You are on page 1of 4

Revised on : 28-06-2016

LEGENDS
Hanoi Pilot Light Metro Line-3 [CP-2] 0% 50% 80% 90% 100%

Construction Design Activity Not yet


Submitted
Rejected or NOWC
Under
SONO Approved

Review
CLASSIFY TEMPORARY WORKS BORED PILE PILE CAP UNDERGROUND TANKS
PERCENTAGE(%) 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 70 80 90 100
Traffic Management Plan MS for cast in place Bored Pile MS for production of Concrete spacer for structural concrete MS for construction of fire fighting tank, water supply tank, septic
General MS for construction of temporary fence MS for production of concrete spacer for Bored pile MS for Shored Excavation Method statement for shored excavation of underground
MS for construction of Temporary Power MS for crosshole sonic logging (CSL) MS for construction of Pile cap MS of waterproofing for underground tanks
MS for construction of Temporary Drainage system MS for driving analysis (PDA) MS for structure backfill Sikatop seal 107, waterproofing material for UDG water tanks
MS for construction of Temporary Water supply MS for core test of cast in place Bored pile (Core Test) Ladder rung for underground tanks
MS for Site Clearing and Demolition for Station 1 to 7 MS for low strain dynamic test (PIT) Cast iron cover for underground tank and manhole
MS for Site Clearing and Demolition for Station 8 MS for Vertical Pile Load Test (Working pile and pilot pile) Proposal of water-stops material - first source
MS for Lateral Pile Load Test Method statement of testing works for plate load test

Fencing Item (including Temporary Power, Water, Drainage) CD Report CD Report CD Report
Station-1 Working Drawing of Site Installation CD Drawing CD Drawing CD Drawing
Working Drawing of Project Information Sign Board MS calculation of sheet pile and struts for shored excavation Working Drawing for Shored Excavation Underground Tank
Traffic Management Plan - Working Drawing for Shored Excavation Pile Cap Working Drawing for Construction Underground Tank
Traffic Management Plan - Working Drawing for Construction Pile Cap

Fencing Item (including Temporary Power, Water, Drainage) CD Report TD assessment report of pile cap CD Report
Station-2 Working Drawing of Site Installation CD Drawing CD Report CD Drawing
Working Drawing of Project Information Sign Board CD Report of Lateral load test for pilot CD Drawing Working Drawing for Shored Excavation Underground Tank
Traffic Management Plan - CD Drawing of Lateral load test for MS calculation of sheet pile and struts for shored excavation Working Drawing for Construction Underground Tank
Traffic Management Plan - CD Report of Vertical load test for pilot Working Drawing for Shored Excavation Pile Cap
CD Drawing of Vertical load test for Working Drawing for Construction Pile Cap

Fencing Item (including Temporary Power, Water, Drainage) CD Report CD Report CD Report
Station-3 Working Drawing of Site Installation CD Drawing CD Drawing CD Drawing
Working Drawing of Project Information Sign Board CD Drawing for Pile No.4 at PF1s MS calculation of sheet pile and struts for shored excavation Working Drawing for Shored Excavation Underground Tank
Traffic Management Plan - Working Drawing for Shored Excavation Pile Cap Working Drawing for Construction Underground Tank
Traffic Management Plan - Working Drawing for Construction Pile Cap

Fencing Item (including Temporary Power, Water, Drainage) CD Report CD Report CD Report
Station-4 Working Drawing of Site Installation CD Drawing CD Drawing CD Drawing
Working Drawing of Project Information Sign Board Calculation report of shee pile for shored excavation of pile Working Drawing for Shored Excavation Underground Tank &
Traffic Management Plan - Working Drawing for Shored Excavation (Tank & Pile cap) Working Drawing for Construction Underground Tank
Traffic Management Plan - Working Drawing for Construction Pile Cap

