You are on page 1of 2

EMX

EMX = (Energy Limit x Wram x Height)/100 (ton-m) see Table 3


Energy Limit = 25 (25% - 50%)

Wram = 3.2 ton Wram = 5 ton


Height (m) EMX (ton-m) Height (m) EMX (ton-m)
0.50 0.400 0.50 0.625
0.75 0.600 0.75 0.938
1.00 0.800 1.00 1.250
1.25 1.000 1.25 1.563
1.50 1.200 1.50 1.875
1.75 1.400 1.75 2.188
2.00 1.600 2.00 2.500
2.25 1.800 2.25 2.813
2.50 2.000 2.50 3.125
2.75 2.200 2.75 3.438
3.00 2.400 3.00 3.750
Wram = 4 ton Wram = 6 ton
Height (m) EMX (ton-m) Height (m) EMX (ton-m)
0.50 0.500 0.50 0.750
0.75 0.750 0.75 1.125
1.00 1.000 1.00 1.500
1.25 1.250 1.25 1.875
1.50 1.500 1.50 2.250
1.75 1.750 1.75 2.625
2.00 2.000 2.00 3.000
2.25 2.250 2.25 3.375
2.50 2.500 2.50 3.750
2.75 2.750 2.75 4.125
3.00 3.000 3.00 4.500

EC 34786.36725 Mpa EC 34786.3673 Mpa


354.72 ton/cm2 354.72 ton/cm2
dia 600 mm dia 400 mm
thickness 100 mm thickness 75 mm
d' 400 mm d' 250 mm
Ar1 2827.433388 Ar1 1256.63706
Ar2 1256.637061 Ar2 490.873852
Ar (Ar1-Ar2) 1570.796327 cm2 Ar (Ar1-Ar2) 765.763209 cm2

DMX
shaft friction (2% x dia) 12 mm
end bearing (5% ~ 10% x dia) 30 mm

CSX see Table 2


CSX = 0.85f'c - fpe
f'c 52 Mpa
fpe 10.1 Mpa (Class C dia. 600 Wika PC Pile)
CSX 34.1 Mpa
1Mpa = 10.19716 kg/cm2

You might also like