CHECKLIST FOR METAL SCAFFOLDING

Site Information Cc :
Main Contractor
Project
Site Registration Number
Site Address
Scaffolding Information Access & Egress, Formwork Support, Working Platform
Type Frame / Tube / Modular Material New / Used / Mixed
Location Project Site Drawing No.
Inspection No. Date & Time
No. Items Yes No N/A
Foundation
1. a) Scaffold erected on firm ground
b) Scaffold not endanger by open excavation.
Sole Plates
2
a) Proper sole plates used
Base Plates
3
a) Proper base plates fitted to all standards or legs of scaffold
Alignment of Scaffold Component
4 a) Standard or frames vertical
b) Ledgers and transom leveled
Scaffold Component Connections
5 a) Standard connected end to end with either sleeve or joint pin
b) Arm lock installed at all vertical joints between frames
Horizontal Bracing
6
a) At every 5 lift of frame / modular scaffold to both inner & outer
Tie Back
a) At every 2 lift or every floor starting from base
7 b) Space not more than 3 bays or 7.5 meter apart whichever are lesser
c) Space no further than one bay from end in a staggered manner
d) Effective temporary tie at the top most working level
Foot - Tie
8
a) Foot ties fitted to both inner and outer standards
Working Platform
a) Continuous working platform at construction level
b) Isolated working platform are provided with proper guardrails and
9 toe boards, which are place inside the standard and securely
fastened in position.
c) Scaffolds planks are closely laid across the full width of the
scaffold with no opening except for access to platform
No. Item Yes No N/A
1
d) Decking are held down securely to prevent uplift and cantilever
effect
e) For timber decking, the plank used shall be at least 200mm wide
and 38mm thick and its not projecting beyond its and support by
more than 4 times its thickness.
f) Barricade to open sides of building
g) Scaffold erected one lift above the top most construction level
Guardrail
10
a) Guardrail are fitted and connected to standard
Torsion Cable / Guy Rope ( if required by design )
11
a) Tension torsion cable at every cantilever bracket
Debris Net
12 a) Debris net to be erected to prevent articles and debris dislodged
from the scaffold, falling on to the public access
Ladder
13
a) Ladder are securely attached to the scaffold at the top and bottom
Temporary Structure
14
a) No scaffold is connected to the temporary structure.
Professional Engineers (P.E) Drawing
15
a) Scaffold are erected strictly in accordance with P.E Drawing
Scaffold Component Material
a) Components and fitting showing no sign of deterioration
16
b) All fitting are tight and undamaged
c) All component and fitting are fixed, secured and placed in position
Housekeeping
a) Working platform, access ways and landing platform are cleared
17 from any obstruction, loose objects and tripping hazards.
b) Scaffold free from debris, unused formwork, scaffold component
etc.
Signage
18
a) Suitable signage/tags are place at appropriate location

GENERAL REMARKS:

2
Inspected By : ( Assessor / Scaffolder ) Verified by:

Name : Palanitharan a/l Krishna Name :

IC No : 760612-07-5049 IC No :

JKKP Reg No: PP/09/PP/01/11 Designation:

Signature : Company Stamp & Signature: