You are on page 1of 12

HS.SAF.09.

F12

CONTRACTOR WORK METHOD STATEMENT (EHS)

1. Contractor Name : ABB Switzerland Ltd(TK- 3. Trades / Disciplines Involved In Work :


4842)
Engineer, Supervisor, Electricians and Helpers.
2. Work Location : 220 kV GIS Substation(control
room 1 & 2)

Proposed Starting Date :

4. Brief Description Of Work To Be Undertaken : 5. Tools / Substance


Portable Tools
Erection of control and protection panel
Hand Electrical Pneumatic
Hazardous Substances
Toxic Flammable Corrosive
Harmful Irritant
Environment Impact
Health & Hygiene Effect

Environmental Impact Health & Hygiene

Yes No Yes No

Hazardous waste Significant Dust Generation


Emissions Noise (above 85 DbA)
Discharge to sea or drains Hazardous substances (if yes attach list)
If answer to any of the above is yes, please circulate to If answer to any of the above is yes, please circulate to
Manager, Environmental Affairs Senior Occupational Hygienist

6. Person Completing The Work Method Statement :

Name : Joachim Kuhlmann Position : Engineer Company : ABB Switzerland

Signature : Date :

File: Revision: 0(26-May-2011) Page 1 of 12


HS.SAF.09.F12

7. Approvals

Contractor Site Rep. Name Signature : Date :

SLII Representative Name Signature : Date :

EMAL Representative Name Signature : Date :

Area Owner Name Signature : Date :

Name Signature: Date:


EMAL EHS Department

The completed Work Method Statement must be submitted at least seven full working days prior to the
commencement of activities.
Where the Work Method Statement indicates the use of Hazardous Substances, a Material Hazard Data
Sheet must be attached.
After the Area Owners approval the Work Method Statement shall be forwarded to EHS department for
approval
The approved Work Method Statement must be attached to the permit(s) to work and all persons involved
in the job instructed in its requirements.

2. RISK ESTIMATOR CHART


The Risk Estimator chart should be used as an assistant for filling out the work
method statement.

Severity
Probability Low x1 Medium x 2 High x3

Low x1 Low Probability x Low Severity LP x MS LP x HS


1x1=1 1x2 = 2 1x3 =3
Medium x2 MP x LS MP X MS MP x HS
2x1 =2 2x2 =4
2x3 =6
High x3 HP x LS HP X HS HP x HS
3 x 1 =3 3x2 = 6 3x3=9

Significant Risk = High Risk (6-9) or Medium Risk (3-4) in terms of probability and severity
Tolerable Risk = Risk reduced to an acceptable level = Low Risk (1-2)
Residual Risk = Risk remaining after implementing recommended control actions (usually very minor).

File: Revision: 0(26-May-2011) Page 2 of 12


SM-CMS.TSK.01.F02

8. Safety Analysis

Identified Hazard(s) Persons Exposed To Precautions and Plan of actions To Be Taken Severity x Probability =
Individual Activities To Associated With Activity Hazard To Remove / Control Hazards Risk
Complete Work. List In
Sequence of Activity Residual Risk
(Use Risk Estimator
Chart)

1.PREPARATION. Slips, trips and fall at the Maintain housekeeping around in the working
same level. Emal / SNC rep., Engr., area. 1x2=2
Supv. Elec,helpers.

All workers involve in the activity must be


Emal / SNC rep., Engr., aware of heat stress, supervisor to ensure
Hot weather. 2x2=4
Supv. Elec,helpers drinking cold water is available.

Wear P.P.E.'s at all times (hard hat, clear


Emal / SNC rep., Engr., safety glass, safety shoes, hand gloves, dust 2x2=4
Not using P.P.E.'s Supv. Elec,helpers. mask, fire retardant long sleeve shirt / pants.