Fencing Item (including Temporary Power, Water, Drainage) CD Report CD Report CD Report
Station-5 Working Drawing of Site Installation CD Drawing CD Drawing CD Drawing
Working Drawing of Project Information Sign Board Calculation report of shee pile for shored excavation of pile Working Drawing for Shored Excavation Underground Tank &
Traffic Management Plan - Working Drawing for Shored Excavation (Tank & Pile cap) Working Drawing for Construction Underground Tank
Traffic Management Plan - Working Drawing for Construction Pile Cap

Fencing Item (including Temporary Power, Water, Drainage) CD Report CD Report CD Report
Station-6 Working Drawing of Site Installation CD Drawing CD Drawing CD Drawing
Working Drawing of Project Information Sign Board Loading arrangement for vertical pile load Calculation report of shee pile for shored excavation of pile Working Drawing for Shored Excavation Underground Tank &
Traffic Management Plan - Working Drawing for Shored Excavation (Tank & Pile Cap) Working Drawing for Construction Underground Tank
Traffic Management Plan - Working Drawing for Construction Pile Cap

Fencing Item (including Temporary Power, Water, Drainage) CD Report CD Report CD Report
Station-7 Working Drawing of Site Installation CD Drawing CD Drawing CD Drawing
Working Drawing of Project Information Sign Board Calculation report of shee pile for shored excavation of pile Working Drawing for Shored Excavation Underground Tank &
Traffic Management Plan - Working Drawing for Shored Excavation (Tank & Pile Cap) Working Drawing for Construction Underground Tank
Traffic Management Plan - Working Drawing for Construction Pile Cap

Fencing Item (including Temporary Power, Water, Drainage) CD Report CD Report CD Report
Station-8 Working Drawing of Site Installation CD Drawing CD Drawing CD Drawing
Working Drawing of Project Information Sign Board Report for construction design: Proposal for lateral pile load Calculation report of sheet pile for Shored Excavation pile caps Working Drawing for Shored Excavation Underground Tank &
Traffic Management Plan - WD for lateral pile load test Method Statement & Working Drawing for Shored Excavation Working Drawing for Construction Underground Tank
Loading arrangement for lateral pile load test Working Drawing for Construction Pile Cap
Report for construction design: Proposal for vertical pile TD assessment report of retaining wall
WD for vertical pile load test CD Report of Retaining Wall
Loading arrangement for vertical pile load test CD Drawing of Retaining Wall

1/4
Revised on : 28-06-2016
LEGENDS
Hanoi Pilot Light Metro Line-3 [CP-2] 0% 50% 80% 90% 100%

Construction Design Activity Not yet


Submitted
Rejected or NOWC
Under
SONO Approved

Review
CLASSIFY PIER SHAFT PIER CAP DOUBLE T BEAM CIP BEAM (CONCOURSE LEVEL)
PERCENTAGE(%) 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 70 80 90 100
Method Statement for construction of Pier shaft TD assessment report for Pier TD assessment report of Double T TD assessment report of Concourse level - cast in place longitudinal
General MS for construction of Pier Cap, CIP beam, Slab Assessment report of test Double T TD asessment report of concourse level - Transition beam
MS for post tensioning of Pier cap CD Report of Double T beams - Concourse MS for construction of Pier Cap, CIP beam, Slab
MS for grouting of Pier cap CD Drawings for Double T beams - Concourse level (Typical
Adjustment CD drawings of Pier cap from S01~S07 (Type PC3 & PC4) Verification calculation report of Double T beams with big
MS repairing concrete crack for Pier cap PC3, PC4 of S01~S03 Method Statement for Production of Double T beams
Method Statement Ultimate Load
Method Statement for Transportation
Method Statement for Erection
Proposal of auxiliary material for pretressing work - Double T
MS for remedy of concrete surface defects (except cracks) of Double
Concrete mix design No. 5 - 45 Mpa - Used for Double T beams
Traffic management plan for transportation of Double T
MS for Service load test of Double T beams

CD CD Report (PC3, PC4) CD Drawing with Opening CD Report (Grid 5-11)


