Project Job no.

LOT 2523, Bandar Kuah, Langkawi - M/s Vantage Freeway


SRI & SRI'S ASSOCIATES SDN. Calcs for Start page no./Revision

BHD. Drainage 10 yrs ARI (10 mins) 1


4987, 2nd Floor, Jalan Kampung Benggali, Calcs by Calcs date Checked by Checked date Approved by Approved date
12200 Butterworth, Pulau Pinang Nana 1/18/2017 Sri 1/18/2017 Sri 1/18/2017

DESIGN RAINFALL
In accordance with Urban Stormwater Management Manual for Malaysia (MSMA Second edition 2012)
Tedds calculation version 1.0.04
State; Perlis
Station name; Padang Katong Kangar
Storm duration; t = 10 min
Return period for rainfall; Period = 10 yr
From Appendix 2.B - IDF constant ; = 57.6450
From Appendix 2.B - IDF constant ; = 0.1790
From Appendix 2.B - IDF constant ; = 0.2540
From Appendix 2.B - IDF constant ; = 0.8260

Rainfall intensity
Peak rainfall intensity; I = (T/1yr) / (t/1hr + ) 1mm/hr
I = 177.99 mm/hr
Design runoff
Catchment ground description; Condominium
Catchment area; A = 15320 m2
Runoff coefficient (Table 2.5); C = 0.75
Design runoff (rational method); Q = C I A = 0.568 m3/s