Professional Documents
Culture Documents
N
7.1.12 Noise Barriers 6
IO
7.2 BUILDING DESIGN STRUCTURAL SPECIFICATION .................................. 6
7.2.1 General Principles 6
7.2.2
7.2.3
Design Principles
Civil and structural design statement AT 7
7
R
7.3 STRUCTURAL CONCRETE .......................................................................... 8
PO
7.4.2 Materials 10
C
7.4.5 Straightness 10
7.4.6 Post-tensioning 10
IS
N
IO
AT
R
PO
R
O
C
EI
IS
TA
QCS 2014 Section 29: Railways Page 3
Part 07: Concrete Structures
7 CONCRETE STRUCTURES
7.1 BRIDGE SPECIFICATION
1 This section shall be applied for the structural design of temporary and permanent structures
of all kind of bridges related to the project, including all bridge substructures such as piers
and their foundations, abutments, culverts etc.
2 Bridges and other similar structures shall be designed in accordance with the following
standards:
(a) EN 1990 Basis of structural design;
N
(b) EN 1991 Actions on structures;
IO
(c) EN 1992 Design of concrete structures;
AT
(d) EN 1993 Design of steel structures;
(e) EN 1994 Design of composite steel and concrete structures;
R
(f) EN 1997 Geotechnical design;
PO
1 The design of bridges and their foundations shall include, but not be limited to, the following:
(a) The selection of the structural system for the bridge structure, the piers and
EI
foundations;
IS
(b) Aesthetics;
TA
(c) Clearances;
(d) Evacuation and emergency access;
(e) Accidental impact from roads;
(f) Footbridges-environment within e.g. temperature control, lighting, appearance;
(g) Method of bridge construction, including Temporary Works and construction
sequence;
(h) Ground/structure interaction, including the effects of Temporary Works;
(i) Dynamic, seismic loads and displacements;
(j) Deflection and rotation of bridge structures;
(k) Ground pressure (including swelling), shear force and bending distribution on
structural members during construction and in the long-term;
(l) Short and long-term ground and groundwater response;
(m) Other changes in static loads such as excavation, surcharge, live loads, traffic
loadings and others;
QCS 2014 Section 29: Railways Page 4
Part 07: Concrete Structures
N
IO
(u) Effects caused by creep and shrinkage of concrete and the resulting effects (including
secondary effects). These effects shall be regarded as permanent loads.
2
AT
Vertical clearance to roads shall be in accordance with the relevant local regulations; the
minimum vertical clearance to existing and planned roads shall be 6.50 m.
R
3 Decks end rotations
PO
(a) Vertical end rotation angle of the decks caused by live load, temperature gradient,
creep and shrinkage shall be limited to = 0.002 rad at abutments and 1 + 2 =
R
(b) Horizontal end rotation of the decks caused by impact, wind, centrifugal force (if any),
C
hunting force, and effect of transverse temperature gradient across the deck shall be
limited to 0.0035 rad. Horizontal deformation includes the deformation of bridge deck
EI
Figure 7.1
Vertical end rotation angle of the decks
TA
Figure 7.2
EQUAL OR SMALLER
3.5/1000
QCS 2014 Section 29: Railways Page 5
Part 07: Concrete Structures
1 Cyclic movements between adjacent span ends (or expansion joints) shall be limited to 3
mm vertically and 2 mm horizontally at the running rail centre line;
2 Under braking and traction forces the relative displacement of the individual bridge deck
under normal (non-seismic) conditions shall not be more than 5 mm in longitudinal direction.
This requirement can be eased if a detailed rail structure interaction calculation demonstrate
that the allowable rail stress is within the limits given in UIC 774-3;
3 Under seismic actions the deck shall be designed to satisfy the fundamental requirements of
EN 1998, including no-collapse and damage minimisation requirements; and
4 Under seismic actions (including temperature creep and shrinkage effects) the gap between
adjacent decks shall be wide enough to prevent contact of adjacent decks.
N
7.1.4 Vibration
IO
1 The limits of vertical and horizontal vibration shall be as stated in EN 1991.
7.1.5 Fatigue
AT
R
1 Fatigue calculations shall be in accordance with the requirements of EN 1991.
PO
1 In general, Temporary Works shall be designed in accordance with the same design
standards as the Permanent Works. However, the Temporary Works design may take into
IS
account the limited time they are expected to function. The calculations and drawings shall
make clear where provision for limited duration has been allowed for, particularly where this
TA
2 The design of Temporary Works shall take into account of all the applied external forces and
imposed structural deformations.
7.1.8 Foundations
1 The top of the foundation surface or pile cap shall be kept at least 1.0 m below the road or
ground level.
