SUPPLY & INSTALLATION OF GAS FILTRATION

SYSTEM AT BERRI PLANT JUBAIL

CONTRACT NO: PR# 7200023928

Health Safety & Environmental Loss Prevention Program

F 26.02.15 REMOVED SECTION 6.6 HOT RQC ERD WS


WORK PERMIT, PAGE 25

E 26.02.15 REMOVED SECTION 16 RQC ERD WS


PAGE 51

D 26.02.15 REMOVED PARA. FROM RQC ERD WS


SECTION 5.1 FOR SMOKING

C 26.02.15 REMOVED SECTION 6.5, 6.6, & RQC ERD WS


6.7. PAGE 25-26

B 26.02.15 INSERT ADDITIONAL ITEMS RQC ERD WS


FROM MARAFIQ

ISSUED FOR
A 20.8.14 ERD LM WS
APPROVAL
Prepared CHECKED APPROVED
REV DATE DESCRIPTION BY: BY: BY:

PROJECT TITLE:
KAFOU Technical Services
Company Ltd. SUPPLY & INSTALLATION OF GAS FILTRATION
SYSTEM AT BERRI PLANT JUBAIL
DATE:
PREPARED BY: Eduardo Dalu 04.12.14 SHEET CONTENT:
DATE:
CHECKED BY: Lorenzo Mortola 14.12.14
HEALTH SAFETY & ENVIRONMENTAL LOSS
DATE:
PREVENTION PROGRAM
APPROVED BY: Wagiealla Saleh 18.12.14
PLANT: BERRI SIZE
PROJECT NO.: KM-12-3340 PROJECT NUMBER:
PR# 7200023928 PLANT JUBAIL A4
PLANT AREA SHEET NO. REVISION

DOCUMENT NO.: KTS-14-3340-HSE


GAS METERING STATION 1 OF 117
F
MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 2 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR # 7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

TABLE OF CONTENTS

1 SCOPE 7

2 INTRODUCTION 8

3 COMPANY SAFETY POLICY 9

4 SAFETY ASSIGNMENT OF RESPONSIBILITY 10


4.1 PROJECT MANAGER 10
4.2 SAFETY SUPERVISOR 11
4.3 FIELD ENGINEER/SUPERVISOR 12
4.4 WORKERS REPONSIBILITIES 12
4.5 SUB CONTRACTORS RESPONSIBILITIES 13
4.6 SAFETY STOP WORK ORDER ( SSWO ) 14

5 EMPLOYEE SAFETY ORIENTATION 15


5.1 GENERAL SAFETY RULES 16

6 SAFETY TRAINING 19
6.1 INDUCTION OF SAFETY TOPICS FOR KAFOU EMPLOYEES 19
6.2 SAFETY TRAINING TOPICS FOR SUPERVISORS 20
6.3 WORK PERMIT RECEIVERS 23
6.4 FIRE WATCH OR TRECH OR PIT WATCH 23
6.5 REPORTING A FIRE 25

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 3 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR # 7200-023-928
Program MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

6.6 FIRE EXTINGUISHERS AND TRAINING 25


6.7 FIRE EXTINGUISHER 25
6.8 ELECTRICAL INSTALLATION AND EQUIPMENT 28
6.9 GROUNDING FOR PROTECTION OF WORKERS 29
6.10 WORK PERMIT 30

7 BEHAVIORAL COMPLIANCE 31

8 SAFETY MEETINGS 32

9 SAFETY INSPECTION 34

10 INCIDENT REPORTING AND INVESTIGATION 39


10.1 REPORTS 39
10.2 INVESTIGATION 42

11 JOB SAFETY ANALYSIS 43


11.1 CLASS A HAZARD 43
11.2 CLASS B HAZARD 43
11.3 CLASS C HAZARD 43

12 WORK PERMIT SYSTEM 44

13 SCAFFOLDING 45

14 HAND & POWER TOOLS 46

15 LIVE ELECTRICAL CABLE HANDLING 47

E Customer Contractor
f
MARAFIQ Power and Utility Company KAFOU
MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 4 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR # 7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

16 HAZARDOUS ENERGY CONTROL (LOTO) 50


16.1 RESPONSIBILITIES 50
16.1.1 LOTO REMOVAL 51
16.2 GROUP LOCK BOXES 51

17 PERSONAL PROTECTIVE EQUIPMENT 54


17.1 CONTRACTOR SHALL ESTABLISH A PPE TRAINING PROGRAM FOR 54
EMPLOYEE THAT SHALL INCLUDE AS MINIMUM.
17.2 HARD HAT 55

17.3 EYE PROTECTION 55

17.4 FOOT PROTECTION 56

17.5 EAR PLUG AND EAR MUFF 56

17.6 HAND GLOVES 56

17.7 FACE SHIELDS AND WELDING HELMETS 57

17.8 RESPIRATORY PROTECTION 57

18 EMERGENCY RESPONSE PROCEDURE 58


18.1 GAS RELEASE EMERGENCY RESPONSE PROCEDURE 58

18.2 EMERGENCY INCIDENT 59

18.3 MAJOR INCIDENT 59

18.4 MINOR INCIDENT 59

18.5 EVACUATION 60

18.6 ASSEMBLY POINT LOCATION 62

18.7 EMERGENCY RESPONSE TEAM DRILL 63

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 5 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR # 7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

19 FIRST AID FACILITIES 64

20 SUBCONTRACTOR MANAGEMENT 66
20.1 INJURY REPORTING AND RECORD KEEPING 66

21 SAFETY OF PUBLIC 69
21.1 CONTROL MEASURES 69

22 SITE SECURITY AND ACCESS CONTROL 71


22.1 CONTROL MEASURES 71

23 ACCESS AND EGRESS ON SITE 72


23.1 CONTROL MEASURES 72

24 PERSONAL HEALTH PRECAUTIONS 74


24.1 CONTROL MEASURES 74

25 WORK AT HEIGHT 77
25.1 CONTROL MEASURES 77

26 NOISE 78
26.1 CONTROL MEASURES 78

27 VIBRATION 79

28 MANUAL HANDLING 80

29 SCAFFOLDING 81

30 LADDERS 84

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 6 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

31 PLANT OPERATIONS 86

32 TEMPORARY ELECTRICITY 89

33 TEMPORARY WORKS 91

34 HOT WORKS / WELDING 92

35 FIRE & EMERGENCY PROCEDURES 94

36 HAZARDOUS SUBSTANCES 96

37 CHEMICALS 98

38 HOUSEKEEPING 99

39 EXISTING SERVICES 100

40 SITE SET UP 102

41 STRUCTURAL STEEL 104

42 EXTERNAL CLADDING 106

43 GLAZING / CURTAIN WALL 108

44 MEP INSTALLATION 110

45 FIT OUT WORKS 112

46 HOT WEATHER WORK. 114

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 7 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue
Date: 04.12.14 7200-023-928

1 SCOPE

The Policies, Procedures and Guidelines contained in this manual shall apply to this
particular (MARAFIQ) Project executed by KAFOU.

KAFOU shall compliment and use in conjunction with the company policies and
procedures of the individual subcontractor's Safety and Loss prevention program.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 8 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Health Safety & Environmental Loss Prevention Project
PR #7200-023-928
Program MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue
Date: 04.12.14 7200-023-928

2 INTRODUCTION

Our safety and prevention plan is to clarify the guidelines and procedures which will be
followed during working in (MARAFIQ) Project. Our objective is to maintain the highest
health and safety for the benefits of the workers, subcontractors, suppliers, client, public and
ourselves. Our commitment is that everyone takes responsibility for working safely and for
the safety of fellow workers. We believe that all safety related incidents are preventable.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 9 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

3 COMPANY SAFETY POLICY:

KAFOU is committed to carry out the responsibilities and duties in a manner designed
to achieve and maintain a high standard of protection for our employees, and those of
our Contractors and Clients, the environment, property, equipment and the public in the
conducts of our business.
KAFOU will continually strive to enhance these standards in all phases of our
operations, from the initial planning and design stages through overall Construction and
including final commissioning turn over, and start-up operations.
The KAFOU management, supervision, employees along with our Subcontractors and
their employees are charged with the responsibility of providing and maintaining the
highest degree of Safety and Health performances and protection of our environment and
the Safety of others affected by our work.
It is this commitment to excellence, which motivates the KAFOU to be diligent in the
placement of field supervision and selection of Subcontractors. Through our established
programs as well as relevant training and open communication. We nurture the
employee's desire to excel in the areas of Safety and quality of work.
Consistent with its commitment, the KAFOU through its Project Management Team will
ensure full compliance with standards and safety requirements as covered in the Project
specification throughout the duration of project.

All provisions contained in this "Industrial Safety and loss Prevention Plan" shall be
totally adhered to by Subcontractor work forces in carrying out the necessary execution of
all works required for the Project.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 10 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

4 SAFETY ASSIGNMENT OF RESPONSIBILITIES


4.1 PROJECT MANAGER

The Project Manager shall familiar with the terms accident, hazard, hazard control and
loss control. The front-line supervisor and upper management should know the procedures
for accident prevention and the step to follow in case of any accidents and know the best
approach to safety performance. He is responsible for the sub contractor and will help
him (sub-contractor) in establishing safe work practice.

The Project Manager shall:

Understand MARAFIQs Standard and ensure that they are followed.


Participate in the scheduled site inspection and contractors performance evaluation of
Marafiq CCS (Committee for Contractors Safety Team) or Marafiq EMT.
Communicate all the OHS issue and receive feedback from all level within the organization on OHS
relevant issues.
Know the requirements of relevant Kingdom of Saudi Arabia Government Workmen
regulations, and make sure it will be implemented.
Set personnel example on site by wearing appropriate PPE.
Ensure all the accidents are reported in accordance with the SEC Project Management
Reporting Guideline.
Ensure implementation of the SEC approved Loss Prevention Program.
Know basic precaution to handle construction hazards. Hazard control involves
developing a program to recognize the destructive effort hazard arising from human
error.
Provide written instruction to the subordinates to understand work method, explain the
sequence of operation, outline potential hazard at each phase of work.
Check work methods and precaution with field supervisor before commencing the work
Develop safety awareness by promoting the safety meeting, presentation and by
implementing safety training.
Follow any hazards identified under the Hazard Identification Procedure..
Will provide the required PPE for all employees on project.
Will be fluent in written and spoken English.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 11 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

4.2 SAFETY SUPERVISOR

A full time Safety Supervisor will be appointed on site at mobilization until the
completion of the project, to coordinate and implement the Loss Prevention Program for
contractor and sub-contractor. All Safety personnel shall completed the Basic Life Support
from internal or external training provider.

The Safety Supervisor shall:

Contractor and subcontractors Safety Officer/Engineer shall undergo Marafiq Safety Section
interview in advance for selection process and reserves the right to reject nominated persons to insist
on an appropriate competent person for the role.
Understand MARAFIQs Standard and ensure all project personnel comply with this document.
Ensure that all foreman and supervisors are aware of Safety Plan before starting of any
work.
Inspect the work site daily and correct unsafe work method and conditions. Keep a
record daily report to Project Manager when necessary.
Keep records of all injuries, accident, fire, motor vehicle accident (MVA), property
damage and crane or heavy equipment accident to MARAFIQ that happened on site.
Keep records of all daily/weekly safety meeting on site, complete with subject discussed
and signed list of attendance.
Advice the management as follows:
Ways to prevent injury to personnel, damage to the site facility or equipment and fires.
Ways to improve the existing work methods.
Provision and use of protective clothing and equipment.
Potential Hazard of site before starting of any work.
Change in safety requirement.
Non-conformance from site management.
Carry out survey and inspections to see the only safe work methods are in operation,
health and safety requirements are being observed.
Determine the cause of any accident occurrence and recommended measure to prevent
any accident.
Supervise the recording and analysis of information on injuries, damage and production
loss. Access accident tends and reviews all safety performance.
Assist by training all level employees.
Take part in discussion on injury, damage and loss control.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


0 MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 12 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Keep up-date with recommended safe practice and safely literature; circulate
information applicable to each level of employee.
Attend job progress meeting where safety is an item on the agenda. Report on job safety
performance.

4.3 FIELD ENGINEER/SUPERVISORS

The Field Engineer/Supervisor shall:

Ensure that they are aware of MARAFIQs Std. before commencing of work.
Organize work so that work is carried out as required in compliance with standards with
minimal risk to men, equipment and materials.
Be familiar with MARAFIQ & ARAMCO work permit system.
Give specific instruction to the worker for the correct work methods.
Plan and maintain good housekeeping.
Coordinate with the sub-contractor and contractor to avoid any confusion about area
responsibilities.

4.4WORKERS RESPONSIBILITES

Use the correct tools and equipments for the work.


