You are on page 1of 13

UNIVERSITY OF THE EAST

COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

PROJECT : 2-storey residential building


OWNER/S : kristel marie r. sotto
LOCATION : san ildefonso, bulacan
BILL OF MATERIALS
Materials and Estimated
Item to be Quantities
estimated
CALCULATIONS 10 12 16
ITEM: mm mm mm
Reinforcement 6m 6m 6m
works UNIT: PCS. PCS.
PCS.
beam
Continuous top Length of bars
bars 5(92.66)=463.3
Total number of bars
2(463.3)/6=154.43 155

Single span top Length of bars


bars 5(24.25)=121.25
Total number of bars
2(121.25)/6=40.42 41

Continuous Length of bars


bottom bars 5(92.66)=463.3
Total number of bars
2(463.3)/6=154.43 155

Single span top Length of bars


bars 5(24.25)=121.25
Total number of bars
2(121.25)/6=40.42 41

Hook length Length of bars


Continuous span 6(1.75)+4(2.85)+3(2.5)+6(2.25)
+2(2.75)+3.45+2(1.5)+1.95(3)
2.875+2.85+2.5+2.582+2.25+3(1.6
25)+1.5+6.675+3.25+6.05
+4(2.55)+5.508+8.145+1.875
=118.47(2)=236.94
Number of pcs.
263.94/6=39.49 40

SUBTOTAL: 432
Prepared by: Approved by:
Cayetano, Kristel C.
Sotto, Racquel O. Engr. Mark G. Costelo
Sulit, Shiella Marie M.

UNIVERSITY OF THE EAST


COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

PROJECT : 2-storey residential building


OWNER/S : kristel marie r. sotto
LOCATION : san ildefonso, bulacan
BILL OF MATERIALS
Materials and Estimated
Item to be Quantities
estimated
CALCULATIONS 10 12 16
ITEM: mm mm mm
Reinforcement 6m 6m 6m
works UNIT: PCS. PCS.
PCS.
Hook length Length of bars
Single span 2(1.75)+2.85+2(1.5)+2.25+
2(2)+3.452(1.125)+1.35+2(2)
+3.45=30.14(2)=60.28
Number of pcs.
60.28/6=10.05 11

CLOSED NUMBER OF STIRRUPS


STIRRUPS 22(4)+7(19)+4(29)+4(22)
3(17)+2(12)+27+2(23)+2(24)
=677(2)=1354
LENGTH OF BARS
1354(1.15)=1557.1
NUMBER OF PCS.
1557.1/6=259.52 260

column NUMBER OF PCS.


footing 7(20)/5= 28

chb wall
footing
transverse Exterior
49.9/(.6)(10)=8.32 9
Interior
24/(.6)(11)=3.64 4
longitudinal Exterior
(3)(49.9)(1.2)/6=29.94 30
Interior
(3)(24)(1.2)/6=14.4 15

SUBTOTAL: 86 70
3
Prepared by: Approved by:
Cayetano, Kristel C.
Sotto, Racquel O. Engr. Mark G. Costelo
Sulit, Shiella Marie M.

UNIVERSITY OF THE EAST


COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

PROJECT : 2-storey residential building


OWNER/S : kristel marie r. sotto
LOCATION : san ildefonso, bulacan
BILL OF MATERIALS
Materials and Estimated
Item to be Quantities
estimated
CALCULATIONS 10 12 16
ITEM: mm mm mm
Reinforcement 6m 6m 6m
works UNIT: PCS. PCS.
PCS.
chb wall
HORIZONTAL
BARS

GROUND 4.6/.3=15.33, 0.8/.3=2.67


FLOOR 0.9/0.3=3, 1.65/0.3=5.5
NUMBER OF PCS.
15(29.29)(1.1)/6+
3(12.5)(1.1)/6+
2(27.05)(1.1)/6+
15(34.6)1.1)/6+
5(.6)(1.1)/6=193.04 194

SECOND 3.2/.3=10.67, 0.9/.3=3


FLOOR 1.65/.3=5.5, .85/.3=2.67
1.3/.3=4.33

NUMBER OF PCS.
10(33.3)(1.1)/6+
3(10)(1.1)/6+
4(14.75)(1.1)/6+
12.2(2)(1.1)/6+
5(1.2)(1.1)/6+
10(42.65)(1.1)/6
=161.13 16
2

SUBTOTAL: 44 70
2 3
Prepared by: Approved by:
Cayetano, Kristel C.
Sotto, Racquel O. Engr. Mark G. Costelo
Sulit, Shiella Marie M.

UNIVERSITY OF THE EAST


COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

PROJECT : 2-storey residential building


OWNER/S : kristel marie r. sotto
LOCATION : san ildefonso, bulacan
BILL OF MATERIALS
Materials and Estimated
Item to be Quantities
estimated
CALCULATIONS 10 12 16
ITEM: mm mm mm
Reinforcement 6m 6m 6m
works UNIT: PCS. PCS.
PCS.
vertical
BARS

Ground floor LENGTH OF BARS


(92)(3.2)+(20)(0.8)+
(18)(0.9)=326.6
NUMBER OF PCS.
(326.6)(1.2)/6=65.32 66

Second floor LENGTH OF BARS


(101)(3.20)+(21)(1.3)+
(13)(.85)+(14)(.85)=373.45
NUMBER OF PCS.
(373.45)(1.2)/6=74.69 75

column
Vertical
bars

Ground LENGTH OF BARS


floor (5.2)(6)=31.2
(31.2)(20)=624
NUMBER OF PCS.
(624)(1.1)/6=114.4 11
5

SUBTOTAL: 69 70
8 3
Prepared by: Approved by:
Cayetano, Kristel C.
Sotto, Racquel O. Engr. Mark G. Costelo
Sulit, Shiella Marie M.

