ELECTRICAL INSTALLATION

Description Qty Unit

ELECTRICAL INSTALLATION

GENERAL NOTES

The equipment in this section of the Bill of Quantities


shall include the contacts and connection points and
equipment specific instrumentation as required to
connect to, and link with, the BMS systems. Such items
are not included in the description but shall be deemed
to be included in the unit rates for the respective
equipment items herein. The Contractor should refer
to the drawings and specifications for the details
of the requirements Note

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/1
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

STRUCTURED CABLING NETWORK INFRASTRUCTURE -


FOR ELV SYSTEMS

Cables in cable tray/trunking (cable tray/trunking


measured separately) including terminations, glands,
locknut, shroud and connection of conductors to terminals

Telecommunication Service Connection

A Connection to QTEL mains; including structured cable


from QTEL MDF, cable trench, backfilling, protection,
approvals and all other items as required by QTEL 1 Item

B Co-ordination, liaison and all charges associated with


QTEL installation of mains Telecommunication supply
connection 1 Item

Structured cabling system to IDF; blown fibre optic cables


in various sizes to suit different systems (2FU, 4FU, 6FU,
8FU, 12FU)

C 3rd basement IDF switches to MDF 8 no

D 2nd basement IDF switches to MDF 12 no

E 1st basement IDF switches to MDF 9 no

F Ground floor IDF switches to MDF 15 no

G Ground floor mezzanine IDF switches to MDF 4 no

H 1st floor IDF switches to MDF 8 no

I 1st floor mezzanine IDF switches to MDF 7 no

J 2nd floor IDF switches to MDF 17 no

K 3rd floor IDF switches to MDF 8 no

L 4th floor IDF switches to MDF 12 no

M 5th floor IDF switches to MDF 8 no

N 6th floor IDF switches to MDF 8 no

O 7th floor IDF switches to MDF 8 no

P 8th floor IDF switches to MDF 8 no

Q 9th floor IDF switches to MDF 8 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/2
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

R 10th floor IDF switches to MDF 8 no

S 11th floor IDF switches to MDF 8 no

T 12th floor IDF switches to MDF 9 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/3
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

A 13th floor IDF switches to MDF 9 no

B 14th floor IDF switches to MDF 10 no

C 15th floor IDF switches to MDF 9 no

D 16th floor IDF switches to MDF 9 no

E 17th floor IDF switches to MDF 6 no

F 18th floor IDF switches to MDF 10 no

G 19th floor IDF switches to MDF 10 no

H 20th floor IDF switches to MDF 10 no

I 21st floor IDF switches to MDF 10 no

J 22nd floor IDF switches to MDF 10 no

K 23rd floor IDF switches to MDF 10 no

L 24th floor IDF switches to MDF 10 no

M 25th floor IDF switches to MDF 10 no

N 26th floor IDF switches to MDF 10 no

O 27th floor IDF switches to MDF 10 no

P 28th floor IDF switches to MDF 10 no

Q 29th floor IDF switches to MDF 10 no

R 30th floor IDF switches to MDF 9 no

S 31st floor IDF switches to MDF 9 no

T 32nd floor IDF switches to MDF 7 no

U 33rd floor IDF switches to MDF 7 no

V 34th floor IDF switches to MDF 8 no

W 35th floor IDF switches to MDF 6 no

X 36th floor IDF switches to MDF 10 no

Y 37th floor IDF switches to MDF 10 no

Z 38th floor IDF switches to MDF 10 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/4
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/5
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

A 39th floor IDF switches to MDF 10 no

B 40th floor IDF switches to MDF 10 no

C 41st floor IDF switches to MDF 10 no

D 42nd floor IDF switches to MDF 9 no

E 43rd floor IDF switches to MDF 9 no

F 44th floor IDF switches to MDF 6 no

G 45th floor IDF switches to MDF 6 no

H 46th floor IDF switches to MDF 6 no

I 47th floor IDF switches to MDF 6 no

J 48th floor IDF switches to MDF 6 no

K 49th floor IDF switches to MDF 6 no

L 50th floor IDF switches to MDF 7 no

M 51st floor IDF switches to MDF 5 no

N lower roof IDF switches to MDF 5 no

O top machine floor IDF switches to MDF 2 no

Structured cabling system to analogue telephone system;


telephone cables ( 50 pair & 100 pair)

