Alcatel BSS

Abis via Satellite Activation

O&M Documentation
Scenario

3BK 17416 1011 RJZZA Ed.09


BLANK PAGE BREAK

Status RELEASED

Short title MPI 101 / 01 7


All rights reserved. Passing on and copying of this document, use
and communication of its contents not permitted without written
authorization from Alcatel/Evolium.

2 / 30 3BK 17416 1011 RJZZA Ed.09


Contents

Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.1.1 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.1.2 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.1.3 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.1.4 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.2.2 Site-specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.2.3 External Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
1.4 Telecom/Supervision Outage and Operating Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1.5 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
1.5.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
1.5.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
1.5.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
2 Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2.1 Before Going On-site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
2.2 Before You Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
2.3 Scenario Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2.3.1 Initial Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2.3.2 Add GPRS (case C2 or C3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2.3.3 Activation of Circuit Satellite (case C1 or C3 or C5) . . . . . . . . . . . . . . . . . . . . . . . . 20
2.3.4 Activation of GPRS Satellite (case C2 or C3 or C4 or C5) . . . . . . . . . . . . . . . . . . 21
2.3.5 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
2.4 Reverse Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
2.4.1 Deactivation of GPRS satellite (case C2 or C3 or C4 or C5) . . . . . . . . . . . . . . . . 25
2.4.2 Deactivation of Circuit Satellite (case C1 or C3 or C5) . . . . . . . . . . . . . . . . . . . . . . 25
2.4.3 Remove GPRS (case C2 or C3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
2.4.4 BTS Call Tests by Terrestrial . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
2.5 Detailed Tasks Specific to Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

3BK 17416 1011 RJZZA Ed.09 3 / 30


Figures

Figures
Figure 1: Abis via Satellite Activation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

4 / 30 3BK 17416 1011 RJZZA Ed.09


Preface

Preface
Purpose To define how to activate Abis via satellite link. Applicable to BSS and OMC-R
at technical release B7.2

Audience Field service technicians

Specialists

Project managers
Foremen

Assumed Knowledge You must have a basic understanding of the following:

Alcatel operations and maintenance concepts for BSS


BSC and BTS terminals, LMTCT tool

Alcatel 1353-RA OMC-R

3BK 17416 1011 RJZZA Ed.09 5 / 30


Preface

6 / 30 3BK 17416 1011 RJZZA Ed.09


1 Overview

1 Overview

This chapter gives information needed for project managers and foremen, for
the presentation to the customer and site planning.

3BK 17416 1011 RJZZA Ed.09 7 / 30


1 Overview

1.1 Presentation
The scenario allows to activate Abis via satellite link.
This scenario can be performed at each time an Abis link is asked to work via
satellite (through add, move...BTS or Abis operations).
Only G3 and G4 BTS can support Abis link via satellite.
Satellite BTS must be configured as free run (no PCM synchronized) (OCXO
synchronization).
In case of chain configuration, only the first BTS can support the physical
Abis via satellite link, the downstream BTSs will work as being satellite BTSs
and thus must be G3 or G4 BTS.

Note: A BSS allows to support both terrestrial and satellite BTSs.


Ring configuration is not supported on impacted Abis..
Satellite links can not be used on both Abis and Ater interfaces due to
transmission delay via satellite.
There is no specific display at OMC-R/HMI for satellite feature.
Transmission supervision is made only via OML for the sattellite BTSs.

The following recommendations should be respected for well functioning


of the Abis satellite:

to use the statistic multiplexing 64 Kb/s RSL

to have at least 1 SDCCH per TRX due to the RSL


to use the point to point configuration

the TS0 should be included in the list of transmitted timeslots from modems
on both directions (downlink and uplink) on the satellite link.

In the cases 1 to 5 below and after, in the procedure, circuit satellite means that
the satellite feature is activated only from circuit traffic point of view. GPRS
satellite refers strict to GPRS parameters set to support satellite.

This method may be impacted by some restrictions. Before you start, consult
BSS Restriction List and Operator Hints corresponding to the SW version
you use!

