PERMOHONAN KEBENARAN MERANCANG UNUTK CADANGAN MENDIRIKAN (HAK MILIK STRATA);-

A) 48 UNIT RUMAH BANDAR 3 TINGKAT


B) 1 BLOK KONDOMINIUM 15 TINGKAT (66 UNIT) TERMASUK 3 TINGKAT TEMPAT LETAK KENDERAA

DI ATAS LOT 2523, JALAN PENARAK, BENDANG BARU, BANDAR KUAH, LAGKAWI, KEDAH DARUL AM

LOT 2523 = 1.1853 ha

DESIGN RAINFALL

In accordance with Urban Stormwater Management Manual for Malaysia (MSMA Second edition 20

5 minute rainfall ;
State;
Perlis
Station name Padang Katong Kangar
Storm duration; t = 5 min
Return period for rainfall; Period = 10 yr
From Appendix 2.B - IDF constant ; = 57.6450
From Appendix 2.B - IDF constant ; = 0.1790
From Appendix 2.B - IDF constant ; = 0.2540
From Appendix 2.B - IDF constant ; = 0.8260

Peak rainfall intensity; I = (T/1yr) / (t/1hr + ) 1mm/hr


I =

Design runoff

* biggest value of I selected for the design purpose

Catchment ground description Bare soil (no cover)

time, t =
period =
Catchment area; A= =
Runoff coefficient (Table 2.5); C= =
I =
Design runoff (rational method); Q=CIA =

Determine the Drain size using manning

Area m2 0.45 0.45 0.2025


Wetted Perimeter m 0.3 0.3 0.45 1.05
Hydraulic Radius 0.19
Slope,s 1 20 0.05

Capacity of drain m3/sec


IRIKAN (HAK MILIK STRATA);-

AT TEMPAT LETAK KENDERAAN.

LAGKAWI, KEDAH DARUL AMAN.

ysia (MSMA Second edition 2012)

5 minute rainfall ; 10 minute rainfall ;


Perlis Perlis
Padang Katong Kangar Padang Katong Kangar
t = 5 min t = 10 min
Period = 10 yr Period = 10 yr
= 57.6450 = 57.6450
= 0.1790 = 0.1790
= 0.2540 = 0.2540
= 0.8260 = 0.8260

/ (t/1hr + ) 1mm/hr I = (T/1yr) / (t/1hr + ) 1mm/hr


213.59 mm/hr I = 177.99 mm/hr

5 minute
10 years
11853 m2
0.75
213.59
0.5274338063 m3/s
0.33
0.2236067977

1.73 > 0.53 1


PERMOHONAN KEBENARAN MERANCANG UNUTK CADANGAN MENDIRIKAN (HAK MILIK STRATA);-
A) 48 UNIT RUMAH BANDAR 3 TINGKAT
B) 1 BLOK KONDOMINIUM 15 TINGKAT (66 UNIT) TERMASUK 3 TINGKAT TEMPAT LETAK KENDERAA

DI ATAS LOT 2523, JALAN PENARAK, BENDANG BARU, BANDAR KUAH, LAGKAWI, KEDAH DARUL AM

LOT 2523 = 1.1853 ha


= 0.71118 ha

DESIGN RAINFALL

In accordance with Urban Stormwater Management Manual for Malaysia (MSMA Second edition 20

5 minute rainfall ;
State;
Perlis
Station name Padang Katong Kangar
Storm duration; t = 5 min
Return period for rainfall; Period = 10 yr
From Appendix 2.B - IDF constant ; = 57.6450
From Appendix 2.B - IDF constant ; = 0.1790
From Appendix 2.B - IDF constant ; = 0.2540
From Appendix 2.B - IDF constant ; = 0.8260

Peak rainfall intensity; I = (T/1yr) / (t/1hr + ) 1mm/hr


I =

Design runoff

* biggest value of I selected for the design purpose

Catchment ground description Bare soil (no cover)

time, t =
period =
Catchment area; A= =
Runoff coefficient (Table 2.5); C= =
I =
Design runoff (rational method); Q=CIA =

Determine the Drain size using manning

Area m2 0.3 0.3 0.09


Wetted Perimeter m 0.2 0.2 0.3 0.7
Hydraulic Radius 0.13
Slope,s 1 20 0.05

Capacity of drain m3/sec


IRIKAN (HAK MILIK STRATA);-

AT TEMPAT LETAK KENDERAAN.

LAGKAWI, KEDAH DARUL AMAN.

ysia (MSMA Second edition 2012)

5 minute rainfall ; 10 minute rainfall ;


Perlis Perlis
Padang Katong Kangar Padang Katong Kangar
t = 5 min t = 10 min
Period = 10 yr Period = 10 yr
= 57.6450 = 57.6450
= 0.1790 = 0.1790
= 0.2540 = 0.2540
= 0.8260 = 0.8260

/ (t/1hr + ) 1mm/hr I = (T/1yr) / (t/1hr + ) 1mm/hr


213.59 mm/hr I = 177.99 mm/hr

5 minute
10 years
7111.8 m2
0.75
213.59
0.3164602838 m3/s
0.25
0.2236067977

0.59 > 0.32 1