P 5th floor telephone distribution box to MDF 1 no

Q 6th floor telephone distribution box to MDF 1 no

R 7th floor telephone distribution box to MDF 1 no

S 8th floor telephone distribution box to MDF 1 no

T 9th floor telephone distribution box to MDF 1 no

U 10th floor telephone distribution box to MDF 1 no

V 11th floor telephone distribution box to MDF 1 no

W 12th floor telephone distribution box to MDF 1 no

X 13th floor telephone distribution box to MDF 1 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/6
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

Y 14th floor telephone distribution box to MDF 1 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/7
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

A 15th floor telephone distribution box to MDF 1 no

B 16th floor telephone distribution box to MDF 1 no

C 18th floor telephone distribution box to MDF 1 no

D 19th floor telephone distribution box to MDF 1 no

E 20th floor telephone distribution box to MDF 1 no

F 21st floor telephone distribution box to MDF 1 no

G 22nd floor telephone distribution box to MDF 1 no

H 23rd floor telephone distribution box to MDF 1 no

I 24th floor telephone distribution box to MDF 1 no

J 25th floor telephone distribution box to MDF 1 no

K 26th floor telephone distribution box to MDF 1 no

L 27th floor telephone distribution box to MDF 1 no

M 28th floor telephone distribution box to MDF 1 no

N 29th floor telephone distribution box to MDF 1 no

O 30th floor telephone distribution box to MDF 1 no

P 31st floor telephone distribution box to MDF 1 no

Q 36th floor telephone distribution box to MDF 1 no

R 37th floor telephone distribution box to MDF 1 no

S 38th floor telephone distribution box to MDF 1 no

T 39th floor telephone distribution box to MDF 1 no

U 40th floor telephone distribution box to MDF 1 no

V 41st floor telephone distribution box to MDF 1 no

W 42nd floor telephone distribution box to MDF 1 no

X 43rd floor telephone distribution box to MDF 1 no

Y 44th floor telephone distribution box to MDF 1 no

Z 45th floor telephone distribution box to MDF 1 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/8
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

AA 46th floor telephone distribution box to MDF 1 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/9
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

Controllers and Instrumentation

Controllers and Instrumentation; complete with


finishes and required accessories

Controls and Instrumentation

A 100 pair telephone distribution box; wall mounted 37 no

B 42U cabinet; floor mounted; for IDF room 83 no

C 18U cabinet; wall mounted; for IDF room 59 no

D 24 port fibre splice tray 142 no

E 24 port POE switch 509 no

F 24 port patch panel 509 no

G 1u cable management 509 no

H 1Kva UPS rack mountable 59 no

I 3Kva UPS rack mountable 83 no

J power distribution unit 142 no

K connectivity panel 947 no

L main core switch; complete 1 Item

M Main telephone distribution frame 1 Item

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/10
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/11
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

VOICE AND DATA NETWORK

System Devices

Cables in cable tray/trunking (cable tray/trunking


measured separately) including terminations, glands,
locknut, shroud and connection of conductors to terminals

Final circuits; socket outlet

A RJ 45 outlet 8559 no

B IP DECT controller with antennas 236 no

Socket outlets/ devices including all fittings and


accessories

Socket outlet

C RJ 45 outlet 8559 no

Devices

D IP DECT controller with antennas 236 no

E IP DECT phone 300 no

F wireless access point 371 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/12
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/13
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

ROOM MANAGEMENT SYSTEM

The Works included under this section shall comprise


development, supply, installation, testing, commissioning
and setting to work of all items which are necessary
for a complete operational Room Management System
as outlined in the drawings and specifications Note

Main Network Infarstructure for Room Management


System measured under Voice & Data Network section Note

System Devices

Room Management System complete with all necessary


accessories, inter-connections, in put / output modules,
on / off modules; include for all conduiting and wiring
as necessary

Thermostat and HVAC Controls

A Modeva British/Int' T stat 3.5 x 3.5 no IR or PIR glass


series 645 no

B remote thermistor 645 no

C 8 relay control board 15 amp 645 no

D base X05B with 5 inputs 426 no

Room Controllers

E motion sensor; ceiling mounted 1,463 no

F 2 circuit dimmer card 600W PS 3,529 no

G main entrance door lock; interface 426 no

Switches and Guest Control

magnetic door switch, wired; surface mouted (for


H wardrobe lights) 1,005 no

I door chime 680 no

LCD controller with clock alarm and static display


J information 477 no

K 2 button; Modeva British single gang light switch 499 no

L 4 button; Modeva British single gang light switch 1,472 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/14
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