8 / 30 3BK 17416 1011 RJZZA Ed.09


1 Overview

1.1.1 Cases
The following cases apply for the method:

C1:
initial state: no GPRS on BSS, no circuit satellite, no GPRS satellite
final state: no GPRS on BSS, circuit satellite, no GPRS satellite

C2:
initial state: no GPRS on BSS, circuit satellite, no GPRS satellite
final state: GPRS on BSS, circuit satellite, GPRS satellite

C3:
initial state: no GPRS on BSS, no circuit satellite, no GPRS satellite
final state: GPRS on BSS, circuit satellite, GPRS satellite

C4:
initial state: GPRS on BSS, circuit satellite, no GPRS satellite
final state: GPRS on BSS, circuit satellite, GPRS satellite

C5:
initial state: GPRS on BSS, no circuit satellite, no GPRS satellite
final state: GPRS on BSS, circuit satellite, GPRS satellite

C6: CRC4 is OFF for the BIUA and the BTS

In this case the intervention on BSC site is necessary after each reprogramming
BIUA.

C7: CRC4 is ON for the BIUA and the BTS

In this case:
the intervention on the BSC site is no more necessary after each BIUA
programmation

some errors (BER10E-4) can be seen on both, BIUA and modem site, but
the voice quality is good.

1.1.2 Options
None.

1.1.3 Restrictions
None.

3BK 17416 1011 RJZZA Ed.09 9 / 30


1 Overview

1.1.4 Grouped Task Sequence

Figure 1: Abis via Satellite Activation

10 / 30 3BK 17416 1011 RJZZA Ed.09


1 Overview

1.2 Preparation
1.2.1 Prerequisites
The following prerequisites apply:

The satellite link (see also modem) must be already tested (programmed)
and installed.

The CRC4 must be set on OFF at the modem site.


If the satellite link is not equipped with Memotec CX series, the modems
must be set to transmit the TS0 into both Uplink and Downlink directions.

BSC and BTS site are clean, tidy and easily reachable.

The software package for satellite, already downloaded.

For BSS with GPRS, GPRS satellite must be preceded by circuit satellite
activation, like is described in this procedure.

For BSS with GPRS, if the MFS was not migrated with the customized Bul
file for GPRS over satellite, the customized BUL file for terrestrial and the
one for satellite values must be available.

1.2.2 Site-specific Information


Abis links Identifier for Abis via Satellite. For chain configuration, the
downstream BTSs identifiers.

Type of modem that will be used on the Abis link.

1.2.3 External Tasks


None.

3BK 17416 1011 RJZZA Ed.09 11 / 30


1 Overview

1.3 Scheduling

Time based on Technical constraints


The number of resources in table below not take into account individual
customer or safety requirements.

1st Abis downstream


Grouped Task MSC BSC BTS BTSs OMC-R Time/Task

Initial checks - - - - 1 Ope 15

Add GPRS **

Activation of Circuit - 1 Com 1 Com - 1 Ope (6+10)/BTS + 5/cell


Satellite + 43/Abis + 6

Activation of GPRS - - - - 1 Ope 10/cell + 25+ 1/GPU


Satellite

Final Checks - - 1 Com - 1 Ope 39+ 15/Abis

TOTAL TIME - - - - - 85+15/cell


+58/Abis+7/BTS+
1/GPU

Ope. : OMC-R Operator


Com : Commissioner.
** : The table values does not take into account the duration of MPI96/MDR1 or MPI96/MDR2 procedures which must
be applied here.

12 / 30 3BK 17416 1011 RJZZA Ed.09


1 Overview

1.4 Telecom/Supervision Outage and Operating Impact


The table below describes the traffic outage and loss of supervision caused
by the concerned Grouped tasks.

Tel.
Out. Out/GPRS Oper.
Ref. Grouped Task Out Tel. Red Sup. Out Impact Impacts...

Initial Checks - - - - None

Add GPRS **

1 Activation of Circuit 6 +44/ - 6+44/ A - Telecom and


Satellite A+7/BTS+1/cell +7/BTS+4/cell supervision outage
only for BTSs of
impacted Abis

2,5* Activation of GPRS 10/cell + - 2 - Outage 5-GPRS


Satellite 15+3/group outage for all BSS
of 5 GPU on the MFS, Outage
2-GPRS outage
only for BTSs of
impacted Abis, plus
2 supervision outage
only for impacted BTSs

Final checks - - - - None

TOTAL TIME 21 +44/ - 8+44/ A - Telecom, GPRS


A+7/BTS+11/cell+ +7/BTS+4/cell outage and
3/group of supervision outage
5 GPU only for BTSs of
impacted Abis

A : Satellite Abis
** : The table values does not take into account the duration of MPI96/MDR1 or MPI96/MDR2 procedures which must
be applied here.
Table 1: Traffic/Supervision Outage

3BK 17416 1011 RJZZA Ed.09 13 / 30


1 Overview

1.5 Resources
1.5.1 Tools
The tables below describe the needed hardware, software tools and forms
needed.

Hardware Tools

Part
Item Number Use at ...