File: Revision: 0(26-May-2011) Page 3 of


12
SM-CMS.TSK.01.F02

Supervisor to give tool box talk regarding


Manual handling hazards Supv. Elec,helpers proper manual handling. 1x1=2

2. ISOLATE THE EXISTING


" BY EMAL / SNC REPRESENTATIVE. "
CONTROL AND EMAL / SNC
PROTECTION PANEL(IF ELECTROCUTION.
REPRESENTATIVE.
REQUIRED)

3. OPENING THE SIDE Supervisor to ensure approved PTW, MS and


COVER OF EXISTING AS RA are available on site.
WELL AS NEW CONTROL
AND PROTECTION Ensure that working crew do not enter into the
PANEL(IF REQUIRED) operational area.
Engr., Supv.
No specific 2x1=2
ElecHelper Complete the pre-work check list on a daily
available permit.
basis.

Daily toolbox meetings to be conducted on


days activity, which will include TRA for the
activity

File: Revision: 0(26-May-2011) Page 4 of


12
SM-CMS.TSK.01.F02

Proper coordination with client prior to


Engr., Supv. & Elec., start the task.
Lack of coordination 1x3=3
helper
with client

Use appropriate non conducting PPEs if


required
Supervisor to ensure the existing control
Supv. & Elec.helpers 1x3=3
Electrocution and protection panel is 100% safe
Verify LOTO.(If required)
Test the terminal of bus bar prior to do
the task. " NO TEST NO TOUCH "

Only competent and authorized person to do


Unauthorized workers Other workers nearby the inspection, ensure notified the client with 1x3=3
all necessary documents.

Manual handling Elec. & help. Supervisor to give toolbox talk regarding 1x2=2
proper manual handling.

Hand tools
Elec., & helpers 2x2=4
Dust All hand tools must be in good condition, no
home made hand tools to be used at site,
supervisor to check.

File: Revision: 0(26-May-2011) Page 5 of


12
SM-CMS.TSK.01.F02

Provide dust mask 3M 8210 or 3M respiratory


mask. (where ever required)

Maintain good housekeeping around the


Slip / Trip & Fall same Supv. Elec. & help. area. 1x2=2
level

Use 3-point contact while climbing up and


down ladder.
Always climb up and down facing the ladder.
Use of step ladder Supv. Elec. & help. 1x3=3
Don't carry tools or materials in your hand
while climbing up and down ladder.
One man to hold the ladder on the ground
while someone working on top.

Wear P.P.E.'s at all times (hard hat, clear


Engr., Supv. & helper safety glass, safety shoes, hand gloves, dust 2x2=4
Not using P.P.E.'s
mask, fire retardant long sleeve shirt / pants.

4. SHIFTING THE NEW


CONTROL AND Manual handling Elec. & help. Supervisor to give toolbox talk regarding 1x2=2
PROTECTION PANEL proper manual handling.
BESIDE TO EXISTING
File: Revision: 0(26-May-2011) Page 6 of
12
SM-CMS.TSK.01.F02

CONTROL AND
PROTECTION PANEL

Maintain good housekeeping around the


Slip / Trip & Fall same Supv., Elec. & Helpers area. 1x2=2
level

Supervisor to ensure that the pallet trolley is in


Pallet trolley. Supv., Elec. & Helpers good conditioned and check the safe working 1x3=3
load against the weight of new control panel
and protection panel.

Supervisor to ensure that the control panel and


Unstable load Supv., Elec. & Helpers protection panel are in stable position prior to 1x3=3
move the pallet trolley.

Only competent and authorized person to do


Unauthorized workers Other workers nearby the inspection, ensure notified the client with 1x3=3
all necessary documents.

File: Revision: 0(26-May-2011) Page 7 of


12
SM-CMS.TSK.01.F02

Wear P.P.E.'s at all times (hard hat, clear


Engr., Supv. & helper safety glass, safety shoes, hand gloves, dust 2x2=4
Not using P.P.E.'s
mask, fire retardant long sleeve shirt / pants.