M 8 button; Modeva British double gang light switch 4 no

N glass capacitive touch door bell wall plate 426 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/15
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

Misslanious

A 4amp power supply 426 no

Controllers and Instrumentation

Controllers and Instrumentation; complete with


conduiting and wiring, finishes and required accessories

Network

B ethernet room gateway with PS 426 no

C CELS smart IR eye; ceiling mount 426 no

D RS 485/RF deep mesh router with power supply rack 1 no

E dell rack mount server R320 RAID 1 no

T&C Tools

F CBL programming tool 13 no

G e528 in circuit programmer with SW 2 no

H Modeva TBL-80 programmer 8 no

I PC softwear and USB tool for room configuration 3 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/16
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/17
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

BACKGROUND MUSIC SYSTEM

System Devices

Cables in cable tray/trunking (cable tray/ trunking


measured separately) including terminations, glands,
locknut, shroud and connection of conductors to terminals

Structured cabling system; fibre optic cables

A IDF to amplifiers 20 no

B IDF to DSP 1 1 no

C IDF to DSP 2 1 no

Final circuits; devices

D ceiling mounted speaker; bose 945 no

E wall mounted speaker; bose 163 no

F ground speaker; bose 35 no

G speaker; ref FS3 sub 15 no

H speaker; ref FS3 sat 48 no

I speaker; ref 502A 33rd floor 4 no

J specker outlet to apartments & hotel rooms 1,230 no

Socket outlets/ devices including all fittings and


accessories

Devices

K ceiling mounted speaker; bose 945 no

L wall mounted speaker; bose 163 no

M ground speaker; bose 35 no

N speaker; ref FS3 sub 15 no

O speaker; ref FS3 sat 48 no

P speaker; ref 502A 33rd floor 4 no

Q specker outlet to apartments & hotel rooms; excluding cover


plate 1,230 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/18
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/19
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

Controllers and Instrumentation

Controllers and Instrumentation; complete with


conduiting and wiring, finishes and required accessories

Power amplifiers

A ref; Bose PM8500N-A 1 no

B ref; Bose PM8250N-A 1 no

C ref; Bose PM8500N-B 1 no

D ref; Bose PM8250N-B 1 no

E ref; Bose PM8500N-C 1 no

F ref; Bose PM8250N-C 1 no

G ref; Bose PM8500N-D 1 no

H ref; Bose PM8250N-D 1 no

I ref; Bose PM8250N-E 1 no

J ref; Bose PM8250N-F 1 no

K ref; Bose PM8250N-G 1 no

L ref; Bose PM8250N-H 1 no

M ref; Bose PM8250N-I 1 no

N ref; Bose PM8250N-J 1 no

O ref; Bose PM8250N-K 1 no

P ref; Bose PM8250N-L 1 no

Q ref; Bose PM8250N-M 2 no

R ref; Bose PM8250N-N 1 no

S ref; Bose PM8250N-O 1 no

Audio Visual accessories to apartments & hotel rooms

T Media hub 1,094 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/20
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/21
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

System controlers, equipment and work station

A digital signal processor (DSP1) 1 no

B digital signal processor (DSP2) 1 no

C control center at AV rack 1 no

D control center at reception area 1 no

E zone controller 8 no

F music sever 1 no

G 5 CD changer 1 no

H AM/FM tuner 1 no

I IPOD dock 1 no

J digital message announcer 1 no

K music styling work station 1 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/22
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/23
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

IP CCTV & ACCESS CONTROL SYSTEM

IP CCTV & Access Control System shall be capable of


monitoring, recording, and function in a true multi-user,
multi-tasking environment. The Contractor shall provide
all software required for efficient operation of all the
automatic system functions Note

Main Network Infarstructure for CCTV & ACS measured


under Voice & Data Network section Note

System Devices

Cables in cable tray/trunking (cable tray/ trunking


measured separately) including terminations, glands,
locknut, shroud and connection of conductors to terminals

Structured cabling system; fibre optic cables

A CCTV server 2nd basement to monitoring room


1st basement 1 no

Final circuits

B fixed camera 34 no

C dome camera 1,146 no

D PTZ camera 47 no

E electronic lock; utility entry 1,034 no

F electronic lock; gust room entry 486 no

G contact atarm module 52 no

H alarm zone module 64 no

I duress/ panic alarm button 53 no

J alpha numeric keypad 5 no

K indoor alarm siren 4 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/24
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/25
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