Installation tools BSC, BTS

PC terminal with associated cable BSC, BTS

Software Tools

Part
Item Number Use at ...

BTS terminal software B7.2 BTS

Transmission terminal software B7.2 BSC, BTS

INSPATxx where xx is the version associated to current document BTS,


edition. Remember that the document you are reading can not be used BSC,OMC-R
with a paper version, its an on-line documentation using hyper-text
links towards below applicable documents (all these are supported on
the same CD-ROM).

Forms None.

1.5.2 Supplies
The table below describes the supplies for Activation of Abis Satellite link

Part
Item Number Contents Use at ...

Site Documentation BSC, BTS & OMC

Set of HW equipments needed for Abis recabling BSC, BTS


(through appropriate modem).

14 / 30 3BK 17416 1011 RJZZA Ed.09


1 Overview

1.5.3 Applicable Documents


You need the following documents to complete this scenario:

BTS terminal User Guide


Transmission Terminal User Guide
BSS Methods Handbook
A1353-RA Configuration Handbook
A1353-RA Surveillance Handbook
Add Logically a New or Running BSS to a New or Running A935 MFS
Add a Running BSS by Moving Existing Links through a New or Running
A935 MFS
BSS Restriction List (depending on SW version)

Operator Hints (depending on SW version)

3BK 17416 1011 RJZZA Ed.09 15 / 30


1 Overview

16 / 30 3BK 17416 1011 RJZZA Ed.09


2 Scenario

2 Scenario

This chapter presents all checks needed before beginning the scenario, and all
detailed tasks to be performed on each site.

3BK 17416 1011 RJZZA Ed.09 17 / 30


2 Scenario

2.1 Before Going On-site


Before going on-site, you must check that the following information are available:
All Prerequisites (Section 1.2.1) are fulfilled

The customer has been informed:


Date
Time
Site name
Site address
Purpose of operation has been indicated

Personnel are available and ready for operation (Refer to Scheduling


(Section 1.3))
Site-specific Information (Section 1.2.2) are available and ready for
operation

Tools (Section 1.5.1) are available and ready for operation


Supplies (Section 1.5.2) are available and ready for operation
Documentation is available and ready for operation

Ensure that boards technical release level delivered is in accordance with the
BSS hardware technical release document.
Ensure that the method used at the BSS site is at the same level as at OMC-R.

2.2 Before You Start


Check that all Prerequisites (Section 1.2.1) in the overview are fulfilled

Well check the availability of all necessary tools and material

Inform the operator


Required Knowledge You must be familiar with the following:

Safety Rules and Precautions


Telecom/Supervision Outage and Operating Impact (Section 1.4)
Instruction for reverse procedure decision
Grouped Task Sequence (Section 1.1.4)
Operator Hints
How to document Faults and Anomalies.

18 / 30 3BK 17416 1011 RJZZA Ed.09


2 Scenario

2.3 Scenario Description


The detailed tasks for Activating Abis Satellite link are described after.
This scenario aims to configure the BSC with BSC timers that are suitable for
supporting satellite BTSs.
The impacted parameters for circuit traffic, which modification is applied by the
BSC according to the Connection_type, are: T200, K_VAL_OML, K_VAL_RSL
(like in B6.2) and N200.
The impacted parameters for GPRS traffic are: type CAE on cell
(Round_trip_delay, Tcorr, Testab, BS_CV_MAX, T3192), and type CST on
MFS (T_one_block, Trelease, T_ACK_WAIT, T_ack_wait_DRX_PCCCH,
T_delayed_DL_TBF_rel_radio). In this procedure, the CAE parameters are
the only ones activated, between the GPRS parameters, if the CST MFS
parameters are already modified during the migration of MFS. If not, both type
parameters must be activated for satellite values.

2.3.1 Initial Checks

Note Task Description Site To do Outage

Perform a BSS Audit Alarm State OMC-R 10 None

Perform a BSS View Status of OMC-R 5 None


Managed Objects and Alarms and
print results.