Activity shall be carried out the personal


supervision of receiving activity.

Supervisor to ensure all applicable PTW to be


available prior to commencement of the task.
Unauthorized workers at
5. INSTALLATION OF NEW Elec, helpers & other
working area may injure 3x1=3
CONTROL AND workers near by Tool box talk to be held at site ,this shall cover
due to curiosity
PROTECTION PANEL the method statement and job safety analysis.

Only competent and authorized personnel to be


deployed, supervisor to ensure all workers
involve in the activity received Big 5 training
of EMAL
Use of damaged step
Inspect step ladder before use, one man should
ladder.
hold the ladder on the ground while is in used.
Use of damaged hand Supv., Elec. & Helpers 3x1=3
power tools.
Competent operator for the use of power tool,
Electrocution/fire
inspect before use (colour coding)

File: Revision: 0(26-May-2011) Page 8 of


12
SM-CMS.TSK.01.F02

Supervisor to inspect the drill machine and


make sure it is in good condition.

Dont use excessive force to drill machine


Using of drill machine.
Elec. & Helpers during drilling. 2x2=4
Electrocution
Only competent and authorized worker for the
using of power tools

Only 110V to be used at site

Provide appropriate safety glass &dust mask


Dust while drilling Elec. & Helpers while drilling 1x3=3

Manual handling. Supervisor to give toolbox regarding proper


Slip and fall of Engr., Supv. manual handling.
3x1=3
control panel /protection Elec,helpers.
panel while fixing. Extra care while fixing control panel
/protection panel

Workers may slip, trip & Maintain house keeping around the area
Engr., Supv.
fall at same ground or 3x1=3
Elec,helpers Walkway and gangway to be kept free of
from height
obstruction

File: Revision: 0(26-May-2011) Page 9 of


12
SM-CMS.TSK.01.F02

All personnel involve in the activities must


Working without proper wear proper PPEs(hard hat, clear safety glass,
Elec. & Helpers 3x1=3
PPEs dust mask long sleeve shirt and reflective vest).

Hand tools, torque Torque wrench must be in good condition with


6. CHECK THE TIGHTNESS wrench Electricians& helpers calibrated sticker on it. supervisor to check. 1x2=2
OF BOLT

Only competent and authorized person to do


7. INSPECTION Other workers nearby the inspection, ensure notified the client with 1x3=3
Unauthorized workers all necessary documents.

Slip / Trip / Fall - same Maintain good housekeeping around the


level Engr., Supv. area. 1x2=2
Elec.helpers All temporary cable should be properly
organized.

Wear P.P.E.'s at all times (hard hat, clear


Emal / SNC rep., Engr., safety glass, safety shoes, hand gloves, dust 2x2=4
Not using P.P.E.'s Supv. Elec.helpers mask, fire retardant long sleeve shirt / pants.

This sheet must be properly completed detailing all of the steps required to complete the job along with the sequence of events and each of the hazards

File: Revision: 0(26-May-2011) Page 10 of


12
SM-CMS.TSK.01.F02

arising. Failure to properly complete the form will result in non-approval.


(Additional sheets to be used as required)

9. Chemical Analysis (This form to be used as required)

Product Name

MSDS supplied Yes / No

Dangerous Goods Class

Hazardous Material Yes / No

Nature of Hazard Irritation / Carcinogen / Corrosive / Toxic / Other

Form Solid /Liquid / Gas / Dust / Vapour / Mist

Exposure Route Inhalation / Skin / Eye / Ingestion

Number of People Exposed

File: Revision: 0(26-May-2011) Page 11 of


12
SM-CMS.TSK.01.F02

Duration of Exposure

Frequency of Exposure

Controls to be implemented

Estimate of Exposure Negligible / Marginal / High


This sheet must be properly completed detailing all the necessary information. Failure to properly complete the form will result in non-approval.

File: Revision: 0(26-May-2011) Page 12 of