju stolariju predvieno je stop-sol (termoizolirajue, reflektujue staklo) 4+16Ar+4mm.
Prostor izmeu stakla se puni argonom. Za unutranju aluminariju predvieno je obino (float)
4+15+4mm staklo.
Parapeti su visine h= 93 cm i 173 cm. Na balkonskim vratima se postavlja spoljanja eslinger roletna sa
automatskim upravljanjem (izrada po emi i uputstvu proizvoaa).
Ulazna vrata u garau su aluminijumska rolo-vrata na elektro pogon.
Vrata na ulazu iz stepeninog dela, kao i tampon zone u garani prostor su metalna protivpoarna 90min
sa atestom.
Ulazna vrata u objekat i vrata na ulazu iz vetrobrana u stepenini prostor u prizemlju su aluminijumska,
zastakljena.
Ulazna vrata u stanove su metalna sa oblogom od furniranog medijapana, protivpoarna sa atestom (sa
poarnom otpornou od 60min).
Stolarija u stanovima je drvena u toku i duploperovanim krilima. Sva unutranja vrata u stanovima se
farbaju u bojom po izboru investitora.
7. Ograde-terase
8. Krovna konstrukcija
Krovna konstrukcija je drvena, dvovodna. Rogovi su dimenzija 12x14, venanice 14x14 cm,
podronjae 14x20, kleta 2x 5/25, stubovi 12x14, sekundarni nosai 10x10 cm, a sve je detaljnije dato
u osnovama krovne konstrukcije i konstruktivnom delu projekta. Krovni pokriva je sendvi panel od
lima sa ispunom od kamene vune.
9. Obrada fasade
Fasada je Demit u boji po izboru sa termoizolacijom zidova od 5,0 cm. Spoljanji zid u prizemlju je
sa oblogom od kamenih ploa u sloju cementnog maltera.
Na fasadi dominiraju dve boje: bela i be, to je prikazano u grafikim prilozima. Delovi fasade (fasadni
zid prizemlja i garae) oblau se kamenim ploama (imitacije krenjakog bunja kamena).
10. Limarski radovi
Sve nadstrenice se opivaju limom svertlo sive boje. Sve ventilacije na krovu se propisno opivaju.
Venci na krovu se opivaju limom radi zatite od uticaja atmosferskih padavina. Vertikalni i horizontalni
oluci su plastificirani u boji fasade i oznaeni su u osnovama u delu arhitekture. Odvodnjavanje vode sa
manjih povrina-loa se vri preko lula za odvod vode.
Sve prostorije u stanovima (osim nekih sanitarnih) provetravaju se prirodnim putem. Sanitarni vorovi
u stanovima se provetravaju prirodno ili vetaki (putem ventilacionih kanala).
Sve instalacije u objektu: vodovod, kanalizacija, elektrika i grejanje su obraene posebnim elaboratima.
IV BETONSKE KONSTRUKCIJE
Proraun objekta (statika i dinamika analiza) uraen je u programskom paketu TOWER 6.0
Radimpex. Proraunski model je prikazan u okviru prorauna konstrukcije. Zbog obimnosti ulazno-
izlaznih podataka u okviru ovog prorauna prikazani su samo reprezentativni rezultati. Proraun je
sproveden metodom konanih elemenata (MKE).
Planom pozicija koji je sastavni deo konstruktivnog dela projekta obeleene su medjuspratne
krstato amirane ploe i armirano betonski ramovi u x i y pravcu. Plan pozicija postoji i u delu statikog
prorauna gde je data dispozicija gore navedenih ramova. Armirano betonski stubovi i armirano betonska
platna su sastavni delovi armirano betonskih ramova. Meutim, u planu pozicija dodatno je izvreno
obeleavanje zidnih platna i stubova radi lake izrade planova detalja armature koji e se koristiti na
gradilitu.
Objekat je fundiran na armirano betonskoj ploi. Temeljna ploa je debljine d=60 cm. Na osnovu
rezultata terenskih istraivanja i laboratorijskih ispitivanja za predvienu vrstu objekta, u geotehikom
modela terena izdvojen je jedan merodavan geotehniki sloj u kome e se vriti zemljani radovi i
temeljenje objekata. Nivo fundiranja je odmah ispod podne ploe garae. Zbog opreme lifta fundiranje
na tom delu je sputeno u odnosu na podnu kotu garae za 1,40 m. Temelj ispod liftovskog otvora je u
takoe temeljna ploa d=60 cm. Usvojena armatura u temeljnoj ploi je B 500B. Marka betona temelja
MB30. Drenana zatita je neophodna, a za delove objekta ukopane u podlogu obavezna je
hidroizolacija. Oekivano sleganje po Steinbrenner-u je 3,36 cm, a sleganje dobijeno u Tower-u je
4,357 cm. Modul reakcije tla je Ms=5000 kN/m3. Dozvoljena nosivost tla je Q=540,280 kN/m2, a
maksimalana vrednost napona u tlu dobijena u Tower-u je max=217,82 kN/m2
Napomena:
1
g = g i = 1,10 kN / m 2
i =1
P2 (pod na tlu)
1. granitne ploice g1 = 0, 02 25 = 0, 50 kN / m 2
2. cementna
g 2 = 0, 04 22 = 0,88 kN / m 2
kouljica
2
g = g i = 1, 38 kN / m 2
i =1
P3
3. malter g 3 = 0, 02 19, 0 = 0, 38 kN / m 2
3
g = g i = 5, 07 kN / m 2
i =1
2
g bez AB ploe = g i = 1, 48 kN / m 2
i =1
P4
1. granitne ploice g1 = 0, 02 25, 0 = 0, 50 kN / m 2
P5
1. parket g1 = 0, 02 7 = 0,14 kN / m 2
2. cementna
g 2 = 0, 04 22, 0 = 0,88 kN / m 2
kouljica
3. zvuna i
toplotna g 3 = 0,10 kN / m 2
izolacija
4. AB ploa g 4 = 0,16 25 = 4, 00 kN / m 2
5. simprolit g 5 = 0, 05 2 = 0,10 kN / m 2
5
g = g i = 5, 22 kN / m 2
i =1
4
g bez AB ploe = g i = 1, 22 kN / m 2
i =1
P6
1. keramika na
g1 = 0, 01 23 = 0, 23 kN / m 2
lepku
2. cementna
g 2 = 0, 05 22 = 1,1 kN / m 2
kouljica
3. zvuna i
toplotna g 3 = 0,10 kN / m 2
izolacija
4. AB ploa g 4 = 0,16 25 = 4, 00 kN / m 2
5. simprolit g 5 = 0, 05 2 = 0,10 kN / m 2
5
g = g i = 5, 53 kN / m 2
i =1
4
g bez AB ploe = g i = 1, 53 kN / m 2
i =1
P7
1. keramika na lepku g1 = 0, 01 23 = 0, 23 kN / m 2
2. cementna
g 2 = 0, 05 22 = 1,1 kN / m 2
kouljica
3. zvuna i toplotna
g 3 = 0,10 kN / m 2
izolacija
4. AB ploa g 4 = 0,16 25 = 4, 00 kN / m 2
5. simprolit g 5 = 0, 05 2 = 0,10 kN / m 2
5
g = g i = 5,53 kN / m 2
i =1
4
g bez AB ploe = g i = 1, 53 kN / m 2
i =1
P8
3
g bez AB ploe = g i = 1, 98 kN / m 2
i =1
P9
4
g = g i = 5, 48 kN / m 2
i =1
3
g bez AB ploe = g i = 1, 48 kN / m 2
i =1
P10
1. parket g1 = 0, 02 7 = 0,14 kN / m 2
2. cementna kouljica g 2 = 0, 04 22 = 0,88 kN / m 2
3. zvuna i toplotna
g 3 = 0,10 kN / m 2
izolacija
4. AB ploa g 4 = 0,16 25 = 4, 00 kN / m 2
5. malter g 5 = 0, 02 19, 0 = 0, 38 kN / m 2
5
g = g i = 5, 50 kN / m 2
i =1
4
g bez AB ploe = g i = 1, 50 kN / m 2
i =1
P11
1. keramika na lepku g1 = 0, 01 23 = 0, 23 kN / m 2
2. cementna kouljica g 2 = 0, 05 22 = 1,10 kN / m 2
3. zvuna i toplotna
g 3 = 0,10 kN / m 2
izolacija
4. AB ploa g 4 = 0,16 25 = 4, 00 kN / m 2
5. malter g 5 = 0, 02 19, 0 = 0, 38 kN / m 2
5
g = g i = 5,81 kN / m 2
i =1
4
g bez AB ploe = g i = 1,81 kN / m 2
i =1
P12
1. keramika na lepku g1 = 0, 01 23 = 0, 23 kN / m 2
2. cementna kouljica g 2 = 0, 05 22 = 1,10 kN / m 2
3. zvuna i toplotna
g 3 = 0,10 kN / m 2
izolacija
4. AB ploa g 4 = 0,16 25 = 4, 00 kN / m 2
5. malter g 5 = 0, 02 19, 0 = 0, 38 kN / m 2
5
g = g i = 5,81 kN / m 2
i =1
4
g bez AB ploe = g i = 1,81 kN / m 2
i =1
P13
4
g = g i = 5, 98 kN / m 2
i =1
3
g bez AB ploe = g i = 1, 98 kN / m 2
i =1
P14
1. keramika na lepku g1 = 0, 01 23 = 0, 23 kN / m 2
2. cementna kouljica g 2 = 0, 05 22 = 1,10 kN / m 2
3. zvuna i toplotna
g 3 = 0,10 kN / m 2
izolacija
4. AB ploa g 4 = 0,16 25 = 4, 00 kN / m 2
5. malter g 5 = 0, 02 19, 0 = 0, 38 kN / m 2
5
g = g i = 5,81 kN / m 2
i =1
4
g bez AB ploe = g i = 1,81 kN / m 2
i =1
P15
1. keramika na lepku g1 = 0, 01 23 = 0, 23 kN / m 2
2. cementna kouljica g 2 = 0, 05 22 = 1,10 kN / m 2
3. zvuna i toplotna
g 3 = 0,10 kN / m 2
izolacija
4. AB ploa g 4 = 0,16 25 = 4, 00 kN / m 2
5. malter g 5 = 0, 02 19, 0 = 0, 38 kN / m 2
5
g = g i = 5,81 kN / m 2
i =1
4
g bez AB ploe = g i = 1,81 kN / m 2
i =1
Kao primer blokova koji mogu biti korieni za zidanje, uzeti su oprkarski prizvodi prizvoaa
Zorka opeka
Klimabloc 25 - za spoljanje i unutranje zidove
Klimabloc 20 - za pregradne zidove zidove
Klimabloc 10 - za pregradne zidove zidove
Fasadni zidovi
FZ 1
Debljina d Zapreminska teina
Slojevi d (kN/m2)
(m) (kN/m3)
kamene ploe 0,02 28,00 0,56
cementni malter 0,03 21,00 0,63
elina mrea
stiropor 0,03 0,15 0,0045
opekarski blok 0,25 8,00 2,00
produni malter 0,02 19,00 0,38
3,575 kN/m2
FZ 2
Debljina d Zapreminska teina
Slojevi d (kN/m2)
(m) (kN/m3)
kamene ploe 0,02 28,00 0,56
cementni malter 0,03 21,00 0,63
elina mrea
stiropor 0,03 0,15 0,0045
opekkarski blok 0,25 8,00 2,00
produni malter 0,02 19,00 0,38
3,574 kN/m2
FZ 3
Debljina d Zapreminska teina
Slojevi d (kN/m2)
(m) (kN/m3)
demit 0,05 1,00 0,05
opekerski blok 0,25 8,00 2,00
produni malter 0,02 19,00 0,38
2,430 kN/m2
FZ 5
Ana Milanovi FG 201/06
43
Diplomski rad
FZ 8
Debljina d Zapreminska teina
Slojevi d (kN/m2)
(m) (kN/m3)
demit 0,05 1,00 0,05
opekerski blok 0,25 8,00 2,00
keramike ploice 0,01 23,00 0,23
2,280 kN/m2
Unutranji zidovi
UZ 1
Debljina d Zapreminska teina
Slojevi d (kN/m2)
(m) (kN/m3)
produni malter 0,02 19,00 0,38
opekarski blok 0,25 8,00 2,00
produni malter 0,02 19,00 0,38
2,760 kN/m2
UZ 2
Debljina d Zapreminska teina
Slojevi d (kN/m2)
(m) (kN/m3)
produni malter 0,02 19,00 0,38
opekarski blok 0,20 8,00 1,60
produni malter 0,02 19,00 0,38
2,360 kN/m2
UZ 4
Debljina d Zapreminska teina
Slojevi d (kN/m2)
(m) (kN/m3)
produni malter 0,02 19,00 0,38
opekarski blok 0,20 8,00 1,60
keramike ploice 0,01 23,00 0,23
2,210 kN/m2
UZ 5
Debljina d Zapreminska teina
Slojevi d (kN/m2)
(m) (kN/m3)
keramike ploice 0,01 23,00 0,23
opekarski blok 0,25 8,00 2,00
keramike ploice 0,01 23,00 0,23
2,460 kN/m2
UZ 6
Debljina d Zapreminska teina
Slojevi d (kN/m2)
(m) (kN/m3)
produni malter 0,02 19,00 0,38
opekarski blok 0,10 9,00 0,90
produni malter 0,02 19,00 0,38
1,660 kN/m2
UZ 7
Ana Milanovi FG 201/06
45
Diplomski rad
UZ 8
Debljina d Zapreminska teina
Slojevi d (kN/m2)
(m) (kN/m3)
keramike ploice 0,01 23,00 0,23
opekarski blok 0,10 9,00 0,90
keramike ploice 0,01 23,00 0,23
1,360 kN/m2
Usvojena optereenja zidova kao linijskih optereenja za spratnu visinu 2,84 m (kN/m')
FZ 1 FZ 2 FZ 3 FZ 5 FZ 8 UZ 1 UZ 2 UZ 3 UZ 4 UZ 5 UZ 6 UZ 7 UZ 8
10,153 10,150 6,475 9,727 6,475 7,838 6,700 7,412 6,276 6,986 4,714 4,288 3,862
240
l = 2402 + 1522 = 284,084 cm cos = = 0,84482
284, 084
Stalno optereenje na segmentu 2-3:
g
Opis slojeva
[kN/m2]
(0,17 +0,30 ) 0,03 30,0
1. Obloga = 1,41
0,30
( 0,17 +0,30 ) 0,03 21,0
2. Cementna kouljica = 0,987
0,30
0,17 0,30 25,0
3. Stepenik =2,125
2 0,30
d g
[m] [kN/m3] [kN/m2]
Ana Milanovi FG 201/06
47
Diplomski rad
Aktivni pritisci:
pa = h k a
k a = tg 2 45
2
20
k a1 = tg 2 45 = 0, 49029
2
k a1 = k a 2 = k a 3 = 0, 49029
P7 P5 P5
sloj 1
0 kN/m2
PZ2
sloj 2
7,00 kN/m2
P3 + 3.05 (a.k.22.38)
PZ2
14,00 kN/m2
sloj 3 P1 - 6.10 (a.k.19.43)
S = 0,35 kN / m 2
Primorje u celini karakteriu, kao dominantni, vetrovi iz pravca severoistoka i jugozapada.
Maksimalne brzine vetrova u Budvi ima severoistok (najvea srednja 4,2 m/s), ali i najveu maksimalnu
brzinu (27,5 m/s).
W = qg ,T , z C A optereenje vetrom
C koefeicijent sile pritiska
qg ,T , z = qm,T , z Gz aerodinamiki pritisak vetra
Gz dinamiki koeficijent
qm,T , z = qm,T ,10 S z k z osredenjeni aerodinamiki pritisak
1
W = ( m ,50,10 2 kt kT ) 10 3 S z 2 K z 2 G z C A [kN/m2]
2
m,T,10 = m,50,10 k t k T [m/s]
1
qm,T,10 = m ,T ,10 2 10 3 [kN/m2]
2
qm,T,z = qm,T,10 K z [kN/m2]
qw = qg,T,z C [kN/m2]
Gustina vazduha:
H 25, 0
= 1, 225 = 1, 2133 = 1, 2219 kg / m 3 (iz pravilnika- taaka 5.2.1)
8000 8000
m,ta ,10
kt = (pravilnk JUS U. C7.110 - taaka 5.3.2.2)
m,3600,10
Urbane zone, klasa hrapavosi C : kt C = 2, 0448 ta 0,0935
kt = 1, 0 za ta = 3600 s
Faktor ekspozicije:
2
z z
K z = b KZ 2 = b
10 10
0,220
19, 65
K z = 0, 500 = 0,8204
10
K z 2 = 0,8204 2 = 0, 67305
Kako uslovi iz kriterujuma 2 pravilnika JUS U. C7.111 nisu ispunjeni, odreivanje krutosti e se vriti
po kriterijumu 3 iz istog pravilnika. On se zasniva na ispitivanj podlonosti konstrukcije rezonantnom
efektu dejstva vetra preko odnosa (R/B)2 i izraza za dinamiki koeficijent Gz.
2
R
Za < 0,5 Gz = 1 + 2 g I z B dinamiki koeficijent
B
2 2
R R
Za > 0,5 Gz = 1 + 2 g I z B 1 + dinamiki koeficijent
B B
b 29,19
= = 1, 485 S = 0, 004
h 19, 65
b
Kako je = 1, 485 > 0, 25
h
R R
2 2
b Q4 /3 b Q5 / 6
Za > 0, 25 = S Za < 0, 25 = S
h B 4 h B 4
R
2 4/3 4/3
Q 0, 5274
Koristimo formulu : = S = 0, 007 = 0,1562
B 4 4 0, 015
2
R
= 0,1526 < 0,5
B
Konstrukcija nije podlona rezonantnom efektu, pa spada u krute konstrukcije.
Sledi postupak 4.
0,220
a 10 0, 041 10
Iz = = = 0, 28747
b z 0,5 9,825
2
R
= 0,1526 < 0,5 Konstrukcija spada u krute i nije podlona rezonantnom efektu dejstava vetra, pa
B
se dinamiki koeficijent rauna po formuli:
Gz = 1 + 2 g I z B
Gz = 1 + 2 3 0, 28747 1, 015 = 2, 7506
g udarni koeficijent koji za glavnu noseu konstrukciju iznosi 3, 00
k z (5) 2 = 0,369
k z (10) 2 = 0,500
k z (15) 2 = 0,598
k z (20) 2 = 0, 678
2
1
W( z ) ' = 1, 2219 (19, 00 1 1) 103 12 2, 7506 K z 2 C A
2
2
W( z ) ' = 0, 607 K z 2 C A
C p A = + 0, 6 ; C p BD = 0, 50 ; C p C = + 0, 40 ; C p E = 0, 90 ; C p FH = 0, 70 ; C p G = 0, 60
WI G = 0,134 A
WII G = 0,184 A
WIII G = 0, 218 A
WIV G = 0, 247 A
Nelinearan proraun
Velicina modela
Broj cvorova: 23180
Broj plocastih elemenata: 19369
Broj grednih elemenata: 2843
Broj granicnih elemenata: 18081
Broj osnovnih slucajeva optereenja: 10
Broj kombinacija optereenja: 28
Jedinice mera
Duzina: m [cm,mm]
Sila: kN
Temperatura: Celsius
Sema nivoa
Naziv z [m] h [m]
Venac 19.60 1.60
Tavan 18.00 3.00
V sprat 15.00 1.50
Podest St 7 13.50 1.50
IV sprat 12.00 1.50
Podest St 6 10.50 1.50
III sprat 9.00 1.50
Podest St 5 7.50 1.50
II sprat 6.00 1.50
Podest St 4 4.50 1.50
I sprat 3.00 1.50
Podest St 3 1.50 1.50
Prizemlje 0.00 1.52
Podest St 2 -1.52 0.23
-1.75 1.30
Garaa (nivo 1) -3.05 1.52
Posest St 1 -4.57 1.53
Garaa (nivo2) -6.10 1.40
Jama lifta -7.50
Tabela materijala
No Naziv materijala E[kN/m2] [kN/m3] t[1/C] Em[kN/m2] m
1 Beton MB 30 3.150e+7 0.20 25.00 1.000e-5 3.150e+7 0.20
2 Drvo - etinari - masivno 1.000e+7 0.20 5.00 1.000e-5 1.000e+7 0.20
Setovi ploca
No d[m] e[m] Materijal Tip prorauna Ortotropija E2[kN/m2] G[kN/m2]
<1> 0.600 0.300 1 Tanka ploca Izotropna
<2> 0.250 0.125 1 Tanka ploca Izotropna
<3> 0.200 0.100 1 Tanka ploca Izotropna
<4> 0.200 0.100 1 Tanka ploca Izotropna
<5> 0.150 0.075 1 Tanka ploca Izotropna
<6> 0.160 0.080 1 Tanka ploca Izotropna
<7> 0.180 0.090 1 Tanka ploca Izotropna
<8> 0.320 0.160 1 Tanka ploca Izotropna
Setovi greda
T 3
25
[cm]
3
25
[cm]
T 3
50
12.5
[cm]
=17
50
25
[cm]
3
22
60
25
[cm]
3
22
60
20
[cm]
T 3
25
[cm]
T 3
20
[cm]
T 3
85
30
[cm]
=17
25
65
[cm]
3
40
20
[cm]
3
40
25
[cm]
T 3
12
[cm]
T 3
12
[cm]
T 3
10
[cm]
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
34 0.59
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
b/d=25/20 0.20
27 b/d=25/20 0.94
H6 b/d=25/20
b/d=25/20 b/d=25/20 b/d=25/20 0.41
0
25/2
25 1.35
b/d=
H5
0.55
23 b/d=25/20
0.59
22
21 0.50
b/d=25/20
20
b/d=25/20
0.36
19 0.14
0
18 0.61
25/2
b/d=25/20
0.25
17
b/d=
H4 0.75
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 b/d=25/20 0.15
10 0.55
b/d=25/20
0.35
0
9
8
25/2
7 0.75
6 b/d=25/2 0.10
0.13
b/d=
0 0.42
5
4
H2' 0.55
0.15
H2 0m b/d=25/20 0.20
0.2 0.60
b/d=25/20
d=
0
25/2
H1' 1.10
b/d=
1.65
H1
b/d=25/20 b/d=25/20
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 POS G 620-1 0.25
28 0.55
b/d=25/60 POS G 620 -2 0.20
27 b/d=25/60 POS G 620-3
0.94
H6 POS G 609 POS G 610-1 POS G 610-2 b/d=25/60
b/d= 21-4
b/d=25/60 b/d=25/60 b/d=25/60 0.41
0
2 5/6
G6
25 POS G 608-1 POS G 608-2 1.35
POS
POS G 618
H5 b/d=25/60 b/d=25/60 POS G 607
b/d=20/40
PO 0.16
0.55
PO 0 .16
23 b/d=25/60
SM
6m 0
d=
0.59
0.1 61
SM
0.1 6 08
0.1 6 09
d=
b/d= 22-3
22 1
61
d = MK
K6
6
6
POS G 611
POS G 612
m
0.50
0
POS G 613
b/d=25/60
b/d=25/60
21
POS G 615-2
K
b/d=25/60
20 MK K
MK
2 5/6
M 18 m
POS G 614
POS G 617
mG 6
b/d=25/60
b/d=25/60
b/d=25/60
0.36
PO G 6 21-3
13
.P1 6OS 07
61
S
m
S . 0.14
PO
19 0
6
2
5/60
PO =
POS
POS
18 0.61
0 b G 622d-=2 0 K
d=
d=
d
S=2M
0.25
17
POS
H4 POS G 606-1 POS G 606-2 POS G 606-3 POS G 606-4 0.75
b/d
15
14 0.25
b/d=20/60 b/d=20/60 b/d=20/60 b/d=20/60
5/60
0.24
0.11
H3'
12 POS G 605 0.70
/d=2
b/d=25/60
POS G 615-1
b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60
b S 21 -2
S0.1G 605
MK 4 0.35
b/d=25/40
60
/60
9 dPO 6
=S0.1G6 61096
25/6
8 K m 0.75
d =/d=2M5K
7
PO G 6
66
6 b/d=25/60m OS M .1 6 0.10
0.13
P =0
POS
0.42
PO
5 d 3
6m 2
4 60
0 .1 60
H2' POS G 602 0.55
1 K 0.15
d = MK
H2 60 M 16 m b/d=25/60 0.20
K S . 0.60
b/d= 21-1
M 6m
S
PO = 0
POS G 616
PO
b/d=25/60
S . 1
0
PO = 0 d
25/6
G6
H1' 1.10
d
POS
1.65
H1 POS G 601-1 POS G 601-2
b/d=25/60 b/d=25/60
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
34 0.59
33
32 0.25
31 0.50
30 0.30
29 POS G 520-1 0.25
28 0.55
b/d=25/60 POS G 520-2 0.20
27 b/d=25/60 POS G 520-3
0.94
H6 POS G 509 POS G 510-1 POS G 510-2 b/d=25/60
b/d= 21-4
0.55
PO 0.1
23 b/d=25/60
SM
6m 8
d=
0.59
0.1 50
SM 6m
0.16 06
507
d=
b/d= 22-3
22 9
50
d = MK
K5
POS G 511
POS G 512
6m
0.50
0
POS G 513
b/d=25/60
b/d=25/60
21
K
POS G 515-2
b/d=25/60
20 K
MK
MK
25/6
M 18 m
POS G 514
POS G 517
mG 5
0.36
b/d=25/60
b/d=25/60
b/d=25/60
PO G 521-3
11
.P1 6OS 05
510
S
0.1
S . 0.14
PO
19 0
5
PO =
5/60
POS
POS
18 0.61
=0 K
d=
d=
d
S=2M
0.25
17
POS
15
14 0.25
b/d=20/60 b/d=20/60 b/d=20/60 b/d=20/60
5/60
0.24
0.11
H3'
12 POS G 505 0.70
/d=2
b/d=25/60
b/d= m22-1POS
H3 POS G 503-1 POS G 503-2 POS G 504-1 POS G 504-2 POS G 504-3 0.15
10 Pb/d=25/60 0.55
b/d=25/60 OS b/d=25/60 b/d=25/60 b/d=25/60
POS G 515-1
b =S M 21-2
S.1G6 50 3
MK 0.35
b/d=25/40
/60
9 dPO 5
=S0.1G6 51094
25/6
8 0.75
= 0 25K
7
PO G 5
6 b/d=25/6m 0.10
0.13
POS
0 0.42
d /d
PO
5 2
6m 1
4 50
0.1 50
H2 M 16 m b/d=25/60 0.20
S . 0.60
b/d= 21-1
S
PO = 0
POS G 516
PO
b/d=25/60
d
25/6
G5
H1' 1.10
POS
1.65
H1 POS G 501-1 POS G 501-2
b/d=25/60 b/d=25/60
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
21
20 0.50
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 0.55
0.35
d = - 7 00
m
9
8 0.75
7
0.1 5
6 0.10
POS
0.13
0.42
5
4
H2' 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 POS G 420-1 0.25
28 0.55
b/d=25/60 POS G 420-2 0.20
27 b/d=25/60 POS G 420-3
0.94
H6 POS G 409 POS G 410-1 POS G 410-2 b/d=25/60
b/d= 21-4
0.55
PO 0.1
23 b/d=25/60
SM
6m 8
d=
0.59
0.1 40
SM 6m
0.16 06
407
d=
b/d= 22-3
22 9
40
d = MK
K4
POS G 411
POS G 412
6m
0.50
0
POS G 413
b/d=25/60
b/d=25/60
21
K
POS G 415-2
b/d=25/60
20 K
MK
MK
25/6
M 18 m
POS G 414
POS G 417
mG 4
0.36
b/d=25/60
b/d=25/60
b/d=25/60
PO G 421-3
11
.P1 6OS 05
410
S
0.1
S . 0.14
PO
19
PO = 0
4
5/60
POS
POS
18 0.61
=0 K
d=
d=
d
S=2M
0.25
17
POS
15
14 0.25
b/d=20/60 b/d=20/60 b/d=20/60 b/d=20/60
5/60
0.24
0.11
H3'
12 POS G 405 0.70
/d=2
b/d=25/60
b/d= m22-1POS
H3 POS G 403-1 POS G 403-2 POS G 404-1 POS G 404-2 POS G 404-3 0.15
10 Pb/d=25/60 0.55
b/d=25/60 OS b/d=25/60 b/d=25/60 b/d=25/60
POS G 415-1
b =S M 21-2
S.1G6 40 3
MK 0.35
b/d=25/40
/60
9 dPO 4
=S0.1G6 41094
25/6
8 0.75
= 0 25K
7
PO G 4
6 b/d=25/6m 0.10
0.13
POS
0 0.42
d /d
PO
5 2
6m 1
4 40
0.1 40
H2 M 16 m b/d=25/60 0.20
S . 0.60
b/d= 21-1
S
PO = 0
POS G 416
PO
b/d=25/60
d
25/6
G4
H1' 1.10
POS
1.65
H1 POS G 401-1 POS G 401-2
b/d=25/60 b/d=25/60
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
21
20 0.50
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 0.55
0.35
m
9
0.1 5
8
7 0.75
6 0.10
0.13
d=
0.42
5
4
H2' 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 POS G 320-1 0.25
28 0.55
b/d=25/60 POS G 320-2 0.20
27 b/d=25/60 POS G 320-3
0.94
H6 POS G 309 POS G 310-1 POS G 310-2 b/d=25/60
b/d= 21-4
0.55
PO 0.1
23 b/d=25/60
SM
6m 8
d=
0.59
0.1 30
SM 6m
0.16 06
307
d=
b/d= 22-3
22 9
30
d = MK
K3
POS G 311
POS G 312
6m
0.50
0
POS G 313
b/d=25/60
b/d=25/60
21
K
POS G 315-2
b/d=25/60
20 K
MK
MK
25/6
M 18 m
POS G 314
POS G 317
mG 3
0.36
b/d=25/60
b/d=25/60
b/d=25/60
PO G 321-3
11
.P1 6OS 05
310
S
0.1
S . 0.14
PO
19
PO = 0
3
5/60
POS
POS
18 0.61
=0 K
d=
d=
d
S=2M
0.25
17
POS
15
14 0.25
b/d=20/60 b/d=20/60 b/d=20/60 b/d=20/60
5/60
0.24
0.11
H3'
12 POS G 305 0.70
/d=2
b/d=25/60
b/d= m22-1POS
H3 POS G 303-1 POS G 303-2 POS G 304-1 POS G 304-2 POS G 304-3 0.15
10 Pb/d=25/60 0.55
b/d=25/60 OS b/d=25/60 b/d=25/60 b/d=25/60
POS G 315-1
b =S M 21-2
S.1G6 30 3
MK 0.35
b/d=25/40
/60
9 dPO 3
=S0.1G6 31094
25/6
8 0.75
= 0 25K
7
PO G 3
6 b/d=25/6m 0.10
0.13
POS
0 0.42
d /d
PO
5 2
6m 1
4 30
0.1 30
H2 M 16 m b/d=25/60 0.20
S . 0.60
b/d= 21-1
S
PO = 0
POS G 316
PO
b/d=25/60
d
25/6
G3
H1' 1.10
POS
1.65
H1 POS G 301-1 POS G 301-2
b/d=25/60 b/d=25/60
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
21
20 0.50
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 0.55
0.35
m
9
0.1 5
8
7 0.75
6 0.10
0.13
d=
0.42
5
4
H2' 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 POS G 220-1 0.25
28 0.55
b/d=25/60 POS G 220-2 0.20
27 b/d=25/60 POS G 220-3
0.94
H6 POS G 209 POS G 210-1 POS G 210-2 b/d=25/60
b/d= 21-4
0.55
PO 0.1
23 b/d=25/60
SM
6m 8
d=
0.59
0.1 20
SM 6m
0.16 06
207
d=
b/d= 22-3
22 9
20
d = MK
K2
POS G 211
POS G 212
6m
0.50
0
POS G 213
b/d=25/60
b/d=25/60
21
K
POS G 215-2
b/d=25/60
20 K
MK
MK
25/6
M 16 m
POS G 214
POS G 217
mG 2
0.36
b/d=25/60
b/d=25/60
b/d=25/60
PO G 221-3
11
.P1 6OS 05
210
S
0.1
S . 0.14
PO
19
PO = 0
2
5/60
POS
POS
18 0.61
=0 K
d=
d=
d
S=2M
0.25
17
POS
15
14 0.25
b/d=20/60 b/d=20/60 b/d=20/60 b/d=20/60
5/60
0.24
0.11
H3'
12 POS G 205 0.70
/d=2
b/d=25/60
b/d= m22-1POS
H3 POS G 203-1 POS G 203-2 POS G 204-1 POS G 204-2 POS G 204-3 0.15
10 Pb/d=25/60 0.55
b/d=25/60 OS b/d=25/60 b/d=25/60 b/d=25/60
POS G 215-1
b =S M 21-2
S.1G6 20 3
MK 0.35
b/d=25/40
/60
9 dPO 2
=S0.1G6 21094
25/6
8 0.75
= 0 25K
7
PO G 2
6 b/d=25/6m 0.10
0.13
POS
0 0.42
d /d
PO
5 2
6m 1
4 20
0.1 20
H2 M 16 m b/d=25/60 0.20
S . 0.60
b/d= 21-1
S
PO = 0
POS G 216
PO
b/d=25/60
d
25/6
G2
H1' 1.10
POS
1.65
H1 POS G 201-1 POS G 201-2
b/d=25/60 b/d=25/60
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
21
20 0.50
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 0.55
0.35
m
9
0.1 5
8
7 0.75
6 0.10
0.13
d=
0.42
5
4
H2' 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 POS G 120-1 0.25
28 0.55
b/d=25/60 POS G 120-2 0.20
27 b/d=25/60 POS G 120-3
0.94
H6 POS G 110 POS G 111-1 POS G 111-2 b/d=25/60
b/d=25/60 b/d=25/60 b/d=25/60 0.41
0.55
b/d= 21-3
PO 0.1
23 b/d=25/60
SM
6m 8
d=
0.59
0.1 10
SM 6m
0.16 06
107
d=
9
25/6
22
1
10
d = MK
K1
POS G 112
POS G 113
6m
0.50
SG
POS G 114
b/d=25/60
b/d=25/60
21
K
POS G 116-2
b/d=25/60
20 K
MK
MK
M 18 m
POS G 115
POS G 118
0.36
b/d=25/60
b/d=25/60
b/d=25/60
11
0.1
S 0.14
0
.