2.3.2 Add GPRS (case C2 or C3)

Note Task Description Site To do Outage

Apply MPI96/MDR1(Add Logically a New or OMC-R


Running BSS to a New or Running A935
MFS) - if you introduce GPRS on the BSS by
adding new Ater Mux
OR
apply MPI96/MDR2 (Add a Running BSS
by Moving Existing Links through a New or
Running A935 MFS) - if you introduce GPRS
on the BSS by changing the existing Ater Mux
or by adding new Ater Mux

3BK 17416 1011 RJZZA Ed.09 19 / 30


2 Scenario

2.3.3 Activation of Circuit Satellite (case C1 or C3 or C5)


2.3.3.1 Stop Traffic for All BTSs of the Impacted Abis

Note Task Description Site To do Outage

Lock BTS_O&M Capability, for all BTSs OMC-R 10/ BTS None
of the impacted Abis
Start supervision outage for impacted BTSs.

Shut Down Cell. This action will OMC-R 4 / cell Start 1


concern all cells of the impacted Abis.
(WTC=3) Notice: perform all the lock action in sequence
without loosing time.
Supervision outage for impacted BTSs.

2.3.3.2 Abis Physical Connections Through Modems

In order to reduce the time duration/ traffic outage, perform the following
2 steps in parallel.
In case of multidrop Abis, the recabling does only concern the first BTS.

Note Task Description Site To do Outage

Recable or cable the Abis link through BSC 15 / Abis Outage 1


modem at BSC side
Supervision outage for impacted BTSs.

Recable or cable the Abis link through BTS 15 / Abis Outage 1


modem at BTS side
Supervision outage for impacted BTSs.

2.3.3.3 Abis Satellite Settings

Note Task Description Site To do Outage

Modify Abis Connection Type Change OMC-R 7/ Abis Outage 1


Connection-type to satellite. Wait for
programming transmission end. Notice: The programming transmission is over
when in Transmission programming field is
displayed Idle.
Supervision outage for impacted BTSs.

Modify BTS Characteristics (here set OMC-R 6 / BTS Outage 1


the clock of the BTS on free runing).
Notice: The programming transmission is over
when in Transmission programming field is
displayed Idle.
Supervision outage for impacted BTSs.

20 / 30 3BK 17416 1011 RJZZA Ed.09


2 Scenario

2.3.3.4 Modify CRC4 Value

The changing of CRC4, at BSC site, is temporary. You need to modify the
CRC4 value after each reprogramming BIUA.

Note Task Description Site To do Outage

C3&C6 Disable BIUA CRC4 Process The value BSC 3 / Abis Outage 1
must be at off if the Modem does the
C1&C6
Drop Insert Mode, otherwise the value Supervision outage for impacted BTSs.
C5&C6 depends on the modem type.

C3&C6 Check Cyclic Redundancy to modify BTS 3 / Abis Outage 1


CRC4 value at BTS terminal. The value
C1&C6
must correspond to the one at BSC Supervision outage for impacted BTSs.
C5&C6 side.

2.3.3.5 Start Traffic for All BTSs of the Impacted Abis

Note Task Description Site To do Outage

Restart Equipment (here BSC) OMC-R 6 Outage 1


Supervision
outage for all
BTS =1

Unlock BTS_O&M Capability, for all OMC-R 30/ BTS Outage 1


BTSs of the impacted Abis
End supervision outage for impacted BTSs

Unlock Cell . This action will concern OMC-R 1 / cell End 1


all cells of the Abis.

2.3.4 Activation of GPRS Satellite (case C2 or C3 or C4 or C5)


2.3.4.1 Activate of MFS CST Satellite Parameters
Follow this chapter only if the MFS customer Bul file for GPRS over satellite
was not charged during the migration of the MFS and only for the first Abis
passed via satellite, when the BSS is configured with GPRS.

3BK 17416 1011 RJZZA Ed.09 21 / 30


2 Scenario

Note Task Description Site To do Outage

Download Customer BUL File for satellite OMC-R 10 None


configuration. See 2.5

Perform a Reset all GPU Data OMC-R 1/GPU Start/End 5

2.3.4.2 Activate of Cells CAE Satellite Parameters

Note Task Description Site To do Outage

Lock GPRS Traffic on Cell (on impacted OMC-R 1/cell Start 2


cells)

Create PRC (here backup PRC1) OMC-R 1 Outage 2

Copy OMC Cells to PRC (here copy the OMC-R 1/cell Outage 2
concerned cells into backup PRC1)