Station-1 CD Drawing CD Drawing (PC3, PC4) CD Drawing (Grid 5-11)
Working Drawing for construction Pier Shaft CD Report (PC1, PC2) CD Report (Grid 1-5, 11-15)
CD Drawing (PC1, PC2) CD Drawing (Grid 1-5, 11-15)
Working Drawing for construction Pier Cap, CIP beam Working Drawing for construction Pier Cap, CIP beam &
MS testing for determination load capacity of the foundation

CD CD Report (PC3, PC4) CD Drawing with Opening CD Report (Grid 5-11)


Station-2 CD Drawing CD Drawing (PC3, PC4) Traffic management plan for erection of Double T beams CD Drawing (Grid 5-11)
Working Drawing for construction Pier Shaft CD Report (PC1, PC2) CD Report (Grid 1-5, 11-15)
CD Drawing (PC1, PC2) CD Drawing (Grid 1-5, 11-15)
Working Drawing for construction Pier Cap, CIP beam Working Drawing for construction Pier Cap, CIP beam &
MS testing for determination load capacity of the foundation

CD CD Report (PC3, PC4) CD Drawing with Opening CD Report (Grid 5-11)


Station-3 CD Drawing CD Drawing (PC3, PC4) CD Drawing (Grid 5-11)
Working Drawing for construction Pier Shaft CD Report (PC1, PC2) CD Report (Grid 1-5, 11-15)
CD Drawing (PC1, PC2) CD Drawing (Grid 1-5, 11-15)
Working Drawing for construction Pier Cap, CIP beam Working Drawing for construction Pier Cap, CIP beam &
MS testing for determination load capacity of the foundation

CD CD Report (PC3, PC4) CD Drawing with Opening CD Report (Grid 5-11)


Station-4 CD Drawing CD Drawing (PC3, PC4) CD Drawing (Grid 5-11)
Working Drawing for construction Pier Shaft CD Report (PC1, PC2) CD Report (Grid 1-5, 11-15)
CD Drawing (PC1, PC2) CD Drawing (Grid 1-5, 11-15)
Working Drawing for construction Pier Cap, CIP beam Working Drawing for construction Pier Cap, CIP beam &
MS testing for determination load capacity of the foundation

CD CD Report (PC3, PC4) CD Drawing with Opening CD Report (Grid 5-11)


Station-5 CD Drawing CD Drawing (PC3, PC4) CD Drawing (Grid 5-11)
Working Drawing for construction Pier Shaft CD Report (PC1, PC2) CD Report (Grid 1-5, 11-15)
CD Drawing (PC1, PC2) CD Drawing (Grid 1-5, 11-15)
Working Drawing for construction Pier Cap, CIP beam Working Drawing for construction Pier Cap, CIP beam &
MS testing for determination load capacity of the foundation

CD CD Report (PC3, PC4) CD Drawing with Opening CD Report (Grid 5-11)


Station-6 CD Drawing CD Drawing (PC3, PC4) CD Drawing (Grid 5-11)
Working Drawing for construction Pier Shaft CD Report (PC1, PC2) CD Report (Grid 1-5, 11-15)
CD Drawing (PC1, PC2) CD Drawing (Grid 1-5, 11-15)
Working Drawing for construction Pier Cap, CIP beam Working Drawing for construction Pier Cap, CIP beam &
MS testing for determination load capacity of the foundation
CD CD Report (PC3, PC4) CD Drawing with Opening CD Report (Grid 5-11)
Station-7 CD Drawing CD Drawing (PC3, PC4) CD Drawing (Grid 5-11)
Working Drawing for construction Pier Shaft CD Report (PC1, PC2) CD Report (Grid 1-5, 11-15)
CD Drawing (PC1, PC2) CD Drawing (Grid 1-5, 11-15)
Working Drawing for construction Pier Cap, CIP beam Working Drawing for construction Pier Cap, CIP beam &
MS testing for determination load capacity of the foundation
CD CD Report (PC1, PC2, PC3, PC4) CD Drawing with Opening CD Report (Grid 1-15)
Station-8 CD Drawing CD Drawing (PC1, PC2, PC3, PC4) CD Drawing (Grid 1-15)
Working Drawing for construction Pier Shaft Working Drawing for construction Pier Cap, CIP beam Working Drawing for construction Pier Cap, CIP beam &
MS testing for determination load capacity of the foundation

