USC LIBRARY BUILDING

WBS

STRUCTURAL ARCHITECTURAL ELECTRICAL PLUMBING

Laying out/Staking
Interior Finish Pipe and Fittings
Exterior Finish
Install wirings Install Fixtures
Tiles Landscape
Earthworks Formworks Install
Outlets/Switches
Installation of Floor and Bathroom Tile Plastering Install Water Install Waste
Installation of (Basement 4th Floor Level) Lines Lines
Excavation Backfilling forms Plastering of Exterior Walls
Plastering
(Basement 4th Floor Level)
Isolated Isolated Steel works Formworks Plastering of Interior Walls Paintings Install Sanitary Install Drainage
Footings Footings
(Basement 4th Floor Level) Lines Lines
Fabrication of steel Painting of Exterior Walls
Filter Box Filter Box Pouring concrete to Paintings
(Basement 4th Floor Level)
structural members
Installation of steel Miscellaneous
Painting of Interior Walls
Septic Septic
(Basement 4th Floor Level)
Tanks Tanks
Miscellaneous Installation of Doors and Windows
(Basement 4th Floor Level)
Wall Wall
Footings Footings Installation of Doors and Windows
(Ground 4th Floor Level)

Foundation Basement First Floor Second Floor Third Floor Fourth Floor

Isolated Column (1st Column (2nd Column (3rd Column (4th Column (5th
Footings Lift) Lift) Lift) Lift) Lift)

Tie Beams Slab on Fill Suspended Suspended Suspended Suspended


Slab Slab Slab Slab

Filter Box Beams/Girders


Beams/Girders Beams/Girders Beams/Girders Beams/Girders
Walls
Septic Tanks Walls Walls Walls Walls

Wall Footings

Roof Trusses