Check PRC (here backup PRC1, OMC-R 2 Outage 2


without forcing administrative state)

Close PRC (here backup PRC1) OMC-R 1 Outage 2

Create PRC (here working PRC2) OMC-R 1 Outage 2

Copy OMC Cells to PRC (here copy the OMC-R 1/cell Outage 2
concerned cells into working PRC2)

Edit n Cells OMC-R 6 Outage 2


Modify the following CAE cell
parameters for all cells in PRC2 as
shown:

Round_trip_delay= 700ms

Tcorr= 700ms
Testab= 1000ms

BS_CV_MAX=15

T3192

=1500ms if
DRX_TIMER_MAX =0 and
EN_DELAYED_DL_TBF_REL
=0

=1000ms if
DRX_TIMER_MAX >0 or
EN_DELAYED_DL_TBF_REL
=1

22 / 30 3BK 17416 1011 RJZZA Ed.09


2 Scenario

Note Task Description Site To do Outage

Check PRC (here PRC2, without forcing OMC-R 2 Outage 2


administrative state)

Activate PRC (here working PRC2, OMC-R 5/cell Outage 2


without forcing administrative state)
Supervision
outage for all
BTS =2

Close PRC (here working PRC2) OMC-R 1 Outage 2

Delete PRC (here working PRC2) OMC-R 1 Outage 2

Unlock GPRS Traffic on Cell (on OMC-R 2/cell End 2


impacted cells)

2.3.5 Final Checks

Note Task Description Site To do Outage

Check Perform some call tests on the new satellite BTS 15 / Abis None
BTS and its downstream BTSs. At least 1
call per BTS. If tests fail turn on the Reverse
Procedure

Display USD Detailed Cell Information OMC-R

C2 Perform GPRS calls to test satellite BTS 15 None


supporting GPRS
C3
C4
C5

C2 If min Pdch = 0,Display USD Detailed Cell OMC-R 2 None


Information by selecting cells having GPRS
C3
to test GPRS Calls When the min Pdch = 0, that means the
C4 resource(TS) is allocated when data are
transfered
C5

C2 Check in the Cell-report that the call succeed OMC-R 5 None


(a G appears on the used timeslot) and
C3
print the report . If tests fail turn on the
C4 Reverse Procedure
C5
Check

3BK 17416 1011 RJZZA Ed.09 23 / 30


2 Scenario

Note Task Description Site To do Outage

C2 Close USD A Interface Overview OMC-R 1 None


C3
C4
C5

C2 Close USD Cell Overview OMC-R 1 None


C3
C4
C5

Perform a BSS Audit Alarm State OMC-R 10 None

Perform a BSS View Status of Managed OMC-R 5 None


Objects and Alarms and print results to
compare with the initial one.

24 / 30 3BK 17416 1011 RJZZA Ed.09


2 Scenario

2.4 Reverse Procedure


2.4.1 Deactivation of GPRS satellite (case C2 or C3 or C4 or C5)
2.4.1.1 Activation of MFS CST Terrestrial Parameters
Follow this chapter only if the MFS customer Bul file for GPRS over satellite
was not charged during the migration of the MFS and only for the first Abis
passed via satellite, when the BSS is configured with GPRS.

Note Task Description Site To do Outage

Download Customer BUL File for terrestrial OMC-R 10


configuration. See 2.5

Perform a Reset all GPU Data OMC-R 1/GPU

2.4.1.2 Activation of Cell CAE Terrestrial Parameters

Note Task Description Site To do Outage

Lock GPRS Traffic on Cell (on impacted OMC-R 1/cell


cells)

Open PRC (here backup PRC1) OMC-R 1

Activate PRC (here PRC1, without OMC-R 5/cell


forcing administrative state)

Close PRC (here PRC1) OMC-R 1

Delete PRC (here PRC1) OMC-R 1

Unlock GPRS Traffic on Cell (on OMC-R 2/cell


impacted cells)

2.4.2 Deactivation of Circuit Satellite (case C1 or C3 or C5)


2.4.2.1 Stop Traffic for All BTSs of the Impacted Abis

Note Task Description Site To do Outage

Lock BTS_O&M Capability, for all BTSs OMC-R 10/ BTS


of the impacted Abis
Start supervision outage for impacted BTSs.

Shut Down Cell This action will concern OMC-R 4 / cell


all cells of the impacted Abis. (WTC=3)
Notice: perform all the lock action in sequence
without loosing time.
Supervision outage for impacted BTSs.