PO
POS
18 0.61
d=
d=
b/d=20/60 b/d=20/60
d b/d=20/60
SM
0.25
17 0.75
0
H4 POS G 106
PO
G 1=
25/6
15
14 0.25
POS d
b/d=20/60 0.24
H3' POS G 105 0.11
12 0.70
H3 b/d=25/60 POS G 103-1 POS G 103-2 POS G 104-1 POS G 104-2 POS G 104-3 0.15
10 Pb/d=25/60 0.55
b/d=25/60 OS b/d=25/60 b/d=25/60 b/d=25/60
POS G 116-1
b/d= m21-1
S0.1G6 10 3
MK 0.35
b/d=25/40
9 dPO 1
=S0.1G6 11094
25/6
8 0.75
d = MK
7
1
6 b/d=25/6m 0.10
0.13
S
0 0.42
PO
PO
5 2
6m 1
4 10
0.1 10
H2 M 16 m b/d=25/60 0.20
S . 0.60
S
PO = 0
POS G 117
PO
b/d=25/60
d
H1' 1.10
1.65
H1 POS G 101-1 POS G 101-2
b/d=25/60 b/d=25/60
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
21
20 0.50
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 0.55
0.35
m
9
0.1 5
8
7 0.75
6 0.10
0.13
d=
0.42
5
4
H2' 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 PO PO PO 0.25
31 SM S S 0.50
2
30 1 01 d= K0
15 d = MK 0 d = MK 0.30
01 K POS G0.2010 0 .2 1 0.25
29
28 K M 20 m 0 m-1 0m 4 0.2 01 0.55
M 0m S . POS G 010 0m 3
0.20
S .2 PO = 0 b/d=25/60 -2
27 PO = 0 d b/d=25/60 POS G 010-3
0.94
H6 POSd G 004-1 POS G 004-2 b/d=25/60
b/d=25/60 b/d=25/60 0.41
25 1.35
H5
PO 0.20
0.55
PO 0.2
23
SM
0m 7
d=
0.59
0.2 00
SM 0m
0.20 05
006
d=
22 8
00
d = MK
K0
POS G 005
0m
0.50
POS G 006
b/d=25/60
21
K
POS G 008-2
b/d=25/60
20 K
MK
MK
M 20 m
POS G 007
POS G 009
0.36
b/d=25/60
b/d=25/60
b/d=25/60
10
009
S
0.2
S . 0.14
PO
19 POS G 003
PO = 0
POS
POS
18 0.61
d=
d=
b/d=20/60
d 0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 POS G 001 POS G 002-1 POS G 002-2 POS G 002-3 0.15
10 Pb/d=25/60 0.55
OS b/d=25/60 b/d=25/60 b/d=25/60
POS G 008-1
MK 0.35
b/d=25/40
9 d= 0
8
7 0.2 0 0 4 0.75
6 m 0.10
0.13
0.42
0.20 03
0m 2
5
0m 1
4
0
0.2 00
0.55
0
H2'
d = MK 0
0.15
MK
d = MK
H2 0.20
0.2
0.60
S
POS
PO
PO
d=
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
21 0.50
20
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 0.55
0.35
m
9
8
7 0.15 0.75
6 0.10
0.13
d=
0.42
5
4
H2' 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 00 0.25
28 -1 m 0.55
S 5 0.20
PO 0.1
27 = 0.94
H6 d
0.41
25 1.35
H5
0.55
23
0.59
22
21
20 0.50
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 0.55
0.35
9
8 0.75
7
6 0.10
0.13
0.42
5
4
H2' 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
Nivo: [-1.75 m]
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 PO PO 0.25
31 SM SM 0.50
30 11 d = K -11 d = K -1 POS 0.30
10 -1 MK
29 -1 K m POS G0-.2109
0 m-1
4 0 .2 1
0m 3 d= -1 0.25
28 K
M 20 m M 20
. POS G - 109 0.20 12 0.55
S S 0 b/d=25/60 -2 m 0.20
27 PO = 0
. PO d = b/d=25/60 POS G - 109-3
0.94
H6 POS dG - 103-1 POS G - 103-2 b/d=25/60
b/d=25/60 b/d=25/60 0.41
25 1.35
H5
PO = 0.2
0.55
PO = 0.2
23
SM 0m
0m 6
d
0.2 -10
SM 0m
4
07 0.59
d
d = K -10
d = K -10
22 -1
POS G - 104
K-
POS G - 105
d = MK
0m
0.50
POS G - 107-2
K-
b/d=25/60
21
b/d=25/60
POS G - 106
POS G - 108
20 K
M 20 m
109
0.20
0.36
b/d=25/60
b/d=25/60
b/d=25/60
M
108
0.2
S
S 0. 0.14
PO
19
PO =
POS
POS
18 0.61
d 0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 POS G - 101 POS G - 102-1 POS G - 102-2 POS G - 102-3 0.15
10 0.55
POS G - 107-1
PO
b/d=25/60
SM b/d=25/60 b/d=25/60 b/d=25/60 0.35
b/d=25/40
9
8 d = K -10 3 0.75
7 0.2 0
6 m 0.10
0.13
0.42
2
5
0m 1
d = K -10
4
0.2 -10
H2' 0.55
m
0.15
d = MK
0.20
0.20
H2
M
0.60
S
POS
PO
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
21
20 0.50
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 0.55
0.35
m
-1
9
8 0.75
7
0.1 5
POS
6 0.10
0.13
0.42
d=
5
4
H2' 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
21
20 0.50
0.36
19 0.14
18 0.61
PO 0.25
17
H4 d = S KP 0.75
15 0.6
14 0m 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 0.55
0.35
9
8 0.75
7
6 0.10
0.13
0.42
5
4
H2' 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
21
20 0.50
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 0.55
0.35
9
8 0.75
7
6 0.10
0.13
5 0.42
4
H2' 0.55
m 0.15
0.20
H2 0
0.6 0.60
d=
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34 K_8
33 K_7
32 K_1 0.25
K_5 0.50
31
30
V_17
0.30
0.25
29 0.55
28
0.20
27 0.94
H6 H_12 K_6
0.41
H_11
1.35
25 H_13
H5 H_10 0.55
23 H_9
V_2
0.59
V_3
V_4
22
0.50
V_1
21
20 H_8
0.36
0.14
19 0.61
V_6
V_8
18
V_17
0.25
V_12
V_9
17 0.75
H4 H_7
K_2
15
14 0.25
K_3
V_10
V_11
0.24
0.11
V_13
V_14
V_16
H3'
12 H_6 0.70
H3 H_5 0.15
10 0.55
0.35
9
8 0.75
7 K_4
V_5
6 H_4 0.10
0.13
0.42
5
4 0.55
H2' H_3 0.15
V_15
0.20
H2 0.60
V_7
1.65
H1 H_1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
1
2
3
4
5
Dispozicija ramova
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
23
b/d=25/60 b/d=25/60
22
S - 1-9
b/d=25/20 b/d=25/20
0.2 9
5m
0.50
2-
ZN2 d ZN
21 POS G 601-1 POS G 601-2 1.10
-8 =
b/d=25/60 b/d=25/60
m
S - 1-8
0.25
3.00
d=
20 POS G 501-1 POS G 501-2
b/d=25/60 b/d=25/60
b/d=25/60
m
S - 1-7
-7
0.25
ZN2
3.00
d=
19 POS G 401-1 POS G 401-2
b/d=25/60 b/d=25/60
b/d=25/60
m
S - 1-6
-6
0.25
ZN2
3.00
d=
18 POS G 301-1 POS G 301-2
b/d=25/60 b/d=25/60
b/d=25/60
m
S - 1-5
-5
0.25
ZN2
3.00
d=
17 POS G 201-1 POS G 201-2
16 b/d=25/60 b/d=25/60
0.60
b/d=25/60
m
S - 1-4
-4
15 0.80
0.25
ZN2
14
0.30
d=
13 POS G 101-1 POS G 101-2 1.30
12
11 b/d=25/60 b/d=25/60
10 0.50
b/d=25/60
m
0.20
S - 1-3
-3
9 0.10
0.25
ZN2
0.70
8 0.60
d=
7 0.90
6
b/d=25/60
0.85
m
1-2
S - 1-2
-2
0.25
ZN 25 m
ZN2
5 0.90
= 0.
d=
d 1.30
4
3
2 0.20
b/d=25/60
0.65
1-1 2-1
S - 1-1
ZN 25 m ZN . 2 5 m
0. 0 2.20
d= d=
1
0 1.40
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Ram: H_1
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
23
22 10
3- m 0.50
ZN 0.2 5
21 = b/d=10/10 1.10
d
d = N3-9
0m
0.2
3.00
Z
20
d = N3-8
0m
0.2
3.00
Z
19
d = N3-7
0m
0.2
3.00
Z
18
d = N3-6
0m
0.2
3.00
Z
17
16 0.60
d = N3-5
0m
15 0.80
14
0.2
0.30
Z
13 1.30
12
11
10 0.50
0.20
0.2 4
0.10
0m
9
3-
0.70
ZN
8 0.60
d=
7 0.90
6 0.85
d = N3-3
0m
5 0.90
0.2
Z
4 1.30
3
2 0.20
0.65
d = N3-2
0m
0.2
Z
2.20
1
3-1
ZN .20 m 1.40
0 0
d =
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Ram: H_2
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
23
b/d=50/25 b/d=50/25
b/d=20/20
22 2
S - 2-9
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
4-1 b/d=25/20
S - 44
0.50
ZN 5 m
S - 17
S - 18
S - 19
S - 20
10
b/
0.2 b/d=10/10 b/d=12/140/b/d=12/14
b/d=12/14
b/d=12/14
b/d=12/14
d=
21 POS G 602 1.10
d= 1
1
d=
0/
b/d=25/60
b/
10
11
S - 2-8
4- m
ZN 0.20 3.00
20 d= POS G 502
b/d=25/60
b/d=50/25
10
S - 2-7
4- m
ZN 0.20 3.00
d =
19 POS G 402
b/d=25/60
b/d=50/25
9
S - 2-6
4- m
ZN .20 3.00
0
18 d= POS G 302
b/d=25/60
b/d=50/25
8
S - 2-5
4- m
ZN .20 3.00
0
d =
17 POS G 202
16 b/d=25/60
0.60
b/d=50/25
7
S - 2-4
15
14 4- m 0.80
ZN .20 0.30
0
d =
13 POS G 102 1.30
12
11 b/d=25/60
10 0.50
b/d=50/25
6 0.20
S - 2-2
9 4- m 0.10
ZN .20 0.70
8 0 0.60
7 d=
0.90
6
b/d=50/25
0.85
0m
S - 2-3
4-4
d = N4-5
0m
5 0.90
ZN
0.2
0.2
Z
d=
4 1.30
3
2 0.20
b/d=50/25
0.65
0m
S - 2-1
4-2
d = N4-3
0m
ZN
0.2
0.2
Z
2.20
d=
1
4-1
ZN .20 m 1.40
0 0
d =
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Ram: H_3
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
23
22
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
0.50
S - 33
b/ S - 34
S - 135
S - 36
b/d=12/14
b/d=12/14
b/d=12/14
b/d=12/14
b/d=12/14
b/d=12/14
b/
b/
10
0
d=
d=
21 1.10
0/
/
10
10
10
1
d=
d=
/1
/1
b/
3.00
20
3.00
19
3.00
18
3.00
17
16 0.60
15 0.80
14
0.30
13 1.30
12
11
10 0.50
0.20
0.10
9 0.70
8 0.60
7 0.90
6 0.85
5 0.90
4 1.30
3
2 0.20
0.65
2.20
1
0 1.40
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Ram: H_4
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
23
b/d=25/55 b/d=25/55
b/d=20/20
22
S - 3-9
b/d=25/20
S - 46
0.50
21 POS G 603-1 POS G 603-2
POS G 603-3
b/d=10/10 POS G 604-1 POS G 604-2 POS G 604-3 1.10
b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60
b/d=65/25
5m
8
S0-.24-8
S - 3-8
d = 7-8
6- m
ZN .25
ZN
0 3.00
20 POS G 503-1 POS G 503-2 d= POS G 504-1 POS G 504-2 POS G 504-3
b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60
b/d=25/55
b/d=65/25
7
5m
S - 3-7
S0-.24-7
d = 7- 7
6- m
ZN .25
ZN
0 3.00
d =
19 POS G 403-1 POS G 403-2 POS G 404-1 POS G 404-2 POS G 404-3
b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60
b/d=25/55
b/d=65/25
5m
6
S - 3-6
S0-.24-6
d = 7-6
6- m
ZN .25
ZN
0 3.00
18 POS G 303-1 POS G 303-2 d= POS G 304-1 POS G 304-2 POS G 304-3
b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60
b/d=25/55
b/d=65/25
5
5m
S - 3-5
S0-.24-5
d = 7- 5
6- m
ZN .25
ZN
0 3.00
d =
17 POS G 203-1 POS G 203-2 POS G 204-1 POS G 204-2 POS G 204-3
16 b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60
0.60
b/d=25/55
b/d=65/25
5m
4
S - 3-4
S0-.24-4
d = 7-4
15
14 6- m 0.80
ZN .25
ZN
0 0.30
d =
13 POS G 103-1 POS G 103-2 POS G 104-1 POS G 104-2 POS G 104-3 1.30
12
11 b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60
10 0.50
b/d=25/55
b/d=65/25
3 0.20
5m
S - 3-3
S0-.24-2
d = 7-3
9 6- m 0.10
ZN .25 0.70
ZN
8 0 0.60
7 POS G 001 d= POS G 002-1 POS G 002-2 POS G 002-3 0.90
6 b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60
b/d=25/55
b/d=65/25
2 2 0.85
5m
S - 3-2
S0-.24-3
d = 7-2
5 5- m 6- m
ZN 0.25 ZN .25 0.90
ZN
0
= d =
4 d POS G - 101 POS G - 102-1 POS G - 102-2POS G - 102-3 1.30
3
2 b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60 0.20
b/d=25/55
b/d=65/25
1 0.65
5m
1
S - 3-1
S0-.24-1
d = 7-1
5- m 6- m
ZN 0.25 ZN .25
ZN
0 2.20
1 d
= d=
0 1.40
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Ram: H_5
2
1
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
23
b/d=85/25 b/d=85/25
22
S - 5-9
b/d=25/20 0.50
21 POS G 605
b/d=12/14 1.10
b/d=25/60
S - 5-8
3.00
20 POS G 505
b/d=25/60
b/d=85/25
S - 5-7
3.00
19 POS G 405
b/d=25/60
b/d=85/25
S - 5-6
3.00
18 POS G 305
b/d=25/60
b/d=85/25
S - 5-5
3.00
17 POS G 205
16 b/d=25/60
0.60
b/d=85/25
S - 5-4
15 0.80
14
0.30
13 POS G 105 1.30
12
11 b/d=25/60
10 0.50
b/d=85/25
0.20
S - 5-2
9 0.10
0.70
8 0.60
7 0.90
6
b/d=85/25
0.85
8-2
S - 5-3
5 ZN 25 m 0.90
= 0.
d 1.30
4
3
2 0.20
b/d=85/25
0.65
8-1
S - 5-1
ZN 25 m
0. 2.20
d=
1
0 1.40
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Ram: H_6
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
23
22
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
0.50
b/ S - 22
b/ S - 23
b/ S - 24
S - 25
b/
b/
b/
0
0
b/d=12/14
b/d=12/14
b/d=12/14
b/d=12/14
b/d=12/14
b/d=12/14
b/d=12/14
/1
/1
/1
d=
d=
d=
21 POS G 606-1 POS G 606-2 POS G 606-3 POS G 606-4 1.10
10
10
10
1
1
d=
d=
d=
0/
0/
0/
b/d=20/60 b/d=20/60 b/d=20/60 b/d=20/60
10
10
10
3.00
20 POS G 506-1 POS G 506-2 POS G 506-3 POS G 506-4
b/d=20/60 b/d=20/60 b/d=20/60 b/d=20/60
3.00
19 POS G 406-1 POS G 406-2 POS G 406-3 POS G 406-4
b/d=20/60 b/d=20/60 b/d=20/60 b/d=20/60
3.00
18 POS G 306-1 POS G 306-2 POS G 306-3 POS G 306-4
b/d=20/60 b/d=20/60 b/d=20/60 b/d=20/60
3.00
17 POS G 206-1 POS G 206-2 POS G 206-3 POS G 206-4
16 b/d=20/60 b/d=20/60 b/d=20/60 b/d=20/60
0.60
15 0.80
14
0.30
13 POS G 106 1.30
12
11 b/d=20/60
10 0.50
0.20
0.10
9 0.70
8 0.60
7 0.90
6 0.85
5 0.90
4 1.30
3
2 0.20
0.65
2.20
1
0 1.40
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Ram: H_7
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
23
22
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
b/ b b b/ b/ 0.50
S - 37
S - 38
S - 39
S - 40
S - 41
S - 42
S - 43
S - 26
S - 27
S - 28
S - 29
S - 30
S - 31
S - 32
3.00
20
3.00
19
3.00
18
3.00
17
16 0.60
15 0.80
14
0.30
13 1.30
12
11
10 0.50
0.20
0.10
9 0.70
8 0.60
7 0.90
6 0.85
5 0.90
4 1.30
3
2 0.20
0.65
2.20
1
0 1.40
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Ram: H_8
1
2
3
5
4
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
23
22
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
0.50
S - 21
S - 11
S - 12
S - 13
S - 14
b/ S - 15
S -/116
10
0
b/
b/
21 b/d=10/10 b/d=10/10 /b/d=12/14
b/d=12/14 b/d=12/14
b/d=12/14
b/d=12/14
b/d=12/14 1.10
d=
d=
10
10
10
10
d=
d=
b/
/1
/1
0
0
3.00
20
3.00
19
3.00
18
3.00
17
16 0.60
15 0.80
14
0.30
13 1.30
12
11
10 0.50
0.20
0.10
9 0.70
8 0.60
7 0.90
6 0.85
5 0.90
4 1.30
3
2 0.20
0.65
2.20
1
0 1.40
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Ram: H_9
1
2
3
5
4
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
23
b/d=25/50
b/d=20/20
22 b/d=25/20
S - 47
S - 48
0.50
21 POS G 607
b/d=10/10 1.10
b/d=25/60
3.00
20 POS G 507
b/d=25/60
3.00
19 POS G 407
b/d=25/60
3.00
18 POS G 307
b/d=25/60
3.00
17 POS G 207
16 b/d=25/60
0.60
15 0.80
14
0.30
13 POS G 108 1.30
12
11 b/d=25/60
10 0.50
0.20
0.10
9 0.70
8 0.60
7 0.90
6 0.85
5 0.90
4 1.30
3
2 0.20
0.65
2.20
1
0 1.40
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Ram: H_10
2
1
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
23
22
b/d=12/12
0.50
b/d=12/12
b/d=12/12
b/d=12/12
b/d=12/12
S - 10
S-8
S-6
S-7
S-9
21 b/d=10/10 b/d=10/10 1.10
3.00
20
3.00
19
3.00
18
3.00
17
16 0.60
15 0.80
14
0.30
13 1.30
12
11
10 0.50
0.20
0.10
9 0.70
8 0.60
7 0.90
6 0.85
5 0.90
4 1.30
3
2 0.20
0.65
2.20
1
0 1.40
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Ram: H_11
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
23
b/d=25/20 -16 m b/d=25/20
d = 0 13 = 0. 15
22
m
b/d=25/20 0.50
9
9-
25
N 25
ZN
0.2 4
5m
9-1
ZN 9
ZN
3.00
d=
0.2 2
5m
9-1
-
ZN9
ZN
3.00
d=
0.2 0
5m
d=0 9
9-1
-
ZN9
ZN
3.00
d=
5m
9-8
-
ZN9
ZN
0.2
3.00
d=
5m
9-6
15
-
0.80
ZN9
14
ZN
0.2
0.30
d=
0.20
5m
d=0 3
9-4
9 0.10
-
ZN9
0.70
ZN
0.2
8 0.60
d=
0 1.40
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Ram: H_12
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
23
22
0.50
21 b/d=10/10 POS G
b/d=10/10608-1b/d=10/10
b/d=10/10POS G 608-2
b/d=10/10 b/d=10/10
b/d=10/10
b/d=10/10
b/d=10/10
b/d=10/10 1.10
b/d=25/60 b/d=25/60
3.00
20 POS G 508-1 POS G 508-2
b/d=25/60 b/d=25/60
3.00
19 POS G 408-1 POS G 408-2
b/d=25/60 b/d=25/60
3.00
18 POS G 308-1 POS G 308-2
b/d=25/60 b/d=25/60
3.00
17 POS G 208-1 POS G 208-2
16 b/d=25/60 b/d=25/60
0.60
15 0.80
14
0.30
13 POS G 109-1 POS G 109-2 1.30
12
11 b/d=25/60 b/d=25/60
10 0.50
0.20
0.10
9 0.70
8 0.60
7 0.90
6 0.85
5 0.90
4 1.30
3
2 0.20
0.65
2.20
1
0 1.40
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Ram: H_13
1
2
3
4
5
1.65
1.10
0.60
0.20
0.15
0.55
0.42
0.10
0.13
0.75
0.35
0.55
0.15
0.70
0.11
0.24
0.25
0.75
0.25
0.61
0.36
0.14
0.50
0.59
0.55
1.35
0.41
0.94
0.20
0.55
0.25
0.30
0.50
0.25
23
b/d=85/25 b/d=85/25
22
d = 10-8 = 0 10-9
S - 5-9
b/d=12/12
b/d=12/12
b/d=25/20 0.50
5m
b/d=/14
S - 22
S - 26
/1=412 12/1
d N
.2
b2/d b/d
4 1.10
Z
3.00
0.2
ZN
20 POS G 511
b/d=25/60
b/d=85/25
d = 10-7
5m
S - 5-7
3.00
0.2
ZN
19 POS G 411
b/d=25/60
b/d=85/25
d = 10-6
5m
S - 5-6
3.00
0.2
ZN
18 POS G 311
b/d=25/60
b/d=85/25
d = 10-5
5m
S - 5-5
3.00
0.2
ZN
17 POS G 211
16 b/d=25/60 0.60
b/d=85/25
d = 10-4
5m
S - 5-4
15 0.80
14
0.2
0.30
ZN
1.30
13 POS G 112
12
11 b/d=25/60 0.50
10
b/d=85/25
0.20
0.10
d = 10-3
5m
S - 5-2
9 0.70
0.2
ZN
8 0.60
7 0.90
6 0.85
b/d=85/25
2
S - 5-3
10- 0.90
5 ZN 5 m
= 0.2
d 1.30
4
3
0.20
2 0.65
b/d=85/25
1
S - 5-1
10-
ZN 5 m
0.2 2.20
d=
1
1.40
0
H1'
H2'
H3'
H1
H2
H3
H4
H5
H6
10
12
14
15
17
18
19
21
20
22
23
25
27
29
28
30
31
32
33
34
Ram: V_1
4
5
6
9
8
7
10
11
12
13
14
15
16
17
18
19
20
21
22
23
10
11
12
13
14
15
16
17
18
19
20
21
22
23
H1 H1
1.65 1.65
H1' H1'
H2 1.10 H2 1.10
H2'
4 0.60 H2'
4 0.60
5 0.20 5 0.20
6 0.15 6 0.15
0.55 0.55
7
8
9 0.42 7
8
9 0.42
ZN ZN ZN ZN ZN ZN ZN ZN 0.13
0.10 0.13
0.10
d
10 d= 14 - d= 14 - d= 14- d= 14 - d= 14- d= 14- d= 14- d= 14- 0.75 10 0.75
H3 H3 ZN
-9
0.2 1 0.2 2 0.35 ZN11 ZN11 ZN 11 ZN11 ZN 11 ZN11 ZN11 ZN 11 0.35
ZN 0.2
0.2 3 0.2 4 0.2 5 0.2 6 0.2 7 0.2 8 -1 -2 -3 -4 -5 -6 -7 -8 d 11
12
H3' 5m 5m 5m 5m 5m 5m 5m 5m 0.55 12
H3' = 0 -9 0.55
14 5 m
0.15 d = 0.2
5m
d = 0.2
5m
d = 0.2
5m
d = 0.2
5m
d = 0.2
5m
d = 0.2
5m
d = 0.2
5m
d = 0.2
5m .25 0.15
14
15 0.70 14
15 m 0.70
H4
17 S - 24 0.11
0.24 H4
17 S - 23 0.11
0.24
b2/d
b2/d
79
19 0.25 19 0.25
b/d=/14
b/d=/14
20
21 S - 31 0.61 20
21 S - 29 0.61
/1=412 12/1
22 0.14 22 0.14
/1=412 12/14
4
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d
0.36 0.36
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
POS G 006
POS G 114
POS G 213
POS G 313
POS G 413
POS G 513
b/d=12/12 b/d=12/12
POS G 005
POS G 113
POS G 212
POS G 312
POS G 412
POS G 512
POS G - 105
POS G - 104
23 0.50 23 0.50
H5 0.59 H5 0.59
b /d=1 POS G 612=1 2/14
25 0.55 25 Z 0.55
ZN ZN ZN ZN ZN ZN ZN ZN ZN ZN ZN ZN ZN ZN d N
d
5m
27 0.41 27 Z Z 0.41
d=
=
0
-1
-2
28 0.94 28
d = N13- d = N13- 0.94
ZN .25
ZN 0.25
29 29 0.2 1 0.2 2
0.20 0.20
15 m
15 m
5m 5m
30
31 0.55 30
31 0.55
32 0.25 32 0.25
0.30 0.30
33
34 0.50 33
34 0.50
0.25 0.25
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
Diplomski rad
Ram: V_5
Ram: V_4
10
11
12
13
14
15
16
17
18
19
20
21
22
23
10
11
12
13
14
15
16
17
18
19
20
21
22
23
H1 H1
1.65 1.65
H1' H1'
H2 1.10 H2 1.10
H2'
4 ZN 0.60 H2'
4 0.60
5 ZN1
7
ZN1
7 0.20 5 0.20
6 ZN Z ZN Z Z Z d = 17-1 0.15 6 0.15
d = 0 -1 d = 0 -3
1 1
0.2 1 0.55 S - 45 0.55
7
8
9 ZN.20 m ZN.2 0 m d= d = N1 d= d = N1 d = N1 d = N17 5m
0.42 7
8
9 0.42
d = 17-2 d = 17-4 0.2 7-5 0.2 7-6 0.2 7-7 0.2 7-8 0.2 7-9 0.2 -10 0.13
0.10 b/d=20/20 0.13
0.10
10 0.2 0.2 0m 0m 0m 0m 0m 0m 0.75 10 0.75
b/d
0m 0m
0.35 0.35
= 1
12
H3' 0.55 12
H3' b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 0.55
2
0.15 0.15
14
15 0.70 14
15 0.70
H4
17 0.11
0.24 H4
17 S - 25 0.11
0.24
/14b/d
18 0.75 18 0.75
80
19 19
b/d=25/20
=12=/1
0.25 0.25
20
21 0.61 20
21 S - 37 0.61
/1
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
0.14 0.14
POS G 007
POS G 115
POS G 214
POS G 314
POS G 414
POS G 514
G 614
22 22
POS G - 106
b/d
/d/11442 b /d
23 0.50 23 0.50
H5 0.59 H5 0.59
=112/1
2/144
25 0.55 25 0.55
d
1.35 d
ZN
d
ZN
d
ZN
d
ZN
d
ZN
d
ZN 1.35
=
H6 H6 = 1 = 1 = 1 = 1 = 1 = 1
27 27
0.
d
16-
d=
=
25 25 25 25 25 25
m m m m m m
0
0
28 0.94 28 0.94
ZN 2 5 m
-1
-2
29 29 S - 50
ZN .25
ZN .25
0.20 0.20
16 m
16 m
30
31 0.55 30
31 b/d=20/20 0.55
32 0.25 32 0.25
0.30 0.30
33
34 0.50 33
34 0.50
0.25 0.25
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
Diplomski rad
Ram: V_7
Ram: V_6
10
11
12
13
14
15
16
17
18
19
20
21
22
23
10
11
12
13
14
15
16
17
18
19
20
21
22
23
H1 H1
1.65 1.65
H1' H1'
d
ZN ZN ZN ZN ZN ZN ZN ZN
=
=
H2 d = 18 -2 d = 18-3 d = 18-4 d = 18 -5 d = 18-6 d = 18-7 d = 18-8 d = 18-9 1.10 H2 1.10
-1
-1
0
ZN 0.2
0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
ZN 0.20
H2'
4
0m 0m 0m 0m 0m 0m 0m 0m 0.60 H2'
4 0.60
5 5
18 0 m
18 m
0.20
0.15 0.20
0.15
b/d=1
6 0.55 6 0.55
7
8
9 0.42 7
8
9 0.42
2/ 14b
0.13
0.10 0.13
0.10
10 0.75 10 0.75
H3 0.35 H3 0.35
/d=12/
12
H3' 0.55 12
H3' 0.55
14
0.15 0.15
14
15 0.70 14
15 0.70
H4
17 0.11
0.24 H4
17 0.11
0.24
0.25 0.25
b/d=12
18 0.75 18 0.75
81
19 0.25 19 0.25
/14
20
21 0.61 20
21 S - 38 0.61
22 0.14
0.36 22 0.14
0.36
b/d=12/12
23 0.50 23 0.50
H5 0.59 H5 0.59
25 0.55 25 0.55
b /d=12
S-6
1.35 1.35
/14
H6 H6 b/d=12/12
27 0.41 27 0.41
28 0.94 28 0.94
29 29
0.20 0.20
30
31 0.55 30
31 0.55
32 0.25 32 0.25
0.30 0.30
33
34 0.50 33
34 0.50
0.25 0.25
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
Diplomski rad
Ram: V_9
Ram: V_8
10
11
12
13
14
15
16
17
18
19
20
21
22
23
10
11
12
13
14
15
16
17
18
19
20
21
22
23
H1 H1
ZN ZN ZN ZN ZN ZN ZN ZN
d= 19 - d= 19 - d= 19- d= 19 - d = 19-10 d = 19-12 d = 19 -14 d = 19-1 6
d
0.2 2 0.2 4 0.2 6 0.2 8 0.2 0.2 0.2 0.2 1.65 1.65
=
H1' 5m 5m 5m 5m 5 5 5 5 H1'
0
19-
ZN m ZN m ZN m ZN m
d
ZN ZN ZN ZN
18
=
H2 d = 19 -3 d = 19-5 d = 19-7 d = 19 -9 d = 19-1 d = 19-1 d = 19 -1 d = 19-1 1.10 H2 1.10
ZN .25 m
-1
0.2 0.2 0.2 0.2 0.2 1 0.2 3 0.2 5 0.2 7
H2'
ZN 0.25
H2'
4
5m 5m 5m 5m 5m 5m 5m 5m 0.60 4 0.60
5 5
19 m
0.20
b/d=
0.20
0.15 0.15
b/d=1
6 S - 34 6 S - 33
POS
0.55 0.55
7 7
12/1
8
9 b/d=12/12 0.42 8
9 b/d=12/12 0.42
2/ 14b
0.13
0.10 0.13
0.10
10 0.75 10 0.75
b/d=25/40
b/d=25/40
b/d=25/40
b/d=25/40
b/d=25/40
b/d=25/40
b/d=25/40
b/d=25/40
4b/d=1
H3 H3
POS G 008-1
POS G 116-1
POS G 215-1
POS G 315-1
POS G 415-1
POS G 515-1
G 615-1
0.35 0.35
POS G - 107-1
/d=12/
12
H3' 0.55 12
H3' 0.55
14
0.15 0.15
14
15 0.70 14
15 0.70
H4 0.11 H4
17 0.11
0.24
17 0.24
0.25 0.25
b/d=12
18 0.75 18 0.75
82
19 19 0.25
0.25
/14
2/14 b /d=12/14
20
21 S - 40 0.61 20
21 S - 39 0.61
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
22 0.14 22 0.14
0.36
POS G 008-2
POS G 116-2
POS G 215-2
POS G 315-2
POS G 415-2
POS G 515-2
POS G 615-2
b/d=12/12 0.36 b/d=12/12
POS G - 107-2
23 0.50 23 0.50
H5 0.59 H5 0.59
25 0.55 25 0.55
b /d=12
b/d=12
Z Z Z Z Z Z S-8 S-7
1.35 1.35
/14
/14
H6
d = N20 d = N20 d = N20 d = N20 d = N20 d = N20 b/d=12/12 H6 b/d=12/12
27 0.2 -3 0.2 -4 0.2 -5 0.2 -6 0.2 -7 0.2 -8
0.41 27 0.41
d
5m 5m 5m 5m 5m 5m
d=
=
S - 49 0.94
20
20
0.94
0
0
28
29 28
29
-1
-2
b/d=20/20 0.20 0.20
30 0.55 30 0.55
Z N .2 5 m
Z N .2 5 m
31 31 0.25
32 0.25 32 0.30
0.30 33
33
34 0.50 34 0.50
0.25 0.25
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
Diplomski rad
Ram: V_11
Ram: V_10
10
11
12
13
14
15
16
17
18
19
20
21
22
23
10
11
12
13
14
15
16
17
18
19
20
21
22
23
H1 H1
1.65 1.65
H1' H1'
b /d=1
b /d=1
H2 1.10 H2 1.10
2/ 14
2/ 14
H2'
4 0.60 H2'
4 0.60
5 0.20 5 0.20
6 S - 36 0.15 6 S - 35 0.15
0.55 0.55
7
8
9 b/d=12/12 0.42 7
8
9 b/d=12/12 0.42
0.13
0.10 0.13
0.10
10 0.75 10 0.75
b/d=1
b/d=1
H3 0.35 H3 0.35
12
H3' 0.55 12
H3' 0.55
0.15 0.15
14
15 0.70 14
15 0.70
H4 0.11
0.24 H4 0.11
0.24
17 0.25 17 0.25
18 0.75 18 0.75
83
19 0.25 19 0.25
2/14 b /d=12/14
2/14 b /d=12/14
20
21 S - 42 0.61 20
21 S - 41 0.61
22 0.14
0.36 22 0.14
0.36
23 b/d=12/12 23 b/d=12/12
0.50 0.50
H5 0.59 H5 0.59
25 0.55 25 0.55
b/d=12
b/d=12
S - 10 S-9
1.35 1.35
/14
/14
H6 b/d=12/12 H6 b/d=12/12
27 0.41 27 0.41
28 0.94 28 0.94
29 0.20 29 0.20
30
31 0.55 30
31 0.55
32 0.25 32 0.25
0.30 0.30
33
34 0.50 33
34 0.50
0.25 0.25
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
Diplomski rad
Ram: V_13
Ram: V_12
10
11
12
13
14
15
16
17
18
19
20
21
22
23
10
11
12
13
14
15
16
17
18
19
20
21
22
23
b /d=1
b/d=1
POS G2/
d
1.10 1.10
/1
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/20
H2 H2
2/14
144
d=
=
POS G 117
POS G 216
POS G 316
POS G 416
POS G 516
2616
0.
0.
H2' S - 17 0.60 H2' 0.60
21-
21-
4 4
1
2
5 b/d=12/12 0.20 5 0.20
0.15 Z Z Z Z Z Z 0.15
d
6 6
ZN 2 5 m
ZN 2 5 m
0.55 0.55
=
7
8
9 0.42 7
8
9
d = N2 d = N2 d = N2 d = N2 d = N2 d = N2
0.42
0
0.13
0.10 0.2 1-3 0.2 1-4 0.2 1-5 0.2 1-6 0.2 1-7 0.2 1-8 0.13
0.10
9
b /d=1
10 0.75 10 5m 5m 5m 5m 5m 5m 0.75
ZN .25bm
H3 H3
2/14
0.35 0.35
12
H3' 0.55 12
H3' 0.55
0.15 0.15
14
15 0.70 14
15 0.70
21- b/d/d==112/2/114
H4 0.11
0.24 H4 0.11
0.24
17 0.25 17 0.25
b /d=1
b /d==12
18 0.75 18 0.75
84
19 0.25 19 0.25
2/14
20
21 0.61 20
21 S - 43 0.61
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
b/d=25/60
4b /db/d=25/20
0.14 0.14
POS G 009
POS G 118
POS G 217
POS G 317
POS G 417
POS G 517
22 22
POS G - 108
1 2/1/144b /d
b/d=1
Z Z Z Z Z Z
4d
2/14
H6 H6
=1/12/41 = 0.
-9
0.41 5m 5m 5m 5m 5m 5m 0.41
d=
=
22 m
22
0
0
28 0.94 28 0.94
-1
-2
29 29
ZN .25
0.20 0.20
30 30
ZN .25 m
22 m
31 0.55 31 0.55
32 0.25 32 0.25
0.30 0.30
33
34 0.50 33
34 0.50
0.25 0.25
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
Diplomski rad
Ram: V_15
Ram: V_14
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
10
11
12
13
14
15
16
17
18
19
20
21
22
23
H1 H1
1.65 1.65
H1' H1'
b /d=1
d
H2 1.10 H2 1.10
d=
=
2/14
0.
0.