Use protective clothing and equipment provided. Do not Endanger himself or co-worker.
Keep tools in good conditions.
Report any accidents, near misses or hazardous conditions to immediate supervisor
Abstain from horseplay and abuse of safety devices, equipment and welfare facilities.
Read companies and proponent safety rules and take note of safety precaution in
restricted areas. Repeated Safety violation will lead to warning and eventual termination
from site.
Obey all the posted warning sign board.
Attend all the Safety Meeting.
Stop the work and ask other co workers to stop the work if the working condition is not
safe.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


0 MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 13 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

4.5 SUB - CONTRACTORS RESPONSIBILITES

Ensure that they are aware of (MARAFIQ)s Std. before commencing of work.
Understand (MARAFIQ) approved Loss Prevention and comply with all the requirements.
Ensure that all the equipment and tool mobilized on site in accordance with the (SEC).
Comply with all the Safety, Health and Securities requirement in all the area.
Attend the designated daily/weekly safety meeting given by the supervisor.
The employee nominated as Contractor Coordinator shall ensure that all the
requirements of this Element are complied by all the Sub-Contractors selected to work at
his company.
Hazard assessment and risk evaluation are performed in cooperation with the Contractor
based on the Degree of risk associated with the assigned work and the workplace.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


0
MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 14 of 117
of of
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

4.6 SAFETY STOP WORK ORDER (SSWO)

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 15 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

5 EMPLOYEE SAFETY ORIENTATION

All KAFOU site personnel including the visitors shall be familiarize with clients
emergency procedures in the job sites. This will be done through pre-assignment
orientation of all job site employees prior to start of work on job site. Visitors and the
worker will be provided with the hard copy /Instructions of this general orientation
information upon arrival at job site.

All personnel who intend to perform task inside the Marafiq premises, plants and facilities
shall undergo Marafiq safety orientation training.

The basic procedures for analyzing a scope of work for hazards establishing abatement
methods and assigning responsibility for New Employees are:
The Law and Safety
Appropriate Regulations
Duties of Employer and Employee

Policy and Administration


Effect of Incentive on Accident Prevention
Human Relations
Consultation
Safety Officer, Duties, Aims and Objectives

Breakdown the scope to the individual task.


Identify the potential hazards and assess the resulting risk.
Eliminate or reduce the risk at the source, where ever possible; and
Recommended safe procedure and or identifying control standards to abate the
residual Risks

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 16 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

5.1 GENERAL SAFETY RULES

Commonsense and good judgment must be shown in the application of our daily
activities. KAFOU shall at all times comply with and ensure that its employees,
subcontractors and visitors comply with applicable Saudi Govt. Safety Regulations and
all (MARAFIQ)s Standard and Loss Prevention rules and Regulations.
All personnel working on site must be made aware on the potential hazards of the pipeline
and the actions they should follow in case of an emergency.
Personal Protective Equipment (PPE) such as hard hats, safety goggles and safety shoes
are mandatory for all personnel at all work locations. Ear protection (ear plugs),
respirators, face shields and similar personal protection shall be worn whenever required.
Full body harness shall be worn when working in elevated areas 6 feet and above,
without complete guardrails.
No activity shall take place in a restricted area unless a signed work permit is obtained
by the KAFOU work permit receiver from the appropriate issuing authority.
Employees shall report all occupational injuries, accidents, including near misses
immediately to their supervisors for appropriate preventive measures.
Fighting and or horseplay are prohibited. Employees involved in these activities are
subject to disciplinary action.
Running on the job site is prohibited.
Site employees have to report any observed unsafe condition at the work area.
Smoking is strictly prohibited inside or outside the perimeter fence of Berri Gas Station.
Sleeping anywhere inside the construction site is absolutely forbidden. Violation of this
rule will result in immediate termination.
Safety devices and guards of any equipment shall never be removed or tampered.
Only tools, equipment and materials that are free of defect are allowed on project site.
Speed limits shall, at all time be observed on or off site.
All site personnel shall observe post job (End-of-Shift) inspection requirements.
Parking of vehicles is permitted ONLY in the designated parking area.
All site employees especially drivers shall, at all time are familiar with the existing
emergency procedures and specific alarms of the (MARAFIQ) facilities.
Use of cellphone is not allowed inside the enclosed perimeter of gas station.
No electrically operated power tools will be used unless protected with a Ground Fault
Circuit Interrupter (GFCI).
Housekeeping shall be observed frequently more than once a day in all work areas.
Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 17 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

The required standard of housekeeping shall be established on site and all personnel
informed of this standard. Trash debris and refuse will be collected daily. All employees
shall clean their respective work areas daily before quitting.
Temporary toilet shall be provided outside the Berri station enclosed fence.
Covered containers, drums, etc. will be provided at various, clearly marked locations
throughout the work site. The containers will be emptied daily at approved rubbish
dumping area.
KAFOU will follow their approved Waste Management Program and comply with the
(MARAFIQ) Sanitary Code and safe housekeeping practices.
Accumulation of rubbish especially combustible materials is strictly prohibited.
Warning barricades and appropriate notices shall be installed and maintained where ever
required and, adhered to; e.g. no smoking sign, no entry, etc.
(MARAFIQ) identification cards shall be carried worn visibly every employee.
Riding on the rear of service pick-ups is prohibited.
While in a vehicle, wearing of seat belts must be observed on or off the site.
Under no circumstance, can unauthorized personnel operate any equipment on the
project.
Inspection of tools and equipment, including personal protective equipment, shall be
observed before and after use.
Isolation and Lock Out/Hold Tag procedures shall be observed when working on or near
energized equipment.
Supervisors must be completely aware of the actual number of personnel in his
respective area at the start of work shift.
All site personnel must exemplify safe personal behavior at all times and where required,
initiate appropriate measures in carrying out his job.
Water coolers shall be used for cooling and storage of drinking water only.
Disposable paper cups shall be provided.
Soap and tissue papers for hand washing shall be provided.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 18 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 19 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

6 SAFETY TRAINING

Safety Training is to keep employees informed of the hazards of his job and how to control
them.

All K A F O U employees shall be given the necessary safety instruction concerning


his job. Pertaining shall teach the common type of hazard on site and the precautions he
must take. Employees, who will be working as welders, technicians, Scaffolding
technicians shall be trained according to their Job Skills.

A permanent record shall be kept for all safety training in accordance with established
procedures. An induction safety course shall be provided on site to point out the hazards
which could be encountered in their daily work. KAFOU is committed to upgrade and
train our employees with respect to (MARAFIQ) Work Permit System. Selected
employees who will be working in the extremely hazardous gas areas will be oriented
and shall follow all safety guidelines set by (MARAFIQ) Safety Representative.

6.1 Induction of Safety Topics for KAFOU employees


Hazard Identification Procedure
Hazards on site:-
Machinery
Transport
Flammables on site (hydrocarbon)
Fire
Falls
Electricity
Site Housekeeping
Handling Materials

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 20 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Precautions against the Above Hazards

Simple precautions that can be taken by Workmen on site

Personal Protective Equipment


What is available?
How to obtain it
Correct use and care

Health
Site Welfare Facilities
Potential Health Hazards
First Aid/CPR

Duties of the Company


Brief outline of the responsibilities of the Company by law
Details of Companys Accident Prevention Policy
Government Labor Law

Employees Duties
Brief outline of responsibilities of employee under law
Explanation of how employees fit into the Companys Plan for Accident
Prevention

6.2Safety Training Topics for Supervisors

Safety and the Supervisor


Safety and Efficient Production Go Together
Accidents affect Morale and Public Relations

Principles of Accident Prevention


Attitudes of Management, Supervision and Operations
Methods of Achieving Safe Operations
Accident
Customer
and Injury Causes Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 21 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Site Inspection
The Role of management
Hazard Identification Procedure
Record Results
Follow up Procedures
Feedback Agencies

Individual Behavior
Motivating Agencies
Individual Behavior
Environmental Affects
Techniques of Persuasion

Site Tidiness
Site Organization
Relationship of Site Housekeeping to Accident
Occurrence
Site Access
Equipment Storage
Material Stacking
Materials Handling

Health
Hazard to Health on Site
Sanitation and Welfare
Protective Clothing
First Aid/CPR

Personnel Protective Equipment


Eye, face Shield , hand Gloves, Safety Shoes, feet and legs
Respiratory Protective Equipment
Protection against Ionizing Radiation

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 22 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Electricity
Appreciation of Electrical Hazards
Power Tools
Arc Welding
Low Voltage System
Lighting and Power System on Sites
Grounding/Ground Fault Circuit Interrupters

Equipment
Accidents Related to Moving Parts of Machinery
Appreciation of Principles of Guarding
Importance of Regular Maintenance

Transportation
Transport to and from site
Hazard connected with site transport
Competent Drivers
Dumpers
Tipping Trucks
Movement near Excavations

Working Places, Ladders and Scaffolding


Hazard connected with the use of ladders
Maintenance and inspection
Type of scaffolding
Overloading
Work on roofs, fragile Material
Openings in walls and floors
Use of safety belts and nets

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 23 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Fire Prevention and Control


Principle causes determining fire
Understanding fire chemistry
Firefighting equipment

Communications
Effective methods of Communication
Method and Preparation of Reports
Safety Committee
Safety Meeting

6.3Work Permit Receivers


Cold work permits
Hot work permits
Confined pace entry permits
Release of hazardous material permits

6.4Fire Watch and Trench or Pit Watch


Work permit system
Use of breathing apparatus
Use of fire extinguisher
Use of fire hydrant
Fire blankets
Fire barrels
Fire alarm
Emergency
Fire Prevention:

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 24 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

KAFOU shall provide and maintain in good working condition suitable firefighting
equipment as per the MARAFIQ Standard. All KAFOU personnel shall properly be
trained in the use of such equipments. Storage lay down and fabrication yards shall be
laid out in accordance with MARAFIQ Standards with respect to the spacing of rows, fire
lanes and compatibility of material.
Fire spreads from an ignition source to a fuel source or other fuel sources by
Conduction, Convection, and Radiation. Conduction: - Transfer of heat through contact
with solid material, Convection: - Transfer of heat through heated air, Radiation: - Heat
transfer through electromagnetic waves given off by flames.
Removed Anticipated Volume of Hot Work
No Activity involving Hot Work is allowed and used only non-spark tools.
All equipment shall be equipped with spark arrestor.
Fire prevention will be given the highest priority by KAFOU on the project. This
requires careful planning and execution especially when activities are to be carried out
within the critical area.

Prior to Start of Work


Employees shall follow safe housekeeping practices to prevent fires. Continuous
training in fire safe procedures, regular inspection of work site areas, and close
supervision of employees job performance are the primary requirements of a
successful fire prevention program.
Prior to Mobilization the Following Considerations Must be Established:
Severity and nature of fire risk and identify Fire hazards, causes of fires, and
safeguards required to prevent fire.
Area safety requirements and understand the basic principles of fire safety and
procedures for Reporting fire, fire fighting, and evacuating the work site.
Training of personnel, understand the use and operation of fire protection equipment
and systems.
No activity involving hot wok is allowed and use only non-spark tools.
Location(s) of activities. Conduct regular periodic inspections to ensure that work
areas remain in a fire safe condition.
Number of motorized equipment.
All equipment shall be equipped with spark arrestor.
Quantity and size of storage yards or buildings.
Quantity and size of flammable storage areas.
Minimum quantity and types of fire extinguisher equipment, i.e. portable 9 Kg
capacity ABC Dry chemical fire extinguishers, fire water barrels, fire buckets, etc.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 25 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

During the mobilization stage or site preparation, the anticipated minimum quantity
of fire extinguishing equipment required shall be determined

6.5 Reporting a Fire:


All fires including those extinguished by KAFOU shall be reported to (MARAFIQ) Site
Representative with a preliminary report followed by a detailed report. All fire incidents
shall be reported and documented entitled Report of Fire Emergency or False Alarm.

6.6 Fire Extinguisher and Training:


KAFOU shall ensure that all site personnel on the project are trained in the proper usage
of fire extinguishers.

6.7 Fire extinguisher:


There are three type of fire extinguishers normally found at the construction site:
Water type, Carbon dioxide and dry chemical powder (DCP) types. All employees
should be aware of the firefighting equipment available on site and be familiar on how
to use it.

Water type Fire Extinguisher:


Class A fire: Pressurized water system to be used only on a fire involving ordinary
combustible materials such as wood, paper, clothing, and some rubber and plastic
materials.

Carbon Dioxide Type Extinguisher:


Class C fire: The Carbon Dioxide (CO2) type extinguisher is normally used for
controlling electrical fires. Fire involving energized electrical equipment, such as
motors, switch gears, circuits and control panels are to be extinguished using carbon
dioxide or DCP fire extinguisher.
CAUTION: A carbon dioxide Extinguisher should never use in closed area where people
are present, because the gas displaces oxygen from the immediate environment. When
oxygen level in the environment is reduced sufficiently to put out a fire, the oxygen level
is also incapable of supporting human life.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 26 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Dry Chemical B:
Class B type Fire: A dry chemical type extinguisher is normally used in controlling of
Flammable or combustible liquids, Flammable gases, Grease, and similar materials, and
some rubber and plastic materials.