3BK 17416 1011 RJZZA Ed.09 25 / 30


2 Scenario

2.4.2.2 Abis Physical Connections without Modems

Note Task Description Site To do Outage

Recable or cable the Abis link at BSC BSC 15 / Abis


side

Recable or cable the Abis link at BTS BTS 15 / Abis


side

2.4.2.3 Abis Terrestrial Settings

Note Task Description Site To do Outage

Modify Abis Connection Type Change OMC-R 7/ Abis


Connection-type to terrestrial. Wait for
programming transmission end. Notice: The programming transmission is over
when in Transmission programming field is
displayed Idle.

Modify BTS Characteristics (here set the OMC-R 6 / BTS


clock of the BTS to the initial value).The
programming transmission is over when
in Transmission programming field is
displayed Idle.

2.4.2.4 Start Traffic for All BTSs of the Impacted Abis

Note Task Description Site To do Outage

Restart Equipment (here BSC) OMC-R 6

Unlock BTS_O&M Capability ,for all OMC-R 30/ BTS


BTSs of the impacted Abis

Unlock Cell. This action will concern all OMC-R 1 / Abis


cells of the Abis.

26 / 30 3BK 17416 1011 RJZZA Ed.09


2 Scenario

2.4.3 Remove GPRS (case C2 or C3)

Note Task Description Site To do Outage

Apply reverse procedure of MPI96/MDR1(Add OMC-R


Logically a New or Running BSS to a New or
Running A935 MFS)
OR
reverse procedure of MPI96/MDR2 (Add
a Running BSS by Moving Existing Links
through a New or Running A935 MFS)
depending on choosed direct procedure.

2.4.4 BTS Call Tests by Terrestrial

Note Task Description Site To do Outage

Perform some call tests on the new terrestrial BTS 15 / Abis


BTS and its downstream BTSs. At least 1
call per BTS

Display USD Detailed Cell Information OMC-R

C2 Perform GPRS calls to test the new terrestrial BTS 15


configuration.
C3
C4
C5

C2 If min Pdch = 0,Display USD Detailed Cell OMC-R 2


Information by selecting cells having GPRS
C3
to test GPRS Calls When the min Pdch = 0, that means the
C4 resource(TS) is allocated when data are
transfered
C5

C2 Check in the Cell-report that the call succeed OMC-R 5


(a G appears on the used timeslot).
C3
C4
C5
Check

C2 Close USD A Interface Overview OMC-R 1


C3
C4
C5

3BK 17416 1011 RJZZA Ed.09 27 / 30


2 Scenario

Note Task Description Site To do Outage

C2 Close USD Cell Overview OMC-R 1


C3
C4
C5

Perform a BSS Audit Alarm State OMC-R 10

Perform a BSS View Status of Managed OMC-R 5


Objects and Alarms and print results to
compare with the initial one.

2.5 Detailed Tasks Specific to Scenario


Download Customer BUL File is described below:

Two cases apply 1. Download the Customet BUL file from diskette
Open an xterm window and launch the following command:
volcheck
From IMT window, select theBUI -> ReceptionView and BUI -> Request
menus to see the bul file execution result

In the Request window, click on the button [ File ]


BUL File Chooser window is opened

From /floppy/floppy0/ sub-directory, select Customer BUL file and click


on [ OK ]
In the Request window, click on the button [ Send ]

Click on [ Close ] in the Request and in ReceiveLog windows to quit


them

Extract the diskette :


From xterm window launch the following commands:
cd /
eject floppy

2. Download the Customer BUL file from CD-ROM


Insert the CD-ROM in the OMC-R

From IMT window, select the BUI -> ReceptionView and BUI ->
Request menus to see the bul file execution result
In the Request window, click on the button [ File ]
BUL File Chooser window is opened

From /cdrom/cdrom0/ sub-directory, select Customer bul file


Click on [ OK ]
In the Request window, click on the button [ Send ]

28 / 30 3BK 17416 1011 RJZZA Ed.09


2 Scenario

Click on [ Close ] in the Request and in ReceiveLog windows to quit


the windows

Extract the CD-ROM :


From xterm window launch the following commands:
cd /
eject cdrom

3BK 17416 1011 RJZZA Ed.09 29 / 30


2 Scenario

BLANK PAGE BREAK

30 / 30 3BK 17416 1011 RJZZA Ed.09