MATERIAL INSPECTED THIS VISIT
Item No. Quantity Description Tag No., Batch No., Serial No., Cast,
Heat No.

SUMMARY / AREAS OF CONCERN

GUI-036-00 (Revision 0) Flash Report Dated: 22nd March 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

1. SMMARY / AREAS OF CONCERN:


1.1 Review shear rings inspection record & SSAW end product inspection record
As per ITP step 09(Incoming raw material quality control and assurance-Raw material inspection), GQIS
inspector reviewed factory original data of shear rings inspection record & SSAW end product inspection
record, randomly spot inspection product and result in conformity with original record, confirm the factory
inspection record is real and reliable, the inspection scope and result in line with the drawing and
specification.

1.2 Witness tensile testing


As per ITP step 08(Incoming raw material quality control and assurance-steel plate and coil material
properties retest), GQIS inspector witness tensile testing, before testing, GQIS inspector reviewed tensile test
equipment calibration certificate and valid time and confirmed that are satisfactory, inspection the sampling
dimension and confirm that are satisfactory and traceable, confirm the tensile test process in accordance with
EN ISO 6892-1:2009, the test result in conformity with standard of BS EN10025-2 and BS EN10025-4.
Heat No. Material Yield Stress Tensile Stress Elongation Bend
16305647 S460M 520 612 37.5 OK
16205583 S420M 470 570 47.5 OK
16105559 S355J2 380 515 38 OK
16105560 S355J2 365 520 40 OK

1.3 Witness bend testing


As per ITP step 08(Incoming raw material quality control and assurance-steel plate and coil material
properties retest), GQIS inspector witness bend testing, before testing, GQIS inspector reviewed bend test
equipment calibration certificate and valid time and confirmed that are satisfactory, inspection the sampling
dimension and confirm that are satisfactory and traceable, confirm the bend test process in accordance with
EN ISO 10028, the test result in conformity with standard of BS EN10025-2 and BS EN10025-4.
Heat No. Material Yield Stress Tensile Stress Elongation Bend
16305647 S460M 520 612 37.5 OK
16205583 S420M 470 570 47.5 OK
16105559 S355J2 380 515 38 OK
16105560 S355J2 365 520 40 OK

1.4 Inspection fit-up and welding between pipe 3568-C06-058-B1 with 3568-C06-058-B2
As per ITP step 18&19(welding inspection-welding preparation& welding process), GQIS inspector checked
fit-up and welding between pipe 3568-C06-058-B1 with 3568-C06-058-B2, checked the gap about 2mm,
alignment about 1.5mm, polished the weld area of two side welding seam about 20mm, during welding
checked consumable was H08MnMoA(SJ101), current about 884A and voltage about 30.1V, which in
accordance with WPS and specification, after finished one side of welding back gouging by electric arc, not
found any indication of welding defect and polish the groove then process back welding, the inspection result
is satisfactory.

1.5 On manufacturing progress reference to attachment document: 3568 Production Summary-04.

Picture

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

Review shear rings inspection record & SSAW end product inspection record

Witness tensile testing

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

Witness tensile testing

Witness tensile testing

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

1.5 Witness bend testing

Inspection fit-up and welding between pipe 3568-C06-058-B1 with 3568-C06-058-B2

Inspection fit-up and welding between pipe 3568-C06-058-B1 with 3568-C06-058-B2

Accepted Yes Non-Compliant No

007 (Revision 0) Daily Report Dated: 29nd August 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

Technical Specialist: Su Jinlong Operations Coordinator:

Date: 8PM 31th, August-8AM 1st, September, Date:


2016

007 (Revision 0) Daily Report Dated: 29nd August 2016