Multipurpose ABC Dry Chemical Powder (DCP):


ABC Dry chemical multipurpose fire extinguisher can control any type of fire involving
wood, petroleum liquid or electrical equipment.

All fire extinguishers will have tags specifying the date of expiry and renewal. To be
signed by appropriate authority.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 27 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928


HOW TO CONTROL THE IGNITION SOURCES OF FIRE

Source of Ignition Examples Preventive Measures

Electrical Equipment Electrical defects, generally due to Use only approved equipments
poor maintenance, mostly in And regular maintenance.
wiring, motors, switches, lamps
and hot elements.
Friction Hot bearing, misaligned or broken Follow a regular schedule of
machine parts, choking or inspection and special
jamming of materials, poor maintenance and lubrication
adjustment
Open flames Cutting, welding, Gas and oil Follow welding procedure; keep
burners, grinding, and heating cutting torches clean and
process. properly adjusted. Do not use
open flames near combustibles.
Smoking and lighter Dangerous near flammable liquids Smoking only in permitted area.
and in area where combustibles Avoid any jacket lighters or
are used or stored matches.
Spontaneous ignition Deposits in ducts and flues. Low- Frequently clean ducts and flues.
grade storage. Industrial wastes. Remove waste daily. Isolate stored
Oily wastes and rubbish. material likely to heat
spontaneously.
Hot Surfaces Hot metal being processed, Electric Check heating apparatus before
lamps, hot ducts or flues, leaving it unattached, air
Exposure of combustible materials circulation, insulation, provide
enough clearance.
Overheated materials Abnormal process temperature, Have careful supervision and
Materials in driers, Overheating of competent operators,
flammable liquids. Supplemented by well maintained
automatic temperature control.
Static electricity Dangerous in presence of Ground equipment, Use static
flammable vapors, occurs at eliminators, humidify the
spreading and liquid flows from atmosphere.
pipes.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 28 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

6.8 Electrical Installation & Equipment:


All material and equipment used in temporary electrical installations shall meet (SEC)
standards, including (NARAFIQ) Construction Safety Manual. KAFOU shall ensure that
Every piece of electrical equipment is a potential source of electric shock Even through an
electric shock is too small to cause injury it may trigger an involuntary reaction that results
in physical injury for example after touching a live wire, a person may lose his balance
and fall off a ladder or scaffolding.
Obviously, design, layout, installation, and preventive maintenance programs can
minimize such incidents on live or hot electrical equipment.
An effective electrical safety policy coupled with an employee training and hazard
awareness program can further prevent electrical shocks.
To minimize electrical related injuries, it is important to follow basic safety
precautions to avoid such an accident.
All temporary electrical installations and equipment on the project will conform to
(MARAFIQ) Std. and National Electrical Code (NEC).
Extension cords will be kept clear of walkways, water pools, and other locations
where they may be exposed to damage, create trip hazards, or set up other hazardous
conditions.
Color tagging, following inspection by a qualified electrician, of hand held power
tools, GFCI units, all electrical equipment/boards, outlets, extension cords, table
saws, appliances, and etc. is required monthly. It is understood a color scheme has
been provided and this requirement is subject to change.

Minimum safety measures that KAFOU will ensure on the project include but not limited
to the following;
Distribution of electrical power on construction site is different from permanent
installation. Distribution boards and supply cable must be properly installed and
protected from accidental damage.
All materials used shall be of an approved type and in good condition.
All portable electric tools must be well maintained and provided 3 core grounded
cable and proper plugs. Approved double insulated or all insulated tools may be used
without a ground wire. Double insulation does not protect against defects in the
cords, plug, and receptacle. Continuous inspection and maintenance are required.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 29 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

When cords are not in use, they should be disconnected and neatly stored. Cords
should be stored in a dry room they should not be exposed to excessively cold or hot
temperatures.
A visual electrical inspection should be made of the extension cord each time it is
used. Cords with cracked or worn insulation or damaged ends should be removed
from service immediately. Cords with the grounding prong missing or cut off must
also be removed from service.
All connections shall be made with approved and proper connectors. When cords
must cross passageway, whether vehicular or personnel, cords should be protected
and identified with appropriate warning. Cords should be used in this manner only
for temporary or emergency use.
Once in every month, the Safety Supervisor and Equipment Foreman shall inspect
equipment and tools. It remove damaged tools, and from the site for repair or scrap.
Once every week the Electrical Supervisor shall check that all electrical equipment is
adequately grounded.
All maintenance work identified from the electrical inspections shall be rectified by
an adequately trained electrician and supervised by the Electrical supervisor.
Ground Fault Circuit Interrupter (GFCI)/ELCB will be used on all electrical circuits
including portable power electrical supplies.
Only qualified electricians will be allowed to perform repair or carry out
maintenance of electrical tools and equipment. When performing maintenance on
electrical system, lockout and tag system must be used.
Keep adequate clearance between electrical line and object being moved or handled.
Machinery guarding is to protect against electric shock and to prevent body contact
with a grounded surface.

6.9 Grounding for Protection of Workers


Grounding cables shall be connected to the ground first, and then the equipment.
Grounding cables shall be installed and removed using hot sticks or insulated gloves.
Grounding cable shall first be disconnected from the line or equipment and then be
disconnected from ground.
Grounding cable shall be at, or as close as practicable to, the work locations.
Grounding cable and clamps shall be capable of conducting the anticipated fault current
and shall have a minimum size of No.2 AWG standard copper.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 30 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

6.10 Work Permit:

KAFOU shall obtain a WORK Permit (MARAFIQ) for any WORK to be carried out
during each shift in any (MARAFQ) specified "Restricted Area" or as may be required
by the Company Representative. It shall be KAFOU's responsibility to ascertain, in
advance, whether the WORK area designated is a Restricted Area. The Company
Representative can give guidance on Restricted Area locations. KAFOU shall only
provide qualified and certified craft personnel to execute and/or supervise WORK.
WORK Permit courses are provided by the Loss Prevention Department. The certificates
of all (MARAFIQ) contractors shall be approved by the proponent organization
superintendent.
Supervisory personnel or other qualified staff must always be present at the WORK Site
while any WORK is in progress. All WORK Permit procedures shall be carried out by
KAFOU in accordance with (MARAFIQ) Work Permit System. Pressure Testing Safely,
Isolation, Lockout and Use of Hold Tags, and
Restricted Area - Restricted area is a portion of facility where approved work permit is
required before any job can be done and comes under the category of restricted area as
designated by (MARAFIQ).
Authorized issuer - are those employees designated and certified by concerned
(MARAFIQ) Site Division heads to issue and approve work permits in restricted area
under their supervision.
Authorized Receiver - are those craftsmen, who have been certified by the (MARAFIQ)
- Site Division heads to sign and receive work permits

PTW nomination forms for MARAFIQ contractors APR nominees shall be forwarded to
Marafiq ISD Safety Section in advance.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 31 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
PR #7200-023-928
Health Safety & Environmental Loss Prevention
Program MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

7 BEHAVIORAL COMPLIANCE
KAFOU Safety Supervisor shall monitor all Site working activities to ensure that the
services are performed in conformity with (MARAFIQ) Loss Prevention Policies and the
entire employee including the high management are following the required Behavioral
Compliances. Such as traffic violation, horseplay, and proper usage of PPE. Observations
and inspections are frequently conducted.
Unsafe acts and conditions shall be immediately reported to the relevant supervisor for
correction. Life threatening hazards shall be corrected immediately. Corrective actions for
unsafe conditions shall be identified and tracked until completion, with follow-up to verify
proper implementation.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 32 of 117120
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

8 SAFETY MEETINGS
KAFOU Safety Supervisor shall conduct on job site the Daily, Weekly and monthly
meeting and it will be recorded and submitted to the Project Manager for his needful
action in a timely manner. The Safety Meeting records are well maintained and one
copy of all the above mentioned report will be kept in the site office permanently.

The following Topics are discussed during Safety meetings:

Hand tool Safety


Safety Tips Emergency Response
Fire Prevention
Housekeeping

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 33 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

TOOL BOX ATTENDANCE SHEET

DATE: TOPIC:
DESIGNATIO
S/N ID/BADGE No. NAME N SIGNATURE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

SAFETY OFFICER
NAME & SIGNATURE:

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 34 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

9 SAFETY INSPECTIONS
KAFOU Safety Supervisor shall monitor all SEC working activities to ensure that the
services are performed in conformity with MARAFIQ Loss Prevention Policies,
principals and practices, and do not imperil any person or property.
KAFOU Safety Supervisor will perform a weekly inspection which will be recorded in
the form of Weekly Site Inspection Checklist signed by all required placed in the site
safety file for review by MARAFIQ Safety Representative as may be required during
shutdown. All inspection and meeting activities will be carried out on a daily basis. This
inspection will be beneficial for all the parties, and KAFOU Project Management and
MARAFIQ Representative shall accompany for the walk through.
The MARAFIQ Safety Representative will visit the site frequently to ensure that the
work is being performed in compliance with MARAFIQ Loss Prevention Policies
findings. Findings of the visit must be received immediate provided to the Corrective
Action Report, or a written justification MARAFIQ Safety Representative by close of
business the following day.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 35 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 36 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 37 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 38 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 39 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

10 INCIDENT REPORTING & INVESTIGATION


We are often able to identify future hazard areas and apply preventive measure through
analysis of previous accident. However effective remedial action can only be applied when
the basic problem is clearly defined by investigation and submission of detailed realistic
report. The evaluation of these facts and the real cause of any accident will assist in
directing our accident prevention activity in the most efficient way.

10.1 REPORTS

An immediate oral report will be made to KAFOU office and the (MARAFIQ)
Representative office in the following cases:
All fatal injuries.
All injuries required medical attention which results in lost time.
Near Misses
All damage to the contractors plant or equipment in excess of SR 10000/-.
All damage to (MARAFIQ) property in any
amount.
All Fires
Damage and near misses to cranes, heavy equipment and personnel.

All accidents shall be reported within 24 hours from the time of the incident occurrence using
the Marafiq Preliminary Incident Report Form and use the Marafiq final Incident
Investagation Report Form after the investigation.
For accidents resulting in KAFOU employee fatality, serious injury to KAFOU
employee(s), or damage to MARAFIQ equipment or property, a written report including
MARAFIQ Form where applicable shall be submitted promptly to the Company
Representative. In addition, MARAFIQ may convene an engineering review or
investigation committee in accordance with the requirements, Notification Requirements
for Incidents (Including Fires); and, Guide for Committees Investigating Major Incidents
and Engineering Reviews of Other Incidents.
Fully detailed written reports of these incidents will be submitted within 24 hours with
copy to the MARAFIQ Site Representative. All other accident will be recorded and
monthly injury and damage reports submitted to MARAFIQ
. Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 40 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Obtain treatment for any injured person.


Ensure that the scene of the accident get undisturbed.
Report to the site supervisor.

KAFOU will maintain, in format approved by (MARAFIQ) a current record


showing all:

Work Injury
Near Misses
Incident of property damage over SR 10,000.
Motor Vehicle Collision.
Incident involving damage to (MARAFIQ) equipment and property.
Damage and near miss for cranes, heavy equipment and personnel.

These records shall be available for inspection at all reasonable times and shall be submitted
to MARAFIQ on request.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 41 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Monthly Injury Summary

Project: Project #.: Date:

Company Name: File No.:

Brief
Days Nature Of Description
Carry Lost Injury And Of Accident
Inj. Name Of Badge Date Of
Craft Over This Part State
No. Injured # Accident
Yes/No Mon Of Body What,
th Affected Where,
How, Why

Total Lost Time Total Days Lost: Total Man-hours Worked This
Injuries this Month: Month:

Report Prepared By: Title And Telephone:

Signature:

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 42 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

10.2 INVESTIGATION

The responsibility to investigate all accidents, incident and to submit reports and recommend
corrective action is incumbent on the site Safety Supervisor.
Visit the scene of the incident and examine any plant or equipment for damage or
misuse.
Question witness what happened, who it happened and why it happened.
Question any injured personnel when it is possible.
Ascertain the events that led to the incident and any irregularities in the operations.
Describe the operation that was taking place and the sequence of events which led to the
incident.
Assist the Safety Supervisor to examine any plant or equipment involved in the accident
and to question witness.

Accident investigation techniques are many and all may be successfully employed in
varying circumstance, the overriding factor, however must always be accident investigation
is to determine the cause and preventive requirements not to apportion blame.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 43 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

11 JOB SAFETY ANALYSIS


Before starting of any work at the (MARAFIQ) job site a site survey will be conducted
by K A F O U Safety Supervisor to identify the potential hazard of the job and the work
needs to be performed to understand the entire hazard at job site. After the survey a
meeting will be conducted with all concern responsible people and a job specific Hazard
Identification Plan will be prepare by KAFOU Safety Supervisor which will be submitted to
(MARAFIQ) Representative for approval before starting of any work on the (MARAFIQ)
Job site

Dynamic Risk Assessment shall be submitted to TAWREED authorized personnel for all
activity having significant risk.