H2' H2' S - 18
23-
23-
4 0.60 4 0.60
1
2
5 0.20 5 0.20
6 0.15 b/d=12/12 0.15
ZN 2 5 m
ZN 2 5 m
0.55 6 0.55
7
8
9 0.42 7
8 0.42
0.13 9 0.13
0.10 0.10
b /d=1
10 0.75 10 0.75
H3 0.35 H3
2/14
0.35
12
H3' 0.55 12
H3' 0.55
0.15 0.15
14
15 0.70 14
15 0.70
H4
17 0.11
0.24 H4 0.11
0.25 17 0.24
0.25
b /d=1
18 0.75 18 0.75
85
19 0.25 19 0.25
20
2/14
21 0.61 20
21 0.61
22 0.14
0.36 22 0.14
0.36
23 0.50 23 S - 12 0.50
H5 0.59 H5 b/d=12/12 0.59
25 0.55 25 0.55
b/d=1
1.35 1.35
2/14
H6 H6
27 0.41 27 0.41
28 0.94 28 0.94
29 29
0.20 0.20
30
31 0.55 30 0.55
0.25 31 0.25
32 0.30 32 0.30
33
34 0.50 33 0.50
0.25 34 0.25
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
Diplomski rad
Ram: V_17
Ram: V_16
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
10
11
12
13
14
15
16
17
18
19
20
21
22
23
H1 H1
1.65 1.65
H1' H1'
b /d=1
H2 1.10 H2 1.10
2/14
H2'
4 S - 20 0.60 H2'
4 S - 19 0.60
5 b/d=12/12 0.20 5 0.20
6 0.15 b/d=12/12 0.15
0.55 6 0.55
7
8
9 0.42 7
8 0.42
0.13 9 0.13
0.10 0.10
b/d=1
b /d=1
10 0.75 10 0.75
H3 H3
2/14
0.35
2/14
0.35
12
H3' 0.55 12
H3' 0.55
0.15 0.15
14
15 0.70 14
15 0.70
H4
17 0.11
0.24 H4 0.11
0.25 17 0.24
0.25
b/d=1
b /d=1
18 0.75 18 0.75
86
19 0.25 19 0.25
2/14
20
2/14
21 0.61 20
21 0.61
22 0.14
0.36 22 0.14
0.36
23 S - 14 0.50 23 S - 13 0.50
H5 b/d=12/12 0.59 H5 b/d=12/12 0.59
25 0.55 25 0.55
b/d=1
b/d=1
1.35 1.35
2/14
2/14
H6 H6
27 0.41 27 0.41
28 0.94 28 0.94
29 ZN ZN 29
0.20 0.20
30
31 d=
24 -1 d = 24
0.55 30 0.55
0. -2
0.25 31 0.25
32 0.25
m
25
0.30 32 0.30
33 m 33
34 0.50 34 0.50
0.25 0.25
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
1.40
2.20
0.65
0.20
1.30
0.90
0.85
0.90
0.60
0.70
0.10
0.20
0.50
1.30
0.30
0.80
0.60
3.00
3.00
3.00
3.00
1.10
0.50
Diplomski rad
Diplomski rad
9.19
23
22 0.50
21 1.10
3.00
20
3.00
19
3.00
18
3.00
17
16 0.60
15 0.80
14 0.30
1.30
13
12
11 0.50
10 0.20
0.10
9 0.70
8 0.60
7 ZN25-3 0.90
d = 0.32 m 0.85
6
5-2
5 ZN2 0.90
.32 m
d=0
1.30
4
3 0.20
2 0.65
5-1
ZN2
.32 m
d=0 2.20
1
1.40
0
Ram: K_1
0
1
0.90
2.60
1.15
0.87
0.75
3.00
1.44
1.00
23
b/d=50/25 b/d=50/25
b/d=25/50
22 2/14 b/
S - 2-9
4 1.10
21 POS G 621-1
0/ 10 POS G 621-2 POS G 621-3 bPOS G 621-4
/d=12
b/d=1
b/d=25/60 b/d=25/60 b/d=25/60 /14
b/d=25/60
b/d=65/25
d = 0 -8
S - 4-8
S - 2-8
9
Z N2
3.00
.25 m
d = 0 -7
S - 4-7
S - 2-7
9
ZN2
3.00
b/d=65/25
.25 m
d = 0 -6
S - 2-6
S - 4-6
9
ZN2
3.00
.25 m
d = 0 -5
S - 4-5
S - 2-5
9
Z N2
3.00
b/d=65/25
.25 m
d = 0 -4
S - 2-4
S - 4-4
15 0.80
9
14
ZN2
0.30
13 1.30
12
11 0.50
10
b/d=65/25
b/d=50/25
0.20
ZN m
0.10
d = 0 -3
-3
0.2 3
S - 4-2
26 m
S - 2-2
5m
28
d = 30-
0.2 27
9 0.70
5m
9
.25
ZN .25 ZN .25 m
Z N2
d = ZN
8 0 0 0.60
d = d= 0.90
7
6 0.85
b/d=50/25
b/d=65/25
.25 m
-2
d = 0 -2
-2
0.2 7-2
S - 2-3
S - 4-3
26 m 28 m
5m
5 0.90
d = N2
Z N .2 5
ZN2
ZN 0.25 -2
Z
= 0 30 m
=
4 d d ZN .25 1.30
3 = 0
d 0.20
2 0.65
b/d=65/25
b/d=50/25
.25 m
-1
d = 0 -1
-1 -1
S - 4-1
0 .2 7-1
S - 2-1
26 m 28 m 30 m
5m
9
d = N2
Z N .2 5 ZN .25
Z N2
ZN 0.25
Z
0 0 2.20
d= d= d=
1
1.40
0
Ram: K_2
0
1
3
4
5
7
8
0.90
2.60
1.15
0.87
0.75
3.00
1.44
1.00
23
b/d=20/20
b/d=20/20
b/d=20/20
22 b/d=25/20 b/d=25/20 0.50
S - 44
S - 46
S - 48
b/d=12/12
0 2/ 14 b /d=1 2/ 14
/1=1
S - 16
b/d
b /d
21 POS10G 622-1 POS G 622-2POS Gb622-3/d=12/ 1.10
=1
= 14
d
0/ 1
b /
b/d=25/60 b/d=25/60 b/d=25/60
0
3.00
20 POS G 522-1
POS G 522-2POS G 522-3
b/d=25/60 b/d=25/60 b/d=25/60
3.00
19 POS G 422-1
POS G 422-2POS G 422-3
b/d=25/60 b/d=25/60 b/d=25/60
3.00
3.00
17 POS G 222-1
POS G 222-2POS G 222-3
16 b/d=25/60 b/d=25/60 b/d=25/60 0.60
15 0.80
14 0.30
1.30
13 POS G 121-1 POS G 121-2POS G 121-3
12
11 b/d=25/60 b/d=25/60 b/d=25/60 0.50
10 0.20
0.10
9 0.70
8 0.60
7 0.90
6 0.85
5 0.90
1.30
4
3 0.20
2 0.65
2.20
1
1.40
0
Ram: K_3
0
1
3
4
5
7
8
23
b/d=20/20
22 b/d=25/20 0.50
S - 45
3.00
20 POS G 519
b/d=25/60
3.00
19 POS G 419
b/d=25/60
3.00
18 POS G 319
b/d=25/60
3.00
17 POS G 219
16 b/d=25/60 0.60
15 0.80
14 0.30
1.40
0
Ram: K_4
23
22 0.50
21 1.10
3.00
20
3.00
19
3.00
18
3.00
17
16 0.60
15 0.80
14 0.30
1.30
13
12
11 0.50
10 0.20
0.10
9 0.70
8 0.60
1 -4
ZN3 m 0.90
7 .32
d=0
6 0.85
0.3 1-3
m
5 0.90
d = N3
2
Z
4 1.30
3
0.20
2 0.65
0.3 231
m
d = N3
2
Z
2.20
1
1.40
0
Ram: K_5
23
b/d=20/20
b/d=20/20
S - 49
34 m 0.50
ZN .25 1.10
21 POS G 620-1 POS G 620-2 POS G 620-3 = 0
b/d=25/60 b/d=25/60 b/d=25/60 d
0.2 -7
5m
d = N34
3.00
Z
3.00
Z
3.00
Z
3.00
Z
15 0.80
d = N34
14
0.30
Z
0.10
5m
9
d = N34
0.70
8
Z
0.60
7 POS G 010-1 POS G 010-2 POS G 010-3 0.90
b/d=25/60 b/d=25/60 b/d=25/60
6 0.85
0.2 -1
5m
d = N34
5 0.90
Z
2.20
1
0 1.40
Ram: K_6
23
22 0.50
21 1.10
3.00
20
3.00
19
3.00
18
3.00
17
16 0.60
15 0.80
14 0.30
1.30
13
12
11 0.50
10 0.20
0.10
9 0.70
8 0.60
ZN32-3
7 m 0.90
d = 0.32
6 0.85
2
32- 0.90
5 ZN 32 m
0.
d= 1.30
4
3
0.20
2 0.65
1
32-
ZN 32 m
0. 2.20
d=
1
1.40
0
Ram: K_7
6.85
23
22 0.50
21 1.10
3.00
20
3.00
19
3.00
18
3.00
17
16 0.60
15 0.80
14 0.30
1.30
13
12
11 0.50
10 0.20
0.10
9 0.70
8 0.60
ZN33-4
7 0.90
d = 0.32 m
6 0.85
3
33- 0.90
5 ZN 2 m
0.3
d= 1.30
4
3 0.20
2 0.65
2
33-
ZN 2 m
0.3 2.20
d=
1
1.40
0
Ram: K_8
0
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
POS G - 107-2
21
20 0.50
b/d=25/60
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
0.55
POS G - 107-1
10 5 m
0.1 0.35
b/d=25/40
d=
m
-1
9
8
7 0.75
0.1 5
POS
6 5 m 0.10
0.13
0.1 0.42
5 d=
d=
4
H2' 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Pogled: St 1
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
107-2
21 0.50
POSGG-008-2
20
b/d=25/60
0.36
19 0.14
18 0.61
0.25
17
POS
H4 0.75
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
0.55
107-1
10 m
POSGG-008-1
5
0.1 0.35
m
b/d=25/40
9 d=
0.1 5
8
7 0.75
6 5 m 0.10
0.13
0.1
d=
0.42
5 d=
POS
4
H2' 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Pogled: St 2
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
21 0.50
008-2
POS G 116-2
20
b/d=25/60
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 m 0.55
POS G 116-1
008-1
5
0.1 0.35
m
b/d=25/40
9
8 d=
0.15
7 0.75
6 5 m 0.10
0.13
0.1
d=
0.42
5
4
H2' d= 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Pogled: St 3
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
21 0.50
215-2
POS G 116-2
20
b/d=25/60
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 m 0.55
215-1
POS G 116-1
5
0.1 0.35
b/d=25/40
9
8 d=
0.15
7 0.75
6 5 m 0.10
0.13
0.1
d=
0.42
5
4
H2' d= 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Pogled: St 4
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
21 0.50
215-2
POS G 315-2
20
b/d=25/60
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 m 0.55
215-1
POS G 315-1
5
0.1 0.35
m
b/d=25/40
9 d=
0.1 5
8
7 0.75
6 5 m 0.10
0.13
0.1
d=
0.42
5
4
H2' d= 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Pogled: St 5
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
21 0.50
315-2
POS G 415-2
20
b/d=25/60
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 m 0.55
315-1
POS G 415-1
5
0.1 0.35
m
b/d=25/40
9
8 d=
0.15
7 0.75
6 5 m 0.10
0.13
0.1
d=
0.42
5
4
H2' d= 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Pogled: St 6
1
2
3
4
5
0.80
0.15
0.67
1.58
0.15
1.50
3.10
3.10
1.25
1.05
0.60
2.00
2.45
2.40
1.50
1.10
0.50
0.35
0.75
0.35
1.50
1.56
0.70
0.59
34
33
32 0.25
31 0.50
30 0.30
29 0.25
28 0.55
0.20
27 0.94
H6
0.41
25 1.35
H5
0.55
23
0.59
22
21 0.50
POS G 415-2
515-2
20
b/d=25/60
0.36
19 0.14
18 0.61
0.25
17 0.75
H4
15
14 0.25
0.24
0.11
H3'
12 0.70
H3 0.15
10 m 0.55
POS G 415-1
515-1
5
0.1 0.35
b/d=25/40
d = - 700
d=
m
9
8
7 0.75
0.1 5
6 m 0.10
0.13
POS
5
0.1 0.42
5
4
H2' d= 0.55
0.15
0.20
H2
0.60
H1' 1.10
1.65
H1
VD''
VD'
VA
VD
VG
VB
VC
VE
VF
10
13
15
16
17
18
19
20
22
23
24
Pogled: St 7
1
2
3
4
5
POp=-
SG 10.520
20 -1
POp=-
SG 10.2
520
0 -2
p=-7.85
POp=-
SG 10.520
20 -3
POS
p=-10.20
G 509 POS G 510-1 POS G 510-2 p=-7.85
1 -4
p=-10.20
G 52
POS
p=-10.20
G 508-1 POS
p=-10.20
G 508-2
POS
G 518
p=-4.72 p=-10.20
POS G 507
p=-7.85
2 -3
POS Gp=-7.85
POS Gp=-7.85
G 511
POS G 512
p=-4.72
513
G 52
POS G 515-2
p=-10.20
p=-4.72
p=-7.85
G 514
517
p=-4.72
1-3
p=-7.85
G 52
OS
POS
POS
0 P
p=-4.72 p=-4.72
POS
POS
p=-7.85
G 506-1 POS G 506-2 p=-7.85POS G 506-3 POS G 506-4
5202.2-2
p=-4.72
p=-7.85
p=-4.72
pG=-1
POS
p=-10.20
G 505
POS
POS
p=-10.20
G 503-1 POS
p=-7.85
G 503-2 POS G 504-1
p=-7.85 p=-7.85 POS
p=-4.72
G 504-2 p=-7.85
POS G 504-3
POS G 515-1
522-1
p=-4.72
521-
PO
p=S-1G0.2
5109
G
p=-4.72
p=-7.85
POS
POS
p=-7.85
p=-10.20 POS
p=-10.20
G 502
1 -1
POS G 516
p=-10.20
G 52
p=-4.72
p=-4.72
POS
POS
p=-10.20
G 501-1 POS
p=-10.20
G 501-2
POp=-
SG 10.420
20 -1
POp=-
SG 10.2
420
0 -2
p=-7.85
POp=-
SG 10.420
20 -3
POS
p=-10.20
G 409 POS G 410-1 POS G 410-2 p=-7.85
1 -4
p=-10.20
G 42
POS
p=-10.20
G 408-1 POS
p=-10.20
G 408-2
POS
G 418
p=-4.72 p=-10.20
POS G 407
p=-7.85
2 -3
POS Gp=-7.85
p=-4.72 p=-15.00 p=-4.72
POS
p=-7.85
POS Gp=-7.85
G 411
POS G 412
p=-4.72
413
G 42
POS G 415-2
p=-10.20 p=-4.72
p=-7.85
G 414
417
p=-4.72
1-3
p=-7.85
G 42
OS
POS
POS
0 P
p=-4.72 p=-4.72
POS
POS
p=-7.85
G 406-1 POS G 406-2 p=-7.85POS G 406-3 POS G 406-4
4202.2-2
p=-4.72
p=-7.85
p=-4.72
pG=-1
POS
p=-10.20
G 405
POS
p=-10.20
POS G 403-1 POS
p=-7.85
G 403-2 POS G 404-1
p=-7.85 p=-7.85 POS
p=-4.72
G 404-2 p=-7.85
POS G 404-3
POS G 415-1
422-1
p=-4.72
421-
PO
p=S-1G0.2
4109
G
p=-4.72
p=-7.85
POS
POS
p=-7.85
p=-10.20 POS
p=-10.20
G 402
1 -1
POS G 416
p=-10.20
G 42
p=-4.72
p=-4.72
POS
p=-10.20
POS G 401-1 p=-10.20
POS G 401-2
POp=-
SG 10.320
20 -1
POS
p=-G
10.2
320
0 -2
p=-7.85
POp=-
SG 10.2
320
0 -3
POS
p=-10.20
G 309 POS G 310-1 POS G 310-2 p=-7.85
4
321-
p=-10.20
G
POS
p=-10.20
G 308-1 POS
p=-10.20
G 308-2
POS
G 318
p=-4.72 p=-10.20
POS G 307
p=-7.85
3
POS Gp=-7.85
POS Gp=-7.85
POS
322-
G 311
POS G 312
p=-4.72
313
315-2
p=-10.20
p=-4.72
p=-7.85
G 314
317
p=-4.72
321-3
p=-7.85
OS G
POS
G
POS
0 P
p=-4.72 p=-4.72
POS
POS G 306-1
p=-7.85 POS G 306-2 p=-7.85POS G 306-3 POS G 306-4
3 202.2-2
p=-4.72
p=-7.85
p=-4.72
SpG=-1
POS
p=-10.20
G 305
p=-10.20
POS G 303-1 POS
p=-7.85
G 303-2 POS G 304-1
p=-7.85 p=-7.85 POS
p=-4.72 POS G 304-3
G 304-2 p=-7.85
2-1PO
POS G 315-1
1 -2
p=-4.72
G 32
G 32
PO
p=S-1G0.31
209
p=-4.72
p=-7.85
POS
POS
p=-7.85
p=-10.20 POS
p=-10.20
G 302
1 -1
POS G 316
p=-10.20
G 32
p=-4.72
p=-4.72
POS
POS
p=-10.20
G 301-1 POS
p=-10.20
G 301-2
POp=-
SG 10.220
20 -1
POp=-
SG 10.2
220
0 -2
p=-7.85
POp=-
SG 10.220
20 -3
POS
p=-10.20
G 209 POS G 210-1 POS G 210-2 p=-7.85
1 -4
p=-10.20
G 22
POS
p=-10.20
G 208-1 POS
p=-10.20
G 208-2
POS
G 218
p=-4.72 p=-10.20
POS G 207
p=-7.85
2 -3
POS Gp=-7.85
POS G p=-15.00
POS G 212
p=-4.72
213
G 22
215-2
p=-10.20
p=-4.72
p=-7.85
G 214
217
p=-4.72
1-3
p=-7.85
G 22
OS
POS
POS
0 P
p=-4.72 p=-4.72
POS
POS
p=-7.85
G 206-1 POS G 206-2 p=-7.85POS G 206-3 POS G 206-4
2202.2-2
p=-4.72
p=-7.85
p=-4.72
pG=-1
POS
p=-10.20
G 205
POS
p=-10.20
POS G 203-1 POS
p=-7.85
G 203-2 POS G 204-1
p=-7.85 p=-7.85 POS
p=-4.72
G 204-2 p=-7.85
POS G 204-3
POS G 215-1
222-1
p=-4.72
221-
PO
p=S-1G0.2
2109
G
p=-4.72
p=-7.85
POS
POS
p=-7.85
p=-10.20 POS
p=-10.20
G 202
1 -1
POS G 216
p=-10.20
G 22
p=-4.72
p=-4.72
POS
POS
p=-10.20
G 201-1 POS
p=-10.20
G 201-2
POp=-
SG 10.120
20 -1
POp=-
SG 10.2
120
0 -2
p=-7.85
POp=-
SG 10.120
20 -3
p=-10.20
POS G 110 POS G 111-1 POS G 111-2 p=-7.85
p=-10.20
POS
p=-10.20
G 109-1 POS
p=-10.20
G 109-2
p=-4.72 p=-10.20
POS G 108
p=-7.85
1-3
G 12
POS Gp=-7.85
p=-4.72 p=-7.85 p=-4.72
p=-7.85
POS Gp=-7.85
G 112
POS G 113
p=-4.72
114
POS G 116-2
p=-10.20 p=-4.72
p=-7.85
G 115
118
p=-4.72
POS
p=-7.85
POS G 107-1 POS G 107-2 POS G 107-3
POS
1 -2
POS
p=-4.72 p=-4.72
POS
p=-7.85
G 106 p=-7.85
0.2102
p=-4.72
G
p=-7.85
p=-4.72
PpO=S-1
p=-10.20
POS G 105
p=-10.20
POS G 103-1 POS
p=-7.85
G 103-2 POS G 104-1
p=-7.85 p=-7.85 POS
p=-4.72
G 104-2 p=-7.85
POS G 104-3
POS G 116-1
121-1
p=-4.72
PO
p=S-1G0.2
1109
G
p=-4.72
p=-7.85
POS
p=-7.85
p=-10.20 POS
p=-10.20
G 102
POS G 117
p=-10.20
p=-4.72
p=-7.00
POS
p=-10.20
G 101-1 POS
p=-10.20
G 101-2
POp=-
SG 10.010
20 -1
POS G 010
p=--2
10. 20
p=-10.20
POS
p=-G
10.010
20 -3
p=-10.20 POS G 004-1
p=-10.20
POS G 004-2
p=-10.20
p=-4.72
p=-4.72
p=-7.85
p=-4.72 p=-4.72
p=-7.85
p=-7.85
p=-4.72
POS G 005
006
POS G 008-2
p=-10.20
p=-4.72
p=-7.85
G 007
p=-15.00
p=-7.85 p=-7.85
POS G 003
POS G
p=-4.72
p=-4.72
POS
p=-4.72
p=-10.20
p=-10.20 POS
p=-7.85
G 001 POS G p=-7.85
002-1 POS G 002-2 POS G 002-3
POS G 008-1
p=-4.72
p=-10.20
p=-7.85
p=-4.72 p=-7.85
p=-7.85
p=-4.72
p=-10.20 p=-10.20
POS G - 109-1
POS G - 109-2
POS G - 109-3
POS G - 103-1 POS G - 103-2
p=-7.85
POS G - 104
POS G - 105
POS G - 107-2
POS G - 106
POS G - 108
POS
p=-7.85
G - 101 p=-7.85
POS G - 102-1 POS G - 102-2 POSp=-7.85
G - 102-3
POS G - 107-1
p=-7.85
p=-7.85
p=-7.85
p=-7.85
p=-7.85
p=-7.85
p=0.34
p=0.13 p=0.74
POS G 601-1POS G 601-2
p=4.72
p=10.20 p=10.20
POS G 101-1POS G 101-2
S - 1-3
p=7.85
p=10.20 p=10.20
S - 1-2
S - 1-1
p=0.48 p=0.25
p=0.25
p=0.25
p=0.19
p=0.16
S - 2-8 S - 2-9
S - 44
S - 33
S - 34
S - 35
S - 36
S - 17
S - 18
S - 19
S - 20
p=6.50
POS G 602
p=10.20
p=10.20
POS G 502 p=4.72
S - 2-7
p=10.20
p=10.20
POS G 402 p=4.72
S - 2-6
p=10.20
p=10.20
POS G 302 p=4.72
S - 2-5
p=10.20
p=10.20
POS G 202 p=4.72
S - 2-4
p=10.20
p=10.20
POS G 102
p=4.72
S - 2-2
S - 2-3
S - 2-1
S - 3-8 S - 3-9
S - 46
p=6.50 p=0.26
POS G 603-1
POS G POS
603-2G 603-3 POS G 604-1 POS G 604-2POS G 604-3
S - 4-8
p=10.20 p=7.85 p=7.85 p=7.85 p=4.72 p=7.85
POS G 503-1POS G 503-2 POS G 504-1 POS G 504-2POS G 504-3
S - 3-7
S - 4-7
p=10.20 p=7.85 p=7.85 p=7.85 p=4.72 p=7.85
POS G 403-1POS G 403-2 POS G 404-1 POS G 404-2POS G 404-3
S - 3-6
S - 4-6
p=10.20 p=7.85 p=7.85 p=7.85 p=4.72 p=7.85
POS G 303-1POS G 303-2 POS G 304-1 POS G 304-2POS G 304-3
S - 3-5
S - 4-5
p=10.20 p=7.85 p=7.85 p=7.85 p=4.72 p=7.85
POS G 203-1POS G 203-2 POS G 204-1 POS G 204-2POS G 204-3
S - 3-4
S - 4-4
p=10.20 p=7.85 p=7.85 p=7.85 p=4.72 p=7.85
POS G 103-1POS G 103-2 POS G 104-1 POS G 104-2POS G 104-3
S - 3-3
S - 4-2
p=10.20 p=7.85 p=7.85
POS G 001 POS G 002-1 POS G 002-2
POS G 002-3
S - 3-2
S - 4-3
p=7.85 p=7.85 p=7.85
POS G - 101 POS G - 102-1POS G - 102-2
POS G - 102-3
S - 3-1
S - 4-1
p=7.85 p=7.85 p=7.85
Ram: H_5
Opt. 1: Sopstvena teina (g)
S - 5-8 S - 5-9
p=0.09
p=6.50
POS G 605
p=10.20
POS G 505
S - 5-7
p=10.20
POS G 405
S - 5-6
p=10.20
POS G 305
S - 5-5
p=10.20
POS G 205
S - 5-4
p=10.20
POS G 105
S - 5-2
p=10.20
S - 5-3
S - 5-1
Ram: H_6
Opt. 1: Sopstvena teina (g)
S - 22
S - 23
S - 24
S - 25
p=7.85 p=7.85
POS G 506-1 POS G 506-2 POS G 506-3POS G 506-4
p=7.85 p=7.85
POS G 406-1 POS G 406-2 POS G 406-3POS G 406-4
p=7.85 p=7.85
POS G 306-1 POS G 306-2 POS G 306-3POS G 306-4
p=7.85 p=7.85
POS G 206-1 POS G 206-2 POS G 206-3POS G 206-4
p=7.85 p=7.85
POS G 106
Ram: H_7
p=0.26 p=0.26
S - 21
S - 11
S - 12
S - 13
S - 14
S - 15
S - 16
Ram: H_9
Opt. 1: Sopstvena teina (g)
S - 47
S - 48
p=0.13
p=6.50
POS G 607
p=4.72 p=10.20
POS G 507
p=4.72 p=10.20
POS G 407
p=4.72 p=10.20
POS G 307
p=4.72 p=10.20
POS G 207
p=4.72 p=10.20
POS G 108
p=4.72
Ram: H_10
Opt. 1: Sopstvena teina (g)
p=0.29 p=0.21
p=0.21
p=0.25
p=0.31 p=0.40 p=0.34
POS G 608-1
POS G 608-2
p=10.20 p=10.20
POS G 508-1
POS G 508-2
p=10.20 p=10.20
POS G 408-1
POS G 408-2
p=10.20 p=10.20
POS G 308-1
POS G 308-2
p=10.20 p=10.20
POS G 208-1
POS G 208-2
p=10.20 p=10.20
POS G 109-1
POS G 109-2
p=7.85
p=7.85
Ram: H_13
p=0.41 p=0.41
S - 10
S-8
S-6
S-7
S-9
Ram: H_11
Opt. 1: Sopstvena teina (g)
p=0.17
POS G 609 POS G 610-1
POS G 610-2
p=10.20 p=7.85
POS G 509 POS G 510-1
POS G 510-2
p=10.20 p=7.85
POS G 409 POS G 410-1
POS G 410-2
p=10.20 p=7.85
POS G 309 POS G 310-1
POS G 310-2
p=10.20 p=7.85
POS G 209 POS G 210-1
POS G 210-2
p=10.20 p=7.85
POS G 110 POS G 111-1
POS G 111-2
p=10.20 p=10.20
POS G 004-1
POS G 004-2
POS G - 103-1
POS G - 103-2
Ram: H_12
Opt. 1: Sopstvena teina (g) Opt. 1: Sopstvena teina (g)
S - 5-8 S - 5-9
S - 23
S - 29
S - 22
S - 26
p=10.20 p=7.85
POS G 511 POS G 512
S - 5-7
p=10.20 p=7.85
POS G 411 POS G 412
S - 5-6
p=10.20 p=7.85
POS G 311 POS G 312
S - 5-5
p=10.20 p=7.85
POS G 211 POS G 212
S - 5-4
p=10.20 p=7.85
POS G 112 POS G 113
S - 5-2
p=10.20 p=7.85
POS G 005
S - 5-3
POS G - 104
S - 5-1
S - 3-8 S - 3-9
S - 45
S - 50
S - 37
S - 25
S - 24
S - 31
POS G 613 POS G 614
p=7.85 p=7.85
POS G 513 POS G 514
S - 3-7
p=7.85 p=7.85
POS G 413 POS G 414
S - 3-6
p=7.85 p=7.85
POS G 313 POS G 314
S - 3-5
p=7.85 p=7.85
POS G 213 POS G 214
S - 3-4
p=7.85 p=7.85
POS G 114 POS G 115
S - 3-3
p=15.00
p=7.85
POS G 006 POS G 007
S - 3-2
POS G - 105 POS G - 106
S - 3-1
Ram: V_3 Ram: V_4
Opt. 1: Sopstvena teina (g) Opt. 1: Sopstvena teina (g)
S - 1-8 S - 1-9
S - 49
S - 40
S - 34
S - 43
S - 21
S-8
p=7.85 p=7.85
POS G 515-1POS G 515-2 POS G 516 POS G 517
S - 1-7
p=7.85
POS G 415-1POS G 415-2 p=7.85
POS G 416 POS G 417
p=7.85 S - 1-6
POS G 315-1POS G 315-2 p=7.85
POS G 316 POS G 317
S - 1-5
p=15.00
POS G 215-1POS G 215-2 p=7.85
POS G 216 POS G 217
S - 1-4
p=7.85
POS G 116-1POS G 116-2 p=7.85
POS G 117 POS G 118
S - 1-3
p=7.85
POS G 008-1POS G 008-2
p=7.85 p=7.85
POS G 009
S - 1-2
POS G - 107-1
POS G - 107-2
POS G - 108
S - 1-1
S - 20
S - 13
S - 14
p=4.72 p=10.20
p=4.72 p=10.20
p=4.72 p=10.20
p=4.72 p=10.20
p=4.72 p=10.20
p=4.72
p=7.85
S - 2-8 S - 2-9
S - 47
S - 44
S - 46
S - 48
S - 15
p=6.50 p=6.50
POS G 621-1
POS G 621-2 POS G 621-3POS G 621-4 p=6.50
S - 16
POS G 622-1
POS G 622-2 POS G 622-3
S - 4-8
POS G 521-1
POS G 521-2 POS G 521-3POS G 521-4
S - 2-7
S - 4-7
p=10.20
POS G 522-1
POS G 522-2 POS G 522-3
POS G 421-1
POS G 421-2 POS G 421-3POS G 421-4
S - 2-6
S - 4-6
POS G 321-1
POS G 321-2 POS G 321-3POS G 321-4 p=10.20
POS G 422-1
POS G 422-2 POS G 422-3
S - 2-5
S - 4-5
POS G 221-1
POS G 221-2POS G 221-3POS G 221-4
S - 2-4
S - 4-4
p=10.20
POS G 322-1
POS G 322-2 POS G 322-3
S - 2-2
S - 4-2
p=10.20
S - 2-3
S - 4-3
POS G 222-1
POS G 222-2 POS G 222-3
S - 2-1
S - 4-1
p=10.20
POS G 121-1 POS G 121-2 POS G 121-3
p=0.10
p=6.50
POS G 619
p=10.20
POS G 519
p=10.20
POS G 419
p=10.20
POS G 319
p=10.20
POS G 219
p=10.20
POS G 119
p=10.20
Ram: K_4
Opt. 1: Sopstvena teina (g)
S - 50
S - 49
p=6.50
POS G 620-1 POS G 620-2 POS G 620-3
Ram: K_6
POS G 620-1
POS Gp=-
6206.5-20
POS G 620-3
POS G 609 POS
p=-0.17
G 610-1 POS G 610-2
4
G 6201 -
-6.5
POS G 608-1 POS G 608-2
POpS=
POS G 618
POS
p=-6.50
G 607
622-3
q = -1.00 q = -1.00
POS G 611
POS G 612
POS G 613
POS G 615-2
q = -1.00
POS G 614
POS G 617
1-3
q = -1.00 q = -1.00 q = -1.00
OS G
G 62
q = -1.00
0 P
POS
POS G 606-1 POS G 606-2 POS G 606-3 POS G 606-4
2-2
.5
p=6-62
p=-6.50
POS G 605
OS G
p=-6.50
POS G 603-1 POS G 603-2POS G 603-3 POS G 604-1 POS G 604-2 POS G 604-3
2-1P
POS G 615-1
1-2
q = -1.00
G 62
G 62
PO
p=
S-6
G.50
619 q = -1.00 q = -1.00
POS
POS
p=-6.50
POS G 602
q = -1.00 q = -1.00
6201-1
POS G 616
q = -1.00
G-6.5
POpS=
POS
p=-0.13
G 601-1 POS
p=-0.74
G 601-2
POp=-
SG 10.520
20 -1
POS
p=-G
10.2
520
0 -2
p=-7.85
POp=-
SG 10.2
520
0 -3
POS G 509
p=-10.20 POS G 510-1 POS G 510-2 p=-7.85
4
521-
p=-10.20
G
POS
p=-10.20
G 508-1 POS
p=-10.20
G 508-2
POS
G 518
p=-4.72 p=-10.20
POS G 507
p=-7.85
3
POS Gp=-7.85
qp=-4.72
= -2.00 p=-15.00 q = p=-4.72
POS G p=-7.85
POS Gp=-7.85
POS
522-
-2.00
G 511
POS G 512
p=-4.72
513
515-2
q = -2.00
p=-10.20
p=-4.72
p=-7.85
G 514
517
p=-4.72
521-3
q = -2.00 q = -2.00 q = -2.00
p=-7.85
OS G
POS
q = -2.00
G
POS
0 P
p=-4.72 p=-4.72
POS
POS
p=-7.85
G 506-1 POS G 506-2 p=-7.85POS G 506-3 POS G 506-4
5 202.2-2
p=-4.72
p=-7.85
p=-4.72
SpG=-1
POS
p=-10.20
G 505
POS
p=-10.20
G 503-1 p=-7.85
POS G 503-2 p=-7.85
POS G 504-1 p=-7.85 POS
p=-4.72 POS G 504-3
G 504-2 p=-7.85
2-1PO
POS G 515-1
1 -2
p=-4.72
G 52
G 52
p=S-1G0.q51
PO = -2.00
209
p=-4.72 q = -2.00
p=-7.85
POS
POS
p=-7.85
p=-10.20 POS
p=-10.20
G 502
q = -2.00 q = -2.00
1 -1
POS G 516
p=-10.20
G 52
p=-4.72
p=-4.72
POS
POS
p=-10.20
G 501-1 POS
p=-10.20
G 501-2
q = -1.50
POp=-
SG 10.420
20 -1
POp=-
SG 10.2
420
0 -2
p=-7.85
POp=-
SG 10.420
20 -3
POS
p=-10.20
G 409 POS G 410-1 POS G 410-2 p=-7.85
1 -4
p=-10.20
G 42
POS
p=-10.20
G 408-1 POS
p=-10.20
G 408-2
POS
G 418
p=-4.72 p=-10.20
POS G 407
p=-7.85
2 -3
POS Gp=-7.85
qp=-4.72
= -2.00 p=-15.00 q = p=-4.72
POS
p=-7.85
POS Gp=-7.85
-2.00
G 411
POS G 412
p=-4.72
413
G 42
POS G 415-2
p=-10.20 q = -2.00 p=-4.72
p=-7.85
G 414
417
p=-4.72
1-3
q = -2.00 q = -2.00 q = -2.00
p=-7.85
G 42
OS
POS
q = -2.00
POS
0 P
p=-4.72 p=-4.72
POS
POS
p=-7.85
G 406-1 POS G 406-2 p=-7.85POS G 406-3 POS G 406-4
4202.2-2
p=-4.72
p=-7.85
p=-4.72
pG=-1
POS
p=-10.20
G 405
POS
p=-10.20
POS G 403-1 POS
p=-7.85
G 403-2 POS G 404-1
p=-7.85 p=-7.85 POS
p=-4.72
G 404-2 p=-7.85
POS G 404-3
POS G 415-1
422-1
p=-4.72
421-
PO q = -2.00
p=S-1G0.2
4109 q = -2.00
G
p=-4.72
p=-7.85
POS
POS
p=-7.85
p=-10.20 POS
p=-10.20
G 402
q = -2.00 q = -2.00
1 -1
POS G 416
p=-10.20
G 42
p=-4.72
p=-4.72
POS
p=-10.20
POS G 401-1 p=-10.20
POS G 401-2
q = -1.50
POp=-
SG 10.320
20 -1
POp=-
SG 10.2
320
0 -2
p=-7.85
POp=-
SG 10.320
20 -3
POS
p=-10.20
G 309 POS G 310-1 POS G 310-2 p=-7.85
1 -4
p=-10.20
G 32
POS
p=-10.20
G 308-1 POS
p=-10.20
G 308-2
POS
G 318
p=-4.72 p=-10.20
POS G 307
p=-7.85
2 -3
POS Gp=-7.85
qp=-4.72
= -2.00 p=-15.00 q = p=-4.72
POS
p=-7.85
POS Gp=-7.85
-2.00
G 311
POS G 312
p=-4.72
313
G 32
POS G 315-2
q = -2.00
p=-10.20
p=-4.72
p=-7.85
G 314
317
p=-4.72
1-3
G 32
OS
POS
q = -2.00
POS
0 P
p=-4.72 p=-4.72
POS
POS
p=-7.85
G 306-1 POS G 306-2 p=-7.85POS G 306-3 POS G 306-4
3202.2-2
p=-4.72
p=-7.85
p=-4.72
pG=-1
POS
p=-10.20
G 305
POS
POS
p=-10.20
G 303-1 POS
p=-7.85
G 303-2 POS G 304-1
p=-7.85 p=-7.85 POS
p=-4.72
G 304-2 p=-7.85
POS G 304-3
POS G 315-1
322-1
p=-4.72
321-
PO q = -2.00
p=S-1G0.2
3109 q = -2.00
G
p=-4.72
p=-7.85
POS
POS
p=-7.85
p=-10.20 POS
p=-10.20
G 302
q = -2.00 q = -2.00
1 -1
POS G 316
p=-10.20
G 32
p=-4.72
p=-4.72
POS
POS
p=-10.20
G 301-1 POS
p=-10.20
G 301-2
q = -1.50
POp=-
SG 10.220
20 -1
POS
p=-G
10.2
220
0 -2
p=-7.85
POp=-
SG 10.2
220
0 -3
POS
p=-10.20
G 209 POS G 210-1 POS G 210-2 p=-7.85
4
221-
p=-10.20
G
POS
p=-10.20
G 208-1 POS
p=-10.20
G 208-2
POS
G 218
p=-4.72 p=-10.20
POS G 207
p=-7.85
3
POS Gp=-7.85
POS G p=-15.00
qp=-4.72
= -2.00 p=-7.85 q = p=-4.72
POS Gp=-7.85
