You are on page 1of 9

HS.SAF.09.

F12

CONTRACTOR WORK METHOD STATEMENT (EHS)

1. Contractor Name : DANWAY (CE 5457) 3. Trades / Disciplines Involved In Work :

2. Work Location : POT LINE 1 & 2 BASEMENT Engineer, Supervisor, Electricians and Helpers.

Proposed Starting Date :

4. Brief Description of Work to Be Undertaken: 5. Tools / Substance


RECTIFICATION FOR DAMAGED CABLE TRAY
Portable Tools
SUPPORT.
Hand Electrical Pneumatic
Hazardous Substances
Toxic Flammable Corrosive
Harmful Irritant
Environment Impact
Health & Hygiene Effect

Environmental Impact Health & Hygiene

Yes No Yes No

Hazardous waste x Significant Dust Generation x

Emissions x Noise (above 85 DbA) x

Discharge to sea or drains x Hazardous substances (if yes attach list) x

If answer to any of the above is yes, please circulate to If answer to any of the above is yes, please circulate to
Manager, Environmental Affairs Senior Occupational Hygienist

6. Person Completing The Work Method Statement :

Name : Position : Company :

Signature : Date :

File: Revision: 0(26-May-2011) Page 1 of 9


HS.SAF.09.F12

7. Approvals

Contractors Site Rep. Name Signature : Date :

EMAL Representative Name Signature : Date :

Area Owner Name Signature : Date :

Name Signature: Date:


EMAL EHS Department

The completed Work Method Statement must be submitted at least seven full working days prior to the
commencement of activities.
Where the Work Method Statement indicates the use of Hazardous Substances, a Material Hazard Data
Sheet must be attached.
After the Area Owners approval the Work Method Statement shall be forwarded to EHS department for
approval
The approved Work Method Statement must be attached to the permit(s) to work and all persons involved
in the job instructed in its requirements.

2. RISK ESTIMATOR CHART


The Risk Estimator chart should be used as an assistant for filling out the work
method statement.

Severity
Probability Low x1 Medium x 2 High x3

Low x1 Low Probability x Low Severity LP x MS LP x HS


1x1=1 1x2 = 2 1x3 =3
Medium x2 MP x LS MP X MS MP x HS
2x1 =2 2x2 =4
2x3 =6
High x3 HP x LS HP X HS HP x HS
3 x 1 =3 3x2 = 6 3x3=9

Significant Risk = High Risk (6-9) or Medium Risk (3-4) in terms of probability and severity
Tolerable Risk = Risk reduced to an acceptable level = Low Risk (1-2)
Residual Risk = Risk remaining after implementing recommended control actions (usually very minor).

File: Revision: 0(26-May-2011) Page 2 of 9


HS.SAF.09.F12

8. Safety Analysis

Severity x Probability =
Risk
Individual Activities To Identified Hazard(s) Persons Exposed To Precautions and Plan of actions To Be Taken To
Complete Work. List In Associated With Activity Hazard Remove / Control Hazards Residual Risk
Sequence of Activity (Use Risk Estimator
Chart)

PREPARATION. Hot environment Emal rep., Engr., After getting valid permit from EMAL only
Supv. Elec, and 2x2=4
Manual handling starts work.
hazards. helpers Engineer / supervisor ensure that the work
permit is valid for the date and time
Ensure the operatives must be go through
EMAL POTLINE Electrical Hazard Training
and Big Five Training.
All personnel involve in the activities must
wear the required PPEs at all times(eg.hard
hat, appropriate safety glass, electrical
insulated safety shoe, hand gloves, dust
mask, fire retardant long sleeve shirt / pants)
All personnel involve in the activity must be
aware of heat stress, supervisor to ensure
cold drinking water and electrolyte are
available at site all time. Use heat
radiation shield.Ensure that Storage of
drinking water while working in Live Potline
and basement must be well outside the
Potline battery limit. (After the Yellow
barricade).
Ensure that people working in duct side
should be rotated every 1 hour.

File: Revision: 0(26-May-2011) Page 3 of 9


HS.SAF.09.F12

Advance planning by contractor considering


the time consumption to receive the permit
from EMAL
Emergency procedure must be displayed at
prominent location and cascade to
operatives on regular interval and recorded.
The operatives must be go through DANWAY
safety induction.
Extra care should be taken while working in
Live Potline and Basement.
Danway supervisor to ensure that danway
employees should not go near the live pot /
busbars and not touching the superstructure.
Use only specific Entry and exit route to
potline.Co-ordinate with shift supervisor for
the specific Entry and exit route.
Only day shift are allowed to work in potline
and danway supervisor to ensure that yellow
lines should not crossed by the any danway
employees.
All hand tools to be used must be in good
condition, no handmade hand tools to be
used at site.
REMOVEL OF DAMAGED The area is highly magnetic and tool may
Hand tools Supv. Elec & helpers 2x1=2
INSULATOR. move uncontrollably. Extra care should be
taken while handling and tools should not
reach to the near by busbars and it should
be non magnetic tools.
All workers near by Cordon the work area to avoid unauthorized 2x2=4
Fall of materials entry.
Provide applicable safety warning
File: Revision: 0(26-May-2011) Page 4 of 9
HS.SAF.09.F12