The Hazard will be classified in three different classes:

11.1 Class A Hazard

A condition or practice which likely to cause permanent disability, loss of life or body part
fully or partially or extensive loss of structure, equipments or materials

11.2 Class B Hazard

A condition or practice which likely to cause serious injury or illness or property damage
that is disruptive, but less than Class A.

11.3 Class C Hazard

A condition or practice which likely to cause minor injury or illness or disruptive


property damage.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 44 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

12 WORK PERMIT SYSTEM


The HSE Procedure establishes the requirements and process to be considered within the
work permit system, to perform relevant project activities in a safe manner.

Permit must be issued:-


Hot Work:- Any work that creates enough heat to ignite flammable Gas-Air mixtures of
flammable materials

Oxygen deficient Atmosphere:- An Atmosphere with less than 19.5% by volume


oxygen at level .The oxygen we normally breathe at lower elevations is about 20.8%.

Oxygen Enriched Atmosphere:- An atmosphere containing more than 23.5% oxygen


by volume . Oxygen-rich atmospheres expand the range of flammability, lower the
ignition energy, and will cause combustible materials to burn violently when ignited.

Permit issuer:- An employee who has been designated by management shall be trained,
qualified and certified to issue a work permit.

Permit receiver:-An employee who has been designated by management shall be


trained, qualified and certified to receive a work permit.

We ensure an appropriate work permit system is established

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 45 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

13 SCAFFOLDING
Any temporary elevated structure /platform and its supporting structure used for supporting
workmen or materials/both.

A tag showing clearly whether the scaffolding has been inspected as per MARAFIQ
HSE Scaffolding requirements and is ready to use.
A Ladder consisting of a pair of side rails connected together by cleats, rungs or Steps.
Shall assure scaffolding above 37 meters plans are reviewed and approved by a qualified
engineer assigned.
To prepare JSA Prior to erection.
To ensure proper work permit is available to perform the activities related to erection,
modification or Dismantling
To perform pre-task toll boxes talk with scaffolders to relay information and instruction
To ensure work permit copies and JSA are available at work site.
To ensure qualified scaffolders are assigned for the task.
To ensure a daily inspection and periodic inspection within 7 days by qualified scaffolding
inspector.
To ensure qualified scaffolders are wearing full body harness belt with double shock
absorber lanyards and attach to an anchorage point at all times (100% tie off).
To conduct daily routine inspection and to notify any observation such as unsafe
scaffolding or scaffolding that is not complying with the requirements of this procedure, to
the scaffolding supervisor, and to change the tag to RED or take any actions as needed
To conduct inspection on modified scaffolding and tag accordingly.
To wear the appropriate personnel protective equipment at all the times.
To wear the full body safety harness and fasten to anchorage point at all times of
scaffolding erection Modification and dismantling process.
For working at heights above 1.8 meters, all scaffolds shall be installed with proper
guardrails.
All personnel who work at more than 1.8 meters (6 feet) height shall wear a full body
harness belt attached to Proper anchorage point or a fall protection device
Loose items shall not be kept on the scaffolding platform

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 46 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

14 HAND & POWER TOOLS


.Only pneumatic power and hand tools driven by compressed air shall be used inside the gas
station and used of electrically power driven tools is not allowed.
Shall ensure proper training of the employee on the proper use, care and inspection of
portable hand and power tools.
Shall implement proper periodically inspection programs for portable hand and power
tools.
Correct tool shall be selected for the job intended. Faulty tools shall not be used
Tools should be stored in designated storage areas.
Tools shall be regularly cleaned and, where necessary, lightly oiled as a protection
against corrosion.
Every portable hand tool shall be connected to ground fault interruption or earth leakage
circuit breaker (ELCB)
Electrical operated tools shall be grounded with a ground conductor or shall be double
insulated.
Tools shall not be altered or repaired without authorization
Cutting tools shall be kept sharp.
Files without a handle should not be used.
Files should not be used as a hammer or as a pry
Appropriate protective equipment shall be worn while using chisel.
Electrical drill shall be unplugged before changing the bit
Appropriate eye protection shall be worn during use of grinding wheels
The tongue guard should be maintained within 1/4inch of the grinding wheel
The soldering iron shall not be used as a screw driver or pry.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 47 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

15 LIVE ELECTRICAL CABLE HANDLING


Purpose:- The HSE procedure establishes the minimum basic requirements for basic
requirements for safe performance of Live (HOT) Electrical work within the project.

Electrical Hazards:-A Recognizable, dangerous condition involving electrical equipment


or systems, which could be the cause of injury or fatality if proper precautions or actions
are not taken.
Electricity: - A form of energy that can be transformed in to the mechanical, chemical,
light or sound energy.
Electrically hazardous tasks are subdivided into four classes: hot work, voltage testing,
proximity work, and other hazardous work.
All live electrical parts in excess of 50 volts AC to ground or 100 volts DC Positive(+)
to negative (-), to which an employee may be exposed shall be de-energized and locked
and tagged out before the employee works on or near them ( as per EPM-SS- 03-04-
3),Hazardous Energy Control Lock Out /Tag Out procedure.
Only qualified persons shall work on electric circuit parts or equipment that have not
been de-energized and / or perform high voltage test. The contractor shall appoint in
writing one or more suitably qualified electricians. Such persons shall be capable of
working safely on energized circuits and shall be well informed of the proper use of
precautionary techniques, personal protective equipment, insulating and shielding
materials and insulating tools.
Safe working distance from energized Apparatus
The four types of Hazards associated with work on or near energized un-insulated
electrical equipment are the following.
Shock and burn due to contact.
Electrical flash burn from arcs.
Blast injury resulting from electrical faults
Up set or shut down of an operating process.

Customer Contractor

MARAFIQ Power and Utility Company KAOFU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 48 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Employee shall not be permitted to approach or bring any conductive object closer to exposed
energized parts than the distances shown below.

Voltage Range (Phase to phase) Minimum Working and clear hot stick
kilovolts Distance
2.1 or less Avoid Contact
2.1 or 15 2ft. 0 inch (24 inch 610 mm)
15.1 to 35 2 ft. 4 inch (28 in. 711mm)
35.1 to 46 2 ft .6 inch (30 in. 762mm)
46.1 to 72.5 3 ft .0 inch (36 in. 914 mm)
72.5 to 121 3 ft. 4 inch (40 in. 1016mm)
138 to 145 3 ft. 6 inch (42 in. 1066mm)
161 to 169 3 ft. 8 inch (44 in. 1117mm)
230 to 242 5 ft. 0 inch (60 in. 1524mm)
345 to 362 7 ft. 0 inch (84 in. 2133mm)
500 to 552 11 ft.0inch (132in. 3352mm)
700 to 765 15 ft.0 inch (180in. 4572mm)

NOTE:- For 345-362 KV, 500-552 kv. And 700-765 kv, minimum clear hot stick distance may
be reduced provided that such distances are not less than the shortest distance between the
energized part and the grounded surface.

Employee shall be provided with, and shall use, electrical protective equipment rated for
the voltage involved and that is appropriate for the specific parts of the body to be
protected for the work to be performed.
Protective equipment shall be maintained in a safe, reliable condition and shall be
periodically inspected or tested. (As per OSHA 1910.37).
Employee shall wear nonconductive (not the ordinary plastic safety helmets) head
protection wherever there is a danger of head injury from electric shock or burns due to
contact with exposed energized parts.
Employee shall wear protective equipment for the eyes, face, and body wherever there is
danger injury caused from electric arcs, flashes or from flying objects resulting from
electrical explosion.
Ladders, Harness, hooks, ropes, hand lines, etc used near exposed energized parts shall
be conductive.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 49 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Conductive articles of jewelry and clothing such as watch bands, bracelets, ring, key
chains, necklace, metalized aprons and cloth with conductive thread or metal headgear
shall not be worn when working close to electrical circuits.
All protective devices, which are placed on conductors or apparatus to protect employee,
shall be left in place until all work is completed.
Adequate hazard warning signage (risk of electric shock, no smoking, hearing protection
required etc) shall be displayed.
Extreme caution shall be used when equipment is being operated near power lines,
which could not be de-energized, minimum clearance from equipment electrical
distribution and transmission lines shall be maintained accordance with table shown
below.

Normal voltage ,KV phase to phase Normal voltage, KV Clearance, ft (m)


Operation near high voltage power lines to 50 10 ft (3.05)
Over 50 to 200 15 ft (4.60)
Over 200 to 350 20 ft (6.10)
Over 500 to 650 35 ft (10.67)
Over 750 to 1000 45 ft (13.72)

NOTE: - Environmental conditions such as fog, smoke, or precipitation mat require increased
clearance

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 50 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

16 HAZARDOUS ENERGY CONTROL (LOTO)


Lock Out Tag Out or Isolation shall be performed by TAWREED authorized personnel.

Hazardous Energy control Board: A key controlled board that contains the master
control HASP documentation and Keys to all Hazardous energy control lock supporting
work.
Hazardous energy control (LOTO) coordinator:-The designated project senior
Representative, assigned with the responsibility for the implementation of this
Hazardous energy control (LOTO) procedure. Hazardous energy control coordinator
shall maintain an inventory of locks, Hasp, Tags and supporting documents.
Hazardous Energy control survey: A summary of all hazardous energy sources and
associated hazardous energy isolation devices that must be identified and isolated in
order to achieve a zero energy state prior to the performance of any specified
maintenance, Inspection, or construction activity.
Hazardous Energy isolation device: A Mechanical device that physically prevents the
inadvertent transmission or release of hazardous energy i.e. electrical disconnect switch,
circuit breaker, slip blind flange mechanical block, etc.

All isolation to be applied in system or requirement shall conform MARAFIQ OSHM no.
11 isolation procedure.

16.1 Responsibilities
Shall ensure an appropriate Hazardous energy control (LOTO) system is established.
Shall ensure that hazardous Energy Control (LOTO) system training programs are
established and maintained.
Auditing /Monitoring /reviewing of the Hazardous Energy Control (LOTO)System
Shall establish an appropriate Hazardous Energy Control (LOTO) System for the
project.
Shall assure this procedure is implemented throughout project execution.
Shall establish auditing programs to verify contractor compliance with Hazardous
energy control (LOTO) procedure.
Shall ensure that affected employee have been given the appropriate training and
understanding of the hazardous Energy control (LOTO) System and their specific
Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 51 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

All Electrical Energy Lockouts shall include assurance of a complete physical break in
the power conductors, either by visual inspection or by testing for absence of voltage
with an acceptable voltage detecting device or both.

16.1.1 LOTO Removal:-

Before lock out and or Tag out devices are removed and the energy is restored
authorized personnel perform the following.
Inspect the work area to assure that tools and equipment have been removed.
Ensure that the machine or equipment components are operationally intact.
Ensure that all personnel are safely positioned or removed from the area.
Notify the affected personnel that the isolation devices have been removed.
Lockout &or Tag out devices shall be removed from each isolating device only by
authorized personnel who installed them.

16.2 Group Lock Boxes

A group loto box may be used when maintenance or servicing is performed by a crew,
department, or other group that requires an excessive amount of isolation devices, under
the control of the crew coordinators.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 52 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT KAFOU Project Ref. No. KM-12-3340
JUBAIL

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Examples of LOCKOUT/TAGOUT Devices

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 53 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT KAFOU Project Ref. No. KM-12-3340
JUBAIL

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 54 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-3297-01


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First MARAF A MARAFIQ


IQ
Index

Issue Date: 04.12.14 7200-023-928

1 PERSONAL PROTECTIVE EQUIPMENT


KAFOU Safety Supervisor shall make sure the usage of proper use of Personal
Protective Equipment (PPE). Use PPE which can protect a person from Head to toe. To
develop an effective PPE program, all the employees shall be familiar with required
standards and requirements.
Each Supervisor shall verify the following basic PPE are provided and worn by all the
workers at job site before proceeding to any job site.
All PPE shall be inspected on project site prior to use. Defective or Damaged PPE shall
be immediately removed from site and discarded.
Employee shall perform a thorough inspection of his PPE prior to use.
For specific Products (Chemicals, Liquid Gases etc).Corresponding material safety data
sheet shall be followed for PPE Selection.
PPE requirement shall be addressed by means of the corresponding JSA.

17.1 Contractor shall establish a PPE Training program for employee that
shall include as minimum.
When PPE is required?
What PPE is required?
How to wear, adjust, maintains PPE?
How to determine if the PPE is damaged or defective?
The useful life and disposal of PPE
Hard Hat.
Safety Glasses (Clear and Dark as applicable).
Safety Shoes (Foot Protection )
Gas mask
Dust Mask
Ear Plug/ Ear Muff in noisy area.
Hand Gloves.
Face Cover
Respiratory Protection

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 55 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-3297-01


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First MARAF A MARAFIQ


IQ
Index

Issue Date: 04.12.14 7200-023-928

17.2 HARD HAT:


Safety hats or helmets are rigid head gear made of materials that are designed to protect
the head from impact, flying particles, electric shock, etc.
Head Protection signs shall be posted at visible places.
User should visually inspect hard hats for components (shell, suspension, headbands,
sweatbands etc.) prior to use.
Every employee shall be provided hard hats and must wear them all the time during
working hours while on the job site. Metal hard hats and bump or laceration caps are
prohibited. This requirement includes office personnel and visitors to the work site.
The suspension cradle is necessary as it provides the impact distribution quality of the
helmet, so it is important that it be properly adjusted to wearers head.
In case of special requirement like welding, grindings or cutting a face shield shall be
used by the worker and a full body harness will be used by the work if the work on
ladder or scaffoldings as required.
All requirements on proper use and selection of PPE will be in compliance with
(MARAFIQ) Std.