POS
222-
-2.00
G 211
POS G 212
p=-4.72
213
215-2
q = -2.00
p=-10.20
p=-4.72
p=-7.85
G 214
217
p=-4.72
1-3
q = -2.00 q = -2.00 q = -2.00
p=-7.85
OS G
G 22
POS
q = -2.00
POS
0 P
p=-4.72 p=-4.72
POS
POS G 206-1
p=-7.85 POS G 206-2 p=-7.85POS G 206-3 POS G 206-4
2 202.2-2
p=-4.72
p=-7.85
p=-4.72
SpG=-1
POS
p=-10.20
G 205
p=-10.20
POS G 203-1 POS
p=-7.85
G 203-2 POS G 204-1
p=-7.85 p=-7.85 POS
p=-4.72 POS G 204-3
G 204-2 p=-7.85
2-1PO
POS G 215-1
1 -2
p=-4.72
G 22
G 22
p=S-1G0.q21
PO = -2.00
209
p=-4.72 q = -2.00
p=-7.85
POS
POS
p=-7.85
p=-10.20 POS
p=-10.20
G 202
q = -2.00 q = -2.00
1 -1
POS G 216
p=-10.20
G 22
p=-4.72
p=-4.72
POS
POS
p=-10.20
G 201-1 POS
p=-10.20
G 201-2
q = -1.50
POp=-
SG 10.120
20 -1
POp=-
SG 10.2
120
0 -2
p=-7.85
POp=-
SG 10.120
20 -3
p=-10.20
POS G 110 POS G 111-1 POS G 111-2 p=-7.85
p=-10.20
POS
p=-10.20
G 109-1 POS
p=-10.20
G 109-2
p=-4.72 p=-10.20
POS G 108
p=-7.85
1-3
G 12
POS Gp=-7.85
qp=-4.72
= -2.00 p=-7.85 q = p=-4.72
p=-7.85
POS Gp=-7.85
-2.00
G 112
POS G 113
p=-4.72
114
POS G 116-2
p=-10.20 q = -2.00 p=-4.72
p=-7.85
G 115
118
p=-4.72
POS
q = -2.00 q = -2.00 q = -2.00
p=-7.85
POS G 107-1 POS G 107-2 POS G 107-3
POS
q = -2.00
1 -2
POS
p=-4.72 p=-4.72
POS
p=-7.85
G 106 p=-7.85
0.2102
p=-4.72
G
p=-7.85
p=-4.72
PpO=S-1
p=-10.20
POS G 105
p=-10.20
POS G 103-1 POS
p=-7.85
G 103-2 POS G 104-1
p=-7.85 p=-7.85 POS
p=-4.72
G 104-2 p=-7.85
POS G 104-3
POS G 116-1
121-1
p=-4.72
PO q = -2.00
p=S-1G0.2
1109 q = -2.00
G
p=-4.72
p=-7.85
POS
p=-7.85
p=-10.20 POS
p=-10.20
G 102
q = -2.00 q = -2.00
POS G 117
p=-10.20
p=-4.72
p=-7.00
POS
p=-10.20
G 101-1 POS
p=-10.20
G 101-2
q = -1.50
q = -2.00 q = -2.00
POS
p=-G
10.010
20 -1 q = -2.00
q = -2.00 q = -2.00 POS G 010
p=--2
10.20
p=-10.20
POS
p=-G
10.2
010
0 -3
p=-10.20 POS G 004-1
p=-10.20
POS G 004-2
p=-10.20
POS G 009 p=-7.85
p=-4.72
p=-4.72
p=-7.85
p=-4.72 p=-4.72
p=-7.85
p=-7.85
qp=-4.72
= -2.00
POS G 005
q = -2.00
006
POS G 008-2
p=-10.20
q = -2.00
p=-4.72
p=-7.85
G 007
q = -2.00
p=-15.00
q = -2.00 q = -2.00
p=-7.85 p=-7.85
POS G 003
POS G
p=-4.72
p=-4.72
POS
p=-4.72
p=-10.20
p=-10.20 POS
p=-7.85
G 001 POS G p=-7.85
002-1 POS G 002-2 POS G 002-3
POS G 008-1
p=-4.72
q = -2.00
p=-10.20
p=-7.85
p=-4.72 p=-7.85
p=-7.85
p=-4.72
p=-10.20 p=-10.20
q = -1.50
q = -2.00 q = -2.00
POS G - 109-1 q = -2.00
q = -2.00 q = -2.00 POS G - 109-2
POS G - 109-3
POS G - 103-1 POS G - 103-2
p=-7.85
q = -2.00
POS G - 104
POS G - 105
POS G - 107-2
q = -2.00
POS G - 106
POS G - 108
q = -2.00
q = -2.00 q = -2.00 q = -2.00
p=-7.85
POS G - 101 p=-7.85
POS G - 102-1 POS G - 102-2 POSp=-7.85
G - 102-3
POS G - 107-1
q = -2.00
p=-7.85
p=-7.85
q = -2.00 q = -2.00
q = -1.50
q = -2.00 q = -2.00
p=-7.85
q = -2.00 q = -2.00
q = -2.00
p=-7.85
q = -2.00 q = -2.00
q = -2.00
q = -2.00 q = -2.00 q = -2.00
q = -2.00
q = -2.00
p=-7.85
p=-7.85
q = -2.00 q = -2.00 q = -2.00
p=0.34
p=0.13 p=0.74
POS G 601-1POS G 601-2
p=4.72
p=10.20 p=10.20
POS G 101-1POS G 101-2
S - 1-3
p=7.85
p=10.20 p=10.20
q = -0.00
q = -0.00
q = 0.00
q = 0.00 q = -0.00
q = -0.00
S - 1-2
q
q== -20.46
q
q== -20.46
-20.46-20.46
q
q== q-20.46
= -20.46
-20.46 q=
q = -20.46
-20.46
q = -20.46
S - 1-1
p=0.48 p=0.25
p=0.25
p=0.25
p=0.19
p=0.16
S - 2-8 S - 2-9
S - 44
S - 33
S - 34
S - 35
S - 36
S - 17
S - 18
S - 19
S - 20
p=6.50
POS G 602
p=10.20
p=10.20
POS G 502 p=4.72
S - 2-7
p=10.20
p=10.20
POS G 402 p=4.72
S - 2-6
p=10.20
p=10.20
POS G 302 p=4.72
S - 2-5
p=10.20
p=10.20
POS G 202 p=4.72
S - 2-4
p=10.20
p=10.20
POS G 102
p=4.72
S - 2-2
q = -0.00
q = -0.00
S - 2-3
q=
q = -20.90
-20.46
q=
q = -20.90
-20.46
S - 2-1
q = -45.81
q = -45.81
S - 3-8 S - 3-9
S - 46
p=6.50 p=0.26
POS G 603-1
POS G POS
603-2G 603-3 POS G 604-1 POS G 604-2POS G 604-3
S - 4-8
p=10.20 p=7.85 p=7.85 p=7.85 p=4.72 p=7.85
POS G 503-1POS G 503-2 POS G 504-1 POS G 504-2POS G 504-3
S - 3-7
S - 4-7
p=10.20 p=7.85 p=7.85 p=7.85 p=4.72 p=7.85
POS G 403-1POS G 403-2 POS G 404-1 POS G 404-2POS G 404-3
S - 3-6
S - 4-6
p=10.20 p=7.85 p=7.85 p=7.85 p=4.72 p=7.85
POS G 303-1POS G 303-2 POS G 304-1 POS G 304-2POS G 304-3
S - 3-5
S - 4-5
p=10.20 p=7.85 p=7.85 p=7.85 p=4.72 p=7.85
POS G 203-1POS G 203-2 POS G 204-1 POS G 204-2POS G 204-3
S - 3-4
S - 4-4
p=10.20 p=7.85 p=7.85 p=7.85 p=4.72 p=7.85
POS G 103-1POS G 103-2 POS G 104-1 POS G 104-2POS G 104-3
S - 3-3
S - 4-2
p=10.20 p=7.85 p=7.85
POS G 001 POS G 002-1 POS G 002-2
POS G 002-3
qq==-0.01
-0.00
S - 3-2
S - 4-3
p=7.85 p=7.85 p=7.85
POS G - 101 POS G - 102-1POS G - 102-2
POS G - 102-3
q =q -20.47
= -20.46
q =q -20.46
= -20.46
S - 3-1
S - 4-1
p=7.85 p=7.85 p=7.85
q =q -63.33
= -63.33
Ram: H_5
Opt. 2: Stalno optereenje
S - 5-8 S - 5-9
p=0.09
p=6.50
POS G 605
p=10.20
POS G 505
S - 5-7
p=10.20
POS G 405
S - 5-6
p=10.20
POS G 305
S - 5-5
p=10.20
POS G 205
S - 5-4
p=10.20
POS G 105
S - 5-2
p=10.20
q = 0.00
q = -0.00
S - 5-3
S - 5-1
q = q-63.33
= -63.33
Ram: H_6
Opt. 2: Stalno optereenje
S - 22
S - 23
S - 24
S - 25
p=7.85 p=7.85
POS G 506-1 POS G 506-2 POS G 506-3POS G 506-4
p=7.85 p=7.85
POS G 406-1 POS G 406-2 POS G 406-3POS G 406-4
p=7.85 p=7.85
POS G 306-1 POS G 306-2 POS G 306-3POS G 306-4
p=7.85 p=7.85
POS G 206-1 POS G 206-2 POS G 206-3POS G 206-4
p=7.85 p=7.85
POS G 106
Ram: H_7
p=0.26 p=0.26
S - 21
S - 11
S - 12
S - 13
S - 14
S - 15
S - 16
Ram: H_9
Opt. 2: Stalno optereenje
S - 47
S - 48
p=0.13
p=6.50
POS G 607
p=4.72 p=10.20
POS G 507
p=4.72 p=10.20
POS G 407
p=4.72 p=10.20
POS G 307
p=4.72 p=10.20
POS G 207
p=4.72 p=10.20
POS G 108
p=4.72
Ram: H_10
Opt. 2: Stalno optereenje
p=0.29 p=0.21
p=0.21
p=0.25
p=0.31 p=0.40 p=0.34
POS G 608-1
POS G 608-2
p=10.20 p=10.20
POS G 508-1
POS G 508-2
p=10.20 p=10.20
POS G 408-1
POS G 408-2
p=10.20 p=10.20
POS G 308-1
POS G 308-2
p=10.20 p=10.20
POS G 208-1
POS G 208-2
p=10.20 p=10.20
POS G 109-1
POS G 109-2
p=7.85
p=7.85
Ram: H_13
p=0.41 p=0.41
S - 10
S-8
S-6
S-7
S-9
Ram: H_11
Opt. 2: Stalno optereenje
p=0.17
POS G 609 POS G 610-1
POS G 610-2
p=10.20 p=7.85
POS G 509 POS G 510-1
POS G 510-2
p=10.20 p=7.85
POS G 409 POS G 410-1
POS G 410-2
p=10.20 p=7.85
POS G 309 POS G 310-1
POS G 310-2
p=10.20 p=7.85
POS G 209 POS G 210-1
POS G 210-2
p=10.20 p=7.85
POS G 110 POS G 111-1
POS G 111-2
p=10.20 p=10.20
POS G 004-1
POS G 004-2
q = -0.00
q = -0.00
POS G - 103-1
POS G - 103-2
q = 63.33
q = 63.33
Ram: H_12
Opt. 2: Stalno optereenje Opt. 2: Stalno optereenje
S - 5-8 S - 5-9
S - 23
S - 29
S - 22
S - 26
p=10.20 p=7.85
POS G 511 POS G 512
S - 5-7
p=10.20 p=7.85
POS G 411 POS G 412
S - 5-6
p=10.20 p=7.85
POS G 311 POS G 312
S - 5-5
p=10.20 p=7.85
POS G 211 POS G 212
S - 5-4
p=10.20 p=7.85
POS G 112 POS G 113
S - 5-2
p=10.20 p=7.85
POS G 005
q = -0.00 q = -0.00 q = -0.00q = -0.00 q = -0.00
q = -0.00
S - 5-3
POS G - 104
S - 5-1
S - 3-8 S - 3-9
S - 45
S - 50
S - 37
S - 25
S - 24
S - 31
POS G 613 POS G 614
p=7.85 p=7.85
POS G 513 POS G 514
S - 3-7
p=7.85 p=7.85
POS G 413 POS G 414
S - 3-6
p=7.85 p=7.85
POS G 313 POS G 314
S - 3-5
p=7.85 p=7.85
POS G 213 POS G 214
S - 3-4
p=7.85 p=7.85
POS G 114 POS G 115
S - 3-3
p=15.00
p=7.85
POS G 006 POS G 007
q = -0.00
q = -0.00
S - 3-2
POS G - 105 POS G - 106
S - 3-1
q = 63.33
q = 63.33
q = -0.00
q = -0.00
q = -0.00q = -0.00
S - 43
S - 21
S-8
p=7.85 p=7.85
POS G 515-1POS G 515-2 POS G 516 POS G 517
S - 1-7
p=7.85
POS G 415-1POS G 415-2 p=7.85
POS G 416 POS G 417
S - 1-6
p=7.85
POS G 315-1POS G 315-2 p=7.85
POS G 316 POS G 317
S - 1-5
p=15.00
POS G 215-1POS G 215-2 p=7.85
POS G 216 POS G 217
S - 1-4
p=7.85
POS G 116-1POS G 116-2 p=7.85
POS G 117 POS G 118
S - 1-3
p=7.85
POS G 008-1POS G 008-2
p=7.85 p=7.85
q = -0.00
q = -0.00 POS G 009
S - 1-2
POS G - 107-1
POS G - 107-2
POS G - 108
S - 1-1
q = 63.33
q = 63.33
S - 19
S - 20
S - 13
S - 14
p=4.72 p=10.20
p=4.72 p=10.20
p=4.72 p=10.20
p=4.72 p=10.20
p=4.72 p=10.20
p=4.72
p=7.85
q = 0.00
q = 0.00
q = 20.46 q = 15.80
q = 20.46 q = 20.46
q = 63.33 q = 63.33
Ram: K_1
Opt. 2: Stalno optereenje Opt. 2: Stalno optereenje
S - 2-8 S - 2-9
S - 47
S - 44
S - 46
S - 48
S - 15
p=6.50 p=6.50
POS G 621-1
POS G 621-2 POS G 621-3POS G 621-4 p=6.50
S - 16
POS G 622-1
POS G 622-2 POS G 622-3
S - 4-8
POS G 521-1
POS G 521-2 POS G 521-3POS G 521-4
S - 2-7
S - 4-7
p=10.20
POS G 522-1
POS G 522-2 POS G 522-3
POS G 421-1
POS G 421-2 POS G 421-3POS G 421-4
S - 2-6
S - 4-6
POS G 321-1
POS G 321-2 POS G 321-3POS G 321-4 p=10.20
POS G 422-1
POS G 422-2 POS G 422-3
S - 2-5
S - 4-5
POS G 221-1
POS G 221-2POS G 221-3POS G 221-4
S - 2-4
S - 4-4
p=10.20
POS G 322-1
POS G 322-2 POS G 322-3
S - 2-2
S - 4-2
p=10.20
q = -0.00 q = 0.00
S - 2-3
S - 4-3
POS G 222-1
POS G 222-2 POS G 222-3
q = -11.74
q = -11.74
q = -20.46 q = -20.46
q = -20.46 q = -20.46
S - 2-1
S - 4-1
p=10.20
POS G 121-1 POS G 121-2 POS G 121-3
q = -63.33 q = -63.33
S - 45
p=0.10
p=6.50 q = 0.00 q = 0.00
POS G 619
p=10.20
POS G 519
p=10.20
POS G 419
p=10.20
POS G 319
p=10.20
POS G 219
p=10.20
POS G 119
p=10.20
q = q-0.00
= -0.50
q
q= q -20.46
=q = -20.45
-20.96
-20.46
=
q = 63.33 q = 63.33
q =q -63.33
= -63.33
S - 49
p=6.50
POS G 620-1 POS G 620-2 POS G 620-3
Ram: K_6
Opt. 2: Stalno optereenje Opt. 2: Stalno optereenje
POS G 620-1
POS G 620-2
POS G 620-3
POS G 609 POS G 610-1 POS G 610-2
4
621 -
G
POS G 608-1 POS G 608-2
POS
POS G 618
POS G 607
2-3
q = -1.50 q = -1.50
POS G 611
POS G 612
POS G 613
POS G 615-2
G 62
q = -1.50
POS G 614
POS G 617
621-3
q = -1.50 q = -1.50 q = -1.50
POS
q = -1.50
G
POS
POS G 606-1 POS G 606-2 POS G 606-3 POS G 606-4
6 22-2
POS G 605
OS G
POS G 603-1 POS G 603-2POS G 603-3 POS G 604-1 POS G 604-2 POS G 604-3
2-1P
POS G 615-1
1-2
POS G q61= -1.50
G 62
G 62
9 q = -1.50 q = -1.50
POS
POS
POS G 602
q = -1.50 q = -1.50
1-1
POS G 616
q = -1.50
G 62
POS
POS G 601-1 POS G 601-2
POS G 520-1
POS G 520-2
POS G 520-3
POS G 509 POS G 510-1 POS G 510-2
4
521-
G
POS G 508-1 POS G 508-2
POS
POS G 518
POS G 507
2 -3
q = -1.50 q = -1.50
POS G 511
POS G 512
POS G 513
G 52
POS G 515-2
q = -1.50
POS G 514
POS G 517
521-3
q = -1.50 q = -1.50 q = -1.50
POS
q = -1.50
G
POS
POS G 506-1 POS G 506-2 POS G 506-3 POS G 506-4
5 22-2
POS G 505
SG
POS G 503-1 POS G 503-2 POS G 504-1 POS G 504-2 POS G 504-3
2-1PO
POS G 515-1
1 -2
G 52
G 52
POS Gq51= -1.50
9 q = -1.50
POS
POS
POS G 502
q = -1.50 q = -1.50
1 -1
POS G 516
G 52
POS
q = -2.50
POS G 420-1
POS G 420-2
POS G 420-3
POS G 409 POS G 410-1 POS G 410-2
1 -4
G 42
POS G 408-1 POS G 408-2
POS
POS G 418
POS G 407
2 -3
q = -1.50 q = -1.50
POS G 411
POS G 412
POS G 413
G 42
POS G 415-2
q = -1.50
POS G 414
POS G 417
1-3
q = -1.50 q = -1.50 q = -1.50
G 42
POS
q = -1.50
POS
POS G 406-1 POS G 406-2 POS G 406-3 POS G 406-4
2-2
G 42
POS G 405
POS
POS G 403-1 POS G 403-2 POS G 404-1 POS G 404-2 POS G 404-3
POS G 415-1
422-1
421-
POS Gq41= -1.50
9 q = -1.50
G
POS
POS
POS G 402
q = -1.50 q = -1.50
1 -1
POS G 416
G 42
POS
POS G 401-1 POS G 401-2
q = -2.50
POS G 320-1
POS G 320-2
POS G 320-3
POS G 309 POS G 310-1 POS G 310-2
1 -4
G 32
POS G 307
2 -3
q = -1.50 q = -1.50
POS G 311
POS G 312
POS G 313
G 32
POS G 315-2
q = -1.50
POS G 314
POS G 317
1-3
POS
q = -1.50
POS
POS G 305
POS
POS G 303-1 POS G 303-2 POS G 304-1 POS G 304-2 POS G 304-3
POS G 315-1
322-1
321-
G
POS
POS
POS G 302
q = -1.50 q = -1.50
1 -1
POS G 316
G 32
POS
q = -2.50
POS G 220-1
POS G 220-2
POS G 220-3
POS G 209 POS G 210-1 POS G 210-2
4
G 221-
POS G 208-1 POS G 208-2
POS
POS G 218
POS G 207
2 -3
q = -1.50 q = -1.50
POS G 211
POS G 212
POS G 213
G 22
POS G 215-2
q = -1.50
POS G 214
POS G 217
221-3
q = -1.50 q = -1.50 q = -1.50
POS
q = -1.50
G
POS
POS G 206-1 POS G 206-2 POS G 206-3 POS G 206-4
2 22-2
POS G 205
SG
POS G 203-1 POS G 203-2 POS G 204-1 POS G 204-2 POS G 204-3
2-1PO
POS G 215-1
1 -2
G 22
G 22
POS Gq21= -1.50
9 q = -1.50
POS
POS
POS G 202
q = -1.50 q = -1.50
1 -1
POS G 216
G 22
POS
q = -2.50
POS G 120-1
POS G 120-2
POS G 120-3
POS G 110 POS G 111-1 POS G 111-2
1-3
G 12
q = -1.50 q = -1.50
POS G 112
POS G 113
POS G 114
POS G 116-2
q = -1.50
POS G 115
POS G 118
POS
q = -1.50 q = -1.50 q = -1.50
POS G 107-1 POS G 107-2 POS G 107-3
q = -1.50
1 -2
POS G 106
G 12
POS
POS G 105
POS G 103-1 POS G 103-2 POS G 104-1 POS G 104-2 POS G 104-3
POS G 116-1
121-1
POS Gq11= -1.50
9 q = -1.50
G
POS
POS G 102
q = -1.50 q = -1.50
POS G 117
POS G 101-1 POS G 101-2
q = -2.50
POS G 006
POS G 008-2
POS G 007
POS G 009
POS G 003
q = -2.00
q = -2.50
q = -3.00 q = -3.00
POS G - 109-1 q = -3.00
q = -2.00 q = -3.00 POS G - 109-2
POS G - 109-3
POS G - 103-1 POS G - 103-2
q = -3.00
POS G - 104
POS G - 105
POS G - 107-2
q = -3.00
POS G - 106
POS G - 108
q = -3.00
q = -3.00 q = -3.00 q = -3.00
q = -2.00
q = -2.00 q = -2.00
q = -2.50
q = -3.00 q = -3.00
q = -3.00 q = -3.00
q = -2.00
q = -3.00 q = -3.00
q = -3.00
q = -3.00 q = -3.00 q = -3.00
q = -2.00
q = -2.00
p=0.95 p=0.44
p=0.27
p=0.27
p=0.22
p=0.14
p=0.14
POS G 601-1POS G 601-2
p=0.85
p=0.34
p=0.25 p=0.32
p=0.44 p=0.25
p=0.25
p=0.25
p=0.14
p=0.05 p=0.38
p=0.27
p=0.27
p=0.24
p=0.24
S - 2-8 S - 2-9
S - 44
S - 17
S - 18
S - 19
S - 20
S - 33
S - 34
S - 35
S - 36
POS G 602
POS G 502
S - 2-7
POS G 402
S - 2-6
POS G 302
S - 2-5
POS G 202
S - 2-4
POS G 102
S - 2-2
S - 2-3
S - 2-1
Opt. 4: Sneg
S - 3-8 S - 3-9
S - 46
p=0.37
p=0.28
POS G 603-1
POS G POS
603-2G 603-3 POS G 604-1 POS G 604-2POS G 604-3
S - 4-8
POS G 503-1POS G 503-2 POS G 504-1 POS G 504-2POS G 504-3
S - 3-7
S - 4-7
POS G 403-1POS G 403-2 POS G 404-1 POS G 404-2POS G 404-3
S - 3-6
S - 4-6
POS G 303-1POS G 303-2 POS G 304-1 POS G 304-2POS G 304-3
S - 3-5
S - 4-5
POS G 203-1POS G 203-2 POS G 204-1 POS G 204-2POS G 204-3
S - 3-4
S - 4-4
POS G 103-1POS G 103-2 POS G 104-1 POS G 104-2POS G 104-3
S - 3-3
S - 4-2
POS G 001 POS G 002-1 POS G 002-2
POS G 002-3
S - 3-2
S - 4-3
POS G - 101 POS G - 102-1POS G - 102-2
POS G - 102-3
S - 3-1
S - 4-1
Ram: H_5
Opt. 4: Sneg
S - 5-8 S - 5-9
p=0.11
p=0.11
p=0.17
POS G 605
POS G 505
S - 5-7
POS G 405
S - 5-6
POS G 305
S - 5-5
POS G 205
S - 5-4
POS G 105
S - 5-2
S - 5-3
S - 5-1
Ram: H_6
Opt. 4: Sneg
p=0.15
p=0.15
p=0.15
p=0.15
p=0.15
p=0.15
p=0.15
S - 22
S - 23
S - 24
S - 25
POS G 106
Ram: H_7
Opt. 4: Sneg
p=0.21
p=0.20
p=0.21
p=0.20
p=0.20
p=0.20 p=0.22
p=0.20 p=0.22
p=0.22
p=0.22
p=0.22
p=0.22
S - 37
S - 38
S - 39
S - 40
S - 41
S - 42
S - 43
S - 26
S - 27
S - 28
S - 29
S - 30
S - 31
S - 32
Ram: H_8
Opt. 4: Sneg
p=0.27
p=0.27
p=0.27
p=0.27
p=0.27
p=0.27
p=0.20
p=0.20
p=0.20
p=0.22
p=0.20
p=0.15
S - 21
S - 11
S - 12
S - 13
S - 14
S - 15
S - 16
Ram: H_9
Opt. 4: Sneg
S - 47
S - 48
p=0.07
POS G 607
POS G 507
POS G 407
POS G 307
POS G 207
POS G 108
Ram: H_10
Opt. 4: Sneg
p=0.36
p=0.27
p=0.35
p=0.33
p=0.27
p=0.27
p=0.33 p=0.36
p=0.25
p=0.25
p=0.30p=0.29
POS G 608-1
POS G 608-2
POS G 508-1
POS G 508-2
POS G 408-1
POS G 408-2
POS G 308-1
POS G 308-2
POS G 208-1
POS G 208-2
POS G 109-1
POS G 109-2
Ram: H_13
Opt. 4: Sneg
p=0.45
p=0.29
p=0.29
p=0.29
p=0.29
p=0.44
S - 10
S-8
S-6
S-7
S-9
Ram: H_11
Opt. 4: Sneg
p=0.49
p=0.17 p=0.32
p=0.15
p=0.13
p=0.19
POS G 609 POS G 610-1
POS G 610-2
POS G 004-1
POS G 004-2
POS G - 103-1
POS G - 103-2
Ram: H_12
p=0. p04=
p07=0.0 p3=0p0.0 p08=.1
3=.0
p70=.0 .0
307p.0=50 20=.1
0=p.0 703p.1=00
p=0p.0= p=p0=p.3
S - 5-8 S - 5-9
.12 .23
S - 23
S - 29
S - 22
S - 26
POS G 611 POS G 612
S - 5-7
POS G 411 POS G 412
S - 5-6
POS G 311 POS G 312
S - 5-5
POS G 211 POS G 212
S - 5-4
POS G 112 POS G 113
S - 5-2
POS G 005
S - 5-3
POS G - 104
S - 5-1
p3=0p0.0 p=0.0.p04
0=.1
p0=p3.0 p08=.1
4=.0 704p.1=00 p=
p=90. 15 03 =p0.=pp=
16p0p4=.0
p=p0=.4 .2p4=0.2 p=0.1 =00.0
=p0. =
7.0 3=00.
7p6.0
p=
=05080.1
5=0.1p3 .224
S - 3-8 S - 3-9
S - 45
S - 50
S - 24
S - 31
5 .1p
S - 37
0
S - 25
POS G 613 p =
POS G 614
S - 3-7
POS G 413 POS G 414
S - 3-6
POS G 313 POS G 314
p=0.0.p08 p=0.0.
p08
=070.p32
p=
0. 30 07 =0.p=
320p.1 p=30
p=70. =p0.=10.
.260.1p7=
p=0p=
=0.
2 1p5=0.
31p=0.5
.301.1
p=0p= 2p=
150.31p
=0.44
S - 39
S - 33
S - 38
3
S-7
S-6
p= p08 p=0.0.p08
p=300.0.
p=70. 070.p32
= =p0.=10. p=
7 0. 30 07 =0.p31
.230.1
p=0p= 2p=150.31 .150.1p=
320p=
=0.
p=10.
2 1p=
5 0.31p=
p=0.p=
S - 49
p=0.4
S - 40
30 0.43
S - 34
S - 41
S - 35
3 p=0.
S-8
S-9
POS G 615-1POS G 615-2
POS G - 107-2
POS G - 107-1
p=0.0.p08 p= 6p40.
090.
.0
p=.0 930.
p=
0. 30 07 =0.p31 1 000.2.5
p==p= 0=
.150.1p7=
310p=
=0.
p=10.
2 1p=
5 0.31p=0 p=1.215 pp= 20pp=
1=60.
0p=
p.0
=060pp=
14 .0.0
=70.
06.2103
0p=0.p=
S - 1-8 S - 1-9
3 .54 0 0.
p=
p=00..424
S - 42
S - 36
0.
S - 43
=
S - 21
p
S - 10
S - 1-7
POS G 416 POS G 417
S - 1-6
POS G 316 POS G 317
S - 1-5
POS G 009
S - 1-2
POS G - 108
S - 1-1
0.p07
p=26 =0.40p 0.p07
p=27 =0.39p
p0=0. =0p.2=80. p9=0. =0p.2=70.
p8=0.3 p=10. p7=0.2 p=09
0p=0.2 0 1p9=0.5 p9=0.2 0.1p9=0
p=0.4 p=0.3 .39
S - 17
S - 18
0
S - 11
S - 12
0.p07
p=27 =0.44p .0p08=6
10.
9=0.
p4=0.2p
=0p.2=70.
p=00. p=p0p=.3=0 0.32p=0.p=
p=0.25 260.
p=10
4p=0.2 9 1p9=0 0.19
p=0.4
p=0.2 .44
S - 19
S - 20
S - 13
5
S - 14
Ram: V_16 Ram: V_17
Opt. 4: Sneg Opt. 4: Sneg
.1p06
pp==00.
0=0.25
p=0.p25 .1p3=0.03p=0.18
0 =p=
0.p= 0 p=0 p=0.1
4p=0.1 0.10p=
10 p=0.1
S - 2-8 S - 2-9
S - 47
7.080.24 3p=0p=
p=0.0 .005.05
S - 15
S - 44
S - 46
S - 48
POS G 621-1
POS G 621-2 POS G 621-3POS G 621-4
S - 16
POS G 622-2 POS G 622-3
POS G 622-1
S - 4-8
POS G 521-1
POS G 521-2 POS G 521-3POS G 521-4
S - 2-7
S - 4-7
POS G 421-1
POS G 421-2 POS G 421-3POS G 421-4 POS G 522-1
POS G 522-2 POS G 522-3
S - 2-6
S - 4-6
POS G 321-1
POS G 321-2 POS G 321-3POS G 321-4
S - 2-5
S - 4-5
POS G 422-1
POS G 422-2 POS G 422-3
POS G 221-1
POS G 221-2POS G 221-3POS G 221-4
S - 2-4
S - 4-4
POS G 322-1
POS G 322-2 POS G 322-3
S - 2-2
S - 4-2
S - 2-3
S - 4-3
POS G 222-1
POS G 222-2 POS G 222-3
S - 2-1
S - 4-1
p=0.17
p=0.14
POS G 619
POS G 519
POS G 419
POS G 319
POS G 219
POS G 119
Ram: K_4
p=0.19
S - 1-8 S - 1-9
POS G 601-1POS G 601-2
p=0.16~0.19
S - 1-7
POS G 401-1POS G 401-2
S - 1-6
POS G 301-1POS G 301-2
S - 1-5
p=0.14~0.16
POS G 201-1POS G 201-2
S - 1-4
POS G 101-1POS G 101-2
S - 1-3
S - 1-2
S - 1-1
Ram: H_1
Opt. 5: Vetar X-pravac
p=0.17
S - 5-8 S - 5-9
POS G 605
POS G 505
p=0.39~0.54
S - 5-7
POS G 405
S - 5-6
POS G 305
S - 5-5
p=0.29~0.39
POS G 205
S - 5-4
POS G 105
S - 5-2
p=0.29
S - 5-3
S - 5-1
Ram: H_6
Opt. 5: Vetar X-pravac Opt. 5: Vetar X-pravac
p=0.17
S - 5-8 S - 5-9
S - 23
S - 29
S - 22
S - 26
POS G 005
q = 0.11
q = 0.11 q = 0.11q = 0.11
S - 5-3
POS G - 104
S - 5-1
S - 3-8 S - 3-9
S - 45
S - 50
S - 37
S - 25
S - 24
S - 31
q = 0.23
POS G 613 POS G 614 q = 0.23
q = 0.23
q = 0.23 q = 0.23
q = 0.23
S - 3-7
POS G 413 POS G 414
S - 3-6
POS G 313 POS G 314
q = 0.21
q = 0.21 q = 0.21
q = 0.21
q = 0.21
q = 0.21 q = 0.21
q = 0.21
S - 3-5
POS G 213 POS G 214
S - 3-4
POS G 114 POS G 115
q = 0.15
q = 0.15 q
q = 0.15
q = 0.15 q== 0.15
q
q== 0.15
0.15 0.15
S - 3-3
POS G 006 POS G 007
q = 0.11
q = 0.11 q = 0.11
q = 0.11
S - 3-2
POS G - 105 POS G - 106
S - 3-1
Ram: V_3 Ram: V_4
Opt. 5: Vetar X-pravac Opt. 5: Vetar X-pravac
q = 0.23 q = 0.23
q = 0.23q = 0.23 q = 0.23
q = 0.23
q=
q = 0.21
0.21
q=
q = 0.21
0.21
q = 0.21q = 0.21
q = 0.21q = 0.21
q
q== 0.15
q
q== 0.15
0.15 0.15
q = 0.15q = 0.15
q = 0.15q = 0.15
q = 0.11
q = 0.11
q = 0.11q = 0.11
p=0.19
S - 2-8 S - 2-9
S - 49
S - 47
S - 40
S - 34
S - 15
S-8
q = 0.23
POS G 615-1POS G 615-2 POS G 621-1
POS G 621-2 POS G 621-3POS G 621-4
q = 0.23
q = 0.23 q = 0.25
q = 0.25
S - 4-8
p=0.16~0.19
S - 2-7
S - 4-7
S - 4-6
S - 4-5
p=0.14~0.16
p=0.14~0.16
S - 4-4
S - 4-2
S - 4-3
POS G - 107-1
POS G - 107-2
S - 2-1
S - 4-1
p=0.12
S - 1-9
S - 50
S - 49
POS G 620-1 POS G 620-2 POS G 620-3 POS G 601-1POS G 601-2 q = 0.16
q = 0.16
q = 0.16
p=0.11~0.12
S - 1-6 p=0.11~0.12
p=0.16~0.19
POS G 420-1 POS G 420-2 POS G 420-3 POS G 401-1POS G 401-2
1-4 S - 1-5
p=0.07~0.09 p=0.09~0.11
S - 1-3 S -p=0.09~0.11
p=0.14~0.16
POS G 220-1 POS G 220-2 POS G 220-3 POS G 201-1POS G 201-2
S - 1-2 p=0.07~0.09
q = 0.12
q = 0.12
q = 0.12
q = 0.12
S - 1-1
Ram: K_6 Ram: H_1
Opt. 6: Vetar Y-pravac Opt. 6: Vetar Y-pravac
S - 2-8 S - 2-9
S - 44
S - 17
S - 18
S - 19
S - 20
q = 0.16 q = 0.16 POS G 602
q=q
0.16
= 0.16 q = 0.16
q = 0.16
POS G 502
S - 2-7
POS G 402
S - 2-6
POS G 302
q
q==q
0.15
q =
= 0.15
0.150.15 q=
q = 0.15
0.15
q=
q = 0.15
0.15
S - 2-5
POS G 202
S - 2-4
POS G 102
q
q==q
0.12
q =
= 0.12
0.120.12 q
q== 0.12
q
q== 0.12
0.12 0.12
S - 2-2
q=q
0.09
= 0.09 q = 0.09
q = 0.09
S - 2-3
S - 2-1
q=G
POS 0.23
609 qPOS= 0.23
G 610-1
POS G 610-2
q = 0.23
q = 0.23
q = 0.23
q = 0.23
POS G 004-1
POS G 004-2
q = 0.11
q = 0.11
q = 0.11
q = 0.11
POS G - 103-1
POS G - 103-2
Ram: H_12
Sp=0.12
p=0.12
S - 5-8 S - 5-9
- 23
S - 29
S - 22
S - 26
POS G 611 POS G 612
p=0.11~0.12
p=0.11~0.12
S - 5-7
POS G 411 POS G 412
S - 5-6
POS G 311 POS G 312
S - 5-5
p=0.07~0.09 p=0.09~0.11
p=0.09~0.11
POS G 211 POS G 212
S - 5-4
POS G 112 POS G 113
p=0.07~0.09
S - 5-2
POS G 005
S - 5-3
POS G - 104
S - 5-1
p=0.17
p=0.12
S - 3-8 S - 3-9
S - 45
S - 50
S - 37
S - 25
S - 24
S - 31
p=0.16~0.17
p=0.11~0.12
p=0.16~0.17
S - 3-7
POS G 413 POS G 414
S - 3-6
POS G 313 POS G 314
S - 3-5
p=0.08~0.11 p=0.11~0.16
p=0.09~0.11
p=0.11~0.16
p=0.08~0.11
S - 3-3
p=0.12
p=0.17
S - 1-8 S - 1-9
S - 49
S - 40
S - 34
S - 43
S - 21
S-8
p=0.16~0.17
p=0.08~0.11 p=0.11~0.16
S - 1-5
p=0.08~0.11 p=0.11~0.16
p=0.09~0.11
POS G - 107-1
POS G - 107-2
POS G - 108
S - 1-1
p=0.17
p=0.17
p=0.17
S - 50
S - 49
POS G 620-1 POS G 620-2 POS G 620-3 q = 0.23
q =q0.23
= 0.23
p=0.16~0.17
p=0.16~0.17
p=0.16~0.17
POS G 420-1 POS G 420-2 POS G 420-3
p=0.08~0.11 p=0.11~0.16
p=0.08~0.11 p=0.11~0.16
p=0.08~0.11 p=0.11~0.16
POS G 220-1 POS G 220-2 POS G 220-3
Ram: K_6
Modalna analiza
POS G 620-1
b/d=25/60 POS G 620-2
b/d=25/60 POS G 620-3
POS G 609 POS G 610-1 POS G 610-2 b/d=25/ 60
1-4
b/d=25/60 b/d=25/60 b/d=25/60
0
G 62
25/6
POS G 608-1 POS G 608-2
b/d=
POS
b/d=25/60 b/d=25/60 POS G 607
POS G 618
b/d=20/40
PO 0.16
b/d=25/60
PO 0.1
SM
d=
6m 0
SM 6m
0.1 61
d=
608
609
1
b/d= 22-3
61
K6
d = MK
6m
6m
POS G 611
POS G 612
K6
0
POS G 613
b/d=25/60
b/d=25/60
K
MK
MK
b/d=25/60
25/6
POS G 615-2
M 18 m
13
G6
POS G 614
POS G 617
S
m
b/d=25/60
b/d=25/60
b/d=25/60
12
0.1
0.1
OS= 21-3
0.1 60 7
PO
S 0.