signboards
Do not keep unwanted materials on
top of the ladder.
Materials to be removed should be in
safe manner one by one--, ensure no
materials to be dropped.
Use only fiber or wooden ladder.
Ensure that ladder are using for
access purpose only.
Height of the wooden ladder should
Using damaged ladder. not exceed 5 mtrs.
Supv. Elect & helpers Dont stack unnecessary materials 3x1=3
Fall from height or inside working area.
from ladder. Always climb up and down facing the
ladder.
Don't carry tools or materials in your
hand while climbing up and down ladder.
Manual handling. Supervisor to give toolbox regarding proper
Supv. Elec, and manual handling.
Slip and fall of insulator helpers
3 x 1 =3
while removing. Extra care while removing the insulator.
Workers may slip, trip & Maintain house keeping around the area
Supv. Elec, and
fall at same ground or helpers Walkway and gangway to be kept free of 3 x 1 =3
from height obstruction
Sharp edges from Extra care while installing the insulator.
Elec & helpers Use hand gloves while installing insulator 2 x 1 =2
cable tray.
Incompetent workers Elect & helpers Competent workers to be deployed,
2x1=2
supervisor to ensure work safe system
INSTALLATION OF NEW Hand tools All hand tools to be used must be in good 2x1=2
Supv. Elec & helpers
INSULATOR condition, no handmade hand tools to be

File: Revision: 0(26-May-2011) Page 5 of 9


HS.SAF.09.F12

used at site.
The area is highly magnetic and tool may
move uncontrollably. Extra care should be
taken while handling and tools should not
reach to the near by busbars and it should
be non magnetic tools.
Supervisor to inspect the battery operated
Using damaged drill machine and make sure it is in good
battery operated tools. Elect & helpers condition with valid colour coding. 2x2=4
Minor Electrocution Dont use excessive force to drill machine
during drilling
Provide appropriate safety glass &respiratory
Emal, Engr., Supv.
Dust mask. 2 x 1 =2
Elec, and helpers
Cordon the work area to avoid unauthorized
entry.
Provide applicable safety warning
signboards
All workers near by Do not keep unwanted materials on 2x2=4
Fall of materials
top of the ladder.
Materials to be removed should be in
safe manner one by one--, ensure no
materials to be dropped.
Supv. Elect & helpers Use only fiber or wooden ladder. 3x1=3
Using damaged ladder. Ensure that ladder are using for
Fall from height or access purpose only.
from ladder. Height of the wooden ladder should
not exceed 5 mtrs.
Dont stack unnecessary materials
inside working area.

File: Revision: 0(26-May-2011) Page 6 of 9


HS.SAF.09.F12

Always climb up and down facing the


ladder.
Don't carry tools or materials in your
hand while climbing up and down ladder.
Manual handling. Supervisor to give toolbox regarding proper
Supv. Elec, and manual handling.
Slip and fall of insulator helpers
3 x 1 =3
support while fixing. Extra care while fixing insulator support.
Workers may slip, trip & Maintain house keeping around the area
Supv. Elec, and
fall at same ground or helpers Walkway and gangway to be kept free of 3 x 1 =3
from height obstruction
Other workers Only competent and authorized person to do
Unauthorized workers the inspection, ensure notified the client with 3x1=3
INSPECTION nearby
all necessary documents.

This sheet must be properly completed detailing all of the steps required to complete the job along with the sequence of events and each of the hazards
arising. Failure to properly complete the form will result in non-approval.
(Additional sheets to be used as required)

File: Revision: 0(26-May-2011) Page 7 of 9


HS.SAF.09.F12

9. Chemical Analysis (This form to be used as required)

Product Name

MSDS supplied Yes / No

Dangerous Goods Class

Hazardous Material Yes / No

Nature of Hazard Irritation / Carcinogen / Corrosive / Toxic / Other

Form Solid /Liquid / Gas / Dust / Vapour / Mist

Exposure Route Inhalation / Skin / Eye / Ingestion

Number of People Exposed

Duration of Exposure

Frequency of Exposure

File: Revision: 0(26-May-2011) Page 8 of 9


HS.SAF.09.F12

Controls to be implemented

Estimate of Exposure Negligible / Marginal / High


This sheet must be properly completed detailing all the necessary information. Failure to properly complete the form will result in non-approval.

File: Revision: 0(26-May-2011) Page 9 of 9