2009 Airport
Sika at Work
The Water Distribution & Waste Water Collection Systems
(Outside)
Project Description and Requirements Project Participants Project Description and Requirements Sika Solution
The airfield facilities include two 60 metre wide main runways, 3700 Owner: New Bangkok International Airport Co., Ltd. The building consists of long span, lightweight steel support structures, n The structural steel framework support columns, partitions and
and 4000 metres long respectively, with parallel taxiways and 120 air- Architects: Murphy Jahn Architecture with exposed precast concrete elements, clear and low e-coated glass, canopies, were securely grouted into the concrete foundations and
craft parking bays on the Apron 5 of the contact gates large enough Engineers: ACT Consultants (Thailand) and Werner Sobek Engineers an innovative 3 layer translucent membrane with integrated water bases with non-shrink, non-metallic SikaGrout and high strength
for the new Airbus A380. Main contractor: IOT Joint Venture cooling and displacement ventilation. This means the system requires Sikadur Epoxy Grout according to their intended loadings.
Sika organization: Sika (Thailand) Limited minimal air changes and the occupants are protected from the intense n Concrete floor surfaces within the terminal building that are likely to
tropical sun and heat, plus noise transmission is greatly reduced. besubject to extreme abrasion and wear from traffic, were given an abra-
Sika Solution sion resistant topping with Sikafloor Syntop Dryshake floor hard-
n S ika Concrete Admixtures Plastocrete
(plasticisers and air The joints between these components and dissimilar materials there- ener. This was broadcast into the freshly placed concrete and finished to
entraining agents) were used to produce all of the concrete, which also fore also had to be durably waterproofed with an elastic sealant. As an a dense, hard wearing surface. More than 150 tonnes were applied on
incorporated up to 20% PFA. The concrete had to achieve and maintain overall finished result, the air conditioning costs were designed to be the project.
its 36% air entrainment, consistence and cohesion, with the work- reduced by around 50% and the overall energy efficiency of the build- n External faade component movement joints and isolation joints
ability required for placing and finishing in the high temperatures and ing has been greatly increased. between dissimilar materials, were sealed with Sikaflex sealant.
humidity. Almost 1 million litres of Sika Concrete Admixtures were used This polyurethane based single component material was selected
on the project. The anticipated high numbers of passengers, their baggage and other due to its easy application in the site conditions, its good adhesion to
n T he lighting units were fixed into the concrete and then securely grout- cargo, necessitated highly wear resistant floor finishes to be produced many different substrates, with weathering resistance and excellent
ed with high strength Sikadur Epoxy Grout to hold lighting. in the designated high traffic areas durability in accordance with American Standard ASTM C920.
n Sarnafil mechanically fastened system.
Sarnafil S327-15 was used for flat roof area 31, 560 m2
Sarnafil G410-18 was used for flat roof area 270 m2
Project Participants
Owner: New Bangkok International Airport Co., Ltd.
Main Passenger Terminal Superstructure: John A Martin & Associates
M & E Engineers: Flack & Kurtz
Main Contractor: ITO Joint Venture
Sika organization: Sika (Thailand) Limited