PO
POS
POS
0
P6OmS
=
d=
d=
2 /6
d
d = M5K
G6
POS
bP/d
POS G 606-1 POS G 606-2 POS G 606-3 POS G 606-4
622-2
b/d=20/60 b/d=20/60 b/d=20/60 b/d=20/60
0
25/6
POS G 605 412.07
SG
b/d=
b/d=25/60
b/d= 22-1 PO
POS G 603-1 POS G 603-2 POS G 603-3 POS G 604-1 POS G 604-2 POS G 604-3
b/d=25/60 b/d=25/60
POS b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60
POS G 615-1
b/dOS 21-2
MK
6 5
4
b/d=25/40
60
POS0.1 60
d= 6
/60
0
PO0S.1G6 6106
25/6
K
G6 m
d = =2M5K
P G6
m9 S M 6m
1
b/d=25/60 PO = 0.
POS
d 3
6m 2
60
0.1 60
POS G 602
1 K
d = MK
60 M 16 m b/d=25/60
K m S .
S
PO = 0
b/d= 21-1
M
PO
S .16
POS G 616
b/d=25/60
O 0 d
0
P =
2 5/6
G6
d
POS
Nivo: Tavan [18.00 m] POS G 601-1 POS G 601-2
b/d=25/60 b/d=25/60
Masa u tezistu nivoa 412.07 T. Polozaj mase (16.24,8.07)
Polozaj centra krutosti (14.54,5.53)
POS G 520-1
b/d=25/60 POS G 520-2
b/d=25/60 POS G 520-3
POS G 509 POS G 510-1 POS G 510-2 b/d=25/60
1-4
b/d=25/60 b/d=25/60 b/d=25/60
0
G 52
25/6
POS G 508-1 POS G 508-2
b/d=
POS
b/d=25/60 b/d=25/60 POS G 507
POS G 518
b/d=20/40
PO 0.16
PO 0.1 b/d=25/60
SM
d=
6m 8
SM 6m
0.1 50
d=
0.16 06
0.16 07
b/d= 22-3
50
K5
d = MK
K5
K5
m
K5
POS G 511
POS G 512
0
POS G 513
b/d=25/60
b/d=25/60
K
b/d=25/60
25/6
POS G 515-2
M 18 m
11
G5
POS G 514
POS G 517
S
SM
SM
m
b/d=25/60
b/d=25/60
b/d=25/60
10
OS= 21-3
S .
PO = 0
K0
P6OmS
PO
PO
d=
d=
2M5/6
d
G5
POS
bP/d
POS G 506-1 POS G 506-2 POS G 506-3 POS G 506-4
5 d
b/d=20/60 b/d=20/60 b/d=20/60 b/d=20/60
0
25/6
631.22
POS G 505
G
b/d=25/60
S
b/d= m22-1 PO
POS G 503-1 POS G 503-2 POS G 504-1 POS G 504-2 POS G 504-3
b/d=25/60 Pb/d=25/60
OS b/d=25/60 b/d=25/60 b/d=25/60
POS G 515-1
b/dOS 21-2
MK
POS0.1 503
b/d=25/40
d= 5
/60
0
PO0S.1G6 510 4
25/6
d = =2M5K
P G5
G6 5
m9
b/d=25/60
POS
2
6m 1
50
0.1 50
POS G 502
K
d = MK
M 16 m b/d=25/60
S .
S
PO = 0
1-1
PO
POS G 516
b/d=25/60
d
0
G 52
25/6
b /d=
POS
POS G 420-1
b/d=25/60 POS G 420-2
b/d=25/60 POS G 420-3
POS G 409 POS G 410-1 POS G 410-2 b/d=25/60
1-4
b/d=25/60
PO 0.1
SM
d=
6m 8
SM 6m
0.1 40
d=
0.16 0 6
0.16 0 7
9
b/d= 22-3
40
K4
d = MK
K4
K4
m
K4
POS G 411
POS G 412
0
POS G 413
b/d=25/60
b/d=25/60
K
b/d=25/60
25/6
POS G 415-2
M 18 m
11
G4
POS G 414
POS G 417
S
SM
SM
m
b/d=25/60
b/d=25/60
b/d=25/60
10
OS= 21-3
b/d= 22 -2 = 0.1 40 5
PO
S .
PO = 0
K0
P6OmS
PO
PO
d=
d=
2M5/6
d
G4
POS
bP/d
b/d=25/60
S
b/d= m22-1 PO
POS G 403-1 POS G 403-2 POS G 404-1 POS G 404-2 POS G 404-3
b/d=25/60 Pb/d=25/60
OS b/d=25/60 b/d=25/60 b/d=25/60
POS G 415-1
b/dOS 21-2
MK
POS0.1 40 3
b/d=25/40
d= 4
/60
PO0S.1G6 410 4
25/6
d = =2M5K
P G4
G6 4
m9
b/d=25/6
POS
0
2
6m 1
40
0.1 40
POS G 402
K
d = MK
M 16 m b/d=25/60
S .
S
PO = 0
1-1
PO
POS G 416
b/d=25/60
d
0
G 42
25/6
b/d=
POS
POS G 320-1
b/d=25/60 POS G 320-2
b/d=25/60 POS G 320-3
POS G 309 POS G 310-1 POS G 310-2 b/d=25/60
1-4
b/d=25/60 b/d=25/60 b/d=25/60
0
G 32
25/6
POS G 308-1 POS G 308-2
b/d=
POS
b/d=25/60 b/d=25/60 POS G 307
POS G 318
b/d=20/40
PO 0.16
b/d=25/60
PO 0.1
SM
d=
6m 8
SM 6m
0.1 30
d=
0.16 0 6
0.16 0 7
9
b/d= 22-3
30
K3
d = MK
K3
K3
m
K3
POS G 311
POS G 312
0
POS G 313
b/d=25/60
b/d=25/60
K
b/d=25/60
25/6
POS G 315-2
M 18 m
11
G3
POS G 314
POS G 317
S
SM
SM
m
b/d=25/60
b/d=25/60
b/d=25/60
10
OS= 21-3
b/d= 22 -2 = 0.1 30 5
PO
S .
PO = 0
K0
P6OmS
PO
PO
d=
d=
2M5/6
d
G3
POS
bP/d
POS G 306-1 POS G 306-2 POS G 306-3 POS G 306-4
3 d
b/d=20/60 b/d=20/60 b/d=20/60 b/d=20/60
0
25/6
POS G 305 634.63
G
b/d=25/60
S
b/d= m22-1 PO
POS G 303-1 POS G 303-2 POS G 304-1 POS G 304-2 POS G 304-3
b/d=25/60 Pb/d=25/60
OS b/d=25/60 b/d=25/60 b/d=25/60
POS G 315-1
b/dOS 21-2
MK
POS0.1 30 3
b/d=25/40
d= 3
/60
0
0.1G6 310 4
25/6
POS
d = =2M5K
P G3
G6 3
m9
b/d=25/6
POS
0
2
6m 1
30
0.1 30
POS G 302
K
d = MK
M 16 m b/d=25/60
S .
S
PO = 0
1-1
PO
POS G 316
b/d=25/60
d
0
G 32
25/6
b/d=
POS
Nivo: III sprat [9.00 m] POS G 301-1 POS G 301-2
b/d=25/60 b/d=25/60
Masa u tezistu nivoa 634.63 T. Polozaj mase (16.12,8.05)
Polozaj centra krutosti (14.30,5.76)
POS G 220-1
b/d=25/60 POS G 220-2
b/d=25/60 POS G 220-3
POS G 209 POS G 210-1 POS G 210-2 b/d=25/60
1-4
b/d=25/60 b/d=25/60 b/d=25/60
0
G 22
25/6
POS G 208-1 POS G 208-2
b/d=
POS
b/d=25/60 b/d=25/60 POS G 207
POS G 218
b/d=20/40
PO 0.16
PO 0.1 b/d=25/60
SM
d=
6m 8
SM 6m
0.1 20
d=
0.16 06
0.16 07
b/d= 22-3
20
K2
d = MK
K2
K2
m
K2
POS G 211
POS G 212
0
POS G 213
b/d=25/60
b/d=25/60
K
b/d=25/60
25/6
POS G 215-2
M 16 m
11
G2
POS G 214
POS G 217
S
SM
SM
m
b/d=25/60
b/d=25/60
b/d=25/60
10
OS= 21-3
S .
PO = 0
K0
P6OmS
PO
PO
d=
d=
2M5/6
d
G2
POS
bP/d
POS G 206-1 POS G 206-2 POS G 206-3 POS G 206-4
2 d
b/d=20/60 b/d=20/60 b/d=20/60 b/d=20/60
0
25/6
POS G 205 634.10
G
b/d=25/60
S
b/d= m22-1 PO
POS G 203-1 POS G 203-2 POS G 204-1 POS G 204-2 POS G 204-3
b/d=25/60 Pb/d=25/60
OS b/d=25/60 b/d=25/60 b/d=25/60
POS G 215-1
b/dOS 21-2
MK
POS0.1 203
b/d=25/40
d= 2
/60
0
PO0S.1G6 210 4
25/6
d = =2M5K
P G2
G6 2
m9
b/d=25/60
POS
2
6m 1
20
0.1 20
POS G 202
K
d = MK
M 16 m b/d=25/60
S .
S
PO = 0
1-1
PO
POS G 216
b/d=25/60
d
0
G 22
25/6
b /d=
POS
POS G 120-1
b/d=25/60 POS G 120-2
b/d=25/60 POS G 120-3
POS G 110 POS G 111-1 POS G 111-2 b/d=25/60
b/d=25/60 b/d=25/60 b/d=25/60
b/d=25/60
b /d= 21-3
PO 0.1
SM
d=
6m 8
0
SM 6m
0.1 10
d=
25/6
0.16 0 6
0.16 0 7
9
1
10
K1
d = MK
K1
K1
SG
m
K1
POS G 112
POS G 113
POS G 114
b/d=25/60
b/d=25/60
K
b/d=25/60
POS G 116-2
M 18 m
11
POS G 115
POS G 118
S
SM
SM
m
b/d=25/60
b/d=25/60
b/d=25/60
m PO
10
G 1d2= 0 K 10 5
PO
S 0.
POS G 107-1 POG 107-2
POS = POS G 107-3
PO
PO
d=
d=
b/d=20/60 d
b/d=20/60 b/d=20/60
1-2.1 6
SM
PO
POS G 106
25/6
b/d=20/60
b/d=
POS
b/d= m21-1
MK
POS0.1 10 3
b/d=25/40
d= 1
0
PO0S.1G6 110 4
25/6
d = MK
G6 1
m9
b/d=25/6
S
0
PO
2
6m 1
10
0.1 10
POS G 102
K
d = MK
M 16 m b/d=25/60
S .
S
PO = 0
PO
POS G 117
b/d=25/60
PO PO PO
SM S
1 01
2 d= K0
15 d = MK 0 S
d = MK
01 K 0
POS G .2 0 m-1 0.2 1
0m 4 0.2 01
K M 20 m 010 0m 3
M 0m S . POS G 010-2
S
PO = 0
.2 PO = 0 b/d=25/60
POS G 010-3
d d b/d=25/60
POS G 004-1 POS G 004-2 b/d=25/60
b/d=25/60 b/d=25/60
PO 0.20
PO 0.2
SM
d=
0m 7
0.2 00
SM 0m
d=
005
0.20 06
8
00
K0
d = MK
0
0m
m
POS G 005
POS G 006
K0
b/d=25/60
K
b/d=25/60
POS G 008-2
MK
MK
M 20 m
POS G 007
POS G 009
10
b/d=25/60
b/d=25/60
b/d=25/60
S
m
0.2
09
S
PO
POS 0.
PO G=003
POS
POS
d=
d=
d
b/d=20/60
744.56
POS G 008-1
MK
b/d=25/40
d= 0
0.20 0 4
m
00 3
0m 2
0m 1
0
0.2 00
d = MK 0
0m
MK
d = MK
0.2
0.2
S
POS
PO
PO
d=
Nivo: Prizemlje [0.00 m]
Masa u tezistu nivoa 744.56 T. Polozaj mase (15.29,8.99)
Polozaj centra krutosti (16.52,14.35)
PO PO
SM SM
11 d = K -11 d = K -1 POS
10 -1 0 4 1 MK
-1 K m POS G -.2109
0 m-1 0.2
0m 3 d= -1
K
M 20 m M 20 0.20 12
S S 0. b/d=25/60 POS G - 109-2 m
PO = 0
. PO d = POS G - 109-3
d b/d=25/60
POS G - 103-1 POS G - 103-2 b/d=25/60
b/d=25/60 b/d=25/60
PO = 0.2
PO = 0.2
SM 0m
0m 6
SM 0m
0.2 -10
07
d = K -10
d = K -10
K-
-1
POS G - 104
d = MK
POS G - 105
0m
K-
POS G - 107-2
b/d=25/60
b/d=25/60
K
POS G - 106
POS G - 108 M 20 m
109
0.20
b/d=25/60
b/d=25/60
b/d=25/60
108
S
SM
0.2
S .
PO
0
PO d =
POS
PO
608.05
b/d=25/60
SM b/d=25/60 b/d=25/60 b/d=25/60
b/d=25/40
d = K -103
0.20
m
0.20 10 2
0m 1
0.2 -10
m
-
MK
d = MK
S
POS
PO
d=
PO
d = S KP 805.32
0.6
0m
Izometrija (Top)
Forma oscilovanja: 1/3 [T=0.9340sec / f=1.07Hz]
Izometrija (Top)
Forma oscilovanja: 2/3 [T=0.8256sec / f=1.21Hz]
Izometrija (Top)
Forma oscilovanja: 3/3 [T=0.5364sec / f=1.86Hz]
Seizmicki proraun
Konstrukcija se moe smatrati praktino nepomerljivom ako su njeni elementi koji je ukruuju u
horizontalnom pravcu relativno simetrino postavljeni u osnovi objekta i ako njihova krutost na
savijanje zadovoljava sledea dva uslova.
H
Q 0, 2 + 0,10 n - za objekte sa n3 H
Q 0, 6 - za objekte sa n4
E I
b b E I
b b
H = 25,70 m
n=8
Eb = 3,15 107 kN / m2 za beton marke MB30
Q = 58867, 29 kN
H
Q = 25, 70
58867, 29
= 8, 741>0,60 - konstrukcija je pomerljiva
E I
b bx 508839,836
H
Q = 25, 70
58867, 29
= 16,58>0,60 - konstrukcija je pomerljiva
E I
b bx 141503,91
hi = k l
EI
h s
= , 0, 4
EI
l g
Faktor efektivne duine stuba iznosi:
1 + 0,15 ( a + b )
-Za pomerljive ramove k = min
2 + 0,3 min
Vitkost stuba:
Ib h
ib = ; hi = k l; = i
Ab ib
H tot - ukupna visina deformabilnog pomerljivog dela konstrukcije mereno od nivoa temelja ili nivoa
"ukljetenja" za uticaje seizmike ili vetra Htot
Eb I b - suma krutosti na savijanje u neisprskalom stanju svih vertikalnih elemenata za ukruenje
objekta u pravcu za koji se utvruje osetljivost na pomeranje
Q - suma svih vertikalnih eksploatacionih optereenja ukljuujui I deo koji prihvataju elementi za
ukruenje
hi - duina izvijanja stuba
k - slobodna, drugim elementima (grede,tavanice,..) nepoduprta duina stuba u posmatranoj ravni
deformacije
ib - faktor efektivne duine stuba koji odraava pomerljivosti krajeva I stepena ukljetenja krajeva stuba
na duinu izvijanja
I b , Ab - poluprenik inercije preseka ib
E b Ib - moment inercije i povrina poprenog preseka stuba bez uticaja armature i prslina
Stub 0-1
EI 0, 000716
2
h s 3, 05
= = = 0, 0783
EI 0, 0045 0, 0045
2,85 + 1, 02
l g
1 + 0,15 ( 0 + 0,0783) = 1,012
k = min k = 1,012
2 + 0,3 0,0783 = 2,023
li = 1, 012 3, 05 = 3, 09 m
3, 09
= = 42,82
0, 07216
Stub 1-2
EI 0, 000716
h
3, 05 2
= s
= = 0, 0783
EI 0, 0045 0, 0045
2,85 + 1, 02
l g
EI 0, 000716
h
3, 00 2
s
= = = 0, 0797
EI 0, 0045 0, 0045
2,85 + 1, 02
l g
1 + 0,15 ( 0,0783 + 0, 0797 ) = 1, 024
k = min k = 1, 024
2 + 0,3 0, 0797 = 2, 023
li = 1, 024 3, 00 = 3, 072 m
3, 072
= = 42, 27
0, 07216
Stub 8-9
EI 0, 000716 0, 000716
h
+
s 1, 60 3, 0
= = = 0,115
EI 0, 0045 0, 0045
2,85 + 1, 02
l g
Stub 0-1
EI 0, 00347
2
h s 3, 05
= = = 2, 670
EI 0, 0045
5, 28
l g
Stub 1-2
EI 0, 00347
h
2
s 3, 05
= = = 2, 670
EI 0, 0045
5, 28
l g
1 + 0,15 ( 2, 670 + 2, 670 ) = 1,801
k = min k = 1,801
2 + 0,3 2, 670 = 2,801
li = 1,801 3, 05 = 6,304 m
6, 304
= = 39, 64
0,159
EI 0, 00347
2
h s 3, 00
= = = 2, 655
EI 0, 0045
5, 28
l g
Stub 8-9
EI 0, 00347 0, 00347
+
h s 1, 6 3, 00
= = = 3, 902
EI 0, 0045
5, 28
l g
1 + 0,15 ( 2, 655 + 3,902 ) = 1,983
k = min k = 1,983
2 + 0,3 3,902 = 3,171
li = 1,983 1,6 = 3,173 m
3,173
= = 19, 96
0,159
Izvijanje stuba S3 oko ose 3 (globalana osa X) S3 Izvijanje stuba S3 oko ose 2 (globalana osa Y)
9 9
k=1,029 k=1,983
1,60
1,60
=31,60 =19,96
8 8
3,00
3,00
k=1,204 k=1,799
=42,27 =33,94
7 7
3,00
3,00
k=1,204 k=1,799
=42,27 =33,94
6 6
3,00
3,00
k=1,204 k=1,799
=42,27 =33,94
5 5
3,00
3,00
k=1,204 k=1,799
?=42,27 =33,94
4 4
3,00
3,00
k=1,204 k=1,799
=42,27 ?=33,94
3 3
3,00
3,00
k=1,204 k=1,799
=42,27 =33,94
2 2
3,05
3,05
k=1,129 k=1,801
=47,67 =39,64
1 1
3,05
3,05
k=1,012 k=1,400
=42,82 =26,86
0 0
Tabela 1: Vitkost suba za x pravac (za moment oko ose y tj. M2)
Ana Milanovi FG 201/06
146
Diplomski rad
Tabela 2: Vitkost suba za y pravac (za moment oko ose y tj. M3)
Provera stabilnosti na izvijanje nije potrebna za vitke elemente (stubove) koji ispunjavaju bar jedan od
sledeih uslova (vai i za pomerljive i za nepomerljive sisteme):
1. i 25
e1
2. 3,5 , i 75
d
e 3,5 i
3. 1 , i > 75
d 75
M1
i 50 25
M2
M1 i M2 su momenti na krajevima izolovanog vitkog elementa (stuba) po teoriji I reda i moraju se tako
izabrati da bude ispunjen uslov M 2 > M1 . M1 i M2 se uzimaju sa pravim algibarskim vrednostima.
Kod stubova koji ne ispunjavaju predhodne uslove mora da se izvri provera stabilnosti na
izvijanje.
Provera stabilnosti na izvijanje za stubove koji su u oblasti Srednje vitkosti 25 < i < 75 se vri
priblinom metodom Metoda dopunske ekscentrinosti koja priblino uvodi teoriju II reda.
Provera stabilnosti na izvijanje za stubove koji su u oblasti Velike vitkosti 75 i 140 mora
da se vri prema teoriji II reda.
M g = 2, 08 kNm N g = 563, 69 kN
M q = 2, 28 kNm N q = 858, 06 kN
e = 0
M g = 3, 57 kNm N g = 394,37 kN
M q = 6, 38 kNm N q = 607, 61 kN
e = 0
e = 0
e = 0
M g = 9, 05 kNm N g = 194,16 kN
M q = 15,58 kNm N q = 224, 06 kN
e = 0
e = 0
e = 0
e = 0
e = 0
e = 0
e = 0
e = 0
e = 0
e = 0
M g = 9, 37 kNm N g = 17, 65 kN
M q = 17,12 kNm N q = 7, 20 kN
e = 0
Proveru stabilnosti vitkog elementa na uticaj izvijanja za stub S3 radili smo samo za segmente stuba
koji su oblasti srednje vitkosti Metodom dopunske ekscentrinosti za x- pravac (za moment M2) i za
y-pravac (za moment M3).
Nu 1646,31
nu = = = 0,584
b d f b 0,55 0, 25 20500
Mu 81, 657
mu = = = 0,116
b d f b 0,55 0, 252 20500
2
1, 00
Aa = b d = 25 55 = 13, 75 cm 2
100 100
y-pravac
Iz Towera 6 je pomou anvelopa za sve kombinacije optereenja sa parcijalnim koeficijentima
sigurnosti ( optereenje ( GSN stub )19 38 ), uzeto Nu:
N u = 1646,31 kN
M u = N u e = 1646,31 0,126 = 207, 435 kNm
Nu 1646,31
nu = = = 0,584
b d f b 0, 25 0,55 20500
Mu 207, 435
mu = = = 0,134
b d f b 0, 25 0,552 20500
2
Nu 1238,38
nu = = = 0, 439
b d f b 0,55 0, 25 20500
Mu 90, 77
mu = = = 0,129
b d f b 0,55 0, 252 20500
2
fb
= 0,32 = = 0, 013%
v
Zavisno od i sledi da je:
i 47, 67
min
= 0, 40 0, 60% 0, 40 = 0, 553
50 50
min
= 0, 60%
Za stubove je minimalana aramatura:
min = (0,8 1, 0)% min = 1, 00%
y-pravac
Iz Towera 6 je pomou anvelopa za sve kombinacije optereenja sa parcijalnim koeficijentima
sigurnosti ( optereenje ( GSN stub )19 38 ), uzeto Nu:
N u = 1238,38 kN
M u = N u e = 1238,38 0, 066 = 81, 733 kNm
Nu 1238,38
nu = = = 0, 439
b d f b 0, 25 0,55 20500
Mu 81, 733
mu = = = 0, 0527
b d f b 0, 25 0,552 20500
2
Nu 1029, 63
nu = = = 0,365
b d f b 0,55 0, 25 20500
Mu 76, 29
mu = = = 0,108
b d f b 0,55 0, 252 20500
2
y-pravac
Iz Towera 6 je pomou anvelopa za sve kombinacije optereenja sa parcijalnim koeficijentima
sigurnosti ( optereenje ( GSN stub )19 38 ), uzeto Nu:
N u = 1029, 63 kN
M u = N u e = 1029, 63 0, 0741 = 76, 29 kNm
Nu 1029, 63
nu = = = 0,365
b d f b 0, 25 0,55 20500
Mu 76, 29
mu = = = 0, 049
b d fb 0, 25 0,552 20500
2
Nu 787,90
nu = = = 0, 280
b d f b 0,55 0, 25 20500
Mu 77, 45
mu = = = 0,109
b d f b 0,55 0, 252 20500
2
y-pravac
Iz Towera 6 je pomou anvelopa za sve kombinacije optereenja sa parcijalnim koeficijentima
sigurnosti ( optereenje ( GSN stub )19 38 ), uzeto Nu:
N u = 787, 90 kN
M u = N u e = 787,90 0, 092 = 72, 49 kNm
Nu 787,90
nu = = = 0, 280
b d f b 0, 25 0,55 20500
Mu 72, 49
mu = = = 0, 047
b d fb 0, 25 0,552 20500
2
Nu 550, 22
nu = = = 0,195
b d f b 0,55 0, 25 20500
Mu 58,32
mu = = = 0, 083
b d f b 0,55 0, 252 20500
2
N u = 550, 22 kN
M u = N u e = 550, 22 0,122 = 67,126 kNm
Nu 550, 22
nu = = = 0,195
b d f b 0, 25 0,55 20500
Mu 67,126
mu = = = 0, 0432
b d f b 0, 25 0,552 20500
2
Nu 334, 45
nu = = = 0,119
b d f b 0,55 0, 25 20500
Mu 60, 201
mu = = = 0, 085
b d fb 0,55 0, 252 20500
2
y-pravac
Iz Towera 6 je pomou anvelopa za sve kombinacije optereenja sa parcijalnim koeficijentima
sigurnosti ( optereenje ( GSN stub )19 38 ), uzeto Nu:
N u = 334, 45 kN
M u = N u e = 334, 45 0,162 = 54,180 kNm
Nu 334, 45
nu = = = 0,119
b d f b 0, 25 0,55 20500
Mu 54,180
mu = = = 0, 0349
b d f b 0, 25 0,552 20500
2
Nu 158,13
nu = = = 0, 056
b d f b 0,55 0, 25 20500
Mu 45,85
mu = = = 0, 065
b d fb 0,55 0, 252 20500
2
y-pravac
Iz Towera 6 je pomou anvelopa za sve kombinacije optereenja sa parcijalnim koeficijentima
sigurnosti ( optereenje ( GSN stub )19 38 ), uzeto Nu:
N u = 158,13 kN
M u = N u e = 158,13 0, 363 = 57, 40 kNm
Nu 158,13
nu = = = 0, 056
b d f b 0, 25 0,55 20500
Mu 57, 40
mu = = = 0, 0370
b d f b 0, 25 0,552 20500
2
Nu 18,13
nu = = = 0, 0064
b d f b 0,55 0, 25 20500
Mu 45,98
mu = = = 0, 065
b d fb 0,55 0, 252 20500
2
y-pravac
Iz Towera 6 je pomou anvelopa za sve kombinacije optereenja sa parcijalnim koeficijentima
sigurnosti ( optereenje ( GSN stub )19 38 ), uzeto Nu:
N u = 18,13 kN
M u = N u e = 18,13 2, = 45, 98 kNm
Nu 18,13
nu = = = 0, 0064
b d f b 0, 25 0,55 20500
Mu 45,98
mu = = = 0, 0297
b d f b 0, 25 0,552 20500
2
Za sve etee usvaja se minimalna armatura. Armatura dobijena pomou minimalnog procenta armiranja se
rasporeuje po obimu celog stuba.
Usvojeno: 8 B 16 ( Aa = 16, 08 cm 2 )
Tu
n (T ) = - napon smicanja usled transverzalne sile
b z
T 56,92
n (T ) = u = = 0, 051 kN / cm 2 = 0, 51 MPa
b z 25 0,9 49,50
M tu
n( Mt ) = - napon smicanja usled momenta torzije
2 Ab 0
d m = 55 2 3,5 = 48 cm - pretpostavljeno
d 48
0 = m = = 6, 0 cm - racunska debljina ekvivalentnog tankozidnog preseka
8 8
Ab = (55 2 3, 5) (25 2 3, 5) = 864 cm 2
O = (55 2 3,5) 2 + (25 2 3,5) 2 = 132 cm
M tu
n(M ) = = 0, 00 kN / cm2
t
2 Ab 0
Stubovi su dimenzionisani po teoriji I reda. Pri ovom postupku poterebno je u ulaznim podacima
globalnim za linijske elemente ekirati opciju pomerljiva konstrukcija, a u ulaznim podacima
lokalnim za linijske elemente ukljuiti uticaj izvijanja. Ovim postupkom se lako uvode uticaji
imperfekcije i nelinernosti materijala.
