You are on page 1of 1

Project Job no.

PLB LAND SDN.BHD.


SRI & SRI'S ASSOCIATES SDN. Calcs for Start page no./Revision

BHD. Zone D - 11.10 hectares 1


4987, 2nd Floor, Jalan Kampung Benggali, Calcs by Calcs date Checked by Checked date Approved by Approved date
12200 Butterworth, Pulau Pinang Nana 12/29/2016 Nana 12/29/2016 Sri 12/29/2016

DESIGN RAINFALL
In accordance with Urban Stormwater Management Manual for Malaysia (MSMA Second edition 2012)
Tedds calculation version 1.0.04
State; Penang
Station name; Kolam Tkgn Air Hitam
Storm duration; t = 5 min
Return period for rainfall; Period = 10 yr
From Appendix 2.B - IDF constant ; = 52.4590
From Appendix 2.B - IDF constant ; = 0.1910
From Appendix 2.B - IDF constant ; = 0.1060
From Appendix 2.B - IDF constant ; = 0.7290

Rainfall intensity
Peak rainfall intensity; I = (T/1yr) / (t/1hr + ) 1mm/hr
I = 273.98 mm/hr
Design runoff
Catchment ground description; Flat and apartment
Catchment area; A = 111000 m2
Runoff coefficient (Table 2.5); C = 0.80
Design runoff (rational method); Q = C I A = 6.758 m3/s