2/4
Revised on : 28-06-2016
LEGENDS
Hanoi Pilot Light Metro Line-3 [CP-2] 0% 50% 80% 90% 100%

Construction Design Activity Not yet


Submitted
Rejected or NOWC
Under
SONO Approved

Review
CLASSIFY SLAB (CONCOURSE LEVEL) COLUMN (CONCOURSE LEVEL) ROAD RE-INSTATEMENT PLATFORM & TRACK SLAB
PERCENTAGE(%) 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 70 80 90 100
TD assessment report of Concourse level- TD assessment report of Concourse to Platform - Columns Construction method of Road re-instatement TD assessment report of platform and track slab
General MS for construction of Pier Cap, CIP beam, Slab
CD report & drawings of Elevator and Escalator pit - Concourse

CD Report (Grid 5-11) CD Report (Grid 5-11) CD Report


Station-1 CD Drawing (Grid 5-11) CD Drawing (Grid 5-11) CD Drawing
CD Report (Grid 1-5, 11-15) CD Report (Grid 1-5, 11-15)
CD Drawing (Grid 1-5, 11-15) CD Drawing (Grid 1-5, 11-15)
Working Drawing for construction Pier Cap, CIP beam &

CD Report (Grid 5-11) CD Report (Grid 5-11) CD Report


Station-2 CD Drawing (Grid 5-11) CD Drawing (Grid 5-11) CD Drawing
CD Report (Grid 1-5, 11-15) CD Report (Grid 1-5, 11-15)
CD Drawing (Grid 1-5, 11-15) CD Drawing (Grid 1-5, 11-15)
Working Drawing for construction Pier Cap, CIP beam &

CD Report (Grid 5-11) CD Report (Grid 5-11) CD Report


Station-3 CD Drawing (Grid 5-11) CD Drawing (Grid 5-11) CD Drawing
CD Report (Grid 1-5, 11-15) CD Report (Grid 1-5, 11-15)
CD Drawing (Grid 1-5, 11-15) CD Drawing (Grid 1-5, 11-15)
Working Drawing for construction Pier Cap, CIP beam &

CD Report (Grid 5-11) CD Report (Grid 5-11) CD Report


Station-4 CD Drawing (Grid 5-11) CD Drawing (Grid 5-11) CD Drawing
CD Report (Grid 1-5, 11-15) CD Report (Grid 1-5, 11-15)
CD Drawing (Grid 1-5, 11-15) CD Drawing (Grid 1-5, 11-15)
Working Drawing for construction Pier Cap, CIP beam &

CD Report (Grid 5-11) CD Report (Grid 5-11) CD Report


Station-5 CD Drawing (Grid 5-11) CD Drawing (Grid 5-11) CD Drawing
CD Report (Grid 1-5, 11-15) CD Report (Grid 1-5, 11-15)
CD Drawing (Grid 1-5, 11-15) CD Drawing (Grid 1-5, 11-15)
Working Drawing for construction Pier Cap, CIP beam &

CD Report (Grid 5-11) CD Report (Grid 5-11) CD Report


Station-6 CD Drawing (Grid 5-11) CD Drawing (Grid 5-11) CD Drawing
CD Report (Grid 1-5, 11-15) CD Report (Grid 1-5, 11-15)
CD Drawing (Grid 1-5, 11-15) CD Drawing (Grid 1-5, 11-15)
Working Drawing for construction Pier Cap, CIP beam &