Nelinearan proraun
Velicina modela
Broj cvorova: 23180
Broj plocastih elemenata: 19369
Broj grednih elemenata: 2843
Broj granicnih elemenata: 18081
Broj osnovnih slucajeva optereenja: 10
Broj kombinacija optereenja: 28
Jedinice mera
Duzina: m [cm,mm]
Sila: kN
Temperatura: Celsius
Statiki proraun
Opt. 1: Sopstvena teina (g)
b/d=25/55
S - 3-9
-12.68
b/d=25/55
S - 3-8
-17.65
b/d=25/55
S - 3-7
-62.62
b/d=25/55
S - 3-6
-104.53
b/d=25/55
S - 3-5
-149.16
b/d=25/55
S - 3-4
-202.26
b/d=25/55
S - 3-3
-273.31
b/d=25/55
S - 3-2
-394.37
b/d=25/55
S - 3-1
-563.69
Ram: H_5
Uticaji u gredi: max N1= -3.51 / min N1= -563.69 kN
Opt. 1: Sopstvena teina (g)
b/d=25/55
0.02
S - 3-9
-5.50
10.79
b/d=25/55
S - 3-8
-10.91
10.85
b/d=25/55
S - 3-7
-10.72
10.10
b/d=25/55
S - 3-6
-9.87
9.05
b/d=25/55
S - 3-5
-8.69
7.51
b/d=25/55
S - 3-4
-7.02
5.50
b/d=25/55
S - 3-3
-4.86
3.57
b/d=25/55
S - 3-2
-2.86
-0.25
b/d=25/55
S - 3-1
2.08
Ram: H_5
Uticaji u gredi: max M2= 10.85 / min M2= -10.91 kNm
b/d=25/55
2.37
S - 3-9
-8.40
5.95
b/d=25/55
S - 3-8
-9.37
12.25
b/d=25/55
S - 3-7
-11.44
10.77
b/d=25/55
S - 3-6
-10.87
11.01
b/d=25/55
S - 3-5
-11.15
10.54
b/d=25/55
S - 3-4
-10.12
11.84
b/d=25/55
S - 3-3
-18.32
11.70
b/d=25/55
S - 3-2
-15.59
-20.60
b/d=25/55
S - 3-1
63.88
Ram: H_5
Uticaji u gredi: max M3= 63.88 / min M3= -20.60 kNm
Opt. 12: Q2
b/d=25/55
S - 3-9
-15.96
7.20
b/d=25/55
S - 3-8
-3.12
b/d=25/55
S - 3-7
-82.13
b/d=25/55
S - 3-6
-151.99
b/d=25/55
S - 3-5
-224.08
b/d=25/55
S - 3-4
-308.31
b/d=25/55
S - 3-3
-419.32
b/d=25/55
S - 3-2
-607.61
b/d=25/55
S - 3-1
-858.06
Ram: H_5
Uticaji u gredi: max N1= 7.20 / min N1= -858.06 kN
Opt. 12: Q2
b/d=25/55
0.02
S - 3-9
-8.70
17.92
b/d=25/55
S - 3-8
-18.26
18.37
b/d=25/55
S - 3-7
-18.20
17.25
b/d=25/55
S - 3-6
-16.89
15.58
b/d=25/55
S - 3-5
-15.00
13.11
b/d=25/55
S - 3-4
-12.32
9.79
b/d=25/55
S - 3-3
-8.72
6.38
b/d=25/55
S - 3-2
-5.22
b/d=25/55
S - 3-1
2.28
Ram: H_5
Uticaji u gredi: max M2= 18.37 / min M2= -18.26 kNm
Opt. 12: Q2
b/d=25/55
3.23
S - 3-9
-12.28
10.62
b/d=25/55
S - 3-8
-17.12
22.79
b/d=25/55
S - 3-7
-21.17
20.00
b/d=25/55
S - 3-6
-20.19
20.46
b/d=25/55
S - 3-5
-20.77
19.63
b/d=25/55
S - 3-4
-18.69
22.47
b/d=25/55
S - 3-3
-33.50
24.84
b/d=25/55
S - 3-2
-29.49
b/d=25/55
S - 3-1
93.32
Ram: H_5
Uticaji u gredi: max M3= 93.32 / min M3= -33.50 kNm
b/d=25/55
S - 3-9
4.85
-36.42
26.67
b/d=25/55
S - 3-8
-18.13
b/d=25/55
S - 3-7
-158.13
b/d=25/55
S - 3-6
-334.45
b/d=25/55
S - 3-5
-550.22
0.89
b/d=25/55
S - 3-4
-787.90
b/d=25/55
S - 3-3
-1029.63
b/d=25/55
S - 3-2
-1238.38
b/d=25/55
S - 3-1
-1646.31
Ram: H_5
Uticaji u gredi: max N1= 26.67 / min N1= -1646.31 kN
Opt. 43: [GSN-stub] 19-38
-7.29
b/d=25/55
S - 3-9
42.17
b/d=25/55
S - 3-8
32.51 -8.60
b/d=25/55
S - 3-7
-1.48
b/d=25/55
S - 3-6
-4.82
b/d=25/55
S - 3-5
40.46
b/d=25/55
S - 3-4
-3.72
b/d=25/55
S - 3-3
44.62
b/d=25/55
S - 3-2
34.57
b/d=25/55
S - 3-1
-76.09
Ram: H_5
Uticaji u gredi: max T2= 44.62 / min T2= -76.09 kN
-44.49
-32.97
-8.48
S - 3-1 S - 3-2 S - 3-3 S - 3-4 S - 3-5 S - 3-6 S - 3-7 S - 3-8 S - 3-9 S - 3-1 S - 3-2 S - 3-3 S - 3-4 S - 3-5 S - 3-6 S - 3-7 S - 3-8 S - 3-9
b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55
0.01
0.01
-2.09 3.51
3.80
16.94
18.98
21.98
22.47
25.20
183
Diplomski rad
Diplomski rad
b/d=25/55
S - 3-9
4.18
75.10
b/d=25/55
S - 3-8
-75.62 28.28
80.31
b/d=25/55
S - 3-7
-80.53
-36.51 81.31
b/d=25/55
S - 3-6
-81.18
-37.39 77.84
b/d=25/55
S - 3-5
-77.17
-33.39 67.45
b/d=25/55
S - 3-4
-66.03
-25.08 50.52
b/d=25/55
S - 3-3
-48.39
14.19
b/d=25/55
S - 3-2
-11.69
-3.57
b/d=25/55
S - 3-1
-1.23 7.14
Ram: H_5
Uticaji u gredi: max M2= 81.31 / min M2= -81.18 kNm
Opt. 43: [GSN-stub] 19-38
b/d=25/55
15.16
S - 3-9
-29.11
48.30
b/d=25/55
S - 3-8
-49.24 4.87
61.97
b/d=25/55
S - 3-7
-56.75
59.77
b/d=25/55
S - 3-6
-59.11
58.53
b/d=25/55
S - 3-5
-62.84
-0.17 51.18
b/d=25/55
S - 3-4
-59.57
45.90
b/d=25/55
S - 3-3
-87.96
48.17
b/d=25/55
S - 3-2
-57.28
b/d=25/55
S - 3-1
178.46
Ram: H_5
Uticaji u gredi: max M3= 178.46 / min M3= -87.96 kNm
Dimenzionisanje (beton)
Merodavno optereenje: 19-38
b/d=25/55
1 PBAB 87, MB 30, B 500B
S - 3-8 S - 3-9
0.72 0.73
2.32 2.35
S - 3-7
2.36 2.39
S - 3-6
2.33 2.37
S - 3-2
2.55 2.59
S - 3-1
4.46 4.53
Ram: H_5
Armatura u gredama: max Aa2/Aa1= 4.53 cm2
Merodavno optereenje: 19-38
b/d=25/55
1.60 1.59
b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55 b/d=25/55
5.05 5.02
5.15 5.12
S - 3-7
5.24 5.20
S - 3-6
5.18 5.15
S - 3-3 S - 3-4 S - 3-5
4.18 4.16
S - 3-2
5.65 5.62
S - 3-1
9.90 9.84
Ram: H_5
Armatura u gredama: max Aa3/Aa4= 9.90 cm2
Merodavno optereenje: 19-38
b/d=25/55
Ram: H_5
Armatura u gredama: max Aa,uz= 0.00 cm2
Usvojena armatura
Usvojena armatura
Usvojena armatura
187
Diplomski rad
Diplomski rad
Dimenzionisanje se vri runo i u programu Tower 6 za granine uticaje Mu, Nu i Tu, nakon
ega e biti uporeeni dobijeni rezultati. Ganini uticaji su preuzeti iz programa Tower 6
na osnovu anvelope svih kombinacija optereenja. Dimenzionisanje pomou programa bie
uraeno na svakoj etai. A runo dimenzionisanje e se uraditi samo u karakteristinim presecima.
Oba dimenzionisanja se rade prema graninom stanju nosuvosti. Paroraunava se aramatura Aa1 i
A a 2 grupie u krajevima platna na duini jedne desetine ukupne duine platna. Konstruktivna
vertikalana armatura se usvaja na osnovu minimalnog procenta armiranja. Horizontalna armatura
slui za prijem smicanja i usvaja se na osnovu transverzalne sile Tu. Minimalni procenti armiranja za
armaturu Aa1 i Aa2, koja je inae jednaka je 0,15 %, a za konstruktivnu vertikalnu armaturu je 0,15 %.
Za horizontalnu armaturu je 0,20 %.
Presek na etai -2
a1 17,8
= = 0, 05
d 365
Horizontalana armatura za prijem napona smicanja usled dejstva transverzalne sile (po dunom metru
AB platana)
Tu 2127,54
n = = = 0, 272 kN / cm 2
b z 25 0,9 347, 2
min0, 20
Aah ,min = b 100 =
25 100 = 5, 00 cm 2
100 100
(
Usvaja se B10 /10 koje imaju povrinu Aah = 7,90 cm2 )
Presek na etai 0
a1 17,8
= = 0, 05
d 365
Sa dijagrama interakcije oitano:
fb
= 0, 00 = = 0, 00
v
Poto je pomou dijagrama interakcije dobijeno da nije potrebna armatura, usvaja se minimalana
armatura.
0,15
Aa1 = Aa 2 = min b d = 25 365 = 13, 686 cm 2
100 100
(
Usvaja se 8B16 koje imaju povrinu Aa1 = 16, 08 cm2 )
Konstruktivna vertikalana armatura (po metru dunom AB platna):
0,15
Aav ,min = min b 100 = 25 100 = 3, 75 cm 2
100 100
(
Usvaja se B10 / 20 koje imaju povrinu Aav = 3,95 cm2 )
Horizontalana armatura za prijem napona smicanja usled dejstva transverzalne sile (po dunom metru
AB platana)
Tu 327, 25
n = = = 0, 042 kN / cm2
b z 25 0,9 347, 2
b 100 0, 42 25 100
Aah = = = 10,50 cm2
m v ( cos + sin ctg ) 2 50 1
min 0, 20
Aah ,min =
b 100 = 25 100 = 5, 00 cm 2
100 100
Usvaja se B10 /10 koje imaju povrinu ( Aah = 7,90 cm2 )
Presek na etai 1
a1 17,8
= = 0, 05
d 365
Sa dijagrama interakcije oitano:
fb
= 0, 00 = = 0, 00
v
Poto je pomou dijagrama interakcije dobijeno da nije potrebna armatura, usvaja se minimalana
armatura.
0,15
Aa1 = Aa 2 = min b d = 25 365 = 13, 686 cm 2
100 100
(
Usvaja se 8B16 koje imaju povrinu Aa1 = 16, 08 cm2 )
Konstruktivna vertikalana armatura (po metru dunom AB platna):
0,15
Aav ,min = min b 100 = 25 100 = 3, 75 cm 2
100 100
(
Usvaja se B10 / 20 koje imaju povrinu Aav = 3,95 cm2 )
Horizontalana armatura za prijem napona smicanja usled dejstva transverzalne sile (po dunom metru
AB platana)
Tu 1155,82
n = = = 0,148 kN / cm 2
b z 25 0,9 347, 2
min 0, 20
Aah ,min =
b 100 = 25 100 = 5, 00 cm 2
100 100
Usvaja se B8 /10 koje imaju povrinu ( Aah = 5, 00 cm2 )
Presek na etai 5
a1 17,8
= = 0, 05
d 365
Sa dijagrama interakcije oitano:
fb
= 0, 00 = = 0, 00
v
Poto je pomou dijagrama interakcije dobijeno da nije potrebna armatura, usvaja se minimalana
armatura.
0,15
Aa1 = Aa 2 = min b d = 25 365 = 13, 686 cm 2
100 100
(
Usvaja se 8B16 koje imaju povrinu Aa1 = 16, 08 cm2 )
Konstruktivna vertikalana armatura (po metru dunom AB platna):
0,15
Aav ,min = min b 100 = 25 100 = 3, 75 cm 2
100 100
(
Usvaja se B10 / 20 koje imaju povrinu Aav = 3,95 cm2 )
Horizontalana armatura za prijem napona smicanja usled dejstva transverzalne sile (po dunom metru
AB platana)
Tu 606, 76
n = = = 0,109 kN / cm2
b z 25 0,9 347, 2
min 0, 20
Aah ,min =
b 100 = 25 100 = 5, 00 cm 2
100 100
Usvaja se B8 /10 koje imaju povrinu ( Aav = 5, 00 cm2 )
Presek
Armatura Runo dimenzionisanje Dimenzionisanje u programu
(etaa)
13,69 cm2, 13,69 cm2,
Etaa -2 Aa1, Aa2
B816 ( Aa = 16, 08 cm 2 ) B816 ( Aa = 16,08 cm2 )
3,75 cm2, 1,88 cm2,
Aav
B10 / 20 ( Aa = 3,95 cm 2 ) B8 /15 ( Aa = 3,33 cm2 )
5,00 cm2, 6,41 cm2,
Presek (1-1) Aah
B10 /10 ( Aa = 7,90 cm 2 ) B10 /10 ( Aa = 7,90 cm 2 )
13,69 cm2, 13,69 cm2,
Etaa 0 Aa1, Aa2
B816 ( Aa = 16, 08 cm 2 ) B816 ( Aa = 16, 08cm 2 )
3,75 cm2, 1,88 cm2,
Aav
B10 / 20 ( Aa = 3,95 cm 2 ) B8 /15 ( Aa = 3,333 cm2 )
5,00 cm2, 2,50 cm2,
Presek (3-3) Aah
B10 /10 ( Aa = 7,90 cm2 ) B8 /15 ( Aa = 3,333 cm 2 )
13,69 cm2, 13,69 cm2,
Etaa 1 Aa1, Aa2
B816 ( Aa = 16, 08 cm 2 ) B816 ( Aa = 16, 08 cm 2 )
3,75 cm2, 1,88 cm2,
Aav
B10 / 20 ( Aa = 3,95 cm 2 ) B8 /15 ( Aa = 3,333 cm2 )
5,00 cm2, 3,48 cm2,
Presek (4-4) Aah
B8 /10 ( Aa = 5, 00 cm 2 ) B8 /10 ( Aa = 5, 0 cm 2 )
13,69 cm2, 13,69 cm2,
Etaa 5 Aa1, Aa2
B816 ( Aa = 16, 08 cm 2 ) B816 ( Aa = 16, 08 cm 2 )
3,75 cm2, 1,88 cm2,
Aav
B10 / 20 ( Aa = 3,95 cm 2 ) B8 /15 ( Aa = 3,333 cm2 )
5,00 cm2, 3,75 cm2,
Presek (8-8) Aah
B8 /10 ( Aa = 5, 00 cm 2 ) B8 /15 ( Aa = 3,333 cm 2 )
Nelinearan proraun
Velicina modela
Broj cvorova: 23180
Broj plocastih elemenata: 19369
Broj grednih elemenata: 2843
Broj granicnih elemenata: 18081
Broj osnovnih slucajeva optereenja: 10
Broj kombinacija optereenja: 28
Jedinice mera
Duzina: m [cm,mm]
Sila: kN
Temperatura: Celsius
Dimenzionisanje (beton)
5m
7- 8
6- m
ZN .2 5
ZN
0 .2
0
=
d=
8 d 8
5m
7- 7
6- m
ZN .2 5
ZN
0 .2
0
=
d=
7 d 7
5m
7- 6
6- m
ZN .2 5
ZN
0 .2
0
d=
d=
6 6
5m
7- 5
6- m
ZN .2 5
ZN
0 .2
0
=
d=
5 d 5
5m
7- 4
6- m
ZN .2 5
ZN
0 .2
0
d=
d=
4 4
5m
7- 3
6- m
ZN .2 5
ZN
0 .2
0
=
d=
3 d 3
2 2
5m
7-2
5- m 6- m
ZN .25 ZN .2 5
ZN
0 .2
0 0
= =
d=
d 2 d 2
1 1
5m
7-1
5- m 6- m
ZN .25 ZN .2 5
ZN
0 .2
0 0
= d=
d=
d 1 1
Ram: H_5
Dispozicija preseka
Ram: H_5
2.5
Aav/Aah
Aa1
Aa2
2.5 2.5
Aav/Aah Aav/Aah
Aa1
Aa2
2.5
Aav/Aah
2.5
Aa1 = 0.00 cm2 (min:13.69) (usv:816) Aa1 = 0.00 cm2 (min:13.69) (usv:816)
Aa2 = 0.00 cm2 (min:13.69) (usv:816) Aa2 = 0.00 cm2 (min:13.69) (usv:816)
Aav = 0.00 cm2/m (min:1.88) (usv:8/15) Aav = 0.00 cm2/m (min:1.88) (usv:8/15)
Aah = 7.39 cm2/m (min:2.50) (usv:10/10) Aah = 6.36 cm2/m (min:2.50) (usv:10/10)
2.5
2.5
2.5 2.5
Aav/Aah Aav/Aah
Aa1
Aa2
Aa1
Aa2
2.5 2.5
Aav/Aah Aav/Aah
2.5
2.5
b/d = 25/365 cm Ab = 9125 cm2 b/d = 25/365 cm Ab = 9125 cm2
Aa1 = 21.66 cm2 (min:13.69) (usv:816) Aa1 = 14.32 cm2 (min:13.69) (usv:816)
Aa2 = 21.66 cm2 (min:13.69) (usv:816) Aa2 = 14.32 cm2 (min:13.69) (usv:816)
Aav = 0.00 cm2/m (min:1.88) (usv:8/15) Aav = 0.00 cm2/m (min:1.88) (usv:8/15)
Aah = 1.27 cm2/m (min:2.50) (usv:8/15) Aah = 3.65 cm2/m (min:2.50) (usv:8/10)
2.5
2.5 2.5
Aav/Aah Aav/Aah
Aa1
Aa2
Aa1
Aa2
2.5 2.5
Aav/Aah Aav/Aah
2.5
Aa1 = 7.72 cm2 (min:13.69) (usv:816) Aa1 = 3.70 cm2 (min:13.69) (usv:816)
Aa2 = 7.72 cm2 (min:13.69) (usv:816) Aa2 = 3.70 cm2 (min:13.69) (usv:816)
Aav = 0.00 cm2/m (min:1.88) (usv:8/15) Aav = 0.00 cm2/m (min:1.88) (usv:8/15)
Aah = 3.90 cm2/m (min:2.50) (usv:8/10) Aah = 3.37 cm2/m (min:2.50) (usv:8/10)
2.5
2.5
2.5 2.5
Aav/Aah Aav/Aah
Aa1
Aa2
Aa1
Aa2
2.5 2.5
Aav/Aah Aav/Aah
2.5
2.5
b/d = 25/365 cm Ab = 9125 cm2 b/d = 25/365 cm Ab = 9125 cm2
Aa1 = 1.94 cm2 (min:13.69) (usv:816) Aa1 = 1.56 cm2 (min:13.69) (usv:816)
Aa2 = 1.94 cm2 (min:13.69) (usv:816) Aa2 = 1.56 cm2 (min:13.69) (usv:816)
Aav = 0.00 cm2/m (min:1.88) (usv:8/15) Aav = 0.00 cm2/m (min:1.88) (usv:8/15)
Aah = 2.44 cm2/m (min:2.50) (usv:8/15) Aah = 1.80 cm2/m (min:2.50) (usv:8/15)
POS G 120
b/d=25/60
POS G 120 POS-Z-32
POS-Z-9 POS-Z-9
b/d=290/25
POS-Z-16
b/d=245/25
POS-Z-20
6 POS G 120
b/d=205/25
POS-Z-22
b/d=145/25
POS-Z-10
b/d=S-Z-29
25
b/d=145/25
b/d=25/60
POS-Z-15
155/
POS G 110 POS G 111 POS G 111
b/d=145/25
PO
POS G 108
POS G 109 POS G 109
b/d=S-Z-28
25
b/d=25/60
b/d=25/60 b/d=25/60
100/
POS G 116
b/d=25/60
PO
25/60
POS G 118
b/d= 121
b/d=25/60
b/d=25/60
b/d=25/60
01
POS G 112
POS G 113
K1
b/d=25/60
G
POS G 114
0.1 105
b/d=25/60
6m
SM 6m
POS
d = MK
POS G 115
PO = 0.1
b/d=S-Z-27
25
S
d
PO
193/
PO
POS G 107 POS G 107 POS G 107
b/d=20/60 b/d=20/60 b/d=20/60
4 4
25/60
POS G 106
b/d= 121
b/d=20/60
b/d=85/25
6 m 01
POS-S-5
POS G 105
G
0.1 K 2
b/d=25/60
POS
3' 3'
d= M
POS G 104 POS G 104
S
b/d=25/55
PO
b/d=25/60 b/d=25/60 b/d=25/60 b/d=25/60 b/d=150/25
b/d=S-S-3
5
POS-Z-11
b/d=92/25
65/2
3 3
PO
POS-Z-6 POS-G-103-3
b/d=385/25 b/d=25/60
b/d=160/25
POS-Z-14
b/d=250/25
POS-Z-21
b/d=285/20
POS-Z-17
b/d=25/40
6 m 03
t-3
POS G 116
0.1 K 1
S-S 5 m
25/60
b/d= 121
PO= 0.1
d= SM
d
PO
POS G 119
G
b/d =25/6
POS
0
25
b/d= -25
POS-Z-4
154/
b/d=385/25
-Z
2
POS
b/d=190/25
POS-Z-18
POS-S-2 2
b/d=25/50 POS G 202
b/d=25/60
b/d=357/25
POS-Z-19
b/d=25/60
POS G 117
POS-Z-3
b/d=220/20
b/d= S-Z-25
25
b/d=25/60
100/
POS G 101 POS G 101
POS-S-1
b/d=25/60 b/d=25/60
PO
1
POS-Z-2
b/d=108/25
A B C D D D E
E F G
6 6
6 m -3
m -4
0,1 101
16 01
0, 1
d= MK
d= M K
S
S
PO
PO
703
2
6 m 1-
1-
0,1 10
10
d = MK
K m
M ,16
S
S 0
PO
PO d=
598
1 1
E E E
POS MK 101-1
Optereenje:
a) Stalno
1. keramika na lepku g1 = 0, 01 23 = 0, 23 kN / m 2
2. cementna kouljica g 2 = 0, 05 22 = 1,10 kN / m 2
3. zvuna i toplotna
g 3 = 0,10 kN / m 2
izolacija
4. AB ploa g 4 = 0,16 25 = 4, 00 kN / m 2
5. malter g 5 = 0, 02 19, 0 = 0, 38 kN / m 2
5
g = gi = 5,81 kN / m2
i =1
gusv = 6, 0 kN / m2
b) Povremeno
1. korisno optereenje p = 1, 5 kN / m 2
ly 598
= = 1, 2
lx 485
Uticaji:
G = g Lx Ly = 6, 0 4,85 5,98 = 174, 018 kN
P = p Lx Ly = 1,5 4,85 5,98 = 43, 045 kN
Dimenzionisanje:
MB 30 f B = 20,5 MPa
B500 B v = 500 MPa
b / d / h = 100 /16 /14, 4
Aa = ?
Mu xp = 11,387 kNm
Mu xo = 25, 688 kNm
Mu yp = 8,185 kNm
Mu oy = 22, 067 kNm
a) Muxp
h0 14, 4
k= = = 6,110 iz tabele usvajamo k=5,998
Mu 11,387 102
fb b 20,5 101 100
za k=5,998 imamo: a = 10 0 00 ; b = 0,850 0 00 ; = 2,858%
f 20,5
= b = 2,858 = 0,117 % > 0,100% usvajamo = 0,117 %
v 500
0,117
Aa = bh = 100 14, 4 = 1, 684 cm 2
100 100
Za glavnu armaturu usvaja se B8/15 ( A = 0,5 cm 2 ) koje imaju povrinu A = 3,334 cm 2 / m
Za dodatnu armaturu:
Aap = 0, 2 1, 684 = 0,337 cm 2 / m
Usvojeno B8/ 40 koje imaju povrinu A = 1, 25 cm 2 / m
b) Muxo
h0 14, 4
k= = = 4, 068 iz tabele usvajamo k=4,039
Mu 25, 688 102
fb b 20,5 101 100
za k=4,039 imamo: a = 10 0 00 ; b = 1, 375 0 00 ; = 6, 406%
f 20, 5
= b = 6, 406 = 0, 263% > 0,100% usvajamo = 0,263 %
v 500
0, 263
Aa = bh = 100 14, 4 = 3, 787 cm 2
100 100
( )
Za glavnu armaturu usvaja se B8/10 A = 0,5 cm 2 koje imaju povrinu A = 5, 00 cm 2 / m
Za dodatnu armaturu:
Aap = 0, 2 3, 787 = 0, 757 cm 2 / m
Usvojeno B8/ 40 koje imaju povrinu A = 1, 25 cm 2 / m
c) Mu yp
h0 14, 4
k= = = 7, 207 iz tabele usvajamo k=7,112
Mu 8,185 102
fb b 20,5 101 100
za k=7,112 imamo: a = 10 0 00 ; b = 0, 700 0 00 ; = 2, 023%
f 20,5
= b = 2, 023 = 0, 0830 % > 0,100% usvajamo = 0,0830 %
v 500
0, 083
Aa = b h = 100 14, 4 = 1,195 cm 2
100 100
Za glavnu armaturu usvaja se B8/15 ( A = 0,5 cm 2 ) koje imaju povrinu A = 3,334 cm 2 / m
Za dodatnu armaturu:
Aap = 0, 2 1,195 = 0, 239 cm 2 / m
Usvojeno B8/ 40 koje imaju povrinu A = 1, 665 cm 2 / m
d) Muxo
h0 14, 4
k= = = 4,389 iz tabele usvajamo k=4,352
Mu 22, 067 102
fb b 20,5 101 100
za k=4,352 imamo: a = 10 0 00 ; b = 1, 250 0 00 ; = 5, 498%
f 20,5
= b = 5, 498 = 0, 225 % > 0,100% usvajamo = 0,225 %
v 500
0, 225
Aa = b h = 100 14, 4 = 3, 24 cm 2
100 100
( )
Za glavnu armaturu usvaja se B8/15 A = 0,5 cm 2 koje imaju povrinu A = 3,334 cm 2 / m
Za dodatnu armaturu:
Aap = 0, 2 3, 24 = 0, 648 cm 2 / m
Usvojeno B8/ 40 koje imaju povrinu A = 1, 665 cm 2 / m
POS MK 101-2
Optereenje:
a) Stalno
g usv = 6, 0 kN / m 2
b) Povremeno
2. korisno optereenje p = 1, 5 kN / m 2
ly 604
= = 1,0
lx 598
Uticaji:
G = g Lx Ly = 6, 0 5,98 6, 04 = 206, 715 kN
P = p Lx Ly = 1,5 5,98 6, 04 = 54,179 kN
Mu xp = 11,387 kNm
Mu xo = 25, 688 kNm
Mu yp = 8,185 kNm
Mu oy = 22, 067 kNm
a) Mu xp ; Mu yp
h0 14, 4
k= = = 5,919 iz tabele usvajamo k=5,849
Mu 12,133 102
fb b 20,5 101 100
za k=5,849 imamo: a = 10 0 00 ; b = 0,875 0 00 ; = 3, 007%
f 20,5
= b = 3, 007 = 0,123% > 0,100% usvajamo = 0,123 %
v 500
0,123
Aa = b h = 100 14, 4 = 1, 771 cm 2
100 100
Za glavnu armaturu usvaja se B8/15 ( A = 0,5 cm 2 ) koje imaju povrinu A = 3,334 cm 2 / m
Za dodatnu armaturu:
Aap = 0, 2 1, 771 = 0,354 cm 2 / m
Usvojeno B8/ 40 koje imaju povrinu A = 1, 665 cm 2 / m
a) Mu xo ; Mu oy
h0 14, 4
k= = = 3,821 iz tabele usvajamo k=3,782
Mu 29,121 102
fb b 20,5 101 100
za k=3,782 imamo: a = 10 0 00 ; b = 1, 500 0 00 ; = 7, 337%
f 20, 5
= b = 7, 337 = 0,301% > 0,100% usvajamo = 0,301 %
v 500
0,301
Aa = bh = 100 14, 4 = 4,334 cm 2
100 100
( )
Za glavnu armaturu usvaja se B8/10 A = 0,5 cm 2 koje imaju povrinu A = 5,00 cm2 / m
Za dodatnu armaturu:
Aap = 0, 2 4,334 = 0,867 cm 2 / m
Usvojeno B8/ 40 koje imaju povrinu A = 1,665 cm2 / m
POS MK 101-3
Optereenje:
a) Stalno
g usv = 6, 0 kN / m 2
b) Povremeno
3. korisno optereenje p = 1,5 kN / m2
ly 703
= = 1,5
lx 485
Uticaji:
G = g Lx Ly = 6, 0 4,85 7, 03 = 204,573 kN
P = p Lx Ly = 1,5 4,85 7, 03 = 51,143 kN
a) Muxp
h0 14, 4
k= = = 6,368 iz tabele usvajamo k=6,322
Mu 10, 484 102
fb b 20,5 101 100
za k=6,322 imamo: a = 10 0 00 ; b = 0,800 0 00 ; = 2, 568%
f 20, 5
= b = 2, 568 = 0,105% > 0,100% usvajamo = 0,105 %
v 500
0,105
Aa = b h = 100 14, 4 = 1, 512 cm 2
100 100
Za glavnu armaturu usvaja se B8/15 ( A = 0,5 cm 2 ) koje imaju povrinu A = 3,334 cm2 / m
Za dodatnu armaturu:
Aap = 0, 2 1,512 = 0,302 cm2 / m
Usvojeno B8/ 40 koje imaju povrinu A = 1,665 cm2 / m
b) Muxo
h0 14, 4
k= = = 5,165 iz tabele usvajamo k=5,115
Mu 15,934 102
fb b 20,5 101 100
za k=5,115 imamo: a = 10 0 00 ; b = 1, 025 0 00 ; = 3, 951%
f 20, 5
= b = 3,951 = 0,162 % > 0,100% usvajamo = 0,162 %
v 500
0,162
Aa = bh = 100 14, 4 = 2, 332 cm 2
100 100
( )
Za glavnu armaturu usvaja se B8/15 A = 0,5 cm 2 koje imaju povrinu A = 3,334 cm2 / m
Za dodatnu armaturu:
Aap = 0, 2 2,332 = 0, 466 cm 2 / m
Usvojeno B8/ 40 koje imaju povrinu A = 1, 665 cm 2 / m
c) Muyp
h0 14, 4
k= = = 10, 070 iz tabele usvajamo k=9,651
Mu 4,192 102
fb b 20, 5 10 1 100
za k=9,651 imamo: a = 10 0 00 ; b = 0, 500 0 00 ; = 1, 091%
f 20,5
= b = 1, 091 = 0, 0447 % < 0,100% usvajamo = 0,100 %
v 500
0,100
Aa = bh = 100 14, 4 = 1, 440 cm 2
100 100
( )
Za glavnu armaturu usvaja se B8/15 A = 0,5 cm 2 koje imaju povrinu A = 3,334 cm2 / m
Za dodatnu armaturu:
Aap = 0, 2 1, 440 = 0, 288 cm2 / m
Usvojeno B8/ 40 koje imaju povrinu A = 1, 665 cm 2 / m
d) Muoy
h0 14, 4
k= = = 5,165 iz tabele usvajamo k=5,115
Mu 15, 934 102
fb b 20, 5 101 100
za k=5,115 imamo: a = 10 0 00 ; b = 1, 025 0 00 ; = 3, 951%
f 20,5
= b = 3,951 = 0,162 % >0,100% usvajamo = 0,162 %
v 500
0,162
Aa = bh = 100 14, 4 = 2, 330 cm 2
100 100
( )
Za glavnu armaturu usvaja se B8/15 A = 0,5 cm 2 koje imaju povrinu A = 3,334 cm2 / m
Za dodatnu armaturu:
Aap = 0, 2 2,330 = 0, 466 cm 2 / m
Usvojeno B8/ 40 koje imaju povrinu A = 1, 665 cm 2 / m
POS MK 101-4
Optereenje:
a) Stalno
gusv = 6, 0 kN / m 2
b) Povremeno
4. korisno optereenje p = 1,5 kN / m 2
ly 703
= = 1, 2
lx 604
Uticaji:
G = g Lx L y = 6, 0 6, 04 7, 03 = 254, 767 kN
P = p Lx L y = 1, 5 6, 04 7, 03 = 63, 692 kN
a) Muxp
h0 14, 4
k= = = 5, 043 iz tabele usvajamo k=5,014
Mu 16, 712 102
fb b 20, 5 10 1 100
za k=5,014 imamo: a = 10 0 00 ; b = 1, 050 0 00 ; = 4,116%
f 20,5
= b = 4,166 = 0,171% > 0,100% usvajamo = 0,171 %
v 500
0,171
Aa = b h = 100 14, 4 = 2, 462 cm 2
100 100
( )
Za glavnu armaturu usvaja se B8/10 A = 0,5 cm 2 koje imaju povrinu A = 5,00 cm2 / m
Za dodatnu armaturu:
Aap = 0, 2 2, 462 = 0, 492 cm 2 / m
Usvojeno B8/ 40 koje imaju povrinu A = 1, 665 cm 2 / m
b) Muxo
h0 14, 4
k= = = 3,386 iz tabele usvajamo k=3,385
Mu 37, 084 102
fb b 20, 5 10 1 100
za k=3,385 imamo: a = 10 0 00 ; b = 1,175 0 00 ; = 9, 231%
f 20,5
= b = 9, 231 = 0,378% > 0,100% usvajamo = 0,378 %
v 500
0, 378
Aa = bh = 100 14, 4 = 5, 443 cm 2
100 100
( )
Za glavnu armaturu usvaja se B10 /10 A = 0, 79 cm 2 koje imaju povrinu A = 7,79 cm2 / m
Za dodatnu armaturu:
Aap = 0, 2 5, 443 = 1, 086 cm 2 / m
Usvojeno B8/ 40 koje imaju povrinu A = 1, 665 cm 2 / m
c) Muyp
h0 14, 4
k= = = 5,949 iz tabele usvajamo k=5,849
Mu 12, 013 10 2
fb b 20, 5 10 1 100
za k=5,849 imamo: a = 10 0 00 ; b = 0,875 0 00 ; = 3, 007%
f 20,5
= b = 3, 007 = 0, 213% > 0,100% usvajamo = 0,213 %
v 500
0, 213
Aa = bh = 100 14, 4 = 3, 067 cm 2
100 100
( )
Za glavnu armaturu usvaja se B8/10 A = 0,5 cm 2 koje imaju povrinu A = 5,000 cm2 / m
Za dodatnu armaturu:
Aap = 0, 2 3, 067 = 0, 613 cm 2 / m
Usvojeno B8/ 40 koje imaju povrinu A = 1, 665 cm 2 / m
d) Muoy
h0 14, 4
k= = = 3, 623 iz tabele usvajamo k=3,607
Mu 32,380 10 2
fb b 20, 5 101 100
za k=3,607 imamo: a = 10 0 00 ; b = 1, 600 0 00 ; = 8, 092%
f 20,5
= b = 8, 092 = 0,332 % > 0,100% usvajamo = 0,332 %
v 500
0, 332
Aa = bh = 100 14, 4 = 4, 781 cm 2
100 100
( )
Za glavnu armaturu usvaja se B10 /15 A = 0, 79 cm 2 koje imaju povrinu A = 5, 26 cm2 / m
Za dodatnu armaturu:
Aap = 0, 2 4, 781 = 0,956 cm 2 / m
Usvojeno B8/ 40 koje imaju povrinu A = 1, 665 cm 2 / m
ak = 1,7 1 1 2 l ps
Ea
a
500
- napon u armaturi: a = v = = 277, 778MPa i
1,8
Mu 16, 712 102
a = usv = = 34,809 kN cm2 = 348, 09MPa
Aa z 3,334 0,9 16
Mp
- napon u zategnutoj armaturi nakon pojave prsline u betonu: ap =
0,9 h0 Aa
b d 2
Mp = f bzs
6
0,4
fbzs = 0,6 + 4 f bz > 1
d
fbzs - vrstoa betona pri zatezanju savijanjem
fbz - vrstoa betona pri aksijalnom zatezanju
fbz = 0,7 fbzm ( za MB30; fbzm = 2,4MPa ) (lan 51, tab. 7)
fbz = 0,7 2, 4 = 1,68 MPa (lan 51)
0, 4
fbzs = 0,6 + 1,68 = 2,07 MPa > 1
4
0,16
100 162
Mp = 2, 07 103 104 = 883, 20 kNcm = 8,832kNm
6
8,832 102
ap = = 20, 440 kN cm 2 = 204, 40MPa
0,9 14, 4 3,334
- 1 = 1, 0 - koeficijent koji uvodi stepen prijanjana i zavisi od vrste armature
- 2 = 0,5 - koeficijent koji uvodi reoloke osobine betona u roku vremena
- Ea = 2,1 105 MPa
a
2
ak = 1,7 1 1 2 ap l ps
Ea
a
348, 09 204, 40
2
ak = 1,7 1 1 2 l ps
Ea
a
500
- napon u armaturi: a = v = = 277, 778MPa i
1,8
ak = 1,7 1 1 2 l ps
Ea
a
166.85 136, 29
2
Optereenje:
g = g 1, 0 m = 6, 00 kN / m
p = p 1,0 m = 1,50 kN / m
Dimenzionisanje (B500B)
ho 14, 4
k= = = 4,158
Mu 24, 59 10 2
fB b 20, 5 10 1 100
iz tabele usvajamo k = 4,157 pa imamo a = 10 lom po armaturi b = 1, 325 = 6, 039
fB 20,5
= = 6, 039 = 0, 248 > 0,10 % usvajam = 0, 248
v 500
0, 248
Aa = b h = 100 14, 4 = 3, 571 cm2
100 100
Za glavnu armaturu usvajamo B 8 /10 koje imaju povrinu A = 5, 00 cm 2
( 0, 2 0,3) Aausv
Aa p = max M pod 0,3 Aa = 0,3 5, 0 = 1,50 cm 2
min
b d
100
max Mg = 2, 24 kNm
max Mp = 1, 06 kNm
ho 14, 4
k= = = 8, 798
Mu 4, 592 102
fB b 20, 5 101 100
iz tabele usvajamo k = 8, 491 pa imamo a = 10 lom po armaturi b = 0, 575 = 1, 413
fB 20,5
= = 1, 413 = 0, 058 < 0,10 % usvajam = 0,100
v 500
0,100
Aa = b h = 100 14, 4 = 1, 44 cm2
100 100
Za glavnu armaturu usvajamo B 8 /15 koje imaju povrinu A = 3, 334 cm 2
( 0, 2 0,3) Aausv
Aa p = max M pod 0,3 Aa = 0,3 3,334 = 1, 0 cm 2
min
b d
100
Za podeonu armaturu usvajamo B 6 /15 koje imaju povrinu A = 1, 87 cm 2
Aa p 100 1,86 100
Kontrola: = = = 0,129 % > min Aa p = 0, 085 %
bh 100 14, 4
b) Presek nad osloncem 1 i 3 i 4
ho 14, 4
k= = = 3,957
Mu 27,142 10 2
fB b 20,5 101 100
iz tabele usvajamo k = 3,931 pa imamo a = 10 lom po armaturi b = 1, 425 = 6, 776
fB 20,5
= = 6, 776 = 0, 278 > 0,10 % usvajam = 0, 278
v 500
0, 278
Aa = b h = 100 14, 4 = 4, 00 cm 2
100 100
Za glavnu armaturu usvajamo B 10 /10 koje imaju povrinu A = 7, 9 cm 2
( 0, 2 0,3) Aausv
Aa p = max M pod 0,3 Aa = 0,3 7,90 = 2,37 cm 2
min
b d
100
Za podeonu armaturu usvajamo B 8 /15 koje imaju povrinu A = 3, 335 cm 2
Aa p 100 3, 335 100
Kontrola: = = = 0, 232 % > min Aa p = 0, 085 %
bh 100 14, 4
b) Presek u osloncem 2
max Mg = 1, 60 kNm
max Mp = 1,14 kNm
ho 14, 4
k= = = 9, 600
Mu 3, 92 10 2
fB b 20, 5 101 100
iz tabele usvajamo k = 8,842 pa imamo a = 10 lom po armaturi b = 0, 475 = 1,302
fB 20,5
= = 1,302 = 0, 0534 < 0,10 % usvajam = 0,100
v 500
0,100
Aa = b h = 100 14, 4 = 1, 44 cm 2
100 100
Za glavnu armaturu usvajamo B 8 /15 koje imaju povrinu A = 3, 334 cm 2
( 0, 2 0,3) Aausv
Aa p = max M pod 0,3 Aa = 0,3 3,334 = 1, 0 cm 2
min
b d
100
Za podeonu armaturu usvajamo B 6 /15 koje imaju povrinu A = 1, 87 cm 2
Aa p 100 1,86 100
Kontrola: = = = 0,129 % > min Aa p = 0, 085 %
bh 100 14, 4
0,8
ao = 5 = 5 = 4, 6
2 2
k1 = 0, 4 ( za B500B )
k2 = 0,125 ( za trougaoni oblik dijagrama u betonu kod savijanja )
0,8
l ps = 2 ( a0 + 0,1 e ) + k1 k2 = 2 ( 4, 6 + 0,110,0 ) + 0, 4 0,125 = 15, 282 cm
z 0,980 102
-Sraunavanje karakteristine irine prslina
a ap
2
ak = 1,7 1 1 2 l ps
Ea
a
500
- napon u armaturi: a = v = = 277, 778MPa i
1,8
Mu 24,59 102
a = = = 34,153 kN cm2 = 341,53MPa
Aa z 5, 00 0,9 16
usv
Mp
- napon u zategnutoj armaturi nakon pojave prsline u betonu: ap =
0,9 h0 Aa
b d 2
Mp = f bzs
6
0,4
fbzs = 0,6 + 4 f bz > 1
d
fbzs - vrstoa betona pri zatezanju savijanjem
fbz - vrstoa betona pri aksijalnom zatezanju
fbz = 0,7 fbzm ( za MB30; fbzm = 2,4MPa ) (lan 51, tab. 7)
fbz = 0,7 2, 4 = 1,68 MPa (lan 51)
0, 4
fbzs = 0,6 + 1,68 = 2,07 MPa > 1
4
0,16
100 162
Mp = 2, 07 103 104 = 883, 20 kNcm = 8,832kNm
6
8,832 102
ap = = 13, 629 kN cm2 = 136, 29MPa
0,9 14, 4 5, 00
- 1 = 1, 0 - koeficijent koji uvodi stepen prijanjana i zavisi od vrste armature
- 2 = 0,5 - koeficijent koji uvodi reoloke osobine betona u roku vremena
- Ea = 2,1 105 MPa
a ap
2
ak = 1,7 1 1 2 l ps
Ea
a
341,53 136, 29
2
ak = 1,7 1 1 2 l ps
Ea
a
500
- napon u armaturi: a = v = = 277, 778MPa i
1,8
Mu 5, 492 102
a = usv = = 7, 628 kN cm2 = 76, 28MPa
Aa z 5, 00 0,9 16
Mp
- napon u zategnutoj armaturi nakon pojave prsline u betonu: ap =
0,9 h0 Aa
bd2
Mp = fbzs
6
0,4
fbzs = 0,6 + 4 f bz > 1
d
fbzs - vrstoa betona pri zatezanju savijanjem
fbz - vrstoa betona pri aksijalnom zatezanju
fbz = 0,7 fbzm ( za MB30; fbzm = 2,4MPa ) (lan 51, tab. 7)
fbz = 0,7 2, 4 = 1,68 MPa (lan 51)
0, 4
fbzs = 0,6 + 1,68 = 2,07 MPa > 1
4
0,16
100 162
Mp = 2, 07 103 104 = 883, 20 kNcm = 8,832 kNm
6
8,832 102
ap = = 13, 629 kN cm2 = 136, 29MPa
0,9 14, 4 5, 00
- 1 = 1, 0 - koeficijent koji uvodi stepen prijanjana i zavisi od vrste armature
- 2 = 0,5 - koeficijent koji uvodi reoloke osobine betona u roku vremena
- Ea = 2,1 105 MPa
a ap
2
ak = 1,7 1 1 2 l ps
Ea
a
76, 28 136, 29
2
Aa usv 7,90
z = 100 = 100 = 1,316% - koeficijent armiranja zategnute povrine betona
Abz 600
- Kontrola prema lanu 114 pravilnika:
z ( z ) > 1,316 % > 0,833% nije potreban je proraun prslina
K p au
Proraun prslina nije potreban, ali emo ga raunati radi uporeivanja rezultata sa progamom
Tower 6.