17.3 EYE PROTECTION:

In all project areas appropriate eye & face protection shall be worn by all personnel and
or visitors.
The colored safety glasses shall not be permitted to be worn at night, dark shady areas or
indoors.
Contact lenses shall not be permitted to be worn inside the project.
Safety glasses protect against flying objects. The use of approved eye protection safety
glass with hard side shields is required. All employees shall be issued with safety glasses
at the start of the project. Goggles, face shields etc., shall be issued from the store room.
Goggles provide additional protection against dust, chemical, or harmful light.
Face shields are an additional safeguard that are worn over protective eye wear.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 56 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First MARAF A MARAFIQ


IQ
Index

Issue Date: 04.12.14 7200-023-928

17.4 FOOT PROTECTION

Foot protection signs shall be posted visible places.


In project areas, appropriate foot protection made of hard leather with slip- resistant and
puncture resistant sole must be worn by all personnel and visitors.
All employees must wear approved work boots or shoes in good condition. Approved
foot-ware is steel-toed shoes. Soft shoes, such as tennis shoes and sandals are not
permitted. Boots/shoes should also protect the ankle

17.5 EAR PLUG & EAR MUFF:


Ear plugs must be worn when personnel are involved in or working close to high noise
operations such as air hose cleaning, concrete breaking or cutting or chipping, etc. or
when performing activities in areas identified to be "High Noise Areas" or close to high
noise producing equipment such as compressors, etc.
Hearing protection safety signs shall be posted at visible places where the noise level
equal or higher than 85 dba.
Provision for the use of double hearing protection (Earmuffs over earplugs) to reduce
high noise levels to less than 85 dba are acceptable.
In all project areas with high noise levels (equal or higher than 85 dba), appropriate
hearing protection shall be worn by all concerned personnel and visitors.
It is imperative to select the appropriate device on the basis of comfort, but more
importantly, on the noise attenuation and protection they provide.

17.6 HAND GLOVES


For all activities requiring hand protection from sharp or rough objects which include:
cable pulling, hand digging, rigging, lifting operations or piping work. Gloves will not
be used in situations where the individual is exposed to "pinch points or working close to
moving machinery parts or gears or objects as they can be caught and trap the hand
before it can be removed from the glove. Welding Leathers (gloves and leggings) will be
provided for welders on site.
Gloves are like a second layer of skin, as they provide protection against chemical,
rough surfaces, sharp objects and temperature extremes. However, remember that gloves
should not be worn when working on or with moving machinery as they can get caught
and trap the hand.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 57 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

MARAFI Rev. A MARAFIQ


Q
Index

Date: 04.12.14 7200-023-928


7200-
17.7 FACE SHIELDS, WELDING HELMETS

Face shield shall be worn when possibility of flying particles, sprays of hazardous
liquids, splashes of molten metals and hot solutions can affect the workers.
Welding helmets or hand shields shall be used during all arc welding or oxygen cutting
operations.
Welding goggles shall be used to protect welding helpers from visible and infrared
radiations.
Chemical goggles shall be worn when there are possibilities that the chemicals or
harmful liquids affect the workers.
User shall physically inspect eye face protection equipment for such things at light leaks,
lens chips and structural integrity.

17.8 Respiratory Protection:

Where respiratory are necessary to protect the health of the employee. The contractor
shall establish and implement a written respiratory protection program.
Medical evaluations of employee required to use respirator.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


x MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 58 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-


Subject: H7SE
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

18 EMERGENCY RESPONSE PROCEDURE


KAFOU must familiarize their personnel with the Disaster Management Plan for the
plant and the area in which the job is located. KAFOU must know exactly what to do
when the emergency evacuation or stop works alarms are sounded and do it without
delay. The KAFOU Safety Supervisor shall follow the following guideline in case of any
emergency:
When the emergency alarm sounded for any reason all the KAFOU worker should stop
the work immediately, make it safe and proceed to nearest assembly area in a timely
manner.
In case of any emergency situation like serious personnel injury, fire or critical damage
to operating equipment help may be obtained by contacting nearest (MARAFIQ) Security
Control Center.
MARAFIQ Emergency No. 341-99-11 shall be posted on site
In case there is no telephone available on job site a radio user can send a message to the
other radio user to contact (MARAFIQ) Security Control Center.
While transmitting the message to the (MARAFIQ) Security Control Center you should
ensure that you are identifying yourself by giving the following details:

Your Exact Location
Nature of Emergency
Service Required
Repeat the above messages
Your Name
Your Badge Number

18.1 Gas Release EMERGENCY RESPONSE PROCEDURE


If there is a reason to suspect of Gas release through which you are working all the
KAFOU employee do the following things:
Dont try to investigate, leave the area.
Check the wind direction by looking at the wind socks.
Walk in cross wind direction towards the nearest assembly area away from the affected
area.
Inform the plant operation about the situation after coming to safe assembly area.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 59 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

If you are driving the car shut down your car and start walking in the cross wind
direction towards the nearest safe assembly area.

18.2 Emergency Incident


An unexpected and undesirable event which must be dealt with at once. This may
include any kind of event that may result in injury of personnel or equipment damage,
involving fire and explosion, combustible & chemical liquid spills, flammable or toxic
gas releases, traffic incidents. A civil protest demonstrations will also be considered
part of An Emergency Incident.

18.3 Major Incident


A Major Incident involves serious property damage, fatal or personnel injury, and may
require assistance of external emergency response teams to control the impact of an
explosion, demolition, severe or life threatening injury, or illness to one or more persons.

18.4 Minor Incident


A Minor Incident involves only internal emergency response to control the impact (such
as a small fire, small flange leak, first aid injury etc.).

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 60 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

EMERGENCY RESPONSE TEAM ORGANIZATION


The site is divided into the following areas for Emergency Response Purposes:

Safety Manager

Head Office Based


Site based

Male Nurse Safety Supervisor

Safety Officer
Ambulance Driver

18.5 EVACUATION
The evacuation shall be initiated whenever any of the following incidences have
occurred on the site.

Major Fire, Explosions, Storm, Gas leak, and Flood Incident.


Detectable Gas Leakages or Chemical Spill Incident

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 61 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

NOTE: During an Emergency Situation all Work Permits to work will be cancelled and
vehicles will be parked along the side of the road with engine stopped, along with all engine
equipments. In the event of a toxic gas release, personnel must escape up-wind for evacuation.

Evacuation Procedure.

When the Alarm


Sounds

Area Supervisor
All Personnel

Vacate Area by Check Area under


Nearest Emergency Your Responsibility.
Exit.

Do not Re-enter Building until Check Area under Your


Authorized. Responsibility.

Assemble at Designated At Assembly Point Undertake


Assembly Point. a Roll calls.

Await further instructions Do not allow Any Person to


from Controller. re-enter.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 62 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

18.6 ASSEMBLY POINT LOCATIONS


All least one designated Assembly Point shall be established in a safe location for each of the
Emergency Response areas. Assembly point will be clearly sign posted and all persons
instructed as to its location.

Assembly Point Areas to be provided by


(MARAFIQ)

Emergency Response: Personnel Injury Case


Accident of
Personnel
Injured Walkie-talkie

Safety Supervisor
Injured? Ambulance

Bring the First-aid in


injured to Ambulance
First-aid Room
(Group Lead) shall
report to KAFOU

Need First-aid in
Hospital? Ambulance
Hospital

First-aid
at Site

Report /
Investigation

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 63 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

18.7 Emergency Response Team Drill


Emergency Response Team Drills shall be held in all areas on a monthly basis as part of a general
evacuation drill. This drill is to improve the mobility and the skills of responding Emergency Response
Team members.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 64 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

19 FIRST AID FACILITIES


KAFOU shall provide and maintain adequate first-aid facilities at the project site
in accordance with the most rigorous requirements of:
The Saudi Arab Labor Law as revised from time to time.
First Aid/CPR Training and First Aid Kits Remote Areas.
Minimum Standard Requirements and Recommendations for Contract Industrial Clinics.
If KAFOU employs 50 or more workmen at a WORK Site (including all personnel at
the WORK Site employed by KAFOU Subcontractors and involved in performance of the
WORK):
KAFOU shall provide and maintain a full-time, dedicated emergency vehicle
(ambulance), properly marked and supplied (including stretcher), to transport injured
personnel to the nearest healthcare facility.

The minimum requirements that the first aid facility will contain include

A desk, hot & cold water, wash basin, examining table, air conditioner, adequate
lighting, splints for bone fractures, bandages and sterile wash water in clinic and dust
tight medical supply cabinet.
First aid supplies will be kept available in a cabinet designed only for those supplies.
The cabinet will be placed under the charge of the qualified nurse, who will ensure the
cabinet is well stocked at all times.
A suitable type of stretcher shall be available on project site at all times.
The ambulance shall be equipped, as minimum with the following supplies:
Stretcher and blankets
Portable oxygen
Splints for bone fractures
Bandages
Sterile wash water

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 65 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

The following information will be prominently posted in the first aid clinic

The name of the designated qualified nurse who is in-charge of the first aid clinic.
Name and location of hospital to which the injured that requires outside medical
hospital treatment is to be sent.

SERIOUS INJURY Nearest Companys


Approved Hospital:

For Further Treatment


FORMAN TO INSTRUCT ALL
PERSONNEL NOT TO MOVE
CASUALITY UNLESS HE IS
IN FURTHER DANGER

IMMEDIATELY INFORM
PROJECT NURSE FOR
ABMULANCE

IF SERIOUS INJURY
IDENTIFIED, CALL LISTED
DISPENSARYS PHONE NOS
FOR EXAMPLE
HEARTATTACK, BACK
INJURIES, ETC.

FORMAN TO APPOINT
FLAG MAN TO DIRECT
AMBULANCE

PROJECT NURSE TO
ARRIVE WITH AMBULANCE

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 66 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

20 SUBCONTRACTOR MANAGEMENT
All the sub contractors will be selected and controlled from (MARAFIQ) approved
contractor list and KAFOU approved contractor list. Preference will be given for the
contractors those are having good track records in the compliance of safety requirements
as per (MARAFIQ) Std. and Saudi Government Law.
Before signing any contract KAFOU will request the sub contactor to submit their
Safety Plan to verify their records. And KAFOU will check if the subcontractors have
(MARAFIQ) certified personnel.

20.1 INJURY REPORTING AND RECORDKEEPING

We are often able to identify future hazard areas and apply preventive measure through
analysis of previous injury. However effective remedial action can only be applied when
the basic problem is clearly defined by submission of detailed realistic report. The
evaluation of these facts and the real cause of any injury will assist in directing our
accident prevention activity in the most efficient way

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 67 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Appendix 1: Risk Assessments - Project Risk Register

S. No Topics Page no

1 Safety of Public

2 Site Security and Access Control

3 Access and Egress on Site

4 Personal Health Precautions

5 Work at Height

6 Noise

7 Vibrations

8 Manual Handling

9 Scaffolding

10 Ladders

11 Plant Operations

13 Temporary Electricity

14 Temporary Works

15 Hot works / Welding

16 Fire and Emergency Procedures

17 Hazardous Substances

18 Chemicals

19 Housekeeping

20 Existing Services

21 Site Setup

24 Confined Spaces

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 68 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

28 Structural Steel

29 External Cladding

31 Glazing / Curtain Walling

32 MEP Installations

33 Fit Out Works

34 Hot Weather Work

35 Injury Reporting and Record Keeping

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 69 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

21 SAFETY OF PUBLIC
During (SEC) work
Associated Risks: Likely-hood Severity (1- Risk Rating
(1-3) 3) (1-9)
Accidents to members of public outside the
2 3 6
site boundary
Accidents arising from access of vehicles to
2 3 6
site
Members of public entering site areas and
2 2 4
getting injured
Construction works leading to crashes /
1 3 3
injuries to public

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 Risk Rating = Likelihood x Severity


