You are on page 1of 1

BEARY'S VALENCIA

MAINTENANCE Professionally managed integrated maintenance system


ELECTRICITY Adequate MESCOM power supply with 100% generator(62KW) back up
ELEVATOR
WATER SUPPLY Municipal water supply augmented by high yielding tube wells and Solar water
heating
DRINKING WATER 20,000 LITERS
FIRE Composite fire protection system, Fire generators, Fire escape staircase
GARBAGE DISPOSAL Garbage chute with disposal facility
GAS Piped metered gas
SEWAGE Modern sewerage treatment plant with treated water used for flushing and landscape
through drip irrigation system
SPRINKLERS SMOKE DETECTORS
PARKING 21 CARS (BASEMENT), Twin car park per unit & ample visitors car park
Rain water harvesting & ground water recharging system

Madhu Rupam (Section A) Melissa Almeida (Section B)


BEARY'S VALENCIA Date of Submission: 16 January 2017
Tall Buildings Assignment 1

You might also like