FOUNDATION
FLOOR
WALL FRAMING
ROOF FRAMING
Rafters 5 2x6 x 14' SPF lumber
Purlins, blocking 12 2x4 x 16' SPF lumber
DOORS
ROOFING
Page 1 of 2
2015 SHED MATERIALS LIST
(Continued)
GLASS
Pieces of glass 4 Measure and subtract 1/4"
HARDWARE
1 lb. 10d galvanized box nails
1 lb. 16d galvanized box nails
5 lbs. 16d sinkers (framing nails)
5 lbs. 2" ring shank siding nails
2 lbs. 4d galvanized box nails
2 lbs. 1-1/4" corrosion-resistant screws
2 lbs. 2-1/2" corrosion-resistant screws
8 4-1/2" corrosion-resistant screws
8 USP Structural Connectors RT7 hurricane ties
40 USP Structural Connectors JA1 framing angles
6 USP Structural Connectors HCPRS rafter ties
1 tube Construction adhesive
2 tubes Exterior painter's caulk
1 Tube of clear silicone (optional for windows)
2 Open bar hangers
2 Handles
1 Locking gate latch
4' 36" window screen
1 Box of 5/16" staples for window screen
Page 2 of 2