= very likely

Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

21.1 Control Measures:

Traffic management plan to be in place to cover movements of pedestrian and site


traffic. TMP to be strictly adhered to
Adequate advance warning signage and local signage will be erected and maintained in
order to alert public traffic to the construction works.
A full time security / gateman operative will be stationed at site entrance / exit during
working hours.
All deliveries must be coordinated to minimize disruption and no materials should be off
loaded or stored outside site boundary.
Plant and machinery must remain inside the site boundary at all times and be
immobilized when not in use.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 70 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Where works could impact the public, they must be specifically planned and a method
statement must be developed.
Site access control to be in place and site perimeter to be fully hoarded
Site perimeter and public interface areas to be checked daily
Roadways and pathways outside site must be kept clean. Dust management required here
also.
Special consideration required for interface with third parties, such as other sites, client
areas etc. Specific RA required
Where elements of the building are close to or over hanging areas accessed by public or
others special considerations are required and RAs to be completed, eg. scaffolding,
formwork, cladding works etc
Ensure that noise, vibration and dust nuisance are kept to a minimum

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 71 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

22 SITE SECURITY & ACCESS CONTROL

Associated Risks: Likely-hood(1- Severity(1- Risk Rating (1-


3) 3) 9)

Unauthorized access to site during construction works 2 3 6


Injury to persons trespassing onto site during out of work
2 3 6
hours
Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = Risk Rating = Likelihood x Severity
very likely
Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

22.1 Control Measures:


Access to site (both pedestrian and vehicular) can only occur at designated entrance
point. Entrance (and exit) are manned during working hours by Security / Gateman
SITE ACCESS CONTROL
Site access control to be in place and site perimeter to be fully hoarded.
All visitors & construction personnel to sign in at security hut prior to entering the site.
Site to be fully secured in out of hours times and all plant to be disabled.
All visitors to report to site office. Site Management and Safety Officer to actively
monitor the ingress of unauthorized personnel onto site.
Provide adequate warning signs to site perimeter and along the streets approaching the
site to inform the public of danger & no trespassing onto site.
During public holiday periods site management are to carry out regular inspections to
ensure site is fully secure.
The site is secured and patrolled by on-site security personnel on a 24/7 basis

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 72 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

23 ACCESS & EGRESS ON SITE

Associated Risks: Likely- Severity(1- Risk Rating


hood(1-3) 3) (1-9)
Site not secured and access allowed to public/third parties 3 2 6
Unauthorized persons getting injured on site 2 3 6
Unauthorized persons gaining access to site during out of
2 3 6
hours
Poor housekeeping leading to slips trips and falls of persons. 2 2 4
Unclear access routes 2 3 6
Unauthorized access to the work areas by non-construction
2 3 6
personnel within IICS areas
Insufficient signage 2 2 4
Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = Risk Rating = Likelihood x Severity
very likely
Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe
Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

23.1 Control Measures:


Access to site to be controlled at all times & site gates to keep shut.
All personnel and visitors to sign in & out.
A Good standard of housekeeping to be maintained on site at all times to avoid risk of
slips, trips and falls.
Site to be secured at all times to avoid unauthorized access as outlined in Risk
Assessment No.2
Access routes on site to be delineated where possible and as required.
Adequate signage to be in place to indicate access and egress routes and to segregate
plant and pedestrians on site.
All plant operators on site to be aware of construction personnel visitors on site. All
plant to have flashing beacons, reversing alarms, auxiliary visual devices and to abide by
site speed limits.
All site operatives on site to be aware of site plant and equipment, to follow designated
routes and to avoid plant and equipment where possible.
Site operatives to wear high visibility clothing at all times and to identify themselves to
drivers where possible.
Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 73 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
PR #7000004805
Health Safety & Environmental Loss Prevention
Program MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7000004805

Weekly toolbox talks to all site operatives to outline works & access routes on site.
Emergency exits must be kept clear and checked regularly.
All opens, shafts and leading edges must be protected at all times.
Overhead walkways must be fitted with toe-boards, brick-guards or netting to prevent
debris falling from above.
The site entrances and surroundings areas must be maintained at all times to avoid injury
to third parties and passersby and general members of the public.
All spillages such as water, oil and chemicals must be dealt with immediately and in
accordance with environmental policy.
All access ways and stairs must be fitted with adequate lighting.
All access ladders must be securely tied or footed and extend at least 1m above landing
level.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 74 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
PR #7200-023-928
Health Safety & Environmental Loss Prevention
Program MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

24 PERSONAL HEALTH PRECAUTIONS


Associated Risks: Likely-hood (1-3) Severity (1-3) Risk Rating (1-9)

Health effects from adverse working 3 2 6


conditions/environment
Personal Protective Equipment (PPE) not worn 2 3 6
Exposure to Hazardous Substances 2 3 6
Poor Welfare Facilities on site 2 2 4
Health Awareness Issues on site 2 2 4

Risk Rating = Likelihood x Severity Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very
likely Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

24.1 Control Measures:


Hazardous materials, practices or substances must be eliminated or
substituted for less hazardous alternatives.
Where usage of hazardous substances is justified, all recommendations or
MSD sheets must be complied with and management must monitor such
operations closely. RA must be completed and method statement for the
works.
PPE must be suitable for the task to be carried out, including specialist PPE.
PPE on all sites is Safety Boots, Helmets and Hi Via Vest

Site Management must monitor and ensure PPE compliance on site

Hearing protection must be worn in areas of excessive noise

If dampening or extraction cannot suppress dust, operatives working in


dusty environments must wear dust masks.
Appropriate eye protection must be worn as required eg. cutting, grinding
etc

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 75 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
PR #7200-023-928
Health Safety & Environmental Loss Prevention
Program MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Gloves must be worn when handling jagged, hot, cold or harmful materials

There will be trained first aiders on site, the identity of whom will be posted
on walls of offices, canteens, etc. Fully stocked first aid boxes also on site.

Welfare facilities will include toilets, drying rooms, canteen areas. All to be
well maintained. No eating on site, except in welfare facilities

Toolbox talk to be given on relevant health issues such as Weils disease,


white finger etc. Posters also to be posted for info purposes

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 76 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
PR #7200-023-928
Health Safety & Environmental Loss Prevention
Program MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

25 WORK AT HEIGHT
Associated Risks: Likely-hood (1-3) Severity (1-3) Risk Rating (1-9)

Falling persons 3 3 9

Falling objects 3 3 9

Public exposed to falls or falling objects 2 3 6

Unprotected edges or opens in floor slabs 2 3 6

Excavations 2 3 6

Works associated with stair and lift cores and


3 3 9
riser shafts
Roof work 2 3 6

All concrete & formwork & block work 3 3 9

Erection of the structural steel, precast,


3 3 9
scaffolding, hoists etc
Installation of glazing, cladding, plastering,
3 3 9
lifts, etc
MEWPs, hoists, mast climbers 3 3 9

Use of uncertified hop-ups 2 2 4

Suspension Trauma 2 3 6

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = Risk Rating = Likelihood x Severity


Very likely Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 77 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
PR #7200-023-928
Health Safety & Environmental Loss Prevention
Program MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

25.1 Control Measures:


Risk assessment required for all work at height. Method statements to be produced where
risks are deemed to be greater than LOW
Collective fall preventative measures be put into place where possible and individual
measures only as a measure of last resort
Inspections and Sign-offs must be completed for all work at height equipment and working
platforms, eg. Scaffolds, ladders, guardrails, walkways, decks, fall arrest equip etc.
See Risk Assessment for ladders
Housekeeping must be maintained on all walkways, desks, platforms, scaffolds etc
Adequate handrails, toe boards must be in place at all times
Floor openings and risers must be adequately protected
Roof work requires specific method statement
Windy conditions must be considered with regard to lose materials and materials on roofs
and scaffolds
Exclusion zones must be implemented where there is works overhead
Netting and canopies should be considered on scaffolding adjacent to 3rd party or public
areas
Rescue plan must be in place for safety harness operations where there is risk of falling
and suspension trauma
Particular restrictions and risk assessments must be in place where there are roof lights to
be installed
Only competent & trained personnel to operate MEWP (Mobile Elevated Work Platform),
hoists & mast climbers
Removal of rubbish from higher levels in the building must be considered with respect to
rubbish chutes etc.
Access control required to roof areas where there are fall arrest requirements, appropriate
signage to be in place.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 78 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
PR #7200-023-928
Health Safety & Environmental Loss Prevention
Program MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

26 NOISE
Likely-hood (1-3) Severity(1-3) Risk Rating (1-9)

3 3 9

2 3 6

2 3 6

2 2 4

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very Risk Rating = Likelihood x Severity
Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe likely

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

26.1 Control Measures:


Hearing protection required for any noise producing activity over 80dB (minimum).
As far as is reasonably practical, new machinery will be fitted with silencers and plant cabs
insulated to quieter the source of noise.
Workers must be informed of the hazard and the risks involved and noise exclusion zones
established and maintained following risk assessment.
Work must be planned so that minimum numbers of workers are exposed to noise.
Ear protection must be changed on a regular basis to maintain safety and health standards.
Operatives must be shown how to use ear protection correctly and toolbox talks will be
provided as necessary.
Where ear muffs cannot be worn e.g., in a JCB rock breaker, where vibration would render
muffs impractical, ear plugs must be worn by operators. All hearing protection is subject to
risk assessment.
Work must be organized so as to cause minimum disruption to the operations of the
neighboring premises & to general public. Protection to existing buildings to be used where
required.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 79 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

27 VIBRATIONS

Associated Risks: Likelihood (1-3) Severity (1-3) Risk Rating (1-9)

Carpal tunnel syndrome 3 3 9

Vibration white finger 3 3 9

Risk Rating = Likelihood x Severity


Severity rated 1-3, 1 = not severe, 2 = Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very likely
severe, 3 = very severe

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Control Measures:

All works involving vibrations e.g. Squabbling, rock breaking etc should be
eliminated
Or minimized as far as possible.

All works involving vibrations must be risk assessed and method statements must be
Produced where risks are deemed greater than low.

Each subcontractor shall undertake their own risk assessment, they may require
Vibration monitoring.

All plant, tools & equipment must comply with current regulation regarding
vibrations,
including all subcontractor equipment

Select the correct tool for the job and ensure that all equipment is properly
checked and maintained

Provide training and information. Anyone using vibrating equipment must be


advised of the risk and the control measure
Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 80 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Continuous works involving vibrations must be risk assessed from the point of view
of personnel rotation eg. where operatives change shifts every two hours

Operatives should be made aware of the risks by carrying out regular tool box talks on
site.

28 MANUAL HANDLING

Likeli-hood (1- Severity (1- Risk Rating


3) 3) (1-9)

3 2 6

3 2 6

2 2 4

2 2 4

3 1 3

3 1 3

2 2 4

2 2 4

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very Risk Rating = Likelihood x Severity
Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe likely

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Control Measures:

All IICS operatives to receive basic manual handling training through tool box
talks

Tasks must be planned, eliminating the need for manual handling in so far as
possible

Planning of works must consider how materials and delivered and off loaded etc
Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 81 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

KAFOU and subcontractors must use mechanical handling equipment


wherever possible to eliminate the risk of manual handling injuries.

Select the right tool for the task in hand and adapt to the individual.

Keep access and work areas free from slip, trip and fall hazards. Clean up spills,
tie-up trailing cables and store materials correctly.

Workers must take regular breaks from activities which may cause repetitive strain
injuries.

29 SCAFFOLDING

Likeli-hood Severity Risk Rating


(1-3) (1-3) (1-9)

3 3 9

3 3 9

3 3 9

3 3 9

3 3 9

3 3 6

3 3 9

2 3 6

2 3 6

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3Risk Rating = Likelihood x Severity


Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe = very likely
Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)
Control Measures:

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 82 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Scaffolding Contractor must produce risk assessment & method statement to cover
safe erection and dismantling of scaffolding on site taking into account relevant
Code of Practice for scaffolding

Scaffold plan must be in place for the project

Scaffold must only be erected, altered or dismantled by experienced, competent


scaffolding technicians

Ground conditions to be assessed to ensure fit for load and base boards in place.
Where there are underground services these must be considered

Safety Officer to make daily / weekly scaffold inspections to ensure compliance


with code of practice and it is safe for the use intended.
Handover Certificates must be completed by the Scaffolding contractor (if scaffold
works not undertaken directly)

The scaffolding register will be kept on site along with records of handover certs
and inspections.

Temporary works designs must be carried out where required for specialist
scaffolds. Design carts must be completed by the designer for such scaffolds, eg.
birdcages, ladder beam arrangements, cantilever scaffolds etc

Scaffolds should be well tied, braced, have adequate access ladders, toe boards,
handrails etc. They must be kept clean and regularly be inspected by site
management.

Loading bays must be designed and have signage to show max loadings.

Scaffold must have adequate signage regarding access points, whether complete /
incomplete etc

Protection against falling objects must be in place as required, such as brick


guards, netting & canopies to protect construction personnel & members of the
public/hospital

Wheeled and tower scaffolds will only be used on firm and even surfaces. Brakes
will be applied when in use.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 83 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Tower scaffolds must not be wheeled along with people on board. All personnel
must dismount prior to moving.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 84 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

30 LADDERS
Associated Risks: Likely-hood (1-3) Severity (1-3) Risk Rating (1-9)

Ladders placed on uneven surface 2 3 6

Ladders not tied 2 3 6

Ladders placed at a poor angle 2 3 6

Defective ladders 2 3 6

Carrying loads up and down ladders 2 2 4

Ladders not projecting at least 1m 2 2 4


above the landing level.
Accidents caused by over-reaching 3 3 9
from ladders
Using wrong ladder for the task. 2 3 6

Personnel standing on top rungs of 2 3 6


step ladder
Risk Rating = Likelihood x Severity
Severity rated 1-3, 1 = not Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very likely
severe, 2 = severe, 3 = very severe

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Control Measures:

All ladders must comply to EN 131 or equivalent

Individual risk assessment must be carried out for operations involving the use
of ladders

As with all operations carried out at heights, the use of ladders should be
planned and should only be used for short duration work, (Short durations
pertain to 25 minutes to 30 minutes max).

