CADANGAN PINDAAN KEPADA 1 UNIT

KEDAI/PEJABAT 3 TINGKAT DIATAS PT NO.4981,


MUKIM SG. SELUANG, DAERAH KULIM, KEDAH
DARUL AMAN.
a) PINDAAN DAN TAMBAHAN KEPADA PELAN
BANGUNAN BERLULUS BIL 12/2011 DLM MPKK.
INST 13/007/11
Water Demand Calculation
Area Estimated Water Total Water
BASED ON SPAN
(m2) Demand Rate Demand
GUIDELINES
(Liters)
Ground Floor 135.45 1000 liters/100 m2 1354.5
First Floor 152.2 1000 liters/100 m2 1522.0
Second Floor 152.,2 1000 liters/100 m2 1522.0
Total (Required) 4398.5
Total (Provided) 4725
(1050gall)
4.0 PIPE SIZING CALCULATION

liters/da
Water Demand per day 4725 y
4.73 m3/day
Time Taken to fill Storage Tanks 2.00 hours
Q = volumetric flow rate 0.000656 m3/sec
v = flow velocity (m/s) 1.0 m/sec
n=
Pipe size required - ( ( Q x 4 )/ ( v x ))
0.029 m
28.90 mm

Proposed Pipe size (internal diameter ) 32 mm


ok !

5.0 CALCULATION OF HEAD LOSSES

5.1 Head Loss due to Height Differences


Total Head Loss, z 10.06 m

5.2 Head Loss due to Lenght of Pipe


Length of Pipe from 'meter position' to the 27.50 m
Storage tank (Type of Pipe used is HDPE )
HAZEN WILLIAMS FORMULA
hf = 10.67x Q1.85/C1.85x d4.87
where:
hf = head loss in meters (water) over the
length of pipe
L = length of pipe in meters 27.50 m
Q = volumetric flow rate, m3/s (cubic meters 0.000656
per second) 25 m3/sec
C = pipe roughness coefficient 120
d = inside pipe diameter, m (meters) 0.032 m
SPAN Table B.7 : Hazen-William Coefficient
C for Various Pipe Materials
Type Of Pipe Hazen-William
Coefficient, C
Ductile Iron (cement lined) 100
Steel (cement lined) 100
HDPE/ ABS/ GRP/uPVC 120

Therefore , head loss hf 0.03743 m

5.3 Head Loss due to Connections, Bends and Tees

Ks No
per s Ks
Coefficient for Various Pipe Fittings no
90o tee in line 0.4 1 0.4
90o bend 0.5 4 2
gate valve 0.25 2 0.5
Total 2.9

Head loss due velocity, hv Ks v2 / 2g

0.15 m

5.4 Total Head Loss

Total Head Loss z + hf + hv 10.25 m

Note: Pressure Required should be


10.50m