UNIVERSITY OF THE EAST


COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

PROJECT : 2-storey residential building


OWNER/S : kristel marie r. sotto
LOCATION : san ildefonso, bulacan
BILL OF MATERIALS
Materials and Estimated
Item to be Quantities
estimated
CALCULATIONS 10 12 16
ITEM: mm mm mm
Reinforcement 6m 6m 6m
works UNIT: PCS. PCS.
PCS.
Second floor LENGTH OF BARS
(4.2)(6)=25.2
(25.2)(20)=504
NUMBER OF PCS.
(504)(1.1)/6=92.4 93
Lateral ties
Ground LENGTH OF BARS
floor (32)(20)=640
NUMBER OF PCS.
(640)/6=106.67 10
7

Second LENGTH OF BARS


floor (27)(20)=540
NUMBER OF PCS.
(540)/6=90 90

SUBTOTAL: 98 70
8 3
Prepared by: Approved by:
Cayetano, Kristel C.
Sotto, Racquel O. Engr. Mark G. Costelo
Sulit, Shiella Marie M.

UNIVERSITY OF THE EAST


COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

PROJECT : 2-storey residential building


OWNER/S : kristel marie r. sotto
LOCATION : san ildefonso, bulacan

BILL OF MATERIALS
Materials and Estimated
Item to be Quantities
estimated
CALCULATIONS
ITEM: 25cm 30cm 40 cm
Reinforcement
works UNIT: kg kg
kg
tie wires

For chb Total area


223.15 - 30.99=192.16
Kilogram of tire wire
(192.16)(.032)=6.15 6.26

For column Intersection in 20 columns


354(20)=7080
Length of tie wires
7080(.3)=2124
Kilogram of tire wire
2124/53=40.08 40.18

For beam Intersection beam


677(10)=6770
Length of tie wires
6770(.25)=1692.5
Kilogram of tire wire
1692.5/53=31.93 32.03

For slab
One way Kilogram of tire wire
(140.58+17.35)(.228)=36 36

subtotal: 114.47

Prepared by: Approved by:


Cayetano, Kristel C.
Sotto, Racquel O. Engr. Mark G. Costelo
Sulit, Shiella Marie M.
UNIVERSITY OF THE EAST
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

PROJECT : 2-storey residential building


OWNER/S : kristel marie r. sotto
LOCATION : san ildefonso, bulacan
BILL OF MATERIALS
Materials and Estimated
Item to be Quantities
estimated
CALCULATIONS
ITEM: 25cm 30cm 40 cm
Reinforcement
works UNIT: kg kg
kg
Two way
Kilogram of tire wire
(95.55)(.35)=33.44 33.53

SUBTOTAL:
148
Prepared by: Approved by:
Cayetano, Kristel C.
Sotto, Racquel O. Engr. Mark G. Costelo
Sulit, Shiella Marie M.
UNIVERSITY OF THE EAST
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

PROJECT : 2-storey residential building


OWNER/S : kristel marie r. sotto
LOCATION : san ildefonso, bulacan
BILL OF MATERIALS
Materials and Estimated
Item to be Quantities
estimated
CALCULATIONS 10 12 16
ITEM: mm mm mm
Reinforcement 6m 6m 6m
works UNIT: PCS. PCS.
PCS.
slab
Ground Length of tie wires
floor (140.58)(2.584)=529.14
NUMBER OF PCS.
363.26/6=60.54 61

Second
Floor
One way NUMBER OF PCS.
(17.94)(2.584)=46.36 47

Two way NUMBER OF PCS.


(95.55)(3.221)=307.77 308

septic vault
horizontal LENGTH OF BARS
(1.1)(10/.3)=36.67
NUMBER OF PCS.
(36.67)/6=6.11 7

vertical LENGTH OF BARS


(1.1)(10.5/.6)=19.25
NUMBER OF PCS.
19.25/6=3.21 4

SUBTOTAL:
416 988 703
Prepared by: Approved by:
Cayetano, Kristel C.
Sotto, Racquel O. Engr. Mark G. Costelo
Sulit, Shiella Marie M.
UNIVERSITY OF THE EAST
COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

PROJECT : 2-storey residential building


OWNER/S : kristel marie r. sotto
LOCATION : san ildefonso, bulacan
BILL OF MATERIALS
Materials and Estimated
Item to be Quantities
estimated
CALCULATIONS 10 12 16
ITEM: mm mm mm
Reinforcement 6m 6m 6m
works UNIT: PCS. PCS.
PCS.
catch basin
horizontal LENGTH OF BARS
(1.1)(1(.35)(16)/.3)=20.53
NUMBER OF PCS.
(20.53)/6=3.42 4

vertical LENGTH OF BARS


(1.1)((.4)(16)/.6)=11.73
NUMBER OF PCS.
11.73/6=1.96 2

TOTAL:
422 988 703
Prepared by: Approved by:
Cayetano, Kristel C.
Sotto, Racquel O. Engr. Mark G. Costelo
Sulit, Shiella Marie M.