ak = 1,7 1 1 2 l ps
Ea
a
500
- napon u armaturi: a = v = = 277, 778MPa i
1,8
Mu 27, 412 102
a = = = 24, 096 kN cm2 = 240,96MPa
Aa usv z 7,90 0,9 16
Mp
- napon u zategnutoj armaturi nakon pojave prsline u betonu: ap =
0,9 h0 Aa
b d2
Mp = f bzs
6
0,4
fbzs = 0,6 + 4 f bz > 1
d
fbzs - vrstoa betona pri zatezanju savijanjem
fbz - vrstoa betona pri aksijalnom zatezanju
fbz = 0,7 fbzm ( za MB30; fbzm = 2,4MPa ) (lan 51, tab. 7)
fbz = 0,7 2, 4 = 1,68 MPa (lan 51)
0, 4
fbzs = 0,6 + 1,68 = 2,07 MPa > 1
4
0,16
100 16 2
Mp = 2, 07 103 104 = 883, 20 kNcm = 8,832 kNm
6
8,832 102
ap = = 8, 626 kN cm2 = 82, 26MPa
0,9 14, 4 7,9
- 1 = 1, 0 - koeficijent koji uvodi stepen prijanjana i zavisi od vrste armature
ak = 1,7 1 1 2 l ps
Ea
a
240,96 82, 26
2
a ap
2
ak = 1,7 1 1 2 l ps
Ea
a
500
- napon u armaturi: a = v = = 277, 778MPa i
1,8
Mu 4, 612 102
a = = = 6, 406 kN cm2 = 64, 06MPa
Aa usv z 5, 00 0,9 16
Mp
- napon u zategnutoj armaturi nakon pojave prsline u betonu: ap =
0,9 h0 Aa
b d2
Mp = f bzs
6
0,4
fbzs = 0,6 + 4 f bz > 1
d
fbzs - vrstoa betona pri zatezanju savijanjem
fbz - vrstoa betona pri aksijalnom zatezanju
fbz = 0,7 fbzm ( za MB30; fbzm = 2,4MPa ) (lan 51, tab. 7)
fbz = 0,7 2, 4 = 1,68 MPa (lan 51)
0, 4
fbzs = 0,6 + 1,68 = 2,07 MPa > 1
4
0,16
100 16 2
Mp = 2, 07 103 104 = 883, 20 kNcm = 8,832 kNm
6
8,832 102
ap = = 13, 630 kN cm 2 = 136,30MPa
0,9 14, 4 5, 0
- 1 = 1, 0 - koeficijent koji uvodi stepen prijanjana i zavisi od vrste armature
- 2 = 0,5 - koeficijent koji uvodi reoloke osobine betona u roku vremena
- Ea = 2,1 105 MPa
a ap
2
ak = 1,7 1 1 2 l ps
Ea
a
64, 06 136,30
2
1
3
6
E
E
E
E
B B B B
Donja zona
Donja zona
B 8/ B 8/1 B 8/ B 8/1
8/1 10 ( 8/1 5 ( 8/1 15( 8/1 5 (
5 ( a= 5 ( a=0 5 ( a= 5 ( a=0
a= 0 a= ) a= )
90 a = 0) 90
90 ) ) 90 )
) )
Glavna armatura
Glavna armatura
E
E
F
E
G
E
1
3
6
G
4.8.1.3. Rekapitulacija za POS MK 101
1
3
6
226
1
3
6
1
3
6
E
E
E
E
B B B B
B 8/ B 8/4 B 8/ B 8/4
8/4 0( a
POS MK 101-1; POS MK 101-2; POS MK 101-3; POS MK 101-4
8/4 40 ( 8/ 4 0 ( a
0 ( =0 8/4 30 (
0 ( a=
a = 0 a = ) 0 ( a= 0( =
90 a = 0 )
90 ) ) a= 0 90
) 90 ) )
)
E
E
F
Dodatna armatura
Dodatna armatura
B
B 8/
B 8 /4 4 0 B
B 8 0 ( ( a= B 8/
8/ /40 a= 0 B 8/ 40
40 ( a 90 ) B 8 40 ( a
( a =0 ) 8/ /40 ( a =0
=9 ) 40 ( a =9 )
0
) ( a =0 0
)
Sve ploe u ovoj poziciji su krstasto armirane.Usvojena armatura za sva etri dela ploe je:
= 9 )
0
)
E
G
1
3
6
E
G
1
3
6
Diplomski rad
Diplomski rad
POS-Z-9 POS-Z-9
b/d=290/25
POS-Z-16
b/d=95/25 b/d=175/25
b/d=245/25
POS-Z-20
b/d=145/25
POS-Z-10
b/d=145/25
POS-Z-15
b/d=145/25
POS-Z-12
01
K1
SM 6m
P O = 0 .1
d
b/d=85/25
POS-S-4
b/d=25/55
POS-S-3
POS-Z-11
b/d=92/25
POS-Z-6
b/d=385/25
Statiki sistem
Ovaj deo ine ploe oslonjene u jednom pravcu. Usvojena armatura je:
oslonac 1, 3 i 4 oslonac 2
B10 /10 B8/15
( A = 7, 90 cm2 / m ') ( A = 3, 334 cm2 / m ')
podeona podeona
armatura B8/15 armatura B6 /15
( A = 2,50 cm2 / m ') ( A = 1,87 cm2 / m ')
Aa = 6,53 cm2
d
M au = M u + Nu a1 = Mu = 39,14 kNm
2
h 0,135
k= = = 3, 089 jednostruko armiranje
Mu 39,14
fb b 20, 5 103 1, 0
iz tabele usvajamo k = 3, 074 pa imamo a = 10 lom po armaturi b = 2, 025 = 11, 296
fB 20,5
= = 11, 296 = 0, 463 > 0,10 % usvajam = 0, 463
v 500
Glavna armatura u gornjoj zoni:
0, 463
Aa = b h =
100 13, 5 = 6, 251 cm 2
100 100
Vrednost proraunate glavne armature iz programa Tower 6 za isti presek:
Aa = 7,37 cm2
Aa = 4,37cm2
Aa = 6,14 cm2
Tipska meuspratna konstrukcija e u oba pravca, i u donjoj i u gornjoj zoni, biti armirana
glavnom armaturom. Pri usvajanju armature prvo se usvaja, i u gornjoj i u donjoj zoni, minimalna
potrebna armatura u oba pravca. Minimalna potrebna armatura za ploe kad se primenjuje rebrasta
armatura je min = 0,10% . Zatim se na osnovu podataka dobijenih u programu Tower 6 usvaja
dodatna armatura u obe zone za oba pravca (ova armatura se usvaja samo u delovima ploe gde je
potrebna sa prepustima za duinu sidrenja armature). Takoe pri usvajanju armature bie potovan
minimalan i maksimalan razmak izmeu ipki glavne armature koji je definisan za povrinske nosae
(ploe) pravilnikom BAB87 i iznosi:
2d 50 cm
emin 4 cm, emax = min = = 20 cm
20 cm 20 cm
Proraun karakteristine irine prsline ak (t ) koja treba da bude manja od granine (maksimalno
dozvoljene) irine prsline au e se izvriti u programu Tower 6 za celu plou, a runo samo za jedan
presek. A nakon toga e se uporediti dobijeni rezultati.
Maksimalna dozvoljena irina prsline au za ovu plou, koja se nalazi u slabo agresivnoj sredini i
koja je optereena stalnim optereenjem i povremenim (kratkotrajno i dugotrajno promenjivim), prema
lanu 113 pravilnika BAB87 je 0,4 mm.
Kao to se iz predhodno navedenog ve moe zakljuiti potrebno je prema lanu 111 pravilnika
BAB87 da bude zadovoljen sledei uslov:
ak (t ) au
ak (t ) au karakteristina irina prslina
au granina irina prslina
z ( %)
K p au
Aa 7,50
z ( %) = 100 = 100 = 0, 750%
Abz 1000
- prenik ipke ili ako su ipke grupisane u svenju prenik amenjujueg profila
1, 63 4
= = 1, 441
3,14
1, 441
1, 441 > = 0,120
30 0, 4
Uslov iz lana 114 pravilnika BAB87 je ispunjen pa sledi da nije potrebno proraunati karakteristinu
irinu prsline ak . Radi uporeivanja dobijenih rezultata sa programom Tower 6 ipak e biti izvren
proraun irine prsline .
ak = 1,7 1 1 2 l ps
Ea
a
- 1 = 1, 0 - koeficijent koji uvodi stepen prijanjana i zavisi od vrste armature
- 2 = 0,5 - koeficijent koji uvodi reoloke osobine betona u roku vremena
z = 0,9 13,5 = 12,15 cm
M q = M g + M p = 20,30 kNm = 2030 kNcm
v 50
1,8 1,8 27, 780 kN / cm
2
a = min = min = 2
M
q 2060 ( 7, 50 12,15 ) 22, 606 kN / cm
( Aa1 z )
MI 883, 20
ap = = = 9, 692 kN cm2
Aa1 z 7,50 12,15
22, 606 9, 692
2
Poreenje dobijenih rezultata e biti prikazano tabelarno. Pri dimenzionisanju ove tipske meuspratne
konstrukcije nije dolo do bitnih odstupanja u rezultatima dobijenih runo i u programu. Moe se
zakljuiti da je dobijena skoro ista povrina potrebne armature.
Tabela 4: Poreenje rezultata dimenzionisanja po teoriji graninog stanja nosivosti tipske meuspratne
konstrukcije
Tabela 5: Poreenje rezultata dimenzionisanja po teoriji graninog stanja prslina tipske meuspratne
konstrukcije
Statiki proraun
Opt. 42: [GSN-ploca-grede] 19-24 Mx [kNm/m]
0.00
4.75
9.49
14.24
18.99
23.74
28.48
33.23
PO 0.1 6
PO 0 .1
SM
d=
6m 8
SM 6m
0 .1 1 0
d=
06
07
9
10
K1
d = MK
K1
K1
6m
6m
K1
K m
11
M
18
S
m
SM
SM
10
0 .1
0 .1
S
PO
6m 5
PO = 0
0
d = MK 1
PO
PO
d=
d=
d
0 .1
S
PO
POS
MK
6m 3
0 .1 1 0
d= 1
0 .1 6 04
d = MK
m
S
PO
33.23
30.88 2
6m 1
10
0 .1 1 0
K m
d = MK
M
S 0.16
S
PO =
PO
d
PO 0 .1
SM
d=
6m 8
SM 6m
0 .1 1 0
d=
06
07
9
10
K1
d = MK
K1
K1
6m
6m
K1
K m
11
M
18
S
m
SM
SM
10
0 .1
0 .1
S
PO
.
6m 5
PO = 0
0
d = MK 1
PO
PO
d=
d=
d
0 .1
S
PO
29.21
POS
MK
6m 3
0 .1 1 0
d= 1
0 .1 6 04
d = MK
m
S
PO
2
6m 1
10
0 .1 1 0
K m
d = MK
M
S 0.16
S
O
PO
P =
d
-62.58
PO 0.1 6
PO 0 .1
SM
d=
6m 8
SM 6m
0 .1 1 0
d=
06
07
9
10
K1
d = MK
K1
K1
6m
6m
K1
K m
11
M
18
S
m
SM
SM
10
0 .1
0 .1
S
PO
0.
6m 5
PO
0
d = MK 1
=
PO
PO
d=
d=
d
0 .1
S
PO
-66.56
POS
MK
6m 3
0 .1 1 0
d= 1
0 .1 6 04
d = MK
m -71.79
S
PO
2
6m 1
10
0 .1 1 0
K
d = MK
M 6m
S .1
S
PO = 0
PO
d
PO 0 .1
SM
d=
6m 8
SM 6m
0 .1 1 0
d=
06
07
9
10
K1
d = MK
K1
K1
6m
6m
K1
K m
11
M 8
S
m
SM
SM
10
0 .1
0 .1
S 1
PO
0.
6m 5
PO =
0
d = MK 1
PO
PO
d=
d=
d
0 .1
S
PO
-88.75
POS
MK
6m 3
0 .1 1 0
d= 1
0 .1 6 04
d = MK
m
S
PO
2
6m 1
10
0 .1 1 0
K
d = MK
M m
S .16
S
PO = 0
PO
PO 0.1 6
PO 0 .1
SM
d=
6m 8
SM 6m
0 .1 1 0
d=
06
07
9
10
K1
d = MK
K1
K1
6m
6m
K1
K m
11
M
18
S
m
SM
SM
10
0 .1
0 .1
S
PO
0.
6m 5
PO
0
d = MK 1
=
PO
PO
d=
d=
d
0 .1
S
PO
POS
MK
6m 3
0 .1 1 0
d= 1
0 .1 6 04
d = MK
m
S
PO
33.23
30.88 2
6m 1
10
0 .1 1 0
K
d = MK
M m
S 1. 6
S
Sr(b=1.00) PO = 0
PO
d
30.49
32.75
Nivo: I sprat [3.00 m]
Uticaji u ploci: max Mx= 33.23 / min Mx= 0.00 kNm/m
Opt. 42: [GSN-ploca-grede] 19-24 Mx [kNm/m]
-71.79
-61.53
-51.28
-41.02
-30.77
-20.51
-10.26
0.00
-62.58
PO 0.1 6
PO 0 .1
SM
d=
6m 8
SM 6m
0 .1 1 0
d=
06
07
9
10
K1
d = MK
K1
K1
6m
6m
K1
K m
11
M 8
S
m
SM
SM
10
0 .1
0 .1
S 1
PO
0.
6m 5
PO =
0
d = MK 1
PO
PO
d=
d=
d
0 .1
S
PO
-66.56
POS
-39.14
MK
6m 3
0 .1 1 0
d= 1
0 .1 6 04
d = MK
m -71.79
S
PO
-14.38
2
6m 1
10
0 .1 1 0
K
d = MK
M 6m
S .1
S
Sr(b=1.00) PO = 0
PO
PO 0.1 6
PO 0 .1
21.64
SM
d=
6m 8
SM 6m
0 .1 1 0
d=
06
07
9
10
K1
d = MK
K1
K1
6m
6m
K1
K
M 8m
11
S
m
SM
SM
10
0 .1
0 .1
S .1
PO
6m 5
PO = 0
0
d = MK 1
PO
PO
d=
d=
d
0 .1
S
13.14
PO
29.21
POS
MK
6m 3
0 .1 1 0
d= 1
0 .1 6 04
d = MK
m
S
PO
2
6m 1
10
0 .1 1 0
22.69
K
d = MK
M m
S 1. 6
S
PO = 0
PO
d
Sr(b=1.00)
Nivo: I sprat [3.00 m]
Uticaji u ploci: max My= 29.21 / min My= 0.00 kNm/m
Opt. 42: [GSN-ploca-grede] 19-24 My [kNm/m]
-88.75
-76.07
-63.39
-50.71
-38.04
-25.36
-12.68
0.00
PO 0.1 6
PO 0 .1
SM
d=
6m 8
SM 6m
0 .1 1 0
d=
06
07
9
10
K1
d = MK
K1
K1
6m
6m
K1
K m
11
M 8
S
m
SM
SM
10
0 .1
0 .1
S 1
PO
0.
6m 5
PO =
0
d = MK 1
PO
PO
d=
d=
d
0 .1
S
PO
-88.75
-35.06
POS
MK
6m 3
0 .1 1 0
d= 1
0 .1 6 04
d = MK
m
S
PO
2
6m 1
10
0 .1 1 0
K
d = MK
M m
S .16
S
PO = 0
PO
-3.61
Sr(b=1.00)
-38.60
10.44 16.59
12.82
PO 0.1 6
10.31
PO 0 .1
SM
d=
6m 8
SM 6m
0 .1 1 0
d=
06
07
9
10
K1
d = MK
K1
K1
6m
6m
K1
K m
11
M
18
S
m
SM
SM
10
0 .1
0 .1
S
PO
0.
6m 5
PO
0
d = MK 1
=
PO
PO
d=
d=
d
0 .1
S
PO
-41.21
11.66
POS
MK
6m 3
0 .1 1 0
d= 1
0 .1 6 04
d = MK
m -44.26
S
PO
20.60
19.09 2
6m 1
10
0 .1 1 0
K
d = MK
M 6m
S .1
S
PO = 0
PO
d
14.02
13.89
PO 0.1 6
PO 0 .1
SM
d=
6m 8
SM 6m
0 .1 1 0
d=
06
07
12.49 14.88
13.82 9
10
K1
d = MK
K1
K1
6m
6m
10.40
K1
K m
11
M 8
S
m
SM
SM
10
0 .1
0 .1
S 1
PO
0.
6m 5
9.69
PO =
0
d = MK 1
PO
d=
d=
d
0 .1
S
PO
12.40
-54.34 14.24
17.85
POS
MK
6m 3
0 .1 1 0
d= 1
0 .1 6 04 11.12
d = MK
m 14.68
S
PO
13.40
2
6m 1
10
0 .1 1 0
K
d = MK
M m
10.22 S 0.1 6
S
PO =
PO
Dimenzionisanje (beton)
Merodavno opterecenje: 19-24 Aa - d.zona - Pravac 1 [cm2/m]
1PBAB 87, MB 30, B 500B, a=2.50 cm 0.00
2.80 (6/15)
3.33 (8/15)
5.00 (8/10)
5.27 (10/15)
6.53 (12/15)
6.53
6.04
3.66
3.64
3.57 4.22
3.53
3.40
3.91
4.36
4.56
3.52
-11.75
-11.44
-16.98
-15.95
)
0
= 0)
0(
8 5 (=
0)
/ 3 (=9
8 5(=
/ 15
8
8
( 0 )
(=
/1
30 )
/ 15
)
)
/
/1
(= 0 )
0
)
/ 15 (=
8 =0 )
/ 30
8/ 5 (=0
8/ 5 (=0
(= 0 )
=9 0
=9 0
=9
( 0
0)
8 / 15
8
15 =9
0)
15(
15(
9
8/ 5(
8
(= 0 )
1
)
) /1
8/
8/
9 0
9 0
=
=9 0 ) 8
(=
8 15 (
8/ 30 ( / 30
8
/ 15
/
8
)
9 0
(=
/ 30
8
8 )
0
8 (/=15 (0 )
/5 =
/ 1 15(=9 0
8/ 8 15 ( =90 )
1 / )
8
8 15 30 0 ) )
8/ 5 (=0
= 00))
8/0(8/ =59(=0
)
15 ( )
/ 2 (=(9=
90
=9 0
)
3 1
0(
8/ 8/
)
0 )
= 0 )
/ 1 (= )
=0 )
(= 0)
)
8 8/ 15=9 0
8 15 (=
)
( 90
90
=
90
15 (=
8 / 15 (
8/
(
5(
/ 15
/20
/
8
8
/ 20
8
-5.27 (10/15)
0(
= 0 )
-5.00 (8/10)
0
)
9
-3.33 (8/15)
)
20 ( 0))
-2.80 (6/15)
)
=0
=9=0
=9 0
-0.00
20 (
0 (
=90)
( =)0)
82/02(
=0 )
(=9 0
8/
= 90 )
0)
= 90 )
)
8/
8/
0 )
8/ 10 (
= 0 )
= 90 )
= 0 )
8/ 10
8/10 (
10/1 0(=0
10/1 0(=9
=
8 0 (=
8/ 10
8 0(=
0(
/ 20
10 /1 0(
8
12 /1 0(
12 /1 0(
12 /1 0(
( 0 )
/2
/ 20
)
12 /1 0(
/1
)
)
)
/2
0 )
(= 0 )
0
)
/ 20 (=
10
8/ 0 (=0
8/ 0 (=0
(= 0 )
= 0
=9 0
=9 0
=9
0)
0)
8 / 20
0 ( =9
)
=0
9
0)
8/30 (=0)
2
8/30(=
20(
20(
8/
8
(
8 20 (=0 )
(= )
2
/ 20
)
10 (
=0
8/
8/
9 0
8
8 10 (
8/
/ 20
/
8/
)
=0
(
10
)
=0 )
2/
( 90 =0 ) =0 )
1
) 20 = 8/ 20 ( 8/ 15 ( 8/3
90 )0) = 90
=( 8/ 0( /1 0(=090 ) =9 0 ) 0 (=
0(30 = 0( /1 14/2 ) 8/ 15 ( 0) 0 )
/18/
81/ 0 10 /190 ) 4 8 0(= 8/10(=
20 ( /10( = 1 = 90 ) =9 0 )
= 0 )
8/ 10=0 14 /1 0( 8/ 10 (
)
20 ( )
/ 2 ()=
90
=9 0
)
8 / =200
1 = 0
)
0(
(8
10
0(
)
2/
)
2 /1
90
= 0 )
= 0 )
= 0 )
=0 )
10 /1 0( )
=9 0 )
)
(=
/ 2 (=
( 90
90
=90
20 (=
8 8/ 20
/ 30
8/
10 /1 0(
0(
8/ 30 (
/ 20
8/ 30 (
8
8
)
0 )
= 90
0(
2 /1 (=
1 0
2 /1
1
PO 0.1 6
PO 0 .1
SM
d=
6m 8
SM 6m
0 .1 1 0
d=
06
07
9
10
K1
d = MK
K1
K1
6m
6m
K1
K m
11
M
18
S
m
SM
SM
10
0 .1
0 .1
S
PO
0.
6m 5
PO
0
d = MK 1
=
PO
PO
d=
d=
d
0 .1
S
PO
POS
MK
6m 3
0 .1 1 0
d= 1
0 .1 6 04
d = MK
m
S
PO
2
6m 1
10
0 .1 1 0
K
d = MK
M m
S 1. 6
S
PO = 0
PO
d
PO 0 .1
SM
d=
6m 8
SM 6m
0 .1 1 0
d=
06
07
9
10
K1
d = MK
K1
K1
6m
6m
K1
K m
11
M 8
S
m
SM
SM
10
0 .1
0 .1
S 1
PO
0.
6m 5
PO =
0
d = MK 1
PO
PO
d=
d=
d
0 .1
S
PO
POS
MK
6m 3
0 .1 1 0
d= 1
0 .1 6 04
d = MK
m
S
PO
2
6m 1
10
0 .1 1 0
K
d = MK
M m
S .16
S
PO = 0
PO
ipke - specifikacija
oblik i mere Vrsta lg n lgn
ozn.
[cm] armature [m] [kom] [m]
10
1 a B500B 8 *6.94 1 x 32 222.12
a = 654 - 694 da = 1.3
10
10
a
2 B500B 8 *7.97 1 x 28 223.15
a = 715, 720, 724, 729, 733, 738, 742, 747, 752, 756, 761, 765, 770, 775,
779, 784, 788, 793, 798, 802, 807, 811, 816, 821, 825, 830, 835, 839
10
10
3 a B500B 8 *6.91 1 x 17 117.48
a = 633 - 709 da = 4.7
10
10
4 a B500B 8 *5.58 1 x 39 217.67
a = 451 - 626 da = 4.6
10
10
a
a = 463, 464, 465, 465, 466, 467, 468, 469, 470, 470, 471, 472, 473, 474,
6 B500B 8 *5.05 1 x 45 227.16
475, 476, 477, 478, 479, 480, 481, 482, 483, 484, 485, 487, 488, 489,
490, 491, 493, 494, 495, 497, 498, 499, 501, 502, 503, 505, 506, 508,
509, 511, 512
10
10
a
7 B500B 8 *1.85 1 x 28 51.87
a = 195, 193, 191, 189, 186, 184, 182, 180, 177, 175, 173, 171, 169, 166,
164, 162, 160, 157, 155, 153, 151, 149, 146, 144, 142, 140, 137, 135
10
10
10
10
10
10
10
10
10
10
10
10
ipke - specifikacija
oblik i mere Vrsta lg n lgn
ozn.
[cm] armature [m] [kom] [m]
10
10
20 B500B 8 3.75 7 26.25
355
10
10
21 B500B 8 6.40 64 409.60
620
10
10
22 B500B 8 3.60 7 25.20
340
10
10
23 B500B 8 2.90 7 20.30
270
10
10
24 B500B 8 3.00 58 174.00
280
10
10
26 B500B 8 2.00 21 42.00
180
10
10
27 B500B 8 4.50 12 54.00
430
10
10
26
40
15
10
10
30
30 30 B500B 10 1.20 435 522.00
15
26
10
10
10
10
10
10
10
10
10
10
10
10
ipke - specifikacija
oblik i mere Vrsta lg n lgn
ozn.
[cm] armature [m] [kom] [m]
10
10
19 B500B 8 3.25 6 19.50
305
10
10
20 B500B 8 3.75 6 22.50
355
10
10
23 B500B 8 2.90 6 17.40
270
10
10
26 B500B 8 6.00 42 252.00
580
10
10
29 B500B 8 5.00 66 330.00
480
10
10
30 B500B 8 4.50 4 18.00
430
10
10
31 B500B 8 7.00 78 546.00
680
10
10
10
a
34 a = 710, 717, 723, 729, 735, 741, 747, 753, 759, 766, 772, 778, 784, 790, B500B 8 *8.35 1 x 35 292.12
796, 802, 808, 815, 821, 827, 833, 839, 845, 851, 857, 864, 870, 876,
882, 888, 894, 901, 907, 913, 919
15
15
ipke - rekapitulacija
lgn Jedinina teina Teina
[mm] [m] [kg/m'] [kg]
B500B
8 8428.84 0.41 3413.68
10 522.00 0.63 330.43
12 16.50 0.91 15.03
Ukupno 3 759.14
A B C D D' D'' E F G H I
POS G 120
b/d=25/60
POS G 120 POS-Z-32
POS-Z-9 POS-Z-9
b/d=290/25
POS-Z-16
b/d=245/25
POS-Z-20
6 POS G 120 6
b/d=205/25
POS-Z-22
b/d=145/25
POS-Z-10
b/d=S-Z-29
25
b/d=145/25
b/d=25/60
POS-Z-15
155/
POS G 110 POS G 111 POS G 111 7
b/d=145/25
PO
POS G 108
POS G 109 POS G 109
b/d=S-Z-28
5
b/d=25/60
100/2
b/d=25/60 b/d=25/60
5 5
POS G 116
b/d=25/60
PO
PO = 0.
PO = 0.1
d
S M 16
d
SM 6m
6 m 08
0
POS G 118
K m
25/6
0.1 K 1
b/d= 121
b/d=25/60
K
110
b/d=25/60
0.16 107
b/d=25/60
d=SM
11
m
POS G 112
0.16 106
POS G 113
b/d=25/60
G
POS G 114
0.1 105
d = MK
9
PO
b/d=25/60
10
6m
d = MK
POS
K m
d = MK
POS G 115
S
M 6
PO
b/d=S-Z-27
25
S 0.1
S
PO d =
S
PO
193/
PO
PO
POS G 107 POS G 107 POS G 107
b/d=20/60 b/d=20/60 b/d=20/60
25 460 25 285 25 285 25 100 360 25 460 25 320 25 246 53
4 4
POS G 118
b/d=25/60
0
POS G 106
b/d= 121
25/6
b/d=20/60
b/d=85/25
POS-S-5
POS G 105
G
0.00 (a.k.25.43)
b/d=25/60
PO S
k.k.
3' + 0.07 (a.k.25.50) 3'
POS G 104 POS G 104
b/d=25/55
b/d=S-S-3
65/25
POS-Z-11
b/d=92/25
3 3
PO
POS-Z-6 POS-G-103-3
b/d=385/25 b/d=25/60
b/d=160/25
POS-Z-14
b/d=250/25
PO
POS-Z-21
S
d = MK 10
b/d=285/20
0.16 5
POS-Z-17
b/d=25/40
6 m103
t-3
POS G 116
S-S 5 m
0
0.1 K
b/d= 121
25/6
PO= 0.1
d=SM
d
PO
POS G 119
G
b/d=25/60
POS
5
54/2
b/d=1Z-25
POS-Z-4
b/d=385/25
POS-
2' 2 2'
6 m 01
440 10
0.1 K 1
K m
M 6
d= S M
S 0.1
b/d=190/25
POS-Z-18
2 PO d = 2
PO
POS-S-2
b/d=25/50 POS G 202
b/d=25/60
b/d=357/25
POS-Z-19
b/d=25/60
POS G 117
1' 1'
POS-Z-3
b/d=220/20
100/-25
25
b/d=25/60
POS-
b/d=25/60 b/d=25/60
b/d=
1 1
POS-Z-2
b/d=108/25
A B C D D' D'' E F H G
b ef
160
d=60 cm
b=25 cm
Statiki sistem:
1 2 3
bo + 20d p
beff = min bo + 0, 25lo
er
Presek u krajnjem polju 0-1, l = 6, 07 m lo = 0, 7 607 = 424,9 cm
25 + 20 16 = 345 cm
beff = min 25 + 0, 25 424,9 = 131, 23 cm
er
Presek u srednjem polju 1-2 i krajnjem polju 2-3, l = 4,87 m lo = 0, 7 607 = 340,9 cm
25 + 20 16 = 345 cm
beff = min 25 + 0, 25 340,9 = 110, 23 cm
er
4.11.1. Granino stanje nosivosti
fB 20,5
= = 1,302 = 0, 053% < min = 0, 20 %
v 500
0, 053
Aa = b h = 100 54, 0 = 2,862 cm 2
100 100
Ova povrina armature je manja od minimalno potrebne ali je sraunata samo da bi se uporedila sa
dobijenom armaturom u Tower-u koja je za isti presek iznosi:
Aa = 2,81cm 2
fB 20,5
= = 0,375 = 0, 015 < 0, 20 %
v 500
0, 015
Aa = b h = 100 54, 0 = 0,81 cm 2
100 100
Ova povrina armature je manja od minimalno potrebne ali je sraunata samo da bi se uporedila sa
dobijenom armaturom u Tower-u koja je za isti presek iznosi:
Aa = 1, 04 cm 2
b = 0, 75 s = 0, 070 = 2, 289
x = s h = 0, 070 54 = 3, 78 cm < d p radi kao pravougaoni presek d / b / h = 132 / 60 / 54
fB 20,5
= = 2, 289
= 0, 093 < 0, 20 %
v 500
0, 093
Aa = b h = 100 54, 0 = 5, 02 cm 2
100 100
Ova povrina armature je manja od minimalno potrebne ali je sraunata samo da bi se uporedila sa
dobijenom armaturom u Tower-u koja je za isti presek iznosi:
Aa = 5,16 cm 2
Uticaji u osloncu 1 i 2 su priblinih vrednsti, tako da e se biti dimenzionisan prsek u osloncu 3 gde su
neto vei uticaji, ali e to vaiti i za presek nad osloncem 2.
h 0,54
k= = = 6,171 jednostruko armiranje
Mu 174, 23
fb b 20,5 103 1,11
iz tabele usvajamo k = 6,155 pa imamo a = 10 lom po armaturi b = 0,825 = 2, 711
fB 20,5
= = 2, 711 = 0,111 < 0, 20 %
v 500
0,111
Aa = b h = 100 54, 0 = 5, 99 cm 2
100 100
Ova povrina armature je manja od minimalno potrebne ali je sraunata samo da bi se uporedila sa
dobijenom armaturom u Tower-u koja je za isti presek iznosi:
Aa = 4, 63 cm 2
Potrebna povrina armature:
0, 200
Aa = b h = 100 54, 0 = 10,80 cm 2
100 100
Usvojeno: 6 B16 (12, 09 cm )
2
U sejzmiki aktivnim podrujina za grede vai da se uzengije proguuju u blizini oslonca na duini
0,2l. Tako da e u duini od 97 cm za grede od 0-2 i duini od 121 cm za deo grede od 2-3, polje u
blizini oslonca imati uzengije na raymaku 10 cm a u poljima 20 cm.