Devices including all fittings and accessories

Devices

A fixed camera 34 no

B dome camera 1,146 no

C PTZ camera 47 no

D electronic lock; utility entry 1,034 no

E electronic lock; gust room entry 486 no

F contact atarm module 52 no

G alarm zone module 64 no

H duress/ panic alarm button 53 no

I alpha numeric keypad 5 no

J indoor alarm siren 4 no

Controllers and Instrumentation

Controllers and Instrumentation; including cabling,


containment requirements, finishes and required
accessories

Controls and Instrumentation

K IP based controller 62 no

L operator workstation for CCTV & ACS; security


monitoring room first basement; including all requird
instumentation, controllers, inter connections and
system softwear; complete 1 Item

M CCTV server; 2nd basement communication room;


inculding all required; data racks, switches, servers,
data storege units, instumentation, controllers and inter
connections; complete 1 Item

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/26
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/27
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

IP TELEVISION SYSTEM

Cables in cable tray/trunking (cable tray/ trunking


measured separately) including terminations, glands,
locknut, shroud and connection of conductors to terminals

Final circuits

A IP TV outlets 856 no

Socket outlets/ devices including all fittings and


accessories

Devices

B IP TV outlets 856 no

Controllers and Instrumentation

Controllers and Instrumentation; including cabling,


containment requirements, finishes and required
accessories

C IP television system controllers and instrumentation;


complete 1 Item

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/28
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/29
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

SMATV & QAM TELEVISION SYSTEM

The works included under this section shall comprise


installation, testing, commissioning and setting to work of
all items which are necessary for a complete operational
MATV & QAM system Note

Main Network Infarstructure for SMATV & QAM system


measured under Voice & Data Network section Note

Cables in cable tray/trunking (cable tray/ trunking


measured separately) including terminations, glands,
locknut, shroud and connection of conductors to terminals

Structured cabling system; 2FU single mode Blown fibre


optic cables

A master antennas to splitter at communication room


2nd basement 3 no

B SMATV + QAM headend rack to fiber splice tray rack 1 Item

Final circuits; RG6 cable TV

C SMATV & QAM outlets 1,495 no

Socket outlets/ devices including all fittings and


accessories

cover plater for sockets outles under interrior design


scope of works Note

Devices

D SMATV & QAM outlets 1,495 no

Controllers and Instrumentation

Controllers and Instrumentation; including cabling,


containment requirements, finishes and required
accessories

Controls and Instrumentation

E SMATV & QAM fiber receiver 48 no

F amplified multiswitch 48 no

G multi switch 12 port 62 no

H multi switch 16 port 11 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/30
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

I dual optical splitter 3 no

J optical to copper converter 6 no

K SMATV & QAM headend rack; complete 1 no

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/31
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

GENERAL REQUIREMENTS ELECTRICAL


SERVICES

General Works

General Ancillary and Completion Works; as specified

Cleaning and Preparation

A cleaning and preparation of all equipment prior to


Testing and Commissioning procedures 1 Item

Testing and Commissioning

B testing and commissioning of Electrical Systems


including all Distribution boards, Controls and Instrumentation
Operation and Maintenance 1 Item

C operation & maintenance documentation; drawings;


manuals; manufacturers instructions, data, reports,
certificates, guarantees, warranties, test records, start/stop
safety and emergency procedures, system software 1 Item

D spare parts, tools, and the like 1 Item

Submissions and Approvals

E submittal documentation as required for approvals 1 Item

F materials submissions and samples 1 Item

G shop drawings 1 Item

H as-built drawings 1 Item

Identification

I identification tags, nameplates, classifications,


nomenclature 1 Item

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/32
December 2013
ELECTRICAL INSTALLATION

Description Qty Unit

To Collection Q

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/33
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/34
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/35
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/36
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/37
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/38
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/39
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/40
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/41
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/42
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/43
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/44
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/45
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/46
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/47
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/48
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/49
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/50
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/51
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/52
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/53
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/54
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/55
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/56
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/57
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/58
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/59
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/60
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/61
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/62
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/63
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/64
December 2013
ELECTRICAL INSTALLATION

Rate Amount

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/65
December 2013
ELECTRICAL INSTALLATION

Rate Amount

To Collection QR 0.00

JW Marriott Hotel Tower


Bill of Quantities BQ/6/8/66
December 2013