1 Turnouts shall not be placed over expansion joints between adjacent decks of the viaduct.
The following minimum distances shall be kept:
(a) Expansion joint to begin of turnout (BT) 2.0 m; and
(b) End of turnout (ET) to expansion joint 0.6 m.
QCS 2014 Section 29: Railways Page 6
Part 07: Concrete Structures
Figure 7.3
Turnout
N
IO
1 Safety railing shall be provided at all locations where the level difference is more than 1.0 m,
unless specified in other regulations.
2
AT
Safety railing shall have a minimum height of 1.10 m above finish floor level.
R
7.1.11 Privacy Screening
PO
1 Privacy screening shall be provided at certain locations. The Contractor shall coordinate the
needs for privacy screening with the relevant authorities.
R
1 Noise barriers shall be provided at certain locations. The Contractor shall coordinate the
C
1 This section shall be applied for the structural design of temporary and permanent structures
of all kind of buildings related to the project, which are not already covered under sections
above.
1 The design of buildings and their foundations shall include, but not be limited to, the
following:
(a) The selection of the structural system;
(b) Aesthetics;
(c) Clearances;
(d) Evacuation and emergency access;
(e) Method of building construction, including Temporary Works and construction
sequence;
(f) Ground/structure interaction, including the effects of Temporary Works;
(g) Dynamic, seismic loads and displacements;
N
(h) Ground pressure (including swelling), shear force and bending distribution on
IO
structural members during construction and in the long-term;
(i) Short and long-term ground and groundwater response;
(j)
AT
Other changes in static loads such as excavation, surcharge, live loads, traffic
loadings and others;
R
(k) The effects of vibration so as to minimise disturbance to existing building structures;
PO
and
(l) Effects caused by creep and shrinkage of concrete and the resulting effects (including
R
1 Prior to the design of the buildings, the Contractor shall submit a civil and structural design
EI
2 The civil and structural design statement shall be submitted to the Engineer for a SONO.
QCS 2014 Section 29: Railways Page 8
Part 07: Concrete Structures
N
2 Concrete
IO
(a) Testing of concrete shall be performed in a laboratory conforming to the requirements
in EN 45001.
3 Aggregates: Cement
AT
R
(a) All cement shall comply with the requirements of EN 197.
PO
(a) Fine aggregates shall be natural or crushed rock sand in compliance with EN 12620.
(b) In case of change of the source of supply, the Engineer shall be notified in advance.
9 Aggregates: Water
(a) Water for concrete mixing, ice, washing and cooling of aggregates as well as curing
shall comply with EN 1008.
10 Additives: Admixtures
(a) The admixtures shall conform to the general and specific requirements of EN 934-2,
EN 934-4 and EN 934-6.
QCS 2014 Section 29: Railways Page 9
Part 07: Concrete Structures
(b) Admixtures shall be delivered to the concrete production site in original sealed
packing, clearly marked and labelled to EN 934-2.
N
(c) Tests shall bet in accordance with the following standards:
IO
(i) Slump Test: EN 12350-2
AT
(ii) Vebe Test: EN 12350-3
(iii) Compaction test: EN 12350-4
R
(iv) Flow Test: EN 12350-5
PO
14 Curing
C
(a) Curing and protection shall comply with the requirements of QCS - Section 5.
EI
2 Detailed records of the stressing and grouting including steel tests and materials certificates,
shall be available for inspection at all times.
3 The minimum quality requirements for materials and workmanship shall be determined by
the following documents listed in order of precedence:
(a) Qatar Construction Specifications (QCS - Section 5, Part 18)
(b) EN 1992, EN 13670 Pre-stressing Tendons.
QCS 2014 Section 29: Railways Page 10
Part 07: Concrete Structures
7.4.2 Materials
2 Cold worked high tensile alloy steel bars for pre-stressing shall comply with the requirements
of BS 4486.
1 All pre-stressing tendons shall be stored in such a way as to avoid damage of any kind.
2 Each cable shall be tagged with its number from which the coil numbers of the steel used
can be identified.
N
1 Stressing tendons anchorages, blocking devices and internal and external surfaces of ducts
shall be clean and free from pitting, loose rust, loose scale and chloride contamination at the
IO
time of incorporation during the Work.
2
AT
Slight rusting of the steel, which can be removed by moderate rubbing, is acceptable, but the
surface shall not show signs of pitting. Tendons showing pitting are not to be used and shall
R
be removed from Site.
PO
7.4.5 Straightness
7.4.6 Post-tensioning
EI
2 Tensioning procedure
(a) Full and detailed records shall be kept of all tensioning operations, including the
measured extensions, pressure-gauge or load-cell readings, and the amount of draw-
in at each anchorage. These records shall be available for inspection at all times.
1 General Information
(a) All ducts shall be thoroughly cleaned and all anchorages shall be sealed before
grouting.