CD Report (Grid 5-11) CD Report (Grid 5-11) CD Report


Station-7 CD Drawing (Grid 5-11) CD Drawing (Grid 5-11) CD Drawing
CD Report (Grid 1-5, 11-15) CD Report (Grid 1-5, 11-15)
CD Drawing (Grid 1-5, 11-15) CD Drawing (Grid 1-5, 11-15)
Working Drawing for construction Pier Cap, CIP beam &

CD Report (Grid 1-15) CD Report (Grid 1-15) CD Report


Station-8 CD Drawing (Grid 1-15) CD Drawing (Grid 1-15) CD Drawing
Working Drawing for construction Pier Cap, CIP beam &

3/4
Revised on : 28-06-2016
LEGENDS
Hanoi Pilot Light Metro Line-3 [CP-2] 0% 50% 80% 90% 100%

Construction Design Activity Not yet


Submitted
Rejected or NOWC
Under
SONO Approved

Review
CLASSIFY LOW VOLTAGE PLUMBING SYSTEM ARCHITECTURE (PART I) ARCHITECTURE (PART II)
PERCENTAGE(%) 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 70 80 90 100 10 20 30 40 50 60 70 80 90 100
Power cable for low voltage system (Permanent TD assessment report of plumbing system
General TD assessment report for low voltage works of viaduct TD assessment report of outdoor storm - water drainage
TD Assessment Report of Infrastructure Water Supply and
CD report of Underground pipe and manhole for Stormwater
CD drawings of Underground pipe and manhole for Stormwater

TD assessment report for low voltage Drawings of Plumbing & drainage system in concourse level for
Station-1 Combined services drawings in concourse
Drawings of LV system in concourse level for opening

TD assessment report for low voltage Drawings of Plumbing & drainage system in concourse level for TD assessment report of access entrance CD report of Indoor emergency staircase & Elevator (Structure work)
Station-2 Combined services drawings in concourse Drawings of Plumbing & drainage system in platform level for TD assessment report of Faade CD drawings of Indoor emergency staircase & Elevator (Structure
Drawings of LV system in concourse level for opening CD report of Water supply system TD assessment report of roof CD report of Indoor steel staircase (Steel structure work)
Combined services drawings in platform CD drawings of Water supply system TD assessment report of Indoor Stairs CD report of Indoor steel staircase (Architecture work)
Drawings of LV system in platform level for opening CD report for Waste water system TD asessment report for architecture work of concourse and CD drawings of Indoor steel staircase (Architect work)
CD report of Earthing & Lightning works CD drawings for Waste water system CD drawings - Item: General construction drawings of Architecture CD drawings of Indoor steel staircase (Structure work)
CD drawings of Earthing & Lightning system CD report of Ground floor level CD report of Indoor emergency staircase & elevator (Architecture
CD drawings of Ground floor level CD drawings of Indoor emergency staircase & elevator (Architecture
CD report of Finishing concourse & Platform level
CD drawings of Finishing concourse & Platform level

TD assessment report for low voltage Drawings of Plumbing & drainage system in concourse level for
Station-3 Combined services drawings in concourse
Drawings of LV system in concourse level for opening

TD assessment report for low voltage Drawings of Plumbing & drainage system in concourse level for
Station-4 Combined services drawings in concourse
Drawings of LV system in concourse level for opening

TD assessment report for low voltage Drawings of Plumbing & drainage system in concourse level for
Station-5 Combined services drawings in concourse
Drawings of LV system in concourse level for opening

TD assessment report for low voltage Drawings of Plumbing & drainage system in concourse level for
Station-6 Combined services drawings in concourse
Drawings of LV system in concourse level for opening

TD assessment report for low voltage Drawings of Plumbing & drainage system in concourse level for
Station-7 Combined services drawings in concourse
Drawings of LV system in concourse level for opening

TD assessment report for low voltage Drawings of Plumbing & drainage system in concourse level for
Station-8 Combined services drawings in concourse
Drawings of LV system in concourse level for opening

4/4