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 85 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Domestic or makeshift ladders are prohibited on site.

Ladder inspections must be carried out by the Safety Officer on a weekly basis
and records kept on file of such inspections

Ladders must be identifiable and ID marking must be recorded

Straight ladders must be tied or footed and extend 1m above landing platform
and should be erected at correct pitch.

Operative should not use top 2-3 steps of a step ladder, should not straddle a step
ladder or works backwards on a step ladder

Step ladders should only be used when fully opened and never used as lean-to
ladders

Over-reaching should be avoided completed and the correct ladder should be


selected for the particular task

Carrying loads up and down ladders must be avoided

Temporary stairs are to be used in preference to ladders in primary access points


where reasonably practicable.

Misusing ladders is considered a serious offence and may lead to dismissal from
site

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 86 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

31 PLANT OPERATIONS

Likely-hood (1-3) Severity (1-3) Risk Rating (1-9)

2 3 6

2 3 6

2 3 6

2 3 6

2 3 6

2 3 6

2 3 6

2 3 6

2 2 4

3 3 9

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very Risk Rating = Likelihood x Severity
Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe likely

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Control Measures:

Only trained and / or competent and authorized personnel may operate site
plant.

With the exception of tower crane erection and dismantling special permission
based on a written risk assessment must be obtained from the Operations
Manager prior to the use of a manage, man riding skip or a man basket /

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 87 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

cradle

Any defects in plant must be reported to site supervisors immediately.

All plant items must be properly maintained on a regular basis. Maintenance


plan required for large plant

Traffic management plan must be in place to identify pedestrian & traffic


routes, signage requirements etc

When operating plant on public streets or on fire tender road, specific risk
assessment and method statement must be in place

Drivers of large plant items should work with a banks man when working in
blind spots, confined spaces, public roads or other hazardous situations.
Special care must be taken near scaffolding and excavations

Drivers should ensure that all persons are standing clear during loading and
unloading/tipping and that their machine is turned off (and key removed)
when not in use.

Passengers must not be carried on any moving plant.

Barriers must be provided to stop machines from driving into excavations and
chocks to be provided at least one meter of the edge for tipping/pouring into
excavations.

All relevant documentation for mobile plant must be retained on site by Site
Management. Certificates must be current and all relevant registers
completed.

Machines should not be overloaded

Operators of plant must complete a daily inspection and in association with


Safety Officer undertake a weekly test

All loads must be secured prior to commencement of journey

Operators of plant must never use a mobile phone.

Spill kits must be on site to deal with fuel spillages etc

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 88 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Loads landed on scaffolding loading bays must be planned so as not to exceed the
safe working load of the bay.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 89 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

32 TEMPORARY ELECTRICITY

Likely-hood (1-3) Severity (1-3) Risk Rating (1-9)

2 3 6

2 3 6

1 3 3

1 3 3

Risk Rating = Likelihood x Severity


Severity rated 1-3, 1 = not severe, Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very likely
2 = severe, 3 = very severe

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Control Measures:

The Company Procedure on Temporary Electrical Installations must be followed. Temp.


Electrical co-coordinator must be appointed by Operations Manager and must inspect
installations weekly.
Only qualified electricians will be permitted to carry out electrical work and
maintenance.
Loose cables should be tied at high level to avoid trip hazards and unnecessary damage.
Procedures must be put in place and a detailed method statement provided by the
competent installation contractor for all works involving live installations during testing
and commissioning.
All electrical testing and commissioning and connections to existing services supplies
must be carried out based on risk assessment and method statement

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 90 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

All electrical supplies must be suitably earthed


A 3 month electrical test of electrical appliances which are fitted with an RCD, including
generators, must be undertaken by a competent person.
The supply and distribution of electricity on site must be planned in advance taking into
account power and range of voltages required and distribution network. Ensure that the
main switchboard sub-boards and transformers are in good condition and tamper proof.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 91 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

33 TEMPORARY WORKS
Associated Risks: Likeli-hood (1-3) Severity (1-3) Risk Rating (1-9)

Design failure resulting in collapse of 2 3 6


structure
Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very Risk Rating = Likelihood x Severity
Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe likely

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Control Measures:

Where temporary works design is not required the works must be risk assessed and
carried out in a safe and planned manner.
Designs must be circulated to the Supervision Engineer for sign-off and approval.
Specific risk assessments and method statement must be carried out for all temporary
works
Temporary works permits must be used where temporary works have to be loaded or
pressurised, for example, formwork decks, back propped slabs or heavy duty scaffold
loading bays.
Permits must be issued by the TWC once satisfied that the design requirements have
been met.
Where temporary works are being carried out by subcontractors the TWC must ensure
that a designer is appointed by the subcontractor and that the design is submitted to the
Supervision Engineer for sign-off and approval.
The Temporary Works Coordinator (TWC) compiles a temporary works schedule for the
project. This schedule identifies all planned temporary works and whether designs are
required for these temporary works. The schedule is updated as the project progresses

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 92 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

34 HOTWORKS/WELDING
Associated Risks: Likely-hood (1-3) Severity (1-3) Risk Rating (1-9)

Materials or persons catching fire. 2 3 6

Workers becoming overwhelmed by 1 3 3


gases produced by welding
Explosion of gases used for welding. 2 2 4

Absence of fire extinguishers 1 3 4

Burns to persons using equipment 2 3 6

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very Risk Rating = Likelihood x Severity
Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe likely

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Control Measures:

All welding operations require risk assessment and hot work permits system,
including fire watch
Only competent, trained personnel may use welding, cutting, brazing, blow lamps
or similar apparatus. Appropriate PPE must be worn, e.g. welding shield, gauntlet
gloves, flame retardant clothing etc
All equipment must be inspected and in good condition. e.g. Flash back arrestors
must be fitted to all flammable compressed gas bottles used for such purposes.
Welding screens, fire blankets, fire extinguishers etc must be in place in
accordance with method statement
Work areas must kept clear and tidy and areas must be checked for flammable

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 93 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

materials, combustible wastes and any other sources of ignition prior to


commencement
Welding procedures should cease at least 1 hour before workers leave site to
ensure that there is no possibility of fire, in accordance with the Hot Work Permit
System.
All connections and equipment should be checked regularly for leaks.
Welding and other similar equipment should only be used in well-ventilated
conditions.
Never use acetylene in excess of 15psig pressure or store acetylene in
temperatures greater than 50C / 122F
Equipment and gas cylinders must be stored in a flammable liquids store (upright
and away from sources of ignition).

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 94 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

35 FIRE & EMERGENCY PROCEDUERS


Associated Risks: Likely-hood (1-3) Severity (1-3) Risk Rating (1-9)

Presence of flammable liquids. 2 3 6

Build-up of combustible wastes 2 3 6

Emergency procedures and telephone 2 3 6


numbers not known
Presence of fuel tanks and gas storage 2 3 6
units
Poorly followed hot works procedures 2 3 6

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very Risk Rating = Likelihood x Severity
Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe likely

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Control Measures:

A fire plan must be in place and up to date, this will include emergency contacts,
escape routes (2), firefighting equipment and fire point locations and fire wardens
Fire escape routes around site and to the neighboring properties must not be blocked at
any time.
Risk assessments and method statements must reflect the need for hot works and the
implementation of a hot works permits. This must include fire watch period
All flammable materials (liquids, gases, solids, etc.) must be classified and labeled in
accordance with regulations so that such materials may be clearly identified. Petrol
and mixes stored in properly constructed safety containers only. Such materials
should only be used as required and surplus materials removed from site.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 95 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Smoking and other sources of ignition are prohibited near flammable materials.
Never overload electrical equipment.
Flammable liquids and gases must be stored properly outside buildings or containers
(in flammable liquids store). Flammable liquids and materials must be stored safely
out of access ways and in designated areas, away from all sources of ignition and
possible sources of interference. Such materials must be adequately cordoned off and
correctly signposted.
Combustible wastes i.e., wood dust, packaging and containers etc. must be disposed of
regularly and dusts must be suppressed to prevent potentially explosive atmospheres.
Fire drills must be carried out on a six monthly basis

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 96 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

37 HAZARDOUS SUBSTANCES
Associated Risks: Likely-hood (1-3) Severity (1-3) Risk Rating (1-9)

Hazardous substances not identified 2 3 6


prior to use.
PPE not supplied or worn. 2 3 6

Areas not sealed off from other workers 2 2 4


where dangerous chemicals are in use.
Ignition sources near flammables 2 2 4

Hazardous substances found on site 1 3 4

Improper storage of hazardous 2 3 6


substances
Building up of unhealthy atmospheres 2 2 4

Occupational Asthma & dermatitis 2 2 4

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very Risk Rating = Likelihood x Severity
Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe likely

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Control Measures:

COSHH Regulations 2002 to be adhered to.


The use of hazardous substances to be avoided in so far as possible.
Where usages of hazardous substances are required, all recommendations on SDS sheets
must be complied with completely. Specific RA must be completed.
All hazardous substances, whether liquid, solid or gaseous will be identified prior to use.
Manufacturers recommendations will be followed exactly.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 97 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Materials Safety Data sheets must be obtained for all chemicals e.g. aerosols, sprays,
special application paints, cementations grouts etc. prior to usage.
Risk Assessments must be prepared for all hazardous substances.
The hierarchy of controls must be considered including: substitution for a safer product,
removal the person from the hazardous substance by changing the work method,
providing engineering method to reduce exposure and finally provide P.P.E. as the last
resort.
KAFOU Contracting will prepare or obtain from the relevant subcontractor method
statements on the handling and application of such substances. READ ALL LABELS.
If any hazardous substance is encountered during construction, work will be stopped and
licensed subcontractor appointed to remove the material and dispose of it safely. This
will include asbestos.
Smoking and naked flames are prohibited around flammable substances.
All dangerous materials/substances will be carefully stored, e.g. gas cylinders stored
upright and in a central location, preferably outdoors.
Care to be taken during excavations in case there is any risk from chemical hazards.
Environmental considerations must be adhered to for example diesel should not be
stored over a storm drain, welfare waste should not be allowed to accumulate or flow
into a river, paint brushes should not be washed into the site foul system etc.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 98 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

37 CHEMICALS
Associated Risks: Likely-hood (1-3) Severity (1-3) Risk Rating (1-
9)

Contamination 2 3 6

Ill health 2 3 6

Dermatitis and burns 2 2 4

Poisoning 2 2 4

Risk Rating = Likelihood x Severity


Severity rated 1-Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very likely
3, 1 = not severe, 2 = severe, 3 = very severe

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)
Control Measures:
Comply with all requirements of the relevant (Material Safety Data Sheets) MSDS.
Keep all MSDS in the on-site Safety File.
Ensure that there is good ventilation in areas where work is being carried out.
Ensure the correct type of PPE is used on site when working with chemicals.
Inform workers of any materials that maybe harmful, carry out regular tool box talks to
all operatives on site.
Provide training for the safe use, storage, handling and emergency procedures for all
workers.
Label, store and transfer all chemicals properly as set out in the relevant MSDS.
Dispose of all contaminated materials/waste as per the relevant MSDS.
Highlight the First Aid requirements on MSDS for all chemicals.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 99 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

38 HOUSE KEEPING

Associated Risks: Likelihood (1-3) Severity (1-3) Risk Rating (1-9)

Slips, Trips & Falls resulting in injury 2 3 6


to personnel
Back, hand or head injuries 2 3 6

Risk Rating = Likelihood x Severity


Severity rated 1-3, 1 = not severe, Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very likely
2 = severe, 3 = very severe

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Control Measures:
Keep all areas clear of obstructions.
Ensure a clean as you go policy is in place and is monitored daily by site management.
Ensure that all timber is de-nailed and disposed of accordingly.
Never drop materials or rubbish from heights. Use chutes for all loose materials.
Place all debris/rubbish in designated skips.
No eating or drinking on site.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 100 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

39 EXISTING SERVICES

Associated Risks: Likely-hood (1-3) Severity (1-3) Risk Rating


(1-9)

Risk of striking underground services 3 3 9


resulting in damage to services or possible
electrocution
Risk of striking overhead electric cables 1 3 4
during lifting operations, by tipper trucks,
mobile elevated work platforms, by ladders
and mobile tower scaffolds etc
Health risk working with existing foul sewer 2 3 6

Risk of working with contaminated earth. 2 2 4

Working in close proximity to live services 3 3 9

Works associated with live sewers 2 2 4

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very Risk Rating = Likelihood x Severity
Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe likely

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)
Control Measures:
As-built services drawings should be provided prior to the project by the Designers /
Engineering Supervisor. Both buried & overhead services should be identified.
Where overhead services are not diverted goalposts will be put in place in accordance
with the Saudi Electricity Code of Practice
All utility companies should be contacted in an attempt to aid in the location of existing
services
Risk assessment and method statements must be in place for all works involving existing
services, especially diverting these or connection to them

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 101 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Live services must be cordoned off form safe areas.


