CALCULO DE PRESIONES EN LA LINEA DE CONDUCC

PROYECTO : EXPEDIENTE MEJORAMIENTO DE SISTEMA DE RIEGO DE SANTA ROSA ALTA-OCOBAMBA-CHINCHEROS-APURIMAC

DATOS :

Cota Captacin N1 3440.65


Cota Captacin N2 3204.78

ESTRUCTURAS TRAMO LONG. HORI. CAUDAL (Qmd) COTA DE TERRENO Desn. del Perd. Carg. Dimetros Dimetro
INICIAL FINAL terreno Unit.Disp ( hf) Calculados Asumido
(m) (lt/seg) (m.s.n.m.) (m.s.n.m.) (Metros) (m/m) D (Pulg) D (Pulg)
1 64.02 8.000 3440.65 3435.87 4.77 0.0745 2.6993 4
2 118.85 8.000 3435.87 3429.67 6.21 0.0522 2.9084 4
3 11.22 8.000 3429.67 3428.52 1.15 0.1024 2.5250 4
4 65.38 8.000 3428.52 3425.04 3.47 0.0531 2.8980 4
5 227.74 8.000 3425.04 3411.43 13.61 0.0598 2.8275 4
NES EN LA LINEA DE CONDUCCION
COBAMBA-CHINCHEROS-APURIMAC

Velocidad (V) Perdida Carga Perdida de Carga COTA PIEZOMETRICA PRESIN


Unit (hf ) en Tramo(Hf) INICIAL FINAL Final
(m/seg) (m/m) (m) (m.s.n.m.) (m.s.n.m.) (m)
1.0 0.01 0.65 3440.65 3439.99 18.74
1.0 0.01 1.21 3435.87 3434.66 5.00
1.0 0.01 0.11 3429.67 3429.55 1.03
1.0 0.01 0.67 3428.52 3427.85 2.81
1.0 0.01 2.32 3425.04 3422.72 11.29