2 Ducts
N
(a) All ducts shall be thoroughly cleaned before grouting.
IO
(b) All surplus water shall be removed.
3 Grouting Equipment
(a) AT
The mixing equipment shall produce grout of homogeneous consistency and shall be
R
capable of providing a continuous supply to the injection equipment.
PO
4 Injecting Grout
(a) The method of injecting grout shall ensure complete filling of the ducts and complete
R
(b) The Contractor shall keep full records of grouting, including the date each duct was
C
grouted, the proportion of the grout and any admixtures used, the pressure, details of
any interruptions and topping up required. These records shall be available for
EI
1 General information
(a) Pre-stressing steel for post-tensioning which is installed in members prior to placing
and curing of the concrete, shall be continuously protected against rust or other
corrosion, until grouted.
7.5 SHOTCRETE
7.5.1 General
1 This specification concerns the provision of materials and workmanship for the production
and application of shotcrete.
1 Reports of each shotcrete mix shall be produced and copies made available on Site for
inspection by the Engineer.
QCS 2014 Section 29: Railways Page 12
Part 07: Concrete Structures
7.5.3 Production
1 Cement
(a) Cement used in shotcrete laying and maintenance works shall meet the requirements
of EN 197-1. The minimum required content in
3
Type CEM I 42,5 cement shall be 400 kg/m .
2 Aggregates
(a) Aggregates used in shotcrete application and maintenance works shall be either
natural or crushed and shall comply with EN 12620.
3 Admixtures
(a) All admixtures used in shotcrete laying and maintenance works shall comply with EN
934-2, EN 934-5 and EN 934-6.
N
4 Reinforcement
IO
3
(a) if steel fibres are used, the minimum quantity shall not be less than 30 kg/m ;
(b) steel fibres shall comply with the requirements of Annex B of EN 14487-1;
(c)
AT
any fibres for shotcrete reinforcement shall be sufficiently small to ensure their uniform
spreading in the mass of the shotcrete and avoid the formation of lumps.
R
PO
6 Curing of Shotcrete
C
1 In situ checks
(a) The thickness of any applied shotcrete shall be verified.
TA
7.6 FORMWORK
1 This section includes the design, production and installation of formwork in accordance with
QCS - Section 5, Part 9.
2 All material for formwork shall be of a quality capable of providing a dense concrete surface.
N
3 Drawings and calculations shall be sufficiently detailed to document adequate strength,
rigidity, and stability to meet all load combinations during the erection of the Permanent
IO
Work.
7.7 WATERPROOFING
C
7.7.1 General
EI
1 This section refers to the supply and installation of the waterproofing systems in concrete
structures.
IS
2 The purpose of the waterproofing systems is to prevent leakage of groundwater into the
TA
4 All the materials to be used for waterproofing shall be compatible with each other, as well as
with any bordering materials such as concrete. Any harmful chemical influences shall be
prevented.
5 The waterproofing system used shall be suitable for the Works and the local conditions of
ground and groundwater. Any expected movement of the structural elements caused by
shrinkage, temperature changes and settlements, should not result in the waterproofing
system losing its waterproofing properties.
6 All waterproofing systems shall be installed and tested in accordance with the
manufacturers instructions or recommendations. Testing shall be undertaken as necessary
to ensure satisfactory functioning of the system at each stage of the installation. Defective
waterproofing systems shall be repaired in accordance with the manufacturers instructions
or replaced.
QCS 2014 Section 29: Railways Page 14
Part 07: Concrete Structures
7 Waterproofing system shall be applied only after effectively sealing of all cracks on exposed
surfaces of the external structural members as per the manufacturers instructions or
recommendations.
Table 7.1
Waterproofing classes
Definition for
Characteristic of the waterproofed inner
Waterproofing impermeability
soffit
Class on the inner
General
soffit
The inner soffit shall not show any moisture
N
areas.
IO
1 Completely dry
Acceptable amount of water in the tunnel
structure: no water.
AT
On the inner soffit, weak moisture penetration
R
shall only appear on max. 10% of each
structures section surface (visible as a dark
PO
waterproofing class 3.
IS
1 Watertightness
(a) Cast in situ concrete linings for tunnels, cross passages and shafts shall be
waterproofing class 1.
(b) Cast in situ concrete linings for underground plant rooms shall be waterproofing class
1.
QCS 2014 Section 29: Railways Page 15
Part 07: Concrete Structures
1 Watertightness
(a) Precast concrete segmental linings shall be of waterproofing class 1
7.7.5 Waterproofing for Cut and Cover Structures and Open Troughs
1 Watertightness
(a) Cast in situ concrete linings for cut-and-cover and open troughs shall be waterproofing
class 1.
END OF PART
N
IO
AT
R
PO
R
O
C
EI
IS
TA