A competent person will operate equipment to locate existing underground services.
All underground services likely to cause a hazard will be identified prior to
commencement of excavation works.
Slit trenches/exploratory works to be carried out on site to identify existing services &
allow them to be recorded.
The location of buried services must be clearly signed caution buried services and
service specific signs must be used.
Excavation permits must be used for all excavations. These will be issued by a
competent KAFOU Engineer and will be signed by the excavation supervisor and
machine driver
Machine digging will be limited and hand digging must take place within 500mm of all
known underground services.
KAFOU Guide Lines for Excavating around Live Services to put into practice on site
by KAFOU management.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 102 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

40 SITE SET UP
Associated Risks: Likelihood (1-3) Severity (1-3) Risk Rating (1-9)

Disruption to the use of Fire Tender 2 2 4


Road
Electrocution from overhead power 1 3 4
lines / street lighting
Injuries from use of cranes 2 2 6

Injuries to public 2 2 4

Falls from Height 2 2 4

Risk Rating = Likelihood x Severity


Severity rated 1-3, 1 = not severe, Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very likely
2 = severe, 3 = very severe

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED

Control Measures:

Signage & barriers to be in place along Fire Tender road (To ensure no access beneath
lifts)
Specific method statement required to outline crane operations and off loading of cabins

All lifting equipment to be certified and requires a thorough examination prior to its use

Plant to be operated by trained / competent person

All operatives on site to have site induction

Access to site area to be restricted

A specific method statement to be developed for erection of site perimeter hoarding

All operatives involved in manual handling to have specific manual handling training

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 103 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

CONFINED SPACES

Associated Risks: Likelihood (1-3) Severity (1-3) Risk Rating (1-9)

Suffocation / entrapment 2 3 6

Failure to escape 2 3 6

Restricted space 3 2 6

Lack of training 2 3 6

Poor ventilation 3 3 9

Gas build up 3 3 9

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very Risk Rating = Likelihood x Severity
likely Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe
Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)
Control Measures:
Note: There is very little confined space works envisaged in this project. The works involving
confined spaces include works to completed manholes. Where works involve confined space
there is a requirement for specific method statement to be produced and all persons involved
must have adequate confined space training.
Confined spaces must be identified. It is the responsibility of Site Management and the
Site Safety Officer to ensure that all confined spaces are identified and that the works are
planned and risk assessed.
All persons working in confined areas to have confined space training.
Supervisors must have adequate confined space training.
Gas monitors must be in place.
No lone working.
Access and egress points must be considered.
All method statements to consider confined space.
Rescue plan to be in place with tripod, winch and breathing apparatus, depending on the
specific confined space.
Two way radio communication to be in place where required.
Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 104 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

41 STRUCTURAL STEEL
Associated Risks: Likely-hood (1-3) Severity(1-3) Risk Rating (1-9)

Works not planned properly. 2 2 4

Persons/objects/materials falling from a 2 3 6


height.
Elements not supported adequately 3 3 9
causing subsequent collapse
Failure of hoisting/lifting appliances and 3 3 9
gear
Failure to store steel safely 2 3 6

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very Risk Rating = Likelihood x Severity
Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe likely

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Control Measures:

Specific risk assessments and method statements must be produced by the Specialist
Structural Steel Contractor prior to the commencement of any site works. These must
take into account all measures below
Erection sequence and support arrangements must be planned in order to reduce the risk
of collapse of elements. Designers should allow for temporary bracing as required and
be involved in erection sequence.
Permanent Design certificate to be in place
Structural steel deliveries must be in accordance with any Traffic Management Plan(s)
and must be support the erection sequence
Supporting columns, slabs etc. must have reached adequate strength prior to the erection
of structural steel elements.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 105 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-3297-01


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Personnel involved must be competent and trained and wear all necessary PPE as
outlined in method statement.
Inspections to be carried out for all work at height equipment used, e.g. ladders,
scaffolds, alloy towers, MEWPS, harnesses etc
All lifting equipment must be certified and checked before use
Cranes used during the erection of precast elements must be approved by the company
appointed person.
Exclusion zones must be implemented for erection and off loading areas etc
Storage of structural steel must be considered and included in method statement

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 106 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-3297-01


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

43 EXTERNAL CLADDING

Associated Risks: Likely-hood (1-3) Severity (1-3) Risk Rating (1-9)

Defective Scaffolding 2 3 6

Persons/objects/materials falling from a 2 3 6


height
Manual Handling 2 2 4

Poor housekeeping resulting slips, trips 2 2 4


and falls
Noise & Dust Generation 2 2 4

PPE not worn 2 2 4

Plant & equipment 2 2 4

Risk Rating = Likelihood x Severity


Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very likely, Severity rated 1-3, 1 = not severe,
2 = severe, 3 = very severe

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Control Measures:
Scaffold must only be erected, altered or dismantled by competent / experienced
scaffolding technicians
No overloading of materials on scaffold platform
Ensure housekeeping is maintained and monitored by KAFOU management
Ensure the correct use of PPE
Dust & Noise management to be in place where working close to adjacent buildings,
cutting of materials to be damped down to reduce dust generation

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 107 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-3297-01


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

KAFOU management to ensure all crane lifting operations are co-ordinate and banks
man to be present at all times
MSDS for all materials/substances to be on file and any hazards/risks when using
materials to be communicated to operatives on site.
Regular tool box training to be carried out on site by KAFOU Safety Adviser &
Sub- contractors supervisor
Works requiring the use of Fall Arrest Equipment, an Emergency Rescue Plan must be
in place & communicated to operatives prior to works commencing
All delivery of materials to be co-ordinate with KAFOU Site Management & to comply
with the requirements of site specific traffic management plan
Work areas to be cordoned off with barriers and appropriate signage warning
construction personnel and members of the public of works overhead
Only certified MEWP are to be used on site with required training
Ensure sub-contractors personnel have required manual handling & abrasive wheel
training
A Site Specific Method Statement is required by Sub-contractor for all stone cladding
works on site.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 108 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-3297-01


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

43 GLAZING / CURTAIN-WALLING

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very Risk Rating = Likelihood x Severity
likely Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)
Control Measures:
Scaffold must only be erected, altered or dismantled by experienced and competent
scaffolding technicians( Refer to RA on Scaffolds)
No overloading of materials on scaffold platform
Ensure housekeeping is maintained and monitored by KAFOU management
Ensure the correct use of PPE
Dust & Noise management to be in place where working close to adjacent buildings,
cutting of materials to be damped down to reduce dust generation & protective screening
to reduce noise levels
KAFOU management to ensure all crane lifting operations are co-ordinate and banks man
to be present at all times

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 109 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-3297-01


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

MSDS for all materials/substances to be on file and any hazards/risks when using
materials to be communicated to operatives on site.
Regular tool box training to be carried out on site by KAFOU Safety Officer &
Sub- contractors supervisor
Works requiring the use of Fall Arrest equipment, an Emergency Rescue Plan must be
in place & communicated to operatives prior to works commencing
All delivery of materials to be co-ordinate with KAFOU Site Management & to comply
with the requirements of site specific traffic management plan
Work areas to be cordoned off with barriers and appropriate signage warning
construction personnel and members of the public of works overhead
Only certified MEWP are to be used on site with required training
Ensure sub-contractors personnel have required manual handling & abrasive wheel
training
A Site Specific Method Statement is required by Sub-contractor for all glazing works on
site

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 110 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-3297-01


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

44 MEP INSTALLATION
Associated Risks: Likely-hood (1-3) Severity (1-3) Risk Rating (1-9)

Working at heights 2 3 6

Access/Egress 2 3 6

Manual handling 2 2 4

Poor housekeeping resulting slips, 2 2 4


trips and falls
Noise & Dust Generation 2 2 4

PPE not worn 2 2 4

Hot works 2 2 4

Power operated tools 2 2 4

Use of Ladders 2 2 4

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very Risk Rating = Likelihood x Severity
Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe likely
Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Control Measures:

Ensure the correct use of PPE on site at all times


KAFOU Site management to issue Hot works permit and a permit to work system is to
be place and monitored daily
Housekeeping to maintained and monitored daily by KAFOU Site Management
Regular tool box training to be carried out on site by KAFOU Safety Officer &
Sub- contractors supervisor

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 111 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-3297-01


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

A Site Specific Method Statement is required by Sub-contractor for high risk mechanical
& electrical works on site
All personnel to be in receipt of manual handling & abrasive wheels training
Mechanical & Electrical installers to be competent and be in possession of appropriate
certification
Correct signage to be in place to notify construction personnel of live power, restricted
work zones, commissioning in progress etc

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 112 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-3297-01


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

45 FIT-OUT WORKS

Associated Risks: Likely-hood (1-3) Severity(1-3) Risk Rating (1-9)

Working at heights 2 3 6

Access/Egress 2 3 6

Manual handling 2 2 4

Poor housekeeping resulting slips, trips 2 2 4


and falls
Noise & Dust Generation 2 2 4

PPE not worn 2 2 4

Mobile Scaffold use 2 2 4

Chemical exposure 2 2 4

Use of Ladders 2 2 4

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very Risk Rating = Likelihood x Severity
Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe likely

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)

Control Measures:

Wheeled and tower scaffolds will only be used on firm and even surfaces. Brakes will
be applied when in use. Wheeled scaffolds may only be moved by pushing near the
base. Out riggers are to be used where necessary
Tower scaffolds must not be wheeled along with people on board. All personnel must
dismount prior to moving.

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 113 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-3297-01


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

Ensure the correct use of ladders on site at all times, refer to RA on Ladders
A Site Specific Method Statement is required by all Sub-contractors for all internal fit-
out works
Regular tool box training to be carried out on site by KAFOU Safety Officer &
Sub- contractors supervisor
Ensure housekeeping is maintained, See RA on Housekeeping

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 114 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 . 7200-023-928

46 HOT WEATHER WORK

Associated Risks: Likely-hood (1- Severity (1-3) Risk Rating (1-9)


3)

Heat Stress 2 3 6

Sunburn 2 3 6

Dehydration 2 3 6

Likelihood rated 1-3, 1 = unlikely, 2 = likely, 3 = very Risk Rating = Likelihood x Severity
Severity rated 1-3, 1 = not severe, 2 = severe, 3 = very severe likely

Risk Level: Low Risk = 1-3, Medium Risk 4-6, High Risk 7-9 (High risk denoted in RED)
Control Measures:

Sufficient water points with salt / glucose packs to be positioned throughout site
Operatives to be given regular tool box talks on how avoid risks associated with hot
weather work and the requirement to maintain fluid intake and wearing of appropriate
PPE
Appropriate PPE Operatives to wear clothing which covers arms, legs and head
(Coveralls ,Face Shield and Helmet)

Appendix 2: Emergency Plans

REPORTS
An immediate oral report will be made to K A F O U office and the SEC
Representative office in the following cases:
All fatal injuries.
All injuries required medical attention which results in lost time.
Fully detailed written reports of these injuries will be submitted within 24 hours with
copy to the MARAFIQ Site Representative. All other injury will be recorded and
monthly injury reports submitted to MARAFIQ.
Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 115 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 . 7200-023-928

In addition any injury which debilitates a man for three days must be reported in writing
for submission in compliance with SAG labor law. This report will be submitted to
MARAFIQ.
Obtain treatment for any injured person.
Ensure that the scene of the accident get undisturbed.
Report to the site supervisor

Customer Contractor

MARAFIQ Power and Utility Company KAFOU


MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 116 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340
KAFOU Document No. KTS-14-3340-HSE
Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14


7200-023-928

Customer Contractor
MARAFIQ MARAFIQ Power and Utility KAFOU
MARAFIQ Power & Utility Company for Jubail and Yanbu Page: 117 of 117
SUPPLY & INSTALLATION OF GAS FILTRATION SYSTEM AT BERRI PLANT JUBAIL KAFOU Project Ref. No. KM-12-3340

KAFOU Document No. KTS-14-3340-HSE


Subject:
Project
Health Safety & Environmental Loss Prevention PR #7200-023-928
Program
MARAFIQ Ref. No.: IS-J-15-0048
Revision

First Rev. A MARAFIQ


Index

Issue Date: 04.12.14 7200-023-928

RECORDKEEPING

KAFOU will maintain, in format approved by (MARAFIQ) a current record showing Work
Injury records shall be available for inspection at all reasonable times and shall be submitted to
(MARAFIQ) on request.

- END -

Customer Contractor

MARAFIQ Power and Utility Company KAFOU