ATTENUATION DESIGN
In accordance with Urban Stormwater Management Manual for Malaysia (MSMA Second edition 2012)
Tedds calculation version 1.0.02

Site characteristics
Location; Kangar
Region; Region 3 - Northern
Project area; A = 1.55 hectare
Terrain type; Mild
Fraction of project area that is impervious; pimp = 0.85
Storage requirement
Permissible site discharge / hectare (Table 5.A1); PSDha = 70.100 l/s/hectare
Permissible site discharge; PSD = PSDha A = 108.655 l/s
Site storage requirement / hectare (Table 5.A1); SSRha = 499.1 m3/hectare
Site storage requirement; SSR = SSRha A = 773.6 m3
Required inlet pipe diameter (Table 5.A3); in = 581 mm
Required outlet pipe diameter (Table 5.A3); out = 254 mm

Summary design table


PSD; 108.7 l/s
SSR; 773.6 m3
in; 581 mm
out; 254 mm;