Proraun karakteristine irine prsline ak (t ) koja treba da bude manja od granine (maksimalno
dozvoljene) irine prsline au e se izvriti u programu Tower 6 za celu plou, a runo samo za jedan
presek. A nakon toga e se uporediti dobijeni rezultati.
Maksimalna dozvoljena irina prsline au za ovu plou, koja se nalazi u slabo agresivnoj sredini i
koja je optereena stalnim optereenjem i povremenim (kratkotrajno i dugotrajno promenjivim), prema
lanu 113 pravilnika BAB87 je 0,4 mm.
Kao to se iz predhodno navedenog ve moe zakljuiti potrebno je prema lanu 111 pravilnika
BAB87 da bude zadovoljen sledei uslov:
ak (t ) au
ak (t ) au karakteristina irina prslina
au granina irina prslina
Proraun prslina u polju
Poznato: MB30; f b = 20,5MPa (lan 82; tabela 15)
B500B; v = 500MPa
b / d / h = 100 /16 /13,5
M q = 83,80 kNm
Au = 6,16 cm 2 (4 B14 )
ao = 0, 25 cm
19,8
1, 224 = 1, 65
30 0, 4
3, 08 4
= = 1,98
30 4
Uslov iz lana 114 pravilnika BAB87 je nije ispunjen pa sledi da je potrebno proraunati
karakteristinu irinu prsline ak .
ak = 1,7 1 1 2 l ps
Ea
a
- 1 = 1, 0 - koeficijent koji uvodi stepen prijanjana i zavisi od vrste armature
- 2 = 0,5 - koeficijent koji uvodi reoloke osobine betona u roku vremena
z = 0,9 54 = 48,60 cm
M q = M g + M p = 83,80 kNm = 8380 kNcm
v 50
1,8 1,8 27, 780 kN / cm
2
a = min = min 8380 =
M 27,992 kN / cm 2
q
( 6,16 48, 60 )
( Aa1 z )
fbzs - vrstoa betona pri zatezanju savijanjem
fbz - vrstoa betona pri aksijalnom zatezanju
fbz = 0,7 fbzm ( za MB30; fbzm = 2,4MPa ) (lan 51, tab. 7)
fbz = 0,7 2, 4 = 1,68 MPa (lan 51)
0, 4 0, 4
f bzs = 0, 6 + 4 f bz = 0, 6 + 1, 68 = 1, 792MPa
d
4
0,54
bd 2
25 60 2
MI = fbzs = 0,1792 = 2688 kNcm
6 6
MI 2688
ap = = = 8,979 kN cm2
Aa1 z 6,16 48, 6
27, 780 8, 979
2
Poreenje dobijenih rezultata e biti prikazano tabelarno. Pri dimenzionisanju grede runo
koeficijent armiranja za sve preseke je manji od minimalnog = 0, 20% , pa je za grede usvojena
armatura za runi proraun po minimalnom koeficijentu armiranja, ali je i sraunata potrebna povrina
armaturae za dobijeni koeficijent armiranja. Ta povrina se uporeuje sa dobijenom povrinom armature
u programu. Gledano tako, nije dolo do bitnih odstupanja u rezultatima dobijenih runo i u programu.
Moe se zakljuiti da je dobijena skoro ista povrina potrebne armature. Program ne preponaje
potrebu ta minimalnom armaturom u linijskim elemetima, pa se usvajanje armature vri po treenom
povrinom koja moe biti i manja od one koju dobijamo kao minimalnu u runom proraunu.
Tabela 7: Poreenje rezultata dimenzionisanja po teoriji graninog stanja nosivosti tipske meuspratne
konstrukcije
povrina armature
povrina armature
Aa = 1, 04 cm 2
Presek u Aa = 0,81 cm 2
polju 1-2 usvojena armatura
usvojena armatura za Aa = 10,80 cm2
2 B14 ( Aa = 3, 08 cm 2 )
6 B16 ( Aa = 12, 09 cm )2
povrina armature
povrina armature
Aa = 5,16 cm 2
Presek u Aa = 5, 02 cm 2
polju 2-3 usvojena armatura
usvojena armatura za Aa = 10,80 cm 2
2 B14 + 2 B16 ( Aa = 7,10 cm 2 )
6 B16 ( Aa = 12, 09 cm 2 )
Tabela 8: Poreenje rezultata dimenzionisanja po teoriji graninog stanja prslina tipske meuspratne
konstrukcije
ak (t ) = 0,319 mm ak (t ) = 0,310 mm
Statiki proraun
Opt. 42: [GSN-ploca-grede] 19-24
-171.10
M3
-112.24
-89.02
33.56
86.43
135.26
Uticaji u gredi: POS G 1 20 (10894-14552-17673-20273)
M3 [kNm]
Opt. 42: [GSN-ploca-grede] 19-24
5.29
M2
4.95
1.51
0.32
0.30
0.21
0.22
0.21
0.01
-0.01
-0.02
-0.08
-0.12
-0.23
-0.21
-1.09
-1.90
-2.02
-2.05
M1
-0.01
Uticaji u gredi: POS G 1 20 (10894-14552-17673-20273)
M1 [kNm]
Opt. 42: [GSN-ploca-grede] 19-24
T3
13.97
12.59
8.49
3.20
0.21
0.17
-0.09
-0.48
-1.43
-14.06
-16.25
T2
126.24
100.14
68.52
-110.83
-113.00
-149.69
Uticaji u gredi: POS G 1 20 (10894-14552-17673-20273)
T2 [kN]
Opt. 42: [GSN-ploca-grede] 19-24
N1
26.52
11.51
-18.33
-31.02
Opt. 12: Q2
-106.18
M3
-69.71
-53.37
20.72
53.58
83.80
Uticaji u gredi: POS G 1 20 (10894-14552-17673-20273)
M3 [kNm]
6.53
Aa2/Aa1
4.21
3.37
1.04
2.81
5.16
Aa3/Aa4 110(15.86m)
110(15.86m)
0.22
Aa,uz
6.53
Aa2/Aa1
4.21
3.37
1.04
2.81
5.16
Aa2/Aa1 414(1.39m) 414(2.03m) 414(0.49m)
214(11.49m) 214(0.89m)
414(3.48m)
Aa2/Aa1
414(1.39m) 414(2.03m) 414(0.49m)
214(11.49m) 214(0.89m)
414(3.48m)
ak(t0)
0.14
0.21
0.26
0.28
0.36
ak(t)
0.17
0.23
0.29
0.31
0.38
ug(t0)
0.35
3.14
6.45
Prsline i ugibi: POS G 1 20 (10894-14552-17673-20273)
ug(t)
0.44
4.26
7.27
ug(t)
0.44
4.26
7.27
Prsline i ugibi: POS G 1 20 (10894-14552-17673-20273)
[-8784.03 , 44718.05] kN/m2 k2 = 0.125
a1,II = 264108.55 kN/m2
POS G 120-1 (14552-10894)
1PBAB 87 Ivicne dilatacije
MB 30 [-0.28 , 1.42] 2 = 0.50
B 500B k2 = 0.125 = 0.85
Eb(t0) = 3.15e+007 kN/m2 a1,II = 264108.55 kN/m2 sr = 1.12
Ea = 2e+008 kN/m2 2 = 1.00 Mr = 28.96 kNm
fbzs = 1771.54 kN/m2 = 0.70 Nr = -9.99 kN
= 0.00 sr = 0.93 a,r = 144537.67 kN/m2
= 0.80 Mr = 28.96 kNm z,ef = 1.02%
s = 0.000 Nr = -9.99 kN Rastojanje prslina Lps = 16.10 cm
k1 = 0.40 a,r = 144537.67 kN/m2 Sirina prslina ak(t) = 0.307 mm
1 = 1.00 Ugib
Savijanje oko ose 3 Dugotrajni uticaji
Ugib: Savijanje oko ose 3 z,ef = 1.02% Merodavna kombinacija: 1.00xI
Rastojanje prslina Lps = 16.10 cm +1.00xII+1.00xIII+1.00xIV
Presek 1-1 x = 2.61m Sirina prslina ak(t0) = 0.253 mm N1 = -18.25 kN
1 10 2 14 Ugib M3 = 52.92 kNm
Merodavna kombinacija: 1.00xI M2 = -0.14 kNm
+1.00xII+1.00xIII+1.00xIV Kratkotrajni uticaji
N1 = -18.25 kN N1 = 0.00 kN
M3 = 52.92 kNm M3 = 0.00 kNm
8/20
(m =2 ) M2 = -0.14 kNm M2 = 0.00 kNm
60
Ugib: Savijanje oko ose 3 fbzs = 1771.54 kN/m2 Merodavna kombinacija: 1.00xI
= 0.00 +1.00xII+1.00xIII+1.00xIV
Presek 2-2 x = 2.43m = 0.80 N1 = 14.49 kN
1 10 2 14 s = 0.000 M3 = 83.42 kNm
k1 = 0.40 M2 = 0.11 kNm
1 = 1.00 ug(t0) = 6.382 mm
Savijanje oko ose 3
Ugib: Savijanje oko ose 3 T = Presek sa prslinom
8/20
(m =2 ) Dugotrajni uticaji
60
60
25 M3 = 0.00 kNm
3
[c m ] M2 = 0.00 kNm
Ivicni naponi u betonu
T = 0 Presek bez prsline [-10563.76 , 45053.15] kN/m2
Ugib Ivicne dilatacije
Merodavna kombinacija: 1.00xI 4 14 1 10 [-0.34 , 1.43]
+1.00xII+1.00xIII+1.00xIV 2 k2 = 0.125
N1 = -7.34 kN 25 a1,II = 265452.89 kN/m2
3
M3 = 20.15 kNm [c m ] 2 = 0.50
M2 = -0.11 kNm = 0.94
ug(t0) = 0.186 mm T = 0 Presek sa prslinom sr = 1.25
Merodavna kombinacija: 1.00xI Mr = 28.25 kNm
T = Presek bez prsline +1.00xII+1.00xIII+1.00xIV Nr = 4.91 kN
Ugib N1 = 14.49 kN a,r = 89943.95 kN/m2
Dugotrajni uticaji M3 = 83.42 kNm z,ef = 1.52%
Merodavna kombinacija: 1.00xI M2 = 0.11 kNm Rastojanje prslina Lps = 13.80 cm
+1.00xII+1.00xIII+1.00xIV Ivicni naponi u betonu Sirina prslina ak(t) = 0.294 mm
N1 = -7.34 kN [-10563.76 , 45053.15] kN/m2 Ugib
M3 = 20.15 kNm Ivicne dilatacije Dugotrajni uticaji
M2 = -0.11 kNm [-0.34 , 1.43] Merodavna kombinacija: 1.00xI
Kratkotrajni uticaji k2 = 0.125 +1.00xII+1.00xIII+1.00xIV
N1 = 0.00 kN a1,II = 265452.89 kN/m2 N1 = 14.49 kN
M3 = 0.00 kNm 2 = 1.00 M3 = 83.42 kNm
M2 = 0.00 kNm = 0.89 M2 = 0.11 kNm
ug(t) = 0.288 mm sr = 1.17 Kratkotrajni uticaji
Mr = 28.25 kNm N1 = 0.00 kN
POS G 120-3 (20273-17673) Nr = 4.91 kN M3 = 0.00 kNm
1PBAB 87 a,r = 89943.95 kN/m2 M2 = 0.00 kNm
MB 30 z,ef = 1.52% ug(t) = 7.174 mm
B 500B Rastojanje prslina Lps = 13.80 cm
Eb(t0) = 3.15e+007 kN/m2 Sirina prslina ak(t0) = 0.276 mm
Ea = 2e+008 kN/m2 Ugib
V FUNDIRANJE
Aktivni pritisci:
pa = h k a
ka = tg 2 45
2
20
ka1 = tg 2 45 = 0, 49029
2
ka1 = ka 2 = k a 3 = 0, 49029
pa1 = 1 h ka1 = 18,50 2, 00 0, 49029 = 18,141 kN / m 2
pa1' = 1 h ka 2 = 18,50 2, 00 0, 49029 = 18,141 kN / m 2
pa 2 = 2 h ka 2 + pa1' = 19,00 1, 00 0, 49029 + 18,141 = 27, 457 kN / m 2
pa 2' = ( 1 h + 2 h ) ka 3 = (18,5 2, 00 + 19 1, 00 ) 0, 49029 = 27, 457 kN / m 2
pa 3 = 3 h ka 2 + pa 2' = 20, 00 0,5 0, 49029 + 27, 457 = 32,360 kN / m2
pa 3 ' = ( 1 h + 2 h + 3 ' h ) ka3 = (18,5 2, 00 + 19 1, 00 10,19 0,5) 0, 49029 = 29,954 kN / m2
pa 4 = 3 ' h ka 3 + pa 3'=10,19 3,2 0,49029+29,954=45,941kN/m 2
P7 P5 P5
sloj 1
0 kN/m2
PZ2
sloj 2
7,00 kN/m2
P3 + 3.05 (a.k.22.38)
PZ2
14,00 kN/m2
sloj 3 P1 - 6.10 (a.k.19.43)
sr = =
V 58867, 29
= 163, 21 kN / m2
A 360,58
- 2.00 sloj 1
zglinjena prainasto
peskovita drobina sa sitnim
komadima kalcitisanog
krecnjaka - 3.00 sloj 2
- 3.50
npv
sloj 3
vulkanogeno-sedimentna
formacija
100
1
100
2
100
26,60
100
4
100
91
5 Zef =4,91 m
100
6
26,61
100
7
100
8
100
9
100
10
z
Ana Milanovi FG 201/06
298
Diplomski rad
L 23, 45
= = 1,95
B 12, 02
S = Si 0, 75 za kruti temelj odosa L / B 2, 0
tpi hi
Si =
Ms
tpi = 4 p0
M s = 13500 kN / m 2
Pri emu je:
Ms - modul stiljivosti tla
koeficijent po Sreinbrenner-u oitan sa dijagrama
i hi z z/b tpi Si
1 1,0 0,5 0,25 0,2488 64,900 0,004807
2 2,0 1,5 0,75 0,2214 57,450 0,008511
3 3,0 2,5 1,25 0,1770 46,169 0,010259
4 4,0 3,5 1,75 0,1374 35,839 0,010619
4' 4,91 4,455 2,228 0,1111 28,979 0,010540
S i 0,044736
PO
d = S KP
0.6
0m
-43.53 -43.56
qa - dozvojena nosivost
Q - ukupno vertikalno doputeno optereeneje temelj
, , - zapreminske teine
, m - ugao unutranjeg trenja, mobilisani ugao unutranjeg trenja
q - najmanje specifino optereenje u nivou temeljne ploe
c, cm - kohezija, mobilisana kohezija
N, Nc - faktori nosivosti koji zavise od mobilisanog ugla unutranjeg trenej
S, Sc - faktori oblika po Brinch Hansen-u
dc, dy - faktori dubine, zavistan od odnosa dubine fundiranja i irine temelja\
ic, iy - faktori nagiba rezultanze sile koja deluje na dnu temelja
tg tg 20
tgm = = = 0, 24265 1338' 21'''
Fs 1,5
za m = 13 38' N = 1, 03 ; N c = 10, 04
100
10,04 NC
10
N
Nq
1,03
N?
1
0,1
13,38
0 5 10 15 20 25 30 35 40 45 50
f ()
Faktori nosivosti prema B. Hansen-u
Dozvoljena nosivost:
Qa = B N S d y i y + (cm + q0 tg m ) N c S c d c ic + q0
2
10
Qa = 12, 02 1, 03 1, 205 1, 0 1, 0 + (4, 00 + 98, 00 0, 24265) 10, 04 1,103 1,195 1, 0 + 98, 0
2
Qa = 540, 218 kN / m 2
Qa = 540, 218 kN / m 2 max = 217, 82 kN / m 2
max - maksimalna vredost napona u tlu dobijena proraunom objekta pomou programskog paketa
TOWER- Radimpex
PO
d = S KP
0.6
0m
217.64 217.81
Presek u x-pravcu
Aa = 32, 44 cm 2
Presek u x-pravcu
h 0, 55
k= = = 3, 671 jednostruko armiranje
Mu 460,11
fb b 20,5 103 1, 0
iz tabele usvajamo k = 3, 648 pa imamo a = 10 lom po armaturi b = 1, 575 = 7,903
fB 20,5
= = 7,903 = 0,324 > 0,10 % usvajam = 0, 693
v 500
Glavna armatura u gornjoj zoni:
0, 324
Aa = b h =
100 55, 00 = 17,82 cm 2
100 100
Vrednost proraunate glavne armature iz programa Tower 6 za isti presek:
Aa = 17,95 cm 2
Presek u y-pravcu
Aa = 29, 60 cm 2
Presek u y-pravcu
d
M au = M u + Nu a1 = Mu = 652,96 kNm
2
h 0,55
k= = = 3, 082 jednostruko armiranje
Mu 652,96
fb b 20, 5 103 1, 0
iz tabele usvajamo k = 3, 074 pa imamo a = 10 lom po armaturi b = 2, 025 = 11, 296
fB 20,5
= = 11, 296 = 0, 463 > 0,10 % usvajam = 0, 463
v 500
Glavna armatura u gornjoj zoni:
0, 463
Aa = b h =
100 55, 00 = 25, 465 cm 2
100 100
Vrednost proraunate glavne armature iz programa Tower 6 za isti presek:
Aa = 25,51cm 2
Temeljna ploa e u oba pravca, i u donjoj i u gornjoj zoni, biti armirana glavnom armaturom.
Pri usvajanju armature prvo se usvaja, i u gornjoj i u donjoj zoni, minimalna potrebna armatura u oba
pravca. Minimalna potrebna armatura za ploe kad se primenjuje rebrasta armatura je min = 0,10%.
Zatim se na osnovu podataka dobijenih u programu Tower 6 usvaja dodatna armatura u obe
zone za oba pravca (ova armatura se usvaja samo u delovima ploe gde je potrebna sa prepustima za
duinu sidrenja armature). Takoe pri usvajanju armature bie potovan minimalan i maksimalan
razmak izmeu ipki glavne armature koji je definisan za povrinske nosae (ploe) pravilnikom
BAB87 i iznosi:
2 d 120 cm
emin 4 cm, emax = min = = 20 cm
20 cm 20 cm
Napon usled reakcije tla pri eksploatacionom optereenju preuyet iz programa Towera 6:
n = 217,82 kN
f ax + fay
= fa 100 = 2 100
dkp hs dkp hs
37,05 + 37,05
= 2 100 = 0,0682% usvojeno = 0,70%
986,90 55
Koeficijenti 1 i 2:
1 = 1,3a = 1,31,3 0,70 = 1,414
2 = 0,45 a = 0,45 1,3 0,70 = 0,489
2 2
1 a = 1,414 0,8 = 0,754 MPa
3 3
2 b = 0,489 2,2 = 1,076 MPa
2
1 a = 0,745 MPa < = 0,5125 MPa prvi uslov
3
Poto je ispunjen prvi uslov nije potrebna dodatna raunska armatura za prijem napona smicanja usled
probijanja stuba kroz plou.
U programu Tower 6 takoe je izvren proraun kontrole napona smicanja usled probijanja
stuba kroz plou. Dobijeno je isto kao i to je dobijeno proraunom koji je raen runo tj. dobijeno je da
nije potrebna dodatna armatura za prijem napona smicanja usled probijanja stuba kroz plou.
Proraun karakteristine irine prsline ak (t ) koja treba da bude manja od granine (maksimalno
dozvoljene) irine prsline au e se izvriti u programu Tower 6 za celu plou, a runo samo za jedan
presek. A nakon toga e se uporediti dobijeni rezultati. Odabran je presek u ramu 10 u x-pravcu.
Maksimalna dozvoljena irina prsline au za temeljnu plou koja se nalazi u slabo agresivnoj
sredini i koja je optereena stalnim optereenjem i povremenim (kratkotrajno i dugotrajno
promenjivim), prema 113 lanu pravilnika BAB87, je 0,4 mm.
Kao to se iz predhodno navedenog ve moe zakljuit potrebno je prema lanu 111 pravilnika
BAB87 da bude zadovoljen sledei uslov:
ak (t ) au
Presek u x-pravcu
Proraun karakteristine prsline se radi za pravac x jer je u ovom preseku vei moment u x-pravcu.
z (% )
K p au
Aa
z (% ) = = 9, 416 %
Abz
- prenik ipke ili ako su ipke grupisane u svenju prenik amenjujueg profila
5, 65 4
= = 2, 682
3,14
26,82
9, 416 > = 2, 235
30 0, 4
Uslov iz lana 114 pravilnika BAB87 je ispunjen pa sledi da nije potrebno proraunati karakteristinu
irinu prsline ak .
sraunavanje srednjeg rastojanja prslina ( l ps )
e = 20, 0 cm razmak izmeu ipki
k1 = 0, 4 ( za B500B )
a k = 1,7 1 1 2 l ps
Ea
a
- 1 = 1, 0 - koeficijent koji uvodi stepen prijanjana i zavisi od vrste armature
- 2 = 0,5 - koeficijent koji uvodi reoloke osobine betona u roku vremena
z = 0,9 54 = 48, 60 cm
M q = M g + M p = 712, 46 kNm = 71246 kNcm
v 50
1,8 1,8 27, 780 kN / cm
2
a = min = min 71246 =
M 39, 567 kN / cm 2
q
( 37, 05 48, 60 )
( Aa z )
f bzs - vrstoa betona pri zatezanju savijanjem
f bz - vrstoa betona pri aksijalnom zatezanju
f bz = 0,7 f bzm ( za MB30; f bzm = 2,4 MPa ) (lan 51, tab. 7)
f bz = 0, 7 2, 4 = 1, 68 MPa (lan 51)
0, 4 0, 4
fbzs = 0, 6 + 4 fbz = 0, 6 + 1, 68 = 1, 792MPa
d
4
0,54
bd 2
100 60 2
MI = fbzs = 0,1792 = 10752 kNcm
6 6
MI 10752
ap = = = 38, 444 kN cm2
Aa z 5, 65 49,5
27, 78 38, 44
2
Poreenje dobijenih rezultata e biti prikazano tabelarno. Pri dimenzionisanju kotraploe nije dolo do
bitnih odstupanja u rezultatima dobijenih runo i u programu. Moe se zakljuiti da je dobijena skoro
ista povrina potrebne armature.
Tabela 4: Poreenje rezultata dimenzionisanja po teoriji graninog stanja nosivosti tipske meuspratne
konstrukcije
Tabela 5: Poreenje rezultata dimenzionisanja po teoriji graninog stanja prslina tipske meuspratne
konstrukcije
1154.18
PO
d = S KP
0 .6
0m
1041.83
PO
d = S KP
0 .6
0m
797.19 837.04 925.86
-489.38
PO
d = S KP
0 .6
0m
-469.09
PO
d = S KP
0 .6
0m
1154.18
PO
d = S KP
0 .6
0m
1041.83
Sr(b=1.00)
81.14
246.47
448.12
461.59
866.53
Nivo: Garaa (nivo2) [-6.10 m]
Uticaji u ploci: max Mx= 1154.18 / min Mx= 0.00 kNm/m
Opt. 42: [GSN-ploca-grede] 19-24 Mx [kNm/m]
-489.39
-419.48
-349.56
-279.65
-209.74
-139.83
-69.91
-0.00
-489.38
PO
d = S KP
-460.11
0 .6
0m
-33.30
-469.09
Sr(b=1.00)
658.32
PO
d = S KP
0 .6
0m
797.19 837.04 925.86
735.34
40.87
Sr(b=1.00)
Nivo: Garaa (nivo2) [-6.10 m]
Uticaji u ploci: max My= 925.86 / min My= 0.00 kNm/m
Opt. 42: [GSN-ploca-grede] 19-24 My [kNm/m]
-657.32
-563.42
-469.51
-375.61
-281.71
-187.81
-93.90
0.00
-652.96
PO
d = S KP
0 .6
0m
Sr(b=1.00)
-166.45
PO
d = S KP
0 .6
0m
-171.34
-289.81 643.50
439.91
PO
d = S KP
0 .6
0m
493.44 518.01 572.83 451.78
486.41
PO
d = S KP
0 .6
0m
32.44
PO
d = S KP
0 .6
0m
26.62 27.69 29.48 24.11
29.60
PO
d = S KP
0 .6
0m
-17.95
PO
d = S KP
0 .6
0m
0( 0)
)
=0) 37.15
=90
=
22 /10(
1 /10(
=90)
18/1 0(
4
4/1
1
1
P2/2
1d O S
2=/2 0(K
0.(6 =P0)
0=9m
0)
20/1
0(=
20/1 0)
0(=9
0 )
)
0(=0
22 /1 0 )
18 /1 0(=9
1
P2/2
1d O S
2=/2 0(K
0.(6 =P0)
0=9m
0)
0)
0(=
8/1
0)
)
=0
=
0(
0(
0/1
6 /1
1
1
PO
d = S KP
0 .6
0m
PO
d = S KP
0 .6
0m
PO
d = S KP
0 .6
0m
PO
d = S KP
0 .6
0m
PO
d = S KP
0.6
0m
Kontrola na probianje
PO
d = S KP
0 .6
0m
Lh
B
96.2
hs
60
96.2
ipke - specifikacija
oblik i mere Vrsta lg n lgn
ozn.
[cm] armature [m] [kom] [m]
Donja zona - pravac x (1 kom.)
20
20
1 B500B 18 3.00 82 246.00
260
20
20
2 B500B 18 4.00 58 232.00
360
20
20
3 B500B 18 3.00 24 72.00
260
20
20
20
20
20
40
50
50
26 30
15
26
20
20
ipke - specifikacija
oblik i mere Vrsta lg n lgn
ozn.
[cm] armature [m] [kom] [m]
20
20
3 B500B 16 3.00 164 492.00
260
20
20
4 B500B 12 6.90 143 986.70
650
20
20
5 B500B 12 8.00 53 424.00
760
20
20
6 B500B 12 5.00 13 65.00
460
480
10
30
55
20
20
20
20
20
ipke - specifikacija
oblik i mere Vrsta lg n lgn
ozn.
[cm] armature [m] [kom] [m]
Gornja zona - pravac y (1 kom.)
20
20
1 B500B 14 4.00 219 876.00
360
20
20
2 B500B 12 6.55 25 163.75
615
20
20
3 B500B 12 8.00 27 216.00
760
20
20
20
ipke - rekapitulacija
lgn Jedinina teina Teina
[mm] [m] [kg/m'] [kg]
B500B
8 656.12 0.41 265.73
12 12232.65 0.91 11143.94
14 1976.00 1.24 2454.19
16 1012.00 1.62 1640.45
18 550.00 2.05 1127.50
20 222.00 2.48 549.45
Ukupno 17 181.27
VI DRVENE KONSTRUKCIJE
+ 19.60 + 19.65
(a.k.45.03) SENDVIC LIMENI
(a.k.45.08)
KLETA 2X5 / 25 cm
SEK.NOSAC 10/ 10 cm
K1
+ 18.87(a.k.44.30)
STUB 12 / 14 cm STUB 12 / 14 cm SEK.NOSAC 10/ 10 cm
PODRONJACA 14 / 20 cm
PAJANTA 10 / 14 cm
SEK.NOSAC 10/ 10 cm
PAJANTA 10 / 14 cm
DISTANCER OD
VENCANICA 12 / 14 cm JASTUK 12 / 14 cm
+ 18.00 (a.k.43.43)
JASTUK 12 / 14 cm
K2 PARINGA 5X25 mm
VENCANICA 12 / 14 cm
1
w= (VmB,50,100 K T K t ) 2 10 3 S z K z 2 G z C p A
2
w - optereenje vetrom u kN ,
- gustina vazduha,
VmB,50,100 - osnovna brzina vetra,
K t - faktor vremenskog osrednjavanja osnovne brzine vetra,
Gustina vazduha:
H 25, 0
= 1, 225 = 1, 2133 = 1, 2219 kg / m 3 )
8000 8000
Faktor ekspozicije:
0,22
z 18,825
K z = b = 0,5 = 0,813
10 10
qw = qm ,T , z Gz - pritisak vetra
Kako uslovi iz kriterujuma 2 pravilnika JUS U. C7.111 nisu ispunjeni, odreivanje krutosti e se vriti
po kriterijumu 3 iz istog pravilnika. On se zasniva na ispitivanj podlonosti konstrukcije rezonantnom
efektu dejstva vetra preko odnosa (R/B)2 i izraza za dinamiki koeficijent Gz.
2
R
Za < 0,5 Gz = 1 + 2 g I z B dinamiki koeficijent
B
2 2
R R
Za > 0,5 Gz = 1 + 2 g I z B 1 + dinamiki koeficijent
B B
Gz = 1 + 2 g I z B
Gz = 1 + 2 3 0, 2492 1, 015 = 2,5176
q g .T , z = qm.T , z G z = 0, 327 2, 5176 = 0,823 kN / m 2 - aerodinamiki pritisak vetra
A B C D E F G H
+0,9 -0,5 -0,8 -0,8 -1,0 -1,0 -0,5 -0,5 0,2
qw = q g ,T , z C p
C p = C pe C pi
Optereenje na krovu:
Stalno optereenje:
-sendvi panel lima sa ispunom od kamene vune: ............................................ g = 0,1618 kN / m 2
Krovni sendvi paneli sa ispunom od kamene vune-VULCASTEEL ROOF
duina panela - min. 2500 mm - max. 12 000 mm
Koeficijent Toplotna
Debljina Teina
prolaza toplote U provodljivost
mm kg/m2 W/m2 K W/mK
60 16,18 0,68 0,04
80 18,18 0,51 0,04
100 20,18 0,41 0,04
120 22,18 0,34 0,04
150 25,18 0,26 0,04
200 30,18 0,20 0,04
Povremeneo optereenje-sneg:
Ngib krova 10, visina objekta 19,65 m, nadmorska visina 25 m.
Kako se ovaj objekat nalazi u primorskom delu, optereenje od snega e da biti: S = 0, 35 kN / m 2
Staticki proraun
Opt. 1: Stalno (g)
-0.80
-0.52
0.61
0.05
0.10
0.75
0.43
0.69
0.74
0.23
0.61
0.61
-0.32
0.75
0.07
-0.04
-0.86
-0.91
-0.78
0.22
0.21
0.07
0.04
0.61
0.75
-0.17
-0.17
-0.14
-0.15
0.61
0.56
0.75
2.03
1.69
0.87
0.67
Reakcije oslonaca
Opt. 2: Korisno
-1.52
-1.00
-0.01
-0.01
0.61
0.10
0.19
0.75
-0.01
0.82
1.32
1.42
0.44
1.17
0.61
-0.61
0.75
0.14
-0.12
-1.64
-1.73
-1.49
Opt. 2: Korisno
0.43
0.39
0.14
0.09
0.61
0.75
0.03
0.03
-0.32
-0.32
-0.27
-0.29
0.61
1.07
0.75
3.89
3.23
1.66
1.32
Reakcije oslonaca
-1.75
-0.07
-0.56
0.61
0.11
0.21
0.75
-0.01
0.65
1.50
0.44
0.46
1.16
0.61
0.75
0.15
0.08
-0.90
-0.79
-1.93
-1.69
0.49
0.09
0.21
0.61
0.18
-0.10
0.75
0.03
-0.02
-0.26
-0.37
-0.33
0.61
0.03
0.75
4.49
2.11
1.88
0.89
Reakcije oslonaca
Opt. 4: I+II
-2.32
-1.52
-0.02
-0.02
0.61
0.16
0.29
0.75
-0.02
-0.01
1.25
2.02
2.16
0.66
1.78
0.61
-0.93
0.75
0.21
-0.16
-2.50
-2.64
-2.28
Opt. 4: I+II
0.65
0.60
0.21
0.13
0.61
0.75
0.04
0.04
-0.49
-0.49
-0.41
-0.44
0.61
1.63
0.75
5.93
4.92
2.53
1.99
Reakcije oslonaca
Merodavni uticaji:
14 cm
M max = 2, 32 kNm
T = 3, 32 kN
N = 0, 65 kN
N c||d M
c|| = + < c||d
A md W
l 435
li = = = 441, 71 cm
cos10 cos10
li 441, 71 1
= 3, 46 = 3, 46 = 31, 55 odgovara: za 10 < < 75 = = 1, 09
2
a 14
1 0,8
100
0, 65 103 850 2,32 103 102
c|| = 1, 09 + = 450, 66 N / cm2 < c|| = 850 N / cm2
12 14 1000 441, 71
max
m|| = 1, 5 < m||d = 90 N / cm 2
bh
1, 91 103
m|| = 1, 5 max = 1, 5 = 17, 05 N / cm 2 < m||d = 90 N / cm 2
bh 12 14
Opt. 4: I+II
0.17
0.05
0.61
-0.03
0.26
0.75
0.11
-0.74
-1.91
Kontrola ugiba:
l 441, 71
l'= = = 448,52 cm
cos cos10
l 448, 52
f dop = = = 2, 24 cm
200 200
f stv = 1,91 cm < f dop = 2, 24 cm
etinari II klase, b / d = 14 / 20 cm
14 cm
20 cm
Reakcija roga:
R = 5, 93 kN
R 5, 93
qr = = = 3,871 kN / m
e 1,85
l1 = 4, 06 m
Staticki proraun
Opt. 1:
-10.15
3.45
7.55
5.00 4.00
Opt. 1:
11.71
5.21
-7.65
-10.28
5.00 4.00
21.99
5.21
5.00 4.00
Reakcije oslonaca
Opt. 1:
0.27
-1.73
-8.59
5.00 4.00
Merodavni uticaji:
M = 13,84 kNm
T = 15,58 kN
N = 0, 00 kN
M 10,15 103 10 2
W potr = = = 1015, 00 cm 3
md 1000
14 202
W= = 933, 33 cm3
6
14 203
I= = 9333, 33 cm 4
12
Za b / d = 14 / 22 cm
Merodavni uticaji:
M = 13,84 kNm
T = 15,58 kN
N = 0, 00 kN
M 10,15 103 10 2
W potr = = = 1015, 00 cm 3
md 1000
14 22 2
W= = 1129, 333 cm3
6
14 223
I= = 12422, 67 cm 4
12
M 10,15 103 10 2
m = = = 898, 76 N / cm 2 < md = 1000 N / cm 2
Wusv 1129,333
max
m|| = 1,5 < m||d = 90 N / cm 2
bh
11, 71 103
m|| = 1,5 max = 1, 5 = 53, 23 N / cm 2 < m||d = 90 N / cm 2
bh 14 22
Kontrola ugiba:
l = 5,17 m
l 517, 00
f dop = = = 2, 585 cm
200 200
f stv = 0, 0859 cm < f dop = 2, 24 cm
etinari II klase, b / d = 14 / 20 cm
12 cm
14 cm
li 72, 2 1
= 3, 46 = 3, 46 = 17,84 odgovara: za 10 < < 75 = = 1, 03
2
a 14
1 0,8
100
R 21,99 103
c|| = = 1, 03 = 134,82 N / cm 2 < c|| = 850 N / cm2
A 12 14
Za stub se usvaja presek 14/16 cm kako bi se podronjaa oslanjala na stub punom irinom.
R 21,99 103
c = = = 196, 33 N / cm 2 < c d = 200 N / cm